| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹13.0 LAccepted-Finance | ₹13.0 L | 1 | Accepted-Finance L1 |
| 2 | 2₹13.4 LRejected-Finance | ₹13.4 L | 2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | CHINNAIYAN SUBRAMANIAN L2 | N RAMALINGAM L1 |
|---|---|---|---|---|---|
| 1.00 | CONSTRUCTION OF 10000 LITRES RCC OHT WITH 7.50 M STAGING HEIGHT with borewell & extension of Pipeline arrangements at Ganapathy nagar in Mutharasanallur PANCHAYAT in Andhanallur Block. Earthwork excavation and depositing on bank with an initial lead of 10m and lift of 2m in the following classification of soils as directed by TWAD Board officers. Hard stiff clay, block cotton, hard red earth shales, murram, ordinary gravel, stoney earth and earth mixed with small size boulders for foundation SS 20B etc., for 0-2.00m Depth | 24.28 | Cum | 285 ₹6,919.80 | 263.5 ₹6,397.78 |
| 2.00 | Sand filling for foundation with clear river sand including cost of sand watering, ramming and consolidation etc complete. | 1.16 | Cum | 2,050 ₹2,378 | 2,035 ₹2,360.60 |
| 3.00 | Cement concrete 1:4:8 (one cement four sand and eight aggregates) using 40mm HBGS for levelling course for foundation including the cost of mixing concrete, ramming, curing etc., complete. | 1.73 | Cum | 6,000 ₹10,380 | 5,758 ₹9,961.34 |
| 4.00 | Supplying and erecting steel centering for sides and soffits I including necessary supports' and shuttering to the required height for RCC items using MS sheets of suitable size of BG.10 stiffeneq with welded MS angles of size 25mm x 25mm x3mm of boarding, laid over silver oak joints of size 10cm x 6.5cm spaceqat 90cm centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm centre to centre complying with standard specifications etc., complete and as directed by TWAD Board officers. for BELOW GL | 3.6 | Sqm | 550 ₹1,980 | 547 ₹1,969.20 |
| 5.00 | Supplying, fabricating and placing in position of HSD steel rods for Reinforcement including the cost of steel and binding wire etc., complete. | 0.45 | MT | 92,000 ₹41,032 | 91,924.5 ₹40,998.33 |
| 6.00 | RCC 1:1 1/2:3 mix using graded aggregtes of HBGs excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating with mechanical vibrator, finishing, curing etc., complete for MAT CONCRETE | 2 | Cum | 9,500 ₹19,000 | 9,498 ₹18,996 |
| 7.00 | Supplying and erecting steel centering for sides and soffits I including necessary supports' and shuttering to the required height for RCC items using MS sheets of suitable size of BG.10 stiffeneq with welded MS angles of size 25mm x 25mm x3mm of boarding, laid over silver oak joints of size 10cm x 6.5cm spaceqat 90cm centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm centre to centre complying with standard specifications etc., complete and as directed by TWAD Board officers. for BELOW GL | 6 | Sqm | 1,350 ₹8,100 | 1,314 ₹7,884 |
| 8.00 | RCC 1:1 1/2:3 mix using graded aggregtes of HBGs excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating with mechanical vibrator, finishing, curing etc., complete for COLUMN UPTO GL | 0.45 | Cum | 9,500 ₹4,275 | 9,498 ₹4,274.10 |
| 9.00 | Earthwork excavation and depositing on bank with an initial lead of 10m and lift of 2m in the following classification of soils as directed by TWAD Board officers. Hard stiff clay, block cotton, hard red earth shales, murram, ordinary gravel, stoney earth and earth mixed with small size boulders for foundation SS 20B etc., for 0-2.00m Depth | 0.15 | Cum | 285 ₹42.75 | 263.5 ₹39.53 |
| 10.00 | Cement concrete 1:4:8 (one cement four sand and eight aggregates) using 40mm HBGS for levelling course for foundation including the cost of mixing concrete, ramming, curing etc., complete. | 0.32 | Cum | 6,000 ₹1,920 | 5,758.5 ₹1,842.72 |
Tender Value
₹14 L
EMD Value
₹14,000
Closing Date
5 Mar 2026, 3:00 pmClosed
BDO
BDO Andhanallur
Construction of 10000lit OHT at Ganapathy nagar in Mutharasanallur Panchayat
2026_RDTN_668399_1
B3/483/2026
Open Tender
Civil Works - Others
90 days
Andhanallur
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹14,000
Yes
5 Mar 2026
28 Feb 2026
5 Mar 2026
28 Feb 2026
5 Mar 2026
28 Feb 2026
CONSTRUCTION OF 10000 LITRES RCC OHT WITH 7.50 M STAGING HEIGHT with borewell & extension of Pipeline arrangements at Ganapathy nagar in Mutharasanallur PANCHAYAT in Andhanallur Block. Earthwork excavation and depositing on bank with an initial lead of 10m and lift of 2m in the following classification of soils as directed by TWAD Board officers. Hard stiff clay, block cotton, hard red earth shales, murram, ordinary gravel, stoney earth and earth mixed with small size boulders for foundation SS 20B etc., for 0-2.00m Depth
Sand filling for foundation with clear river sand including cost of sand watering, ramming and consolidation etc complete.
Cement concrete 1:4:8 (one cement four sand and eight aggregates) using 40mm HBGS for levelling course for foundation including the cost of mixing concrete, ramming, curing etc., complete.
Supplying and erecting steel centering for sides and soffits I including necessary supports' and shuttering to the required height for RCC items using MS sheets of suitable size of BG.10 stiffeneq with welded MS angles of size 25mm x 25mm x3mm of boarding, laid over silver oak joints of size 10cm x 6.5cm spaceqat 90cm centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm centre to centre complying with standard specifications etc., complete and as directed by TWAD Board officers. for BELOW GL
Supplying, fabricating and placing in position of HSD steel rods for Reinforcement including the cost of steel and binding wire etc., complete.
RCC 1:1 1/2:3 mix using graded aggregtes of HBGs excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating with mechanical vibrator, finishing, curing etc., complete for MAT CONCRETE
Supplying and erecting steel centering for sides and soffits I including necessary supports' and shuttering to the required height for RCC items using MS sheets of suitable size of BG.10 stiffeneq with welded MS angles of size 25mm x 25mm x3mm of boarding, laid over silver oak joints of size 10cm x 6.5cm spaceqat 90cm centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm centre to centre complying with standard specifications etc., complete and as directed by TWAD Board officers. for BELOW GL
RCC 1:1 1/2:3 mix using graded aggregtes of HBGs excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating with mechanical vibrator, finishing, curing etc., complete for COLUMN UPTO GL
Earthwork excavation and depositing on bank with an initial lead of 10m and lift of 2m in the following classification of soils as directed by TWAD Board officers. Hard stiff clay, block cotton, hard red earth shales, murram, ordinary gravel, stoney earth and earth mixed with small size boulders for foundation SS 20B etc., for 0-2.00m Depth
Cement concrete 1:4:8 (one cement four sand and eight aggregates) using 40mm HBGS for levelling course for foundation including the cost of mixing concrete, ramming, curing etc., complete.
Supplying and erecting steel centering for sides and soffits I including necessary supports' and shuttering to the required height for RCC items using MS sheets of suitable size of BG.10 stiffeneq with welded MS angles of size 25mm x 25mm x3mm of boarding, laid over silver oak joints of size 10cm x 6.5cm spaceqat 90cm centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm centre to centre complying with standard specifications etc., complete and as directed by TWAD Board officers. for ABOVE GL
Supplying, fabricating and placing in position of HSD steel rods for Reinforcement including the cost of steel and binding wire etc., complete.
RCC 1:1 1/2:3 mix using graded aggregtes of HBGs excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating with mechanical vibrator, finishing, curing etc., complete for GL Brace Beam and Landing Slab
Refilling the foundation with excavated earth including watering and consolidation etc., complete.
Supplying and erecting steel centering for sides and soffits I including necessary supports' and shuttering to the required height for RCC items using MS sheets of suitable size of BG.10 stiffeneq with welded MS angles of size 25mm x 25mm x3mm of boarding, laid over silver oak joints of size 10cm x 6.5cm spaceqat 90cm centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm centre to centre complying with standard specifications etc., complete and as directed by TWAD Board officers. for 0-2.72M Ht
RCC 1:1 1/2:3 mix using graded aggregtes of HBGs excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating with mechanical vibrator, finishing, curing etc., complete for 0-2.72M ht
Supplying and erecting steel centering for sides and soffits I including necessary supports' and shuttering to the required height for RCC items using MS sheets of suitable size of BG.10 stiffeneq with welded MS angles of size 25mm x 25mm x3mm of boarding, laid over silver oak joints of size 10cm x 6.5cm spaceqat 90cm centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm centre to centre complying with standard specifications etc., complete and as directed by TWAD Board officers. for 2.72-3.02M Ht
Supplying, fabricating and placing in position of HSD steel rods for Reinforcement including the cost of steel and binding wire etc., complete.
RCC 1:1 1/2:3 mix using graded aggregtes of HBGs excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating with mechanical vibrator, finishing, curing etc., complete for 2.72-3.02M ht
Supplying and erecting steel centering for sides and soffits I including necessary supports' and shuttering to the required height for RCC items using MS sheets of suitable size of BG.10 stiffeneq with welded MS angles of size 25mm x 25mm x3mm of boarding, laid over silver oak joints of size 10cm x 6.5cm spaceqat 90cm centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm centre to centre complying with standard specifications etc., complete and as directed by TWAD Board officers. for Square Column 3.02-3.30M Ht
For Square Column 3.30-4.30M Ht
For Square Column 4.30-5.30M Ht
For Square Column 5.30-5.74M Ht
RCC 1:1 1/2:3 mix using graded aggregtes of HBGs excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating with mechanical vibrator, finishing, curing etc., complete for Square Column 3.02-4.50M ht
For Square Column 4.50-5.74M ht
Supplying and erecting steel centering for sides and soffits I including necessary supports' and shuttering to the required height for RCC items using MS sheets of suitable size of BG.10 stiffeneq with welded MS angles of size 25mm x 25mm x3mm of boarding, laid over silver oak joints of size 10cm x 6.5cm spaceqat 90cm centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm centre to centre complying with standard specifications etc., complete and as directed by TWAD Board officers. for Second Brace Beam 5.74-6.04M Ht
Centering-Floor slab
Centering-Floor slab Curved surface
Supplying, fabricating and placing in position of HSD steel rods for Reinforcement including the cost of steel and binding wire etc., complete.
RCC 1:1 1/2:3 mix using graded aggregtes of HBGs excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating with mechanical vibrator, finishing, curing etc., complete for Second Brace Beam 5.74-6.04M Ht
Supplying and erecting steel centering for sides and soffits I including necessary supports' and shuttering to the required height for RCC items using MS sheets of suitable size of BG.10 stiffeneq with welded MS angles of size 25mm x 25mm x3mm of boarding, laid over silver oak joints of size 10cm x 6.5cm spaceqat 90cm centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm centre to centre complying with standard specifications etc., complete and as directed by TWAD Board officers. for Square Column 6.04-6.30M Ht
For Square Column 6.30-7.30M Ht
For Curved surface plain surface
RCC 1:1 1/2:3 mix using graded aggregtes of HBGs excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating with mechanical vibrator, finishing, curing etc., complete for Square Column 6.04-8.76M ht
RCC 1:1 1/2:3 mix using graded aggregtes of HBGs excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating with mechanical vibrator, finishing, curing etc., complete for Square Column 6.04-8.76M ht
Supplying and erecting steel centering for sides and soffits I including necessary supports' and shuttering to the required height for RCC items using MS sheets of suitable size of BG.10 stiffeneq with welded MS angles of size 25mm x 25mm x3mm of boarding, laid over silver oak joints of size 10cm x 6.5cm spaceqat 90cm centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm centre to centre complying with standard specifications etc., complete and as directed by TWAD Board officers. for Curved surface
Supplying and erecting steel centering for sides and soffits I including necessary supports' and shuttering to the required height for RCC items using MS sheets of suitable size of BG.10 stiffeneq with welded MS angles of size 25mm x 25mm x3mm of boarding, laid over silver oak joints of size 10cm x 6.5cm spaceqat 90cm centre to centre and supported by casuarina props of 10cm to 13cm dia spaced at 75cm centre to centre complying with standard specifications etc., complete and as directed by TWAD Board officers. for Curved surface
Supplying, fabricating and placing in position of HSD steel rods for Reinforcement including the cost of steel and binding wire etc., complete.
RCC 1:1 1/2:3 mix using graded aggregtes of HBGs excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating with mechanical vibrator, finishing, curing etc., complete for Third Brace Beam 8.76-9.00M Ht
Providing PVC ventilating arrangements mosquito proof nylon net with 110 mm PVC pipes and cowl etc., complete.,
Providing manhole cover of size 0.60 m X 0.60 m in RCC 1: 1.5:3 with suitable reinforcement and 5O x 5O x 6mm MS angle fixed along edges etc., complete.,
Providing and fixing of RCC inner access ladder in RCC 1:1.5:3 (one cement, one and half sane! and three aggregates) using 20mm HBG stone for OHT including cost of reinforcement, placing grill in position, centering shuttering charges, mixing concrete curing etc., to required height and clear width of 4Scm consisting of two Nos. of ve~ical post of 10cm x lScm and step slab of 25mm x 25mm etc., complete.
Fabrication, supply, delivery and fixing of outside MS Ladder of 45cm clear wide made out of 50 mm x 50 mm x 60 mm MS angle for both sides and for steps at 30 cm C/C welded jointed etc., for I staging from GL to Fst level brace (weight 4.5kg/m) Iind and IIIrd staging upto floor slab and IVth staging from floor slab to roof top. Supply, delivery and fixing of 32 mm GI pipes medium for hand rails from I stage to IVth stage. RCC M30 Grade mix for Landing slab 5 nos. at Ground Level - 1 No. and abouve Ground Level - 4 Nos. Supply and fixing of 32 mm GI pipe medium for hand rails for the Landing slab. Supplying and fixing of MS base plate of 100 mm x 100mm x 6 mm thick for fixing Anchore fastener bolt for fixing of hand rails at Landing Slab and MS Ladder providing locking arrangements with two coats of approved enamel paint over one coat of red oxide paint as per approved Type Design and as directed by TWAD board officers.
Provision for cut stone slab
Exterior Emulsion Paint two coats with approved exterior emulsion paint over one coat of priming coat over cement plastered exposed surface of the Reservoir including cleaning, preparing the surface and curing etc., complete..
65mm dia GI pipes for inlet connection
65mm dia GI pipes for over flow and RWH
65mm dia GI pipes for delivery pipe.
50mm dia GI pipes for scour pipe.
63mm dia PVC Threaded coupler
65mm dia GI Tee
65mm dia 90 Deg. Bend
65mm dia GI Bend (Short)
75 X 63mm dia PVC Reducer
65mm dia GM Gate Valve
50mm dia GM Gate Valve
63 mm pvc pipe 4ksc
63mm Earth work for
75 mm pvc pipe 6ksc
75 Earth work
Geophysical Investigation charges.
Construction of bore wells (Upto 60Mts depth
Labour charges for inserting the PVC casing
Supply Of 150mm ID PVC CS Screen casing
Charges for developing the borewell with air Compressor
Supply and delivery of 5.00Hp Three phase per isi 50lpm x75 m head
Control panel board Consist of following 1.voltmeter &ammeter suitable for above pumpset
20mm gi coupling
6sqmm mulitistrand copper wire
Ms kiosk
600mm x 600mm plywood
50 mm gi elebow
50 mm gi union
50 mm MS clampset
50 mm Upvc
50mm Adopter
50mm Collor
50 mm gi Coupling
50 mm gi Pipe
50 mm GM Gate Valve
50 mm gi Non Return Valve
150mm ms borecover plate
Reels insulator
3way gang box
5ams Fuse type switches
5ams indicator
100 ams fuse unit (500V)
Earth plate
1sqmm muti strand flex copper wire
32mm gi service pipe
32 mm gi Bend
32 mm gi Coupling
GI Screw 30mmx6mm
5” x 3/8 boltnut
¼ gi boltnut (1”-3”each 10 nos)
shellac
thread ball
insulation taproll ( Roll/10 m )
4.0 sqmm sub flat cable (3 core copper cable)
Nylon Rope
63mm PVC Pipe 4 Kg/cm2 (TWAD 2022-2023.)including earthwork laying, jointing and refiling Charges
63mm PVC elbow
63mm PVC Coupling
63mm PVC Tee
63mm PVC End Cap
90mm PVC elbow
90mm PVC Coupling
90mm PVC Tee
90mm PVC End Cap
Labour charges for the erection of submersible pumpset in borewell/openwell including fixing
Provision for Chlorinator
Provision for Name Board
Provision for Photo charges
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.43 MB
PriceBid1MutharasanallurOHT.pdf
Tender Documents • 0.55 MB
BOQ_803065.xls
BOQ • 0.34 MB
TechBid1MutharasanallurOHT.pdf
Additional Documents • 1.15 MB