Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.8 LAccepted-AOC KAVILUMPARA PO KOZHIKODE PIN 673513 | KOZHIKODE | KOZHIKODE | KERALA | 673513 | ₹8.8 L | L1 | Accepted-AOC L1 |
| Rank | Bidder | Total Amount |
|---|---|---|
| L1 | JOSEPH V.J | ₹8,78,202.9 |
| Sl No | Description | Qty | Unit | JOSEPH V.J L1 |
|---|---|---|---|---|
| 1.00Approach Road Work | ||||
| 1.00 | 11.1.1.1 : Excavation for Structures
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.
I.Ordinary soil
(i)Upto 3 m depth | 49.74 | cum | 489.5 ₹24,347.73 |
| 1.00 | 75.7.1 : DRY RUBBLE MASONRY _ Random rubble masonry with hard stone, including Through/Bond stone in foundation and superstructure including packing to compactness to lines and levels, cost and conveyance of all materials labour charges etc. complete as per approved drawing and relevant technical specifications. | 201.67 | cum | 3,840 ₹7,74,424.32 |
| 1.00 | 11.4.4 : Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203IV.R.C.C grade M 20 | 8.1 | cum | 7,839 ₹63,480.22 |
| 1.00 | 11.8 : Supplying, fitting and placingTMT bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1202 | 0.23 | tonne | 67,875 ₹15,950.62 |
Tender Value
₹8.9 L
EMD Value
₹13,400
Closing Date
24 Nov 2021, 6:00 pmClosed
EXECUTIVE ENGINEER
LSGD DIVISION
ROAD
2021_LSGD_451986_2
TA/LSGD/KKD/234/2021-22
Open Tender
Civil Works - Roads
180 days
MARUTHONKARA
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,000
Yes
₹13,400
Yes
18 Feb 2026
17 Nov 2021
26 Nov 2021
17 Nov 2021
24 Nov 2021
17 Nov 2021
Amount
Approach Road Work
11.1.1.1 : Excavation for Structures Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. I.Ordinary soil (i)Upto 3 m depth
75.7.1 : DRY RUBBLE MASONRY _ Random rubble masonry with hard stone, including Through/Bond stone in foundation and superstructure including packing to compactness to lines and levels, cost and conveyance of all materials labour charges etc. complete as per approved drawing and relevant technical specifications.
11.4.4 : Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203IV.R.C.C grade M 20
11.8 : Supplying, fitting and placingTMT bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1202
Bidder Name
JOSEPH V.J
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_649789.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid