Tender Value
₹37.3 L
EMD Value
₹37,300
Closing Date
15 Oct 2026, 6:00 pm7d left
Addl. CITY ENGINEER
Contract for SITC of central Air condition system at shroff Road Library with allied Electrical, Mechanical Work with 5 (FIVE) Years of All Inclusive Comprehensive Maintenance
351282
central Air condition system /CZ/ AC/ 2026-2027
Open
Electrical
Works
Rajkot
15 documents required · 15 mandatory
₹1,875
Rajkot Municipal Corporation
₹37,300
1 Oct 2026
1 Oct 2026
1 Oct 2026
15 Oct 2026
1 Oct 2026
Name of Work: Contract for SITC of central Air condition system at shroff Road Library with allied
Electrical, Mechanical Work with 5 (FIVE) Years of All Inclusive Comprehensive
(E-Tender No. - central Air condition system /CZ/ AC/ 2026-2027)
Sr. No. Event Description Mile Stone Date
1 Downloading of E-tender Dt. –01.10.2026 to Dt. 15.10.2026 up to 18:00 Hrs.
2 Pri - Bid Meeting Dt. – 09.10.2026
Additional City Engineer-Roshni Department
Rajkot Municipal Corporation,
Dr. Ambedkar Bhavan, Central Zone, Room No.8 Second Floor,
Dhebar Road, Rajkot-360001
3 Last date of online submission of E-tender Dt.. – 15.10.2026 up to 18:00 Hrs.
Date of submission of physical document Dt. – 21.10.2026 up to , 18:00 Hrs
4 EMD, Tender fee and other documents.
5 Opening of technical bid and verification of
physical documents - EMD, Tender fee and Dt. – 22.10.2026 at 11:00 hrs
Other documents, if possible.
6 Opening of On-line price bid (if possible) Dt. – 23.10.2026 at 11:00 hrs
7 Tender validity period 120 Days
Additional City Engineer-Roshni Department
Rajkot Municipal Corporation,
Dr. Ambedkar Bhavan, Central Zone
Room No.8 Second Floor, Dhebar Road, Rajkot-360001
RAJKOT MUNICIPAL CORPORATION
e-TENDER NOTICE
E-tenders are invited by Rajkot Municipal Corporation for below mentioned work from reputed and
financially sound contractor, fulfilling tender criteria and working with any Govt. or Semi-Govt.
Sr. Name of the work Details
1 Contract for SITC of central Air condition
system at shroff Road Library with allied 1. Estimated cost: Rs.37,28,474 /-(Without GST)
Electrical, Mechanical Work with 5 (FIVE) 2. Amount of EMD: Rs. 37,300/-
Years of All Inclusive Comprehensive 3. Tender Fees: Rs. 1875/- (Non refundable)
Maintenance 4. Time limit for completion of work : 02 Months
Mile stone dates for E-tendering are as follows:
Sr. No. Event Description Mile Stone Date
1 Downloading of E-tender Dt. –01.10.2026 to Dt. 15.10.2026 up to 18:00 Hrs.
2 Pri - Bid Meeting Dt. – 09.10.2026
Additional City Engineer-Roshni Department
Rajkot Municipal Corporation,
Dr. Ambedkar Bhavan, Central Zone, Room No.8 Second Floor,
Dhebar Road, Rajkot-360001
3 Last date of online submission of E-tender Dt.. – 15.10.2026 up to 18:00 Hrs.
Date of submission of physical document Dt. – 21.10.2026 up to , 18:00 Hrs
4 EMD, Tender fee and other documents.
5 Opening of technical bid and verification of
physical documents - EMD, Tender fee and Dt. – 22.10.2026 at 11:00 hrs
Other documents, if possible.
6 Opening of On-line price bid (if possible) Dt. – 23.10.2026 at 11:00 hrs
7 Tender validity period 120 Days
The Tender fee (Non Refundable) & Bid Security (EMD) will be accepted in form of Demand Draft only, in favor of
“Rajkot Municipal Corporation”, Rajkot, from any Nationalized or Scheduled bank (except Cooperative Bank) in
The agency submitting the tender shall have to produce documentary evidence for full-filling of prequalification
criteria mentioned in the technical bid.
Pre Qualification/ Eligibility Criteria:
1. The bidder must have experience of at least one work of similar nature of
40% of tender amount. The said work must be completed in last seven
financial years. The bidder shall have to submit the required certificate
from the competent authority.
“Similar nature of work” means “SITC of central Air condition system with
allied Electrical, Mechanical Work in Government, Semi-Government
organization. The work experience of private project will not be
The bidder must submit the copy of Completion Certificate (3A Form)
along with copy of Work Order for the same:-
i) Substantially completed works means those works which are
completed at least 90% of original contract price on the date of
submission of this tender and execution is satisfactory.
ii) The work may have been executed by the applicant as prime
contractor or as a member of a joint venture. In case a project has
been executed as a joint venture, joint venture proportion will be
taken into consideration.
2. The copy of valid Electrical Contractor license.
3. Registration Certificate in Class-E-1 and above in R&B, Electrical Division, Govt. of
Gujarat OR from Any state govt. /Central Govt. Body.
4. GST Registration
5. PAN Registration
6. PF Registration
7. ESIC Registration.
8. Financial Criteria
The bidder must have achieved a minimum annual turnover in any one year over
the last seven financial years of the total value of this contract.
Sr No Year Enhancement Factor
1 1 (Base Year 2026 – 27)
9.2 Enhancement Factor
RMC will consider enhancement factor as below to arrive at the yearly turnover
2. The bidder should not have been Black Listed, suspended, terminated, backed out,
debarred & delisted by any Municipal Body / Urban Local Body / Development
Authority in any State Government Body or undertaking / any department or
undertaking of Government of India, since inception of the firm
/ Company. Such a case will be rejected out rightly. A Declaration in this regard on
Rs.300/- Stamp Paper duly Notarized shall have to be submitted as per Annexure
along with the tender documents. Submission of the bid document without such
Notarized declaration will be rejected out rightly.
9. All required documents submitted should be duly certified and self attested.
10. After opening of online Technical Bid, the procedure for the pre-qualification shall be
adopted and the e-Price Bid of only successful qualified bidder shall be opened for
final evaluation of the contract. The decision of Municipal Commissioner regarding the
pre-qualification shall be final and binding to all the bidders.
11. Conditional Tenders will be out rightly rejected.
12. The agency has to submit all required documents as per tender pre-
qualification criteria with the on line submission of the bid within the
stipulated date and time. The physical submission shall be made in Sealed
Envelope and the name of work shall be super scribed on the top of the
envelope.( Tender fee, EMD and no black list affidavit)
13. Technical Bid with required documents & certified copies must be
submitted before last date & time by Regd. Post or Speed post only at
following address. No courier or hand delivery or postal delay is
Additional City Engineer-Roshni Department
Rajkot Municipal Corporation,
Dr. Ambedkar Bhavan, Central Zone
Room No.8 Second Floor, Dhebar Road, Rajkot-360001
14. The Tender of those bidder(s) who fail to submit the required documents
physically within the stipulated date and time will be treated as non
responsive and their Price Bid will not be opened.
15. Price Bid must be submitted Online only as per n-procure procedure.
16. The jurisdiction area will be Rajkot.
17. Security Deposit / Performance Guarantee: -
5% of Contract Value in Form of Bank Guarantee or FDR.
If the Contract price offered by the selected bidder is lower than 10%
but up to 20% of the Estimated project Cost than the additional
performance security shall be calculated @ 20% of the difference in the
Estimated project cost minus 10% of the Estimated project cost and
Contract price offered by the selected bidder.
If the Contract price offered by the selected bidder is lower than 20%
of the Estimated project Cost than the additional performance security shall
be calculated @ 30% of the difference in the Estimated project cost minus
10% of the Estimated project cost and Contract price offered by the
selected bidder.
The Additional performance security shall be treated as part of the
performance security.
The performance security shall be valid beyond 60 Days of the defect
Liability period and the additional performance security shall be valid
beyond 28 Days of Project completion Date.
Final SD will be calculated on the time of Final Bill be actual
completion amount.
18. Commissioner, Rajkot Municipal Corporation, Rajkot, reserves the right to
accept / reject any or all e-Tender(s) without assigning any reasons thereof.
19. In case of any queries related to the tender, the prospective bidder may email the
same to Shree R. C. Bagthaliya, Deputy Executive Engineer on
[email protected] prior to pre-bid meeting. Queries received after above
mentioned time frame will not be entertained. Pre-bid meeting will be held at
central Zone Office as per address given in the tender.
Additional City Engineer
Roshni Department-, Central Zone
Rajkot Municipal Corporation
Dr. Ambedkar Bhavan
Room No.8 Second Floor, Dhebar Road, Rajkot-360001
20. Bidder has to quote their rates without GST and including other taxes. The invoice
should be submitted by contractor showing the breakup of GST in the bill. GST
will be paid extra at the prevailing rate at the time of execution.
21. After opening of Technical Bid, the procedure for the pre-qualification shall be
adopted and the Price Bid of only successful qualified bidder shall be opened for
final evaluation of the contract. The decision of Municipal Commissioner
regarding the pre-qualification shall be final and binding to all the bidders.
Addi. City Engineer
Roshni Department
Rajkot Municipal Corporation
CHECK LIST FOR SUBMISSION OF DOCUMENTS (ONLINE AND OFFLINE)
The bidder must submit the relevant documents as per the below.
Sr. No Particulars Online Submission Offline Submission
01 Tender Fee (Scan Copy OF DD) Scan Image Of DD Original DD
02 EMD (Scan Copy of DD) Scan Image of DD Original DD
03 Tender Documents , Corrigendum etc Scan Image of Duly Signed and --
Stamped Tender Documents and
04 Valid Electrical Contractor License Scan Image --
05 R & B Dept Registration, “E-1” Class and Scan Image --
06 Work Order Copies, Work Exp. Certificates Scan Image --
07 PF Registration Scan Image --
08 ESIC Registration Scan Image
09 Turnover Certificate Scan Image --
11 PAN Registration Scan Image --
12 NO BLACK LIST Agreement Scan Image Original
14 GST Registration Scan Image --
15 MOU Agreement if any Scan Image --
16 Technical Details/Datasheet of AC System Scan Image --
17 Declaration/ Site Visit Confirmation on Letter Scan Image --
Note: The bidder must submit all relevant documents as per qualification criteria and
tender conditions. No correspondence to the agency will be done for shortfall documents.
Original documents to be brought by bidder/authorized person for verification on the
date and time as communicated by engineer-in-charge. Successful bidder to submit hard
copy of tender documents including addenda/Corrigendum, if any and other supportive
documents as required in this tender, duly stamped & signed on all pages.
Name of Work : SITC of central Air condition system at shroff Road Library with allied Electrical,
Mechanical Work
with 5 (FIVE) Years of All Inclusive Comprehensive Maintenance
Site Description, Scope of Work and General Requirement.
Rajkot Municipal Corporation has constructed a library in Ward No. 3. The SITC work of
the Central Air Condition System in this library is to be done in the existing building.
The agency will have to visit the site and submit the design of the Central Air Condition
System along with the tender.
The whole project has to execute with 1 Year of Defect Liability Period +
Years of Comprehensive Maintenance. Annual comprehensive maintenance will
have to be done for a period of total five years, which will be paid every year as per
the price of the tender.
1) Site. Location
1.1 Shroff Road library
Ward no.3 Near Sharda bag
COMMON TERMS AND CONDITIONS OF THE TENDER
I. The conditional tender will not be accepted and will be rejected outright.
II. The tender for the work shall remain open for a period of 120 days from the last date of
submission of the tender and the tenderer shall not be allowed to withdraw or modify the
offer on his own during this period. Any modifications or additions in terms and conditions of
this tender not acceptable to The Municipal Commissioner, Rajkot Municipal Corporation,
Rajkot shall without prejudice to any right or remedy, be at liberty to forfeit in full said earnest
money absolutely.
III. RMC reserves the right to reject all the tenders of the lowest or any other tender which is the
judgment of the RMC and also does not appear to be in its best interest and the tenderer shall
have no cause of action or claim against the RMC of its officers, employees, successors for
assignees for rejection of its tender.
IV. It must be clearly and distinctly understood that the conditions of contract and specifications
shall be rigidly enforced and no relaxation on the grounds of customs prevailing shall be
V. The quoted rates online in the Financial Bid shall be exclusive of all taxes, duties, etc. GST Will
be paid extra on given price as per the prevailing Rate.
VI. It is considered that the tenderer has visited the site of work, fully acquainted himself with the
local situations regarding materials, labour and other factors pertaining to work at site and
studied the design, plans and estimates before submitting the tender. No further price
escalation will be entertained in redesign of any of items related to this project. Proof of Site
Visit to be submitted along with Tender Documents.
VII. The work is to be completed in all respects as per the time schedule from the date of written
order to be commencing the work. Within this period, the bidder shall take approval of all
documents & drawings and as per tender specification from relevant Engineer-in-charge.
VIII. All fees, Royalty or rent of any land/Ware house to store any material related to any project
will be paid by bidder.
IX. In execution of work, if any connection of electricity cable, telephone line, water supply line,
underground drainage line, gas line or any private line of any private property will be cut or
damaged by any person or machinery or equipment of bidder, all responsibility will be of
bidder and bidder has to pay whatever charges incurred to joint it in proper workable
X. O & M period shall commence from the date of issue of satisfactory Installation, Testing and
Commissioning certificate (one year defect liability period + Five years comprehensive
XI. This notice will form part of the Contract.
XII. The tenderer is advised to get acquainted with the site and situation thereof to assess the
quantum of work and site ready ness.
XIII. ESI REGISTRATION:
The contractors who are liable to be registered under ESI Act must possess ESI registration
number at the time of filling of tender. The agency should follow all the rules and regulations of
ESI Act as per prevailing norms.
XV. PROFESSIONAL TAX
The bidder shall have to pay the Professional Tax for current financial year imposed by
Government of Gujarat, and also the bidder shall have to produce Enrollment Certificate for the
Add Asst Engineer Dy. Ex. Engineer Add City Engineer (i/c)
Roshni Dept. Roshni Dept. Roshni Dept.
GENERAL CONDITIONS OF CONTRACT
No. Description
GC-1 Definitions and Interpretations
GC-2 Location of site and accessibility
GC-3 Scope of work
GC-4 Ruling language
GC-5 Interpretation of Contract Document
GC-6 Contractor to understand himself fully
GC-7 Errors in submissions
GC-8 Sufficiency of E-TENDER
GC-9 Discrepancies
GC-10 Performance Guarantee (Security Deposit)
GC-11 Inspection of work
GC-12 Defect Liability
GC-13 Power of Engineer-In-Charge to give further instructions.
GC-14 Programme
GC-15 Sub-letting of work
GC-16 Sub-Contracts for temporary works, etc.
GC-17 Time for completion
GC-18 Extension of time
GC-19 Contract Agreement
GC-20 Liquidated damages
GC-21 Forfeiture of Security Deposit
GC-22 Action of Forfeiture of Security Deposit
GC-23 No compensation for alteration in or restriction in work
GC-24 In the event of death of contractor
GC-25 Members of the owner not individually liable
GC-26 Owner not bound by personal representations
GC-27 Contractor's office at site
GC-28 Contractor's subordinate staff and their conduct
GC-29 Termination of sub-contract by owner
GC-30 Power of entry
GC-31 Contractor's responsibility with the other Contractor and Agencies.
GC-32 Other Agencies at site
GC-34 Rights of various interests
GC-35 Price adjustments
GC-36 Terms of Payment
GC-37 Retention Money
GC-38 Payments due from the Contractor
GC-39 Contingent Fee
GC-40 Breach of Contract by Contractor
GC-41 Default of Contractor
GC-42 Bankruptcy
GC-43 Ownership
GC-44 Declaration against waiver
GC-45 Laws governing the contract
GC-46 Over payment and under payment
GC-47 Settlement of disputes
GC-48 Disputes of differences to be referred to
GC-49 Arbitration
GC-50 Termination of the Contract
GC-51 Special risks
GC-52 Change in Constitution
GC-53 Sub-contractual relations
GC-54 Patents and Royalties
GC-56 Execution of work
GC-57 Work in monsoon
GC-58 Work on Sundays and Holidays
GC-59 General Conditions for construction work
GC-60 Drawings to be supplied by the Owner
GC-61 Drawings to be supplied by the Contractor
GC-62 Setting outwork
GC-63 Responsibilities of Contractor for correctness of work
GC-64 Materials to be supplied by the Owner
GC-65 Conditions of issue of materials by the Owner
GC-66 Materials procured with assistance of the Owner
GC-67 Materials obtained from dismantling
GC-68 Article of value of treasure found during construction
GC-69 Discrepancies between instructions
GC-70 Alternations in specifications and designs and extra work.
GC-71 Action when no specifications are issued
GC-72 Abnormal rates
GC-73 Assistance to Engineer-In-Charge
GC-74 Tests for quality of work
GC-75 Action and compensation in case of bad workmanship
GC-76 Suspension work
GC-77 Owner may do part of the work
GC-78 Possession prior to completion
GC-79 Completion Certificate
GC-80 Schedule of Rates
GC-81 Procedure for measurement of work in progress
GC-82 Running account payments to be regarded as advances
GC-83 Notice for claim for additional payment
GC-84 Payment of Contractor's Bill
GC-85 Final Bill
GC-86 Receipt for payment
GC-87 Completion Certificate
GC-88 Taxes, Duties, etc.
GC-89 Insurance
GC-90 Damage to Property
GC-91 Contractor to Indemnify Owner
GC-92 Implementation of Apprentice Act
GC-93 Health and Sanitary arrangements for workers
GC-94 Safety Code
GC-95 Accidents
Note:- All the General Conditions referred to hereinabove shall form an integral and inseparable part
of this Tender Document. The provisions, terms and conditions specified under General Conditions
Nos. GC, in their entirety, shall be deemed to be applicable to and binding upon this Tender.
In this Contract, the following terms shall be interpreted as indicated:
(a) “The Contract” means the agreement entered into between the Purchaser and the
Tenderer, as recorded in the Contract Form signed by the parties. Including all
attachments & appendices thereto and all documents incorporated by reference
(b) “The Contract Price” means the price payable to the Tenderer under the Contract for
the full and proper performance of its contractual obligations;
(c) “The Goods” means all of the equipment, machinery, and / or other materials which
the supplier is required to supply to the Purchaser under the Contract;
(d) “Services” means services ancillary to the supply of the Goods, such as transportation
& insurance, and any commissioning, provision of technical assistance, training and
other such obligations of the Tenderer covered underthe Contract;
(e) “The Purchaser” means the Organization purchasing the Goods; and
(f) “The Tenderer” or “The Bidder” or “The Agency” means the individual or firm
supplying the Goods under this Contract.
The Goods supplied under this Contract shall conform to the standards mentioned in the
Technical Specifications, and, when no applicable standard is mentioned, to the authoritative
standard appropriate to the Good’s country of origin and such standards must be appropriate
with Indian standards shall be the latest issued by the concerned institution.
3.0 Patent Rights
The Tenderer shall indemnify the Purchaser against all third-party claims of infringement of
patent, trademark or industrial design rights arising from use of the Goods or any part thereof
4.0 Security Deposit
The successful bidder has to submit the Security Deposit @5% of Contract Value in the form of
Bank Guarantee or FDR (Nationalized/Scheduled Bank) before signing the contract. Validity of
DD / FDR / Bank Guaranty will be 78 Month from the date of Agreement.
If the contract price offered by the selected bidder is lower than 10% but up to 20% of the
estimated project cost then the additional performance security shall be calculated @ 20% of
the difference in estimated project cost minus 10% of the estimated project cost and contact
price offered by selected bidder.
If the contract price offered by the selected bidder is lower than 20% of the estimated project
cost then the additional performance security shall be calculated @ 30% of the difference in
estimated project cost minus 10% of the estimated project cost and contact price offered by
selected bidder.
The full security deposit amount shall be refunded, without any interest, after deduction of
dues, taxes, penalties etc. (if any) after successful completion of defect liability period for the
The Tenderer has to pay necessary Stamp Duty as per prevalent rules at the time of execution
All CPBG or FDR must be having validity period of 78 months and must be issued from
nationalized or scheduled banks.
Final SD Amount will be calculated at the time of final BILL (I.e. Actual Completion Amount and
as per RMC Tender Protocol)
5.0 Tools & Tackles:
All tools and tackles required for the job shall have to be procured by the contractor at his cost
and they will be retained their property. The contractor will have to maintain reliable sets of
tools and tackles in adequate quantities so as to complete the job as expeditiously as possible.
6.0 Inspections and Tests
The Purchaser or its representative shall have the right to inspect and / or to test the Goods to
confirm their conformity to the Contract. The special conditions of contract and / or the
Technical Specification shall specify what inspections and tests the Purchaser requires and
where they are to be conducted. Mostly inspections and tests may be carried out of goods
origin place and it is willingness of purchaser to conduct it or not. The Purchaser shall notify
the Tenderer in writing of the identity of any representatives retained for these purposes.
The inspections and tests may be conducted at goods’ origin or on the premises of the
Tenderer with agency, at point of delivery and / or at the Good’s final destination. Where
conducted on the premises of the Tenderer, all reasonable facilities and assistance (including
access to site, drawings and production data) shall be furnished to the inspectors at no charge
to the Purchaser.
If any inspected or tested Goods fail to conform to the Specifications/tender conditions, the
Purchaser may reject them and the Tenderer shall either replace the rejected Goods or make
all alterations necessary to meet specification requirements free of cost to the Purchaser.
The Purchaser’s right to inspect, test and, where necessary, reject the Goods after the Good’s
arrival on site shall in no way be limited or waived by reason of the Goods having previously
been inspected, tested and passed by the Purchaser or its representative prior to the Goods’
shipment from the Place of origin inspection of any material.
Nothing in above clause shall in any way release the Tenderer from any warranty or other
obligations under this Contract.
At random sample will be collected from ordered - materials is received at site/store and
taken to Govt. recognized institution / laboratories for testing under relevant standard only
getting satisfactory test report certificates same shall be accepted and payment will be
processed. All expanses to carry-out any tests will be born / deposited by the tenderer.
Tenderer or his authorized representative can remain present during sampling. If any test fails
the contractor has to replace the same within 10 days.
RMC will engage TPI/PMC agency, if required, from its approved agencies. The bidder is fully
responsible to repair, replace or re-arrange the goods/materials/workmanship of all nature, if
the same is failed in TPI. The decision of TPI Agency and RMC shall be final and bound to the
bidder in this respect.
RMC along with PMC/ TPI may visit the manufacturer’s site, testing laboratory etc. to witness
QAP, inspections, routine Tests etc., if required. The cost for such visit, conveyance etc. will be
borne by the tenderer.
Inspection charges and expenses for inspection at OEM workplace will be bare by Contractor.
Charges include Traveling, Lodging and Boarding Charges. Within Gujarat mode of Traveling
will by Road / Rail and in case of Interstate travel mode of travel will be by air.
Inspection will be done by RMC official along with PMC / TPI Person and cost for the same will
be bare by contractor.
The agency has to bear the expenses for all the tests and inspections required to be carried
out for this tender works. For Inspection agency has to bear all expenses like travelling, Hotel
Stay, food etc. of as much as RMC/PMC staff. Inspection will be done at OEM Work Place.
Mode of Traveling is either by AIR or By Train and it is based on the location or based on
traveling Hour.
7.0 Performance Backup Charges
The tenderer must submit FDR or Contract cum Performance Bank Guarantee or deduct from
final bill of 05% of total amount of actual work done as Performance Backup Charges (Other
final bill of 05% of total amount of actual work done as Performance Backup Charges (Other
than the security Deposit) after the successful completion of the project before preparation of
final bill. The same will be returned to the contractor after completion of defect liability
period. No interest will be paid on this Performance Backup Chagres.
8.0 Transportation
Where the Tenderer is required under the Contract to deliver the Goods, FOB, transport of the
Goods, up to and including the point of putting the Goods, up to and including the point of
putting the Goods on board the vessel at the specified port of loading, shall be arranged and
paid for by the Tenderer, and the cost thereof shall be included in the Contract Price.
Where the Tenderer is required to affect delivery under any other terms, for example, by post
or to another address in the source country, the Tenderer shall be required to meet all
transport and storage expenses until delivery.
9.0 Guarantee Period/Defect liability: (Minimum 1 Years)
The successful tenderer shall have to stand guarantee against bad workmanship and supply of
poor quality and / or defective materials for minimum 05 years after the date of successful
completion of the total installation and handing over the same to RMC. Any defect /
discrepancy detected during this guarantee period will have to be made good by the
contractor at his costs and risks.
If, by any reason, RMC is required to rectify such defects/ discrepancies detected during this
guarantee period/defect liability period, the entire cost involved will be released from the
dues payable to the contractor bills / Bank Guarantee by RMC.
In case of damage to the any parts of the exacting and new project/system occurred due to
external accidents, causalities or damages due to natural calamities, the bidder must restore
the project or parts thereof without any additional payments towards the labour work,
however, RMC will pay the bidder for the supply of the material as per the tender approved
rates or as per prevailing SOR of RMC during the whole Performance Guarantee Period.
10.0 Assignment
The Tenderer shall not assign, in whole or in part, its obligations to perform under the
Contract, except with the Purchaser’s prior written consent.
11.0 Sub contracts
The Tenderer shall notify the Purchaser in writing of all subcontracts awarded under the
Contract if not already specified in his Tender. Such notification, in his original Tender or later,
shall not relieve the Tenderer from any liability or obligation under the Contract.
12.0 Delays in the Tenderer’s Performance
Delivery of the Goods and performance of Services shall be made by the Tenderer in
accordance with the time schedule specified by the Purchaser.
In case of any such delay or poor work, RMC will impose the penalty @0.1% of the contract
value per day maximum to 10% of the contract value given in the work order. However, if such
delay is prolonged beyond the required realization of the project or an unexcused delay by the
tenderer in the performance of its delivery obligations shall render the tenderer liable to any
or all of the following sanctions: i) forfeiture of its performance security, ii) imposition of
liquidated damages (iii) termination of the contract for default.
The Municipal Commissioner, RMC reserves the rights to terminate/black list/debar the
contract during contract period without assigning any reason and remaining work carried out
by other agency as the risk and cost of tenderer and forfeit the security deposit.
13.0 Force Majeure
The Tenderer shall not be liable for forfeiture of its performance security, liquidated damages
or termination for default, if and to the extent that, its delay in performance or other failure to
perform its obligations under the Contract is the result of an event of Force Majeure.
For purposes of this clause, “Force Majeure” means an event beyond the control of the
Tenderer not involving the Tenderer’s fault or negligence and not foreseeable. Such events
may include, but are not restricted to, acts of the Purchaser either in its sovereign or
contractual capacity, wars or revolutions, fires, floods, epidemics, quarantine restrictions and
freight embargoes.
If a Force Majeure situation arises, the Tenderer shall and promptly notify the Purchaser in
writing of such condition and the cause thereof, Unless otherwise directed by the its
obligations under the Contract as far as reasonably practical, and shall seek all reasonable
alternative means for performance not prevented by the Force Majeure event.
14.0 Termination for Insolvency
Every contractor shall, unless exempted in writing by the Concerned Engineer, produce along
with his tender a solvency certificate of his financial ability. If he fails to produce such a
certificate his tender will not be considered.
The Purchaser may at any time terminate the Contract by giving written notice to the
Tenderer, without compensation to the Tenderer, if the Tenderer becomes bankrupt or
otherwise insolvent, provided that such termination will not prejudice or affect any right of
action or remedy which has accrued or will accrue thereafter to the Purchaser.
15.0 Governing Language
The Contract shall be written in the language of the bid, as specified by the Purchaser in the
Instruction to Tenderer. All correspondence and other documents pertaining to the Contract
which are exchanged by the parties shall be written in that same language.
16.0 Applicable Law
The Contract shall be interpreted in accordance with the Indian laws.
Any notice given by one party to the other pursuant to the Contract shall be sent in writing (or
by Letter/fax/scanned copy through email) to the address specified for that purpose in the
Special Conditions of Contract.
Any notice shall be effective when delivered or on the notice’s effective date, whichever is
18.0 Taxes and Duties
Customs / import duty, excise duty, and any other taxes on finished products, sales tax on
works contract and turnover taxes, if any, paid by the Contractor under any central, state or
local government rules and regulations will be Included to the Contract Price. Only GST will be
19.0 Child Labour Act
No Contractor shall employ any child having less than 18 years, as it is prohibited by the Child
Labour Prohibition and Regulation Act, 1986. The bidder is fully responsible to follow the
related regulations of such act.
20.0 Brand Names
The maker of Equipments shall be as per attached list. If make of a particular item is not given
in the tender, then prior approval of RMC for that make must be required.
The Goods supplied under the Contract shall be fully insured against loss or damage incidental
to manufacture or acquisition, transportation, storage and delivery in the manner specified or
directed by EIC.
This project is with comprehensive O&M of five years, any parts/spares/components of the
whole project are stolen by any means and damage by any accident, the contractor has to
replace the same without any extra charges.
22.0 Extra Item of Work ;
If any work/Item not included in this tender & required to execute for any work then Price
Applicability for such item will be considered as below:
Sr No Preference Priority Remarks
01 First Base Rate of existing SOR/Rate Contract
of RMC (Any Department)
02 Second Base Rate of existing SOR of R&B
03 Third Market Rate Policy of RMC
23.0 Measurement of Work
The measurements of work will be taken according to the usual method in use in the Rajkot
Municipal Corporation and no proposals to adopt alternative methods will be accepted. Add.
City Engineer’s decision as to what is ‘the usual method in use in the Rajkot Municipal
Corporation’ will be final.
24.0 No claim to any payment or for restriction of work
In the case of such delay in the supply of materials, RMC shall grant such extension of time for
the completion of the works as shall appear reasonable in accordance with the circumstances
of the case. The decision of RMC as the extension of time shall be accepted as final by the
Action and compensation in case of bad work : If, at any time before the expiry of defects
Liability, period, it shall appear to Additional City Engineer or EIC of the work, that any work
has been executed with unsound, imperfect or unskilled workmanship or with materials or
inferior quality or that any materials or articles provided by him for the execution of the work
are unsound, or of a quality inferior to that contracted for or are otherwise not in accordance
with the contract, it shall be lawful for Additional City Engineer to intimate this fact in writing
to the Contractor and then notwithstanding the fact that the work, materials or articles
complained of, may have been passed, certified and paid for, the Contractor shall be bound
forthwith to rectify, or remove and reconstruct the work so specified in whole or in part as the
case may require, or if so required shall remove the materials or articles so specified in whole
or in part and provide other proper and suitable materials or articles at his
own charge and cost, and in the event of his failing to do so within a period to be specified by
The Additional City Engineer in the written intimation aforesaid, the Contractor shall be liable
to pay compensation at the rate of one percent on the amount of the estimate of the
rectification for every day not exceeding ten days during which the failure so continues, and in
the event of any such failure as aforesaid continuing beyond ten days, Additional City Engineer
may rectify or remove, and re-execute the work or remove and replace the materials
complained of, as the case may be at the risk and expense in all respects of the Contractor
should The Additional City Engineer consider that any such inferior work of materials as
described above may be accepted or made use of, it shall be within his discretion to accept the
same at such reduced rates as he may fix therefore, However, the contractor shall be
responsible for normal maintenance of the work till the final bill for the work is prepared by
the engineer / officer of RMC.
25.0 Defect Liability Period (12 Months):
The Contractor shall be responsible to make good and remedy at his own expense any defect
which may develop or may be noticed before the period mentioned hereunder from the
certified date of completion. The Engineer-in-charge shall give the Contractor a notice in
writing/by e-mail/in verbal about the defects and the Contractor shall make good the same
within 48 hours of receipt of the notice.
In the case of failure on the part of the Contractor, Engineer-in-charge may rectify or remove
or re-execute the work at the risk & cost of the Contractor. The Engineer-in- charge shall be
entitled to appropriate the whole or any part of the amount of the security deposit towards
the expenses, if any, incurred by him in rectification, removal or re-execution.
The Defects Liability period shall be as under:
(a) The period shall be 60 months from the date of start of O & M period. (AMC)
The successful tenderer shall have to maintain the whole project in complete working
condition for 60 months from the successful date of installation and completion of the project.
In case, the agency is failed to maintain the working of the sports lighting system as per the
O&M conditions of the tender, the Municipal Commissioner reserve rights to
blacklist/Terminate/debar the agency and to forfeit the tenderer’s Performance Backup
Charges as well as Security Deposit Setting out the Works
The Contractor shall be responsible for the true and proper setting out of the works in relation
to original points, lines and levels of reference given by the Engineer in writing or shown on
the Drawings and for correctness, subject as above mentioned in the position, levels,
dimensions and alignment of all parts of the works and for the provision of all necessary
instruments, appliances and labor in connection therewith.
27.0 Amenities to be Preserved
The Contractor shall cause the least possible interference with the existing amenities, whether
natural or manmade. No tree shall be removed/cut without permission of the Engineer’s
Representative and clearance of the site shall generally be kept to the minimum necessary for
the works and temporary works. Temporary works shall be sited so as minimize the number of
trees to be cut.
All necessary actions for any diversion of traffic shall be arranged by the contractor with all
indicating signboards while work in progress with adequate lighting system during night
28.0 Safety Measures and Services
The Contractor shall be responsible for the safety of all workmen and other persons entering
or in the works and shall take all measures necessary to ensure their safety to the approval of
the Engineer’s Representative.
Contractor shall provide and maintain at his own expenses all lights, guards, fencing and
necessary watchmen when and where necessary or ad required by Owner / Engineer for the
protection of the works or for the safety and convenience of those employed on the works
and the public. Contractor shall also provide at his cost traffic barricades, men for diverting
and controlling traffic, necessary sign boards for diversion of traffic. In the event of failure on
the part of Contractor, Owner man with or without notice to Contractor put up a fence or
improve a fence already put up or provide and/or improve the lighting or adopt such other
measures as he may deem necessary, and all the cost of such work and procedures as may be
adopted by Owner/Engineer shall be borne by Contractor. Maintenance of adequate warning
and general lighting at nights at place of work is essential.
Contractor shall take the necessary permission and clearance of all the authorities like
department of Roads, traffic, Water Supply and Drainage; Electricity Board, Telephone
Company, etc. Wherever necessary and observe the regulations regarding the execution of
work in congested areas, heavy traffic areas, etc.
29.0 Liability of accidents to persons
In the case of an accident, in respect of which compensation may become payable under
Workmen’s Compensation Act by the tenderer.
30.0 Clearing Site on Completion
On completion of the Works, the Contractor shall clear away and remove from the site all
Constructional Plant, surplus materials, rubbish, Temporary Works of every kind and leave the
whole of the site and the works clean and in a workmanlike condition to the satisfaction of
The Engineer-in-charge.
31.0 Safe custody of stores:
The bidder will be entirely responsible for all the erected poles and materials used by him for
the works and the executed portion of the works till it is officially taken over by RMC.
It would be the responsibility of the bidder to keep the insurance policy alive throughout the
entire period of execution and till the installation is handed over to RMC for any loss, damage
or theft of materials and/or erected works before taking over by RMC.
32.0 ST, IT & PT clearance etc:
The bidder is responsible for ST, IT and PT clearance.
33.0 Labor license:
The bidder will have to abide by the provisions of contract labour (Regulation & Abolition) Act.
1970. For the purpose, principal employer’s certificate would be issued by RMC, if required.
34.0 Accidents:
RMC shall neither be responsible nor shall be liable to pay any compensation for any accident
caused to any worker / public arising out of execution of work / executed portion of work till it
is finally taken over and handed over to RMC/Appropriate Authority.
35.0 Stoppage of work:
RMC shall not be responsible nor be liable to pay any compensation for any interruption of
work in the field due directly to war, strike, civil commotion, lockout, risk, earthquake
tempest, lightning, flood, cyclone etc. which occur beyond its control. Similarly, RMC also
would neither be held responsible nor liable for compensation for stoppage of contractor’s
work in the field arising out of resistance
/ resentment of local public.
36.0 Non-interference with existing services:
During execution, the erection contractor will be required to take all precautionary measures
not to interfere / dash / disturb with any service line for electrical, water, drainage, petro-
products or similar other service. In case such things happen incidentally the same has to be
made good at his own cost within least possible time so that public service is disturbed for a
minimum period of time. In case of road cutting utmost cares should be taken not to disturb
public transport facilities. After the work the road should be so repaired as to restore original
shape. Whenever require, contractor should work in night shift also.
The successful tenderer must coordinate with the other concerned authority/agency for
smooth execution of the work. If the successful tenderer is not able to co-ordinate with
other agencies in time, any obstruction for other works like road, drain made by him will be
corrected in his own cost.
37.0 Execution of work:
Execution of the work should be carried out as per standard practices followed by the
instructions of the Engineer-in-charge. Not-with-standing what has been stipulated in the
specification or elsewhere in this tender, all works carried out and all materials supplied shall
conform to relevant I.E. Rules and I.S.S. The work shall be completed in all respect including
providing all sundry materials. All size given in this tender is tentative only, so bidder has to
design all electrical items & get approval of all items before installation from Engineer-in-
charge. All responsibilities which is either regarding faulty design or any reason where lighting
not found as per the tender will be of bidder/lead partner.
38.0 Comprehensive Maintenance work & Handing Over /Taking Over:
After successful Design, Supply, Installation, Testing and Commissioning of AC system, A
Completion certificate for SITC work has to be obtained from EIC / PMC. Comprehensive
Maintenance period for 5 (five) years will commence after date of SITC work completion.
During the Comprehensive Maintenance period agency has to keep complete AC system in
healthy condition. Agency has to rectify any faults arising in the AC system during the
Comprehensive Maintenance period at his own cost. charge will be paid for this as per tender.
Delay in rectification more than stipulated time will be penalized as per penalty clause
mentioned in the tender.
After successful completion of 5 (five) years comprehensive Maintenance and on completion
of the defect liability period of 12 months for AC system RMC will take-over complete AC
system as per tender condition
39.0 Formalities for Electricity Connection
The contractor has to do necessary liaison like registering of application, submission of test
report etc as and when required with PGVCL related to acquisition of electricity connection for
sports lighting. All the charges like Application Registration Charges, Demand Charges, Test
Report Charges will be reimbursed to the contractor against the submission of the original
41.0 PRICE AND PAYMENT
The Tenderer must understand clearly that the prices quoted are for the total works or the
part of the total works quoted for and include all costs due to materials, labour,
equipment, supervision, other services, royalties, taxes etc. and to include all extra to cover
the cost. No claim for additional payment beyond the prices quoted will been entertained and
the Tenderer will not be entitled subsequently to make any claim on any ground. Price
escalation clause will not be applicable for this tender in any condition.
Only GST will be paid extra as per actual
42 .0 Payments towards Running Account Bill (RA Bill)
Payment:- The payments to the successful bidder will be made as per following.
After complete SITC work final bill will be raise
45.0 RETENTION MONEY:
Pursuance to clause 44 (Terms of Payment) any on at money due to the Contractor for work
done, Corporation will hold as Retention money five (5) percent of the value of work. The
retention money will not normally be due for payment until the completion of the entire work
and till such period the work has been finally accepted by the Corporation and a completion
certificate issued by the Corporation.
Award of the contract or the rejection or e-Tenders will be made during the Tender validity
After all contract contingencies are satisfied and the Notice of Award is issued, the
successful Tenderer shall execute the Contract Agreement within the time stated and
shall furnish the Bond as required herein. The contract Agreement shall be executed,
in form stipulated by the Owner.
If the Tenderer receiving the Notice of Award fails or refuses to execute the Contract
Agreement within the stated time limit or fails or refuses to furnish the Bond as
required herein. The Owner may annul his award and declare the e-Tender security
forfeited and will take action as deemed fit.
A corporation, partnership firm or other consortium acting as the Tenderer and
receiving the award shall furnish evidence of its existence and evidence that the
officer signing the contract agreement and Bonds for the corporation, partnership firm
or other consortium acting as the Tenderer is duly authorized to do so.
Add Asst Engineer Dy. Ex. Engineer Add City Engineer (i/c)
Roshni Dept. Roshni Dept. Roshni Dept
*Speciaal condition for Contract-
1) The Agency must be carriy out complate service of the Ac plant every three month and submit report to the concern
2) The contractor must be use only BIS materials and must approved to the concern Autority if any material shoud be
required to inspect the agency must be Agreed for inspection of materials as per instruction of Engineer Incharge.
3) whenever a fault-related AC system complain is received via phone-Whatsapp media, or e-mail sucha as excessive
noise-insufficient cooling the fault must be resolved within 24 hours.
4) The Agency is required to comprehensive maintenance for total 6- Years payment will be make accordance with the
tender terms of the Important Note .If any parts require to replacement or repaire No separate/Extra payment will be
made for that work.
5)Before starting the work The Agency must submit the complete layout drawing showing all details and there for work
must commence only after it is approved by incharge engineer.
6) The Agency must visit the site before bidding for the tender ,considering the existing building structure of the shroff
road library before bidding the rate of work. After the work order is issued no any terms ,condition or demand from the
Agency will not be accepted.
7) A site visit confirmation letter must also be attached with the tender documents.
8) The central Ac system must be designed in such a way that a minimum temperature of 20 Degree Centigrade is
maintained and adequate airflow is delivered to all areas of the building.
9) After the compition of SITC work of AC system if a minimum temperature of 20 degree C .and proper airflow are not
achieved the Agency must carry out necessary modification at his own expense, No separate payment made for this
10) The Central AC system should have minimum sound Disturbance so that people reading in the library feel no noise
11) In case of any extra Item carry out to complete this project , the rate will be applied as per current R & B SOR. No on
or less percentage will apply.
12) All cables will be used copper during compate this work.
13) Earthing must be done every parts of Centrally AC system and installed safety devie like Under voltage, Over voltage
,Surge voltage when any fault create due to PGVCl power system, all responsibility carry by contractor and no any extra
payment done by Rajkor municipal corporation.
14) If any minor civil work require for complte the work like,wall jari,core cutting,foundation work of outer unit etc are
in scope of Agency.
Important Note :-
The approved contract and price will be valid for one year, in which if AC system are to be
installed in any other building of Rajkot Municipal Corporation, the work will have to be done as
per the approved price and tender terms and condition by the agency and a separate security
deposit will have to be given for that work.
For the comprehensive maintenance period price
Sr.No. Year Price
0 Defect liability Free
02 1St Year 3.5 % of Approved rate + GST
03 2nd year 4.0% of Approved rate+ GST
04 3rd year 4.5 % of Approved rate+ GST
05 4th year 4.5 % of Approved rate+ GST
06 5th year 5.0% of Approved rate+ GST
Penalty clause for Maintenance :-
: If the agency fails to complete the work within the period stated in the work order, 0.1% per
day after completion of the period and up to a maximum of 10% of the contract value.
: From the day of receipt of complaint regarding general repairing, if the complaint is not
Resolved within 24 hours, Rs.200/- penalty will be charged for additional per day.
: From the day of receipt of complaint regarding major repairing, if the complaint is not
Resolved within 05 days, Rs.500/- penalty will be charged additional per day.
1)Penalty will deducted in the bill amount or in the security deposit or in the maintenance bill
2)If the agency fails to performance the maintenance work, Than the maintenance work will be do by other
agency at the main agency’s cost and risk and forfeit security deposit and the agency will be
terminate/debarred/ black list as per the rules.
3) If the agency submit false documents in the tender process, The agency will be terminate/debarred/
black list and EMD will be confiscate as per the rules
A) SITC Work: - 02 Month
B) Guaranty period / Defect Liability Period :- 12 Month
C) Maintenance Period: - 60 Month (Start after Guaranty period / Defect Liability Period complete)
List of Approved Make
LIST OF APPROVED MAKES OF HVAC UNIT
SR.NO ITEM / COMPONENT APPROVED MAKES
1 AC UNIT DAIKIN / CARRIER / BLUE STAR / TOSHIBA
2 G. I. SHEETS JINDAL / SAIL / ISPAT / TATA
3 EXPANDED POLYSTYRENE BEARDSELL / COOLINE / LLYOD
4 FIBREGLASS UP TWIGA / KIMMCO
5 GRILLES COMSOS/ AIRMASTER
6 AIR CURTAIN ACME / SAP / RUSSEL / ALOMONARD
7 CABLES HAVELLS/CCI / FINOLEX/ POLYCAB/ RR
8 ELECTRICAL COMPONENT SIEMENS / L&T
9 METERING DEVICE L&T / SIEMENS
10 INDICATING LAMPS SIEMENS / L&T
11 MCB/ ELCB / ELMCB SIEMENS / LEGRAND / HAVELLS
12 GI PIPE TATA / JINDAL
13 U-PVC WATER PIPE PRINCE / SUPREME / ASTRAL / FINOLEX
14 NITRILE RUBBER AEROFLEX / ARMACELL
15 AIR HANDLING UNIT CITIZEN / ZECO / ETHOS / NUTECH
*Any make/model must be approved by EIC before its utilization for the project.
LIST OF MATERIALS OF APPROVED BRAND/ MANUFACTURER (ONLY FIRST QUALITY TO BE USED
(ELECTRICAL WORKS)
MAKE LIST FOR ELECTRICAL WORKS
SR.NO. ITEM STANDARD MAKE
CPRI / ERDA APPROVED PANEL BUILDER. 70KA
6 LT PANELS SHORT CIRCUIT WITHSTANDS STRENGTH.
ACCESSORIES AS PER MENTIONED IN MAKE
LIST.SUBJECT TO CLIENT CONFIRMATION.
7 DISTRIBUTION BOARDS LEGRAND / SCHNIEDER / HAGER / L&T / SIEMENS
8 MEDIUM VOLTAGE CABLE & WIRE FINOLEX / POLYCAB / KEI / HAVELLS
9 CABLE TRAY (ALLTYPE ) PROFAB / PRECISION / UNIVERSAL / INDIANA
AS PER SPECIFIED PANEL DESCRIPTION IN BOQ.
10 LT SWITCH GEAR (ALL RANGE) MODEL AS PER SPECIFIED IN BOQ ABB/
SIEMENS/ L&T/ LEGRAND / SCHNIEDER
11 LT MCCB SIEMENS / SCHNEIDER / LEGRAND / ABB / L&T
12 LT MCB, ELCB LEGRAND / SIEMENS / SCHNEIDER / L&T
13 LTSFU SIEMENS / SCHNEIDER ELECTRIC / L&T / ABB
14 LT CONTACTORS SIEMENS / SCHNEIDER ELECTRIC / ABB /
15 AUTO CHANGE OVER SWITCH SCHNEIDER / ABB / L&T / SIEMENS / LEGRAND
16 STARTER (STAR-DELTA /DOL) SCHNEIDER / ABB / L&T / SIEMENS / LEGRAND
18 METERS (DIGITAL) ENERCON / SCHNEIDER /L&T / SECURE / ABB
SIEMENS / SCHNEIDER ELECTRIC / ABB /
20 INDICATING LAMP
21 ELECTRIC TIMER SIEMENS / LEGRAND / L&T
22 ROTARY SWITCH SIEMENS / SCHNEIDER ELECTRIC / KEYCEE /
PUSH BUTTON AND PUSH BUTTON SIEMENS / SCHNEIDER ELECTRIC / L & T/
SET BCH / RAAS CONTROL
24 SELECTOR SWITCH KEYCEE / SALZER / SCHNEIDER / SIEMENS
25 ANNUNCIATOR PROTON / EAPL
26 LUGS DOWELL’S / 3D / JAINSON / COMET / HMI
27 BIMETALLIC LUGS ISMAL / HMI / DOWELLS
28 CABLE GLAND JAINSON / 3D / COMET / HMI
29 PVC CONDUITS AND ACCESSORIES PRECISION / NIHIR / POLYCAB / ASTRAL
30 CASING CAPING PRECISION / NIHIR / POLYCAB
MODULAR SWITCHES, SOCKETS &
31 MK / LEGRAND / HAVELLS/ANCHOR
OTHER ACCESSORIES
DIGITAL MULTI FUNCTION
50 SECURE/AE/ CONZERV/ENERCON
51 LT CABLE LUGS DOWELS/3M/COMET
CHEMICAL EARTHING ( BORE
52 ASHLOK / LPI
Add Asst Engineer Dy. Ex. Engineer Add City Engineer (i/c)
Roshni Dept. Roshni Dept. Roshni Dept.
TENDER SECURITY
Whereas .............................................................. (hereinafter called “the Tenderer”) has submitted its
tender for Contract for SITC of central Air condition system at shroff Road Library with allied
Electrical, Mechanical Work with 5 (FIVE) Years of All Inclusive Comprehensive Maintenance -
(hereinafter called “the Tender”) …………………………………………….. know all of
…………………………………………….. having our registered office at ………………………………………………………..
(Hereinafter called “the Bank”) are bound up to ......................................... for which payment well and
truly to be made to the said Purchaser, the Bank binds itself, its successors and assigns by these presents.
Sealed with the Common Seal of the said Bank this ………. day of ………………………..
The Conditions of this obligation are:
1. If the Tenderer withdraws its Tender during the period of tender validity specified by
the Tenderer on the Tender Form; or
2. If the Tenderer having been notified of the acceptance of its tender by the Purchaser,
during the period of tender validity:
(a) Fails or refuses to execute the Contract Form, if required, or
(b) Fails or refuses to furnish the Performance Security, in accordance with the
instructions to Tenderer;
We undertake to pay to the Purchaser up to the above amount upon receipt of its first written
demand, without the Purchaser having to substantiate its demand, provided that in its demand
the Purchaser will note that the amount claimed by it is due to it owing to the occurrence of one
or both of the two conditions, specifying the occurred condition or conditions.
This guarantee will remain in force up to and including thirty (30) days after the period of tender
validity, and demand in respect thereof should reach the Bank not later than the above date.
……… (Signature of
* The above format is indicative and may subject to change
CONTRACT FORM (On 300 Rs. Stamp paper)
This Agreement made the ………. day of ……………….., 20……. between Rajkot Municipal Corporation
(Name of Purchaser) of India (Country of Purchaser) hereinafter “the Purchaser” of the one part
……………………………………………………………………………… (Name of Supplier) of
…………………………………………………………. (City and Country of Supplier) hereinafter the “the Supplier”
of the other part for Tender for the work Contract for SITC of central Air condition system at shroff
Road Library with allied Electrical, Mechanical Work with 5 (FIVE) Years of All Inclusive
Comprehensive Maintenance -Rajkot
Whereas the Purchaser is desirous that certain Goods and ancillary Services should be provided by
the Supplier, viz. (Brief Description of Goods and Services and has accepted a tender by the Supplier
for the supply of those Goods and Services in the sum of (Contract Price in Words and Figures)
hereinafter “the Contractor Price”).
NOW THIS AGREEMENT WITNESSED AS FOLLOWS:
1. In this Agreement words and expressions shall have the same meanings as are respectively
assigned to them in the Conditions of Contract.
2. The following documents shall be deemed to form and be read and constructed as part of
this Agreement viz.:
b) The Schedule of Requirements ;
c) The Technical Specifications ;
d) The General Conditions of Contract;
e) The Special Conditions of Contract ; and
f) The Purchaser’s Notification of Award
g) Subsequent correspondences.
3. In consideration of the payments to be made by the Purchaser to the Supplier as hereinafter
mentioned, the Supplier hereby covenants with the Purchaser to provide the Goods and
Services and to remedy defects therein in conformity in all respects with the provisions of
4. The Purchaser hereby will pay the Supplier in consideration of the provision of the Goods
and Services and the remedying of defects therein, the Contract Price or such other sum as
may become payable under the provisions of the Contract at the times and in the manner
prescribed by the Contract.
IN WITNESS whereof the parties hereto have caused this Agreement to be executed in
accordance with their respective laws the day and year first above written.
Signed, Sealed and Delivered by the
Said Rajkot Municipal Corporation (For the Purchaser) in the presence of ……………………………………………………..
Signed, Sealed and Delivered by the said ................................... (For the Supplier) in the presence of
* The above format is indicative and may subject to change
BANK GUARANTEE OF SECURITY DEPOSIT / PERFORMANCE BANK GUARANTEE
In consideration of the Rajkot Municipal Corporation of the city of Rajkot (hereinafter to as the
Authority) having agreed to exempt
(Hereinafter referred to as “the said Contract”) from the demand of earnest money in cash for
the due fulfillment of the terms and conditions of the
agreement made between the for
…………………………………………………………………………… (Hereinafter referred to us “the said agreement”)
onproduction of Bank Guarantee for Rs. ………………………....... Rupees ................................ only.
We ................................................................Bank (hereinafter referred to as “Bank”) do hereby undertake to
……………………………………………… only on the demand from Authority.
Any such demand on the bank shall be conclusive as regards as amount due and payable by the
bank under this guarantee. However, liability of the bank under this agreement shall restricted to as
amount not exceeding Rs. ………………………....... Rupees ..... only.
We the bank further agree that the guarantee herein contain shall remain in full force and effect
during the period that would be taken for the validity of the said bid and that it shall continue to
enforceable till all the dues of the Authority under or virtue of the said agreement have been
received by the bank from the Authority. However unless the demand of claim under the guarantee
is made to the bank in writing on or before the ……………………….. (Specify the date) the bank shall be
discharged from all liabilities under this guarantee.
With the bank further with Authority shall have fullest liberty, without the concert of the bank
without effecting in any manner it obligations herein under to vary and of the terms and conditions
of the said agreement or extend time for validity by the said bid from time to time or to postpone for
any time for any time or from time to time any of the powers exercisable by the Authority against
the site Contractor and to forebear to enforced any of the terms and conditions relating to the said
agreement and the bank shall not be relieved from liability by reason of any such variation, or
extension granted to the contractor for any forbearance, at Contractor or by any such matter or
thing whatsoever which the law relating to sureties would, but this provision, have the effect of so
relieving the Bank.
We .............................................................................. must undertake not to revoke the Guarantee during
currency except with the previous concert of the Authority in writing.
Dated the …………. day of ………………… of 20……..
(Contractor) Surety
Contract No. And date of Contract
* The above format is indicative and may subject to cha
APPENDIX FOR NO BLACKLIST AFFIDAVIT
Duly Notarized On Rs.300/-Stamp paper
hereby declare that our firm/Company is not blacklisted, Not Terminated,
not debarred and enquires /court cases/litigation is pending against us by
Govt. of India / Govt. of Gujarat or any State Board / Corporations / Urban
Authority, since inception of the firm / Company.
I further undertake that if above declaration is proves to be wrong / Incorrect
or misleading, our Tender / Contract stands to be cancelled or terminate.
Signature of Authorized person of the firm/company
TECHNICAL SPECIFICATIONS FOR VRV/VRF /HVAC WORK
UNITARY REFRIGERATION EQUIPMENTS
1.1 The scope briefly consists of, but not limited to, the following:
Designing, Supply, Installation, Testing & Commissioning of the VRV /VRF HVAC units Operating on R
410A refrigerant complete with necessary tools and tackles for operation and maintenance.
Installation of the units with other components as per specifications and complete the total system.
Make available at site the manufacturer’s factory trained technical representative to co-ordinate the
initial start up, testing and commissioning of the units. Testing (factory and field), commissioning,
supervision, training of client’s representatives as well as complete the related documentation work.
The following standards shall be applicable
a) IS : 4283 Hot air fans
b) IS : 8272 Industrial cooling fans (man coolers)
c) IS : 1391 Room Air conditioners
d) IS : 8148 Packaged Air conditioners
e) IS : 2997 Air circulator type electrical fan and regulator
f) IS : 1169 Electrical pedestal type fans and regulators
g) IS : 374 Electrical ceiling type fan and regulator
3.0 GENERAL REQUIREMENTS
3.1 The unitary air conditioners shall include Refrigeration compressor, Drive Motor, Air cooled
Condensing Unit, Evaporator, Refrigeration Piping, Automatic control system enclosure etc.
3.2 The equipment assembly shall be well balanced to achieve minimum vibration and noise. The
condensing unit mounted outdoor shall be suitable for the climate and atmosphere condition prevailing to
avoid / minimize corrosion. Necessary anti corrosive treatments shall be provided for the metallic
3.3 The equipments shall meet the requirements indicated in the equipment data and shall meet the cooling
load specified at the outdoor design data furnished and the distance / static head between the outdoor and
the indoor units.
4.0 SPECIFICATION OF EQUIPMENT / MATERIAL AND INSTALLATION STANDARDS
4.1 VRV / VRF - INVERTER SCROLL COMPRESSOR
Units shall be air cooled, variable refrigerant volume air conditioner consisting of one outdoor unit
and multiple indoor units. Each indoor units having capability to cool or heat independently for the
requirement of the rooms.
It shall be possible to connect minimum 10 indoor units on one refrigerant circuit. The indoor units on any
circuit can be of different type and also controlled individually. Following type of indoor units shall be
connected to the system:
Ceiling mounted cassette type
Ceiling mounted Ductable type
Floor Mounted Air handling Unit type
Fan Coil Units
Hi-Wall Split Units
Compressor installed in outdoor unit shall be equipped with at least one inverter compressor up to 16HP, two
inverter compressors up to 32 HP and above this, three inverter compressors. The system shall be capable of
changing the rotating speed of inverter compressor by inverter controller to follow variations in cooling and
Outdoor unit shall be suitable for mix match connection of all type of indoor units.
The refrigerant piping between indoor units and outdoor unit shall be extended up to 150m with maximum
50m level difference without any oil traps.
Both indoor units and outdoor unit shall be factory assembled, tested and filled with first charge of refrigerant
before delivering at site. Necessary tapping of refrigerant gas should be made after inter connection of both
indoor units and outdoor units.
4.1.2 OUTDOOR UNIT
The outdoor unit shall be factory assembled, weather proof casing, constructed from heavy gauge mild steel
panels and coated with baked enamel finish. The unit should be completely factory wired tested with all
necessary controls and switch gears:
All outdoor units above 5 HP shall have minimum two scroll compressors and be able to operate even
in case one of compressor is out of order.
No of outdoor unit required at site will be as per the design and hence HVAC Installer has to submit
the HVAC System design before proceeding for work.
Size of the outdoor unit will be approved by EIC/ PMC. Please submit required documents before
execution of work at site.
In case of outdoor units above 16HP (MULTI MODULAR), the outdoor unit shall have at least
inverter compressor so that the operation is not disrupted with failure of any compressor.
It should also be provided with duty cycling for automatically switching starting sequence of multiple
outdoor units/compressors.
The noise level shall not be more than 60 dB(A) at normal operation measured horizontally 1m away
and 1.5m above ground level.
The outdoor unit shall be modular in design and should be allowed for side by side installation
The unit shall be provided with its own microprocessor control panel and gauges.
On / Off Control of Outdoor unit will be from Control room and necessary arrangement will be done
by the HVAC Installer. No any extra payment will be given for such arrangement.
The outdoor unit should be fitted with low noise, aero spiral design fan with large airflow and should be
designed to operate compressor-linking technology. The unit should also be capable to deliver 55Pa external
static pressure to meet long exhaust duct connection requirement.
The condensing unit shall be designed to operate safely when connected to multiple fan coil units, which have
a combined operating nominal capacity up to 130 % of indoor units.
4.1.3. COMPRESSOR
The compressor shall be highly efficient scroll type with a COP of more than 3.5 and capable of
inverter control. It shall change the speed in accordance to the variation in cooling or heating load
All outdoor units shall be designed for automatic capacity control to meet load fluctuation and indoor
unit individual control. All parts of compressor shall be sufficiently lubricated stock. Forced
lubrication may also be employed.
Oil heater shall be provided in the compressor casing.
4.1.4. HEAT EXCHANGER
The heat exchanger shall be constructed with copper tubes mechanically bonded to aluminum fins to form a
cross fin coil.
The aluminium fins shall be covered by anti-corrosion resin film.
The unit shall be provided with necessary number of direct driven low noise level propeller type fans
with digital controlled motor arranged for vertical discharge. Each fan shall have a safety guard.
4.1.5. REFRIGERANT CIRCUIT
The refrigerant circuit shall include liquid & gas shut-off valves and a solenoid valves at condenser end.
All necessary safety devices shall be provided to ensure the safely operation of the system.
4.1.6. SAFETY DEVICES
All necessary safety devices shall be provided to ensure safe operation of the system.
Following safety devices shall be part of outdoor unit; high pressure switch, fuse, crankcase heater, fusible
plug, over load relay, protection for inverter, and short recycling guard timer.
4.1.7. OIL RECOVERY SYSTEM
Unit shall be equipped with an oil recovery system to ensure stable operation with long refrigeration piping
4.1.8. INDOOR UNITS
4.1.8.1. GENERAL
Indoor units shall be either ceiling mounted cassette type, or ceiling mounted ductable type or floor mounted
Air handling type or other as specified in BOQ. These units shall have electronic control valve to control
refrigerant flow rate respond to lead variations of the room.
a) The address of the indoor unit shall be set automatically in case of individual and group control
b) In case of centralized control, it shall be set by liquid crystal remote controller.
The fan shall be dual suction, aerodynamically designed turbo, multi blade type, statically & dynamically
balanced to ensure low noise and vibration free operation of the system. The fan shall be direct driven type,
mounted directly on motor shaft having supported from housing.
The Fan shall be designed for friction free operation for usage in Explosive areas, Also the electrical drives /
parts shall be of Flame proof design for usage in explosive areas.
The cooling coil shall be made out of seamless copper tubes and have continuous aluminum fins. The fins shall
be spaced by collars forming an integral part. The tubes shall be staggered in the direction of airflow. The
tubes shall be hydraulically/ mechanically expanded for minimum thermal contact resistance with fins. Each
coils shall be factory tested at 21kg/sqm air pressure under water.
Unit shall have cleanable type filter fixed to an integrally moulded plastic frame. The filter shall be slide away
type and neatly inserted.
Each indoor unit shall have computerized PID control for maintaining design room temperature. Each unit
shall be provided with microprocessor thermostat for cooling and heating.
Each unit shall be with wired LCD type remote controller. The remote controller shall memorize the latest
malfunction code for easy maintenance. The controller shall have self-diagnostic features for easy and quick
maintenance and service. The controller shall be able to change fan speed and angle of swing flat individually
as per requirement.
4.1.8.2. CEILING MOUNTED CASSETTE TYPE UNIT (MULTI FLOW TYPE)
The unit shall be ceiling mounted type. The unit shall include pre-filter, fan section and DX-coil section. The
housing of the unit shall be powder coated galvanized steel. The body shall be light in weight and shall be able
to suspend from four corners.
Unit shall have an external attractive panel for supply and return air. Unit shall have four way supply air grilles
on sides and return air grille in center.
Low gas detection system and very low operating sound.
All the indoor units regardless of their difference in capacity should have same decorative panel size for
harmonious aesthetic point of view. It should have provision of connecting branch ducts.
4.1.8.3. CEILING MOUNTED DUCTABLE TYPE UNIT
Unit shall be suitable for ceiling mounted type. The unit shall include pre filter, fan section & DX coil section
.The housing of unit shall be light weight powder coated galvanized steel. The unit shall have high static fan for
Ductable arrangement.
4.1.8.4. CEILING SUSPENDED TYPE
Unit shall be suitable for ceiling suspended arrangement below false ceiling. The unit includes pre-filter, fan
section & DX coil section. The housing of unit shall be light weight powder coated galvanized steel.
4.1.8.5. Fan Coil Units
The thermostat shall be space type for cooling/heating. The thermostat shall be snap acting, line voltage,
mercury bulb type with a differential 1.1 deg. C. It shall have min. (3) Three speed controls complete with
wiring etc. Snap acting thermostat shall operate on 220±6% volts, 50 cycles/ second, single phase AC supply.
4.1.8.6. CENTRALIZED TYPE REMOTE (TOUCH SCREEN TYPE) CONTROLLER
A multifunctional compact centralized controller shall be provided with the system. The Graphic Controller
must act as an advanced air-conditioning management system to give complete control of VRV air-
conditioning Equipment, It should have ease of use for the user through its touch screen, icon display and
color LCD display.
It shall be able to control up to 64 groups of indoor units with the following functions:-
a) Starting/stopping of Airconditoners as a zone or group or individual unit.
b) Temperature settling for each indoor unit or zone.
c) Switching between temperature control modes, switching of fan speed and direction of airflow,
enabling/disabling of individual remote controller operation.
d) Monitoring of operation status such as operation mode & temperature setting of individual indoor units,
maintenance information, trouble shooting information.
e) Display of air conditioner operation history.
f) Daily management automation through yearly schedule function with possibility of various schedules.
The controller shall have wide screen user friendly color LCD display and can be wired by a non polar 2 wire
transmission cable to a distance of 1 km. away from indoor unit.UPS / Battery backup for 4 Hours.
4.1.8.7. UNIFIED ON/OFF CONTROLLER
Unified ON/OFF controller shall be supplied which shall be controlled through centralized type remote
The controller shall be able to control minimum 15 groups (each group containing maximum 16 indoor units)
or 128 nos. of indoor units with the following functions:
a) On/Off as a zone or individual unit.
b) Indication of operation condition of each group.
c) Select one of 4 operation modes.
4.1.8.8. REFRIGERANT PIPING
All refrigerant piping for the air conditioning system shall be constructed from soft seamless upto 19.1mm and
hard drawn copper refrigerant pipes for above 19.1mm with copper fittings and silver-soldered joints. The
refrigerant piping arrangements shall be in accordance with good practice within the air conditioning
industry, and are to include charging connections, suction line insulation and all other items normally forming
part of proper refrigerant circuits.
All joints in copper piping shall be sweat joints using low temperature brazing and or silver solder. Before
jointing any copper pipe or fittings, its interiors shall be thoroughly cleaned by passing a clean cloth via wire
or cable through its entire length. The piping shall be continuously kept clean of dirt etc. while constructing
the joints. Subsequently, it shall be thoroughly blown out using nitrogen.
After the refrigerant piping installation has been completed, the refrigerant piping system shall be pressure
tested using nitrogen at pressure of 20Kg per sq.cm and 10 Kg per sq.cm (lowside). Pressure shall be
maintained in the system for 24 hours. The system shall then be evacuated to minimum vacuum if 700mm hg
and held for 24 hours.
The air-conditioning system supplier shall be design sizes and erect proper interconnections of the complete
refrigerant circuit.
The thickness of copper piping shall not be less than 20gauge for pipes upto 19.1mm and 18guage for above
The suction line pipe size and the liquid line pipe size shall be selected according to the manufacturers
specified outside diameter. All refrigerant pipes shall be properly supported and anchored to the building
structure using steel hangers, anchors, brackets and supports which shall be fixed to the building structure by
means of inserts or expansion shields of adequate size and number to support the load imposed thereon.
To protect nitrile rubber insulation of exposed copper piping from degrading due to ultra violet rays &
atmospheric condition, it shall be covered polyshield coating with atleast two coats of resin and hardener
(Make- poly bond company) above nitrile rubber insulation. Fiberglass tape shall be helically wound & coated
with painted two coats of resin with hardener to give smooth & plain finish.
4.1.8.9. PIPE INSULATION
a) Refrigerant Pipe Insulation
The whole of the liquid and suction refrigerant lines including all fittings, valves and strainer bodies, etc. shall
be insulated with 9mm thick elastomeric nitrile rubber as specified in BOQ.
b) Drain Pipe Insulation
Drain pipes carrying condensate water shall be insulated with 6 mm thick elastomeric nitrile rubber
For proper drainage of condensate, U Trap shall be provided in the drain piping (wherever required). All pipe
supports shall be of pre fabricated & pre painted slotted angle supports, properly installed with clamps etc.
Addi Assistant Engineer Deputy Executive Engineer Addi City Engineer
Roshani Branch Roshani Branch Roshani Branch
Rajkot Municipal Corporation Rajkot Municipal Corporation Rajkot Municipal Corporation
Rajkot Municipal Corporation
Roshni Department-Central zone
Name of work-SITC of Air conditioning system in Datopanth Thengdi library-shroff Road
sr no. Description Qty unit Rate Total R&B SOR Remarks
Outdoor units suitable for cooling and
heating, having all hermetically sealed
inverter type Scroll Compressor(s),
microprocessor based Controller, top
discharge type condensing unit(s), with
R410 A Refrigerant (Or Eco Friendly Green
Gas if any), vibration isolators, with suitable
foundation, MS Stand for Unit with
necessary paint etc. complete as required.
The unit shall deliver the rated capacity at
AHRI Conditions and work even at 50°C
ambient temperature without tripping. The
unit shall be suitable to work on 400V +/-
10%, 3 Phase, 50Hz AC power supply. The
unit shall be filled with first charge of the
refrigerant and ready for use as required.
The COP at AHRI conditions shall not be less
than 3.1 and IEER not less than 6.5. (Design
should be got approval before execution
from engineer in charge)
1.consider 1 H.P=0.8 TR for estimation
2 Supply, installation, testing and
commissioning of following minimum
capacity VRV high wall type indoor unit
with synthetic washable media pre-filter,
fan section with low noise fan/dynamically
balanced blower, multispeed motor, coil
section with DX Copper coil, electronic
expansion valve, outer cabinet, necessary
supports, vibration isolation, cord less
remote control etc., suitable for operation
on single phase 230 V ± 10%, 50Hz AC
supply, max noise level 60dB @ 400 cfm per
TR(minimum) complete, as required. The
unit shall have automatic force shut down
provision in case of fire on receiving signal
from BMS System. The cooling capacity of
indoor unit will be at air inlet conditions of
27 Degree C DB and 19 Degree C WB
temperature (2.8 TR) 20 Nos 32803.00 656060.00 8.6.2
Supply, Installation, testing and
commissioning including vaccumiazation
and Nitrogen testing of following nominal
sizes of soft/hard drawn copper refrigerant
piping for VRV system, complete with
fittings, with suitable adjustable ring type
hanger supports, jointing/brazing including
accessories, insulated with XPLE Class-0
tubular insulation/with Class-0 closed cell
elastometric nitrile rubber tubular sleeves
sections of specified thickness as given
below for Suction and Liquid lines, all
accessories as per specifications etc with
necessary refrigerant joint as required :
(D) 15.86 mm dia (OD) (Soft drawn) with
tube thickness 1.2 mm with 19 mm thick
Supply, Installation, testing and
commissioning including vaccumiazation
and Nitrogen testing of following nominal
sizes of soft/hard drawn copper refrigerant
piping for VRV system, complete with
fittings, with suitable adjustable ring type
hanger supports, jointing/brazing including
accessories, insulated with XPLE Class-0
tubular insulation/with Class-0 closed cell
elastometric nitrile rubber tubular sleeves
sections of specified thickness as given
below for Suction and Liquid lines, all
accessories as per specifications etc with
necessary refrigerant joint as required :
(D) 31.8 mm dia (OD) (Soft drawn) with tube
thickness 1.2 mm with 19 mm thick
5 Supply, Installation, testing and
commissioning of remote for VRF indoor
6 Supply and installatuin of following dia pvc
pipe with necessary accessaories 32 MM
Supply installation testing and
commissioning of armoured cable 3-core
sqmm for machine and controll equipment 210 MTR 152.00 31920.00 8.6.6
8 SITC of MS stand for outdoor unit 500 kg 77.00 38500.00 3.16.4
9 Providing and erecting XLPE(IS:7098)(I)-88
ISI armoured cable multistrand Copper
conductor for 1.1 KV. to be laid on wall
with necessary clamps or in existing trench
/ pipe at road crossing or floor of following
size of cables.
10 Providing and erecting XLPE(IS:7098)(I)-88
ISI armoured cable multistrand Copper
conductor for 1.1 KV. to be laid on wall
with necessary clamps or in existing trench
/ pipe at road crossing or floor of following
size of cables.
(B) 3 1/2 core 35 Sq. mm ( 16 Sq. mm 1/2
11 Solderless crimping type Copper lugs
conforming to IS suitable for cable of
following size evenly crimped with high
pressure tool & connected to switchgear
terminals with brass/cadmium plated nut
bolts in an approved manner. (A)1.5/2.5 to
Approved make ELCBs / RCCBs conforming
to IS: 12640 and having sensitivity of 30 mA
and Short Circuit withstand capacity of 6 KA
and suitable for operation on 3 phase and
neutral 415V. having characteristic of quick
action & tripping with all advance feature &
do not incorporate any electronic
component for following Max. rating
erected as directed.(iii) 100 Amps. FP
14 Supplying & erecting earth pit of minimum
bore dia.150mm size approved make
Earthing Electrode consisting Flat-in-Pipe
Technology as per IS 3043-1987 made of
corrosion free G.I.Pipes having Outer pipe
dia of 50mm having 80-200 Micron
galvanising, Inner pipe dia of 25 mm having
200-250 Micron galvanising, connection
terminal dia of 12mm with constant ohmic
value surrounded by highly conductive
compound with high charge dissipation
suitable for following type of applications.
(c) For Electrical Installation covering
Transformer Neutrals, Lightning arrester
Earthing, A.C.Plant & Sensitive Computer
System(like Automation, SCADA) i.e
independent Earthing in normal soil.
Length of Pipe : 3.00 mtrs Back filling
Compound :2 nos Bags of 25 Kg.
Providing and erecting required size HOT
deep Galvanised iron strip for earthing of
H.T. , OCB/ ACB/ Transformer LT panel
15 board, Motors etc. 65 kg 77.00 5005.00 3-14-2
providing and erecting Approved make Four
pole moulded case circuit breaker having
breaking capacity ICU of 35 KA. and above
at 415 V . having normal current rating
250A. with variable thermal & magnetic
release suitable to work on A.C.supply
c/s. with all internal connections &
complete erected in existing 16 G.M.S.
16 ICS=100% of ICU only Cat III 1 Nos 22813.00 22813.00
Approved make Four pole moulded case
circuit breaker having breaking capacity ICU
of 25 KA. at 415 V,having normal current
rating up to 25 A to 100A. with Fixed
thermal & magnetic release suitable to work
on A.C. supply 50 c/s. with all internal
connections & complete erected in existing
16 G.M.S. housing. ICS=100% of ICU
Supplying and erecting triple pole & neutral
440V / 500V panel mounting Copper
Busbars with four equal Nos. of electrolyte
bus having current density not more than
1.6 Amp. / sq.mm (Rated current / cross
section area) duly wrapped with colour
insulating tape for phase sequence of
following current carrying capacity, erected
with necessary bus bar supports /insulators,
main cable socket to each bar, erected in
existing cubical panel with necessary
(B) Suitable for 200 Amp. capacity
Providing & erecting weather proof, dust &
vermin proof, floor mounted front operated
indoor type cubical panel board having IP-
54 protection made from 14 SWG thick CRC
M.S. sheet for outer body & doors, 16 SWG
thick CRC M.S.sheet for internal partitions
with necessary supporting angles, flats
including cutting, bending, drilling, welding,
riveting with internal partitions & cable alley
as per requirements & instruction of
engineer-in-charge with erection of supplied
switch gears, BUSBARS, with suitable size of
inter connecting PVC copper wire / copper-
aluminium strips, rubber grommets, rib,
bakelite control fuses for measuring
instruments, earth bus & earth bolts,
foundation flange - bolts-base Plates,
sufficient nos. of hinged doors, handles with
locking arrangement and rubber gasket
complete. The Panel shall be painted with
epoxy powder coating. (The rates excludes
the cost of switchgears, bus bars, inter
19 Aluminium strips, meters, Fuses etc. 4 sqmtr 10365.00 41460.00 3-16-1
Tsize.(A) The standard companies switch
gear witch gears are used after fabrication
for beneficial use (i) with 350mm depth
Add Asst Engineer Dy. Ex. Engineer Add City Engineer (i/c)
Roshni Dept. Roshni Dept. Roshni Dept
RAJKOT MUNICIPAL CORPORATION
NAME OF WORK :- Contract for SITC of central Air condition system at shroff Road Library with
allied Electrical, Mechanical Work with 5 (FIVE) Years of All Inclusive
Comprehensive Maintenance
Sr. No. Event Description Mile Stone Date
1 Downloading of E-tender Dt. –01.10.2026 to Dt. 15.10.2026 up to 18:00 Hrs.
2 Pri - Bid Meeting Dt. – 09.10.2026
Additional City Engineer-Roshni Department
Rajkot Municipal Corporation,
Dr. Ambedkar Bhavan, Central Zone, Room No.8 Second Floor,
Dhebar Road, Rajkot-360001
3 Last date of online submission of E-tender Dt.. – 15.10.2026 up to 18:00 Hrs.
Date of submission of physical document Dt. – 21.10.2026 up to , 18:00 Hrs
4 EMD, Tender fee and other documents.
5 Opening of technical bid and verification of
physical documents - EMD, Tender fee and Dt. – 22.10.2026 at 11:00 hrs
Other documents, if possible.
6 Opening of On-line price bid (if possible) Dt. – 23.10.2026 at 11:00 hrs
7 Tender validity period 120 Days
Additional City Engineer - Roshni Department
“Dr. Ambedakar Bhavan ” Rajkot Municipal Corporation
Central Zone Office, Room No. 8, Second Floor, Dhebar Road
Rajkot Municipal Corporation
Sr.No. Description of work Percentage Rate in figure
(Above/Below/At Par)
01 Contract for SITC of central Air condition system Quote Online only
at shroff Road Library with allied Electrical, (Up to Two Decimal)
Mechanical Work with 5 (FIVE) Years of All
Inclusive Comprehensive Maintenance
It is percentage rate tender, all price must be quoted on-
Other services, royalties, taxes etc. and to include all extra
to cover the cost.
Only GST will be paid extra as per actual.
Add Asst Engineer Dy. Ex. Engineer Add City Engineer
Roshni Dept. Roshni Dept. Roshni Dept.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Final shroff road library AC tender.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .