Loading…
Loading…
Tender Value
₹31.8 L
EMD Value
₹80,000
Closing Date
9 Sept 2026, 4:00 pm
Managing Director
Managing Director, Cochin International Airport Ltd, Kochi Airport P O, 683111
SITC of DC Fast Charging Stations for EV Passenger Coaches at Cochin International Airport
2026_CIAL_865886_1
CIAL/ELE/417A/ET22
Open Tender
Electrical Works
Item Rate
120 days
Cochin International Airport Ltd
Please refer Tender documents.
9 documents required · 9 mandatory
₹2,360
₹80,000
19 Aug 2026
19 Aug 2026
10 Sept 2026
19 Aug 2026
9 Sept 2026
28 Aug 2026
19 Aug 2026 - 27 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1DC Fast charger | |||||
| 1.01 | Supply of DC Fast charger of min 240kW capacity dual gun CCS2 type • The charger shall be a 240kW DC fast charger suitable for electric bus charging at an airport apron.
• It must support CCS2 protocol and comply with IS 17017/IEC 61851.
• The charger should provide full 240kW output when a single gun is operating and support dynamic power sharing in dual-gun mode.
• It should be ARAI-approved and comply with BIS/Indian EV charger standards.
Input Requirement
1.Input Voltage: 380-415V AC, 3-phase
2.Input Frequency: 50 Hz
3.Power Factor: >0.98 for load 50-100%
4.THDi: <5% at full load
5.Efficiency: ≥93%
6. Input Supply Failure back-up: Battery backup for minimum 1 hour for the control System and billing unit. Data logs should be synchronized with CMS during back up time, in case battery drains out.
8.Cable Length: Minimum usable length 5 meters
9.Warranty : 2 Years
Output Requirements
Maximum Power Output: 240kW,DC Output Voltage Range: 200-1000V,Max Current per Gun: Minimum 250A Continious,No. of Charging Guns: 2 (CCS2 connectors)
Dynamic Power Sharing: Yes (240kW in single gun mode, 120kW per gun in dual mode)
Mechanical & Environmental Specifications,IP Rating: Minimum IP54 for outdoor installation,Cooling System: Forced air cooling,Operating Temperature: -10°C to +55°C ,Installation Type: Floor-mounted, free-standing
User Interface & Communication
Display: Minimum 9” TFT LCD touchscreen,Connectivity: Ethernet, 4G LTE, Wi-Fi, Protocol Support: OCPP 2.0.1 minimum or higher,Remote Monitoring & Diagnostics: Supported
Protection & Safety Features
Overcurrent, overvoltage, undervoltage protection ,Short circuit, earth leakage, and insulation resistance monitoring, Emergency stop button, Surge protection and residual current detection.Compliance with IS 17017 & IEC safety standards
Certification & Compliance
ARAI-certified for 240kW fast charger,BIS certification,Safety standards compliance (IEC 61851/IS17017),ISO 15118 Preferable | - | Nos | 1.25 | - |
| 1.02 | Installation, Testing and Commissioning of EV Charger: Installation, testing and commissioning of the EV charger, including providing and fixing a suitable MS base/support, all necessary components, auxiliaries, accessories and complete documentation. The scope shall also include glanding and termination of the incoming power cable and earthing conductor from the LT panel at the EV charger, including all required glands, lugs, hardware and accessories, ensuring proper connectivity and satisfactory operation of the complete system in accordance with applicable standards and OEM recommendations. | - | Nos | - | - |
| 2CPO | |||||
| 2.01 | Charge Point Operator (CPO) System – Platform for managing two EV chargers with remote monitoring, user authentication (password/RFID/OTP login), real-time diagnostics, automated billing (monthly invoice generation), consumption-based reporting, mobile/web app access, and integration with Central Management System (CMS) (OCPP 2.0.1 or higher/latest supported version.). Includes CMS/CPO subscription or licence charges, cloud hosting, software/firmware updates, data storage, cybersecurity updates, technical support and associated services for a period of seven (7) years, without additional cost to CIAL.The CPOs shall have all the features as specified in the technical specifications and as directed by Engineer in charge. | - | Years | 10 | - |
| 3Annual Maintenance Charges:Annual Maintenance Charges:The AMC for the EV chargers shall commence after completion of the two-year Defects Liability Period (DLP) and shall be carried out in accordance with the Technical Specifications and prescribed maintenance requirements.His includes software/firmware updates and upgrades, technical support, and other maintenance-related services required for satisfactory operation of the EV chargers during the AMC period. | |||||
| 3.01 | For 1st year | - | Months | 10 | - |
| 3.02 | For 2nd year | - | Months | 10 | - |
| 3.03 | For 3rd year | - | Months | 22 | - |
| 3.04 | For 4th year | - | Months | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.45 MB
Tender.pdf
Tender Documents • 2.70 MB
BOQ_1465393.xls
BOQ • 0.40 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].