Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹4.3 LAdmitted-Fee/PreQual/Technical/Finance | -15.70% | ₹4.3 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹4.6 L+₹27,947.06 (6.52%)Admitted-Fee/PreQual/Technical/Finance NADUPILAKAL VADIKKETH CHOTHAYIL ROAD THODIYOOR | KANNUR | KERALA | 670511 | -10.20% | ₹4.6 L+₹27,947.06 (6.52%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹4.6 L+₹29,014.13 (6.77%)Admitted-Fee/PreQual/Technical/Finance MUKALEL AMARAVATHY P O KUMILY | KUMILY | IDUKKI | KERALA | -9.99% | ₹4.6 L+₹29,014.13 (6.77%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹6.0 L
EMD Value
₹14,900
Closing Date
20 Aug 2026, 5:00 pmClosed
Deputy Director
Deputy Director, Periyar East Division, Thekkady
Kitchen renovation work at Rajiv Gandhi Complex in Eco Development Range during 2026-27
2026_FD_864199_1
CS-51556/2026/S
Open Tender
Hardware
Percentage
30 days
Eco Development Range
Please refer Tender documents.
5 documents required · 5 mandatory
₹1,420
Yes
₹14,900
Yes
29 Aug 2026
10 Aug 2026
22 Aug 2026
10 Aug 2026
20 Aug 2026
10 Aug 2026
10 Aug 2026 - 20 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge. In cement mortar | 2.08 | cum | 2,129.84 | ₹4,423.68 |
| 2 | Blacksmith 1st class | 4 | Day | 1,315.39 | ₹5,261.56 |
| 3 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil | 10.76 | cum | 359.72 | ₹3,868.79 |
| 4 | Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with: Cement mortar 1:6 (1 cement : 6 coarse sand) | 3.24 | cum | 8,343.49 | ₹27,032.91 |
| 5 | Solid masonry using pre cast solid blocks (factory made) of size 30x20x15cm or nearest available size confirming to IS 2185 part I of 1979 for super structure up to floor two level with thickness 15cm in : CM 1:6 (1 cement : 6 coarse sand) etc complete | 4.35 | cum | 7,713.54 | ₹33,553.9 |
| 6 | Centering and shuttering including strutting, etc. and removal of form for: Lintels, beams, plinth beams, girders bressumers and cantilevers | 6.15 | sqm | 762.88 | ₹4,691.71 |
| 7 | Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth level: Thermo - Mechanically Treated bars of grade Fe-500D or more | 180 | kg | 112.43 | ₹20,237.4 |
| 8 | Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level: 1:2:4 (1 cement: 2 coarse sand: 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 1.57 | cum | 9,963.93 | ₹15,623.44 |
| 9 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level: 1:4:8 (1 Cement: 4 coarse sand (zone-III) derived from natural sources: 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 0.8 | cum | 7,932.89 | ₹6,346.31 |
| 10 | Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete. Hot finished welded type tubes | 655.3 | kg | 194.27 | ₹1,27,305.13 |
stage.html
html • 0.02 MB
finance_1463347.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.04 MB
Tendernotice_2.pdf
PDF • 0.21 MB
Tendernotice_3.pdf
PDF • 0.07 MB
Tendernotice_4.pdf
PDF • 2.11 MB
BOQ_1463347.xls
BOQ • 0.40 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .