Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹3.1 LAccepted-AOC KANNUR | KERALA | 670001 | 1 | Accepted-AOC Lowest | |
| 2 | 2₹3.1 L−₹1,625 (0.52%)Rejected-Finance | 2 | Rejected-Finance High quoted rate | |
| 3 | 3₹3.2 L+₹9,000 (2.87%)Rejected-Finance | 3 | Rejected-Finance High quoted rate | |
| 4 | 4₹32.4 L+₹29.3 L (931.8%)Rejected-Finance | 4 | Rejected-Finance High quoted rate | |
| 5 | 5₹3.4 L+₹24,725 (7.87%)Rejected-Finance | 5 | Rejected-Finance High quoted rate |
Tender Value
₹4.3 L
EMD Value
₹6,504
Closing Date
4 Dec 2021, 3:00 pmClosed
Assistant Executive Engineer,PWD,Roads Sub Divisio
Assistant Executive Engineer,PWD,Roads Sub Division,Kozhikode-673004
Investigation work for Beypore LACORBITAL road project
2021_PWD_456294_1
D3/ETN/29/2021-22
Open Tender
Civil Works - Roads
Item Rate
90 days
FEROK
Please refer Tender documents.
10 documents required · 10 mandatory
₹960
Yes
₹6,504
Yes
13 Jan 2022
25 Nov 2021
7 Dec 2021
25 Nov 2021
4 Dec 2021
25 Nov 2021
Amount
Investigation
OD67050/2021-2022:Total station surveying and preparation of site plan for Plain and open area without hindrance to line of sight with 1 m contour intervals , with 5m x 5m interval
OD67052/2021-2022:Preparing alignment for the proposed road and drawing out a suitable alignment meeting all requirements of Indian road Congress (IRC). Also satisfying the Engineering aesthetic and economic requirement, designing of horizontal curves (wherever feasible) including spiral transitions and vertical curves after finalizing the alignment and also preparing the LS and CS at interval of 50m C/C including junction designing (wherever required) and preparation of Junction drawings.
OD67053/2021-2022:Imposing the alignment to Field Measurement Book and preparing LA strip plan with the list of survey numbers and extends of each plot to be acquired as per the direction of the Engineer in Charge including all cost of transportation, labour, preparing drawings with sufficient copies, collecting data etc complete.
OD67051/2021-2022:Conducting subsoil investigation test at suitable intervals including taking samples , grain size analysis, Temperature measurement, Atterbergs limits, Proctor compaction, Soaked CBR value etc. submitting compiled reports etc as per the IRC guide lines and direction of Departmental officers
OD67055/2021-2022:Setting up GTS points on the project road as per the direction of Engineer in charge including all cost of labour , materials, transportation, Collecting data, hire charge of equipment etc complete
THE URALUNGAL LABOUR CONTRACT CO-OPERATIVE SOCIETY
ANAS K.P.
BJDS INFRASTRUCTURES AND PROJECTS PRIVATE LIMITED
Essense consultants
RITECH SURVEYING AND ENGINEERING LLP
Bidder Name
THE URALUNGAL LABOUR CONTRACT CO-OPERATIVE SOCIETY
MUHAMMED MUSTHAFA.P.A
Essense consultants
RITECH SURVEYING AND ENGINEERING LLP
BJDS INFRASTRUCTURES AND PROJECTS PRIVATE LIMITED
ANAS K.P.
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_652859.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .