Tender Value
₹60.0 L
EMD Value
₹59,978
Closing Date
16 Aug 2024, 10:00 amClosed
Dy.Chief Engineer
Electrical Circle Uhl Stage-IIIBVPCLJoginder Nagar
Work of repair and commissioning at site of 01 No. 132/11 KV, 6.3 MVA, Three Phase Power Transformer (BHEL make) lying at 3X33.33 MW Uhl stage III Power House under Senior Executive Engineer, Electrical Division No 1 Uhl stage III BVPCL, Chullah, Dis
2024_HPSEB_91628_1
BVPCL(E) Circle/02/2024-25
Open Tender
Electrical Works
Item Rate
60 days
Uhl stage-III HEP Chullah
Please refer Tender documents.
8 documents required · 8 mandatory
₹1,120
₹59,978
18 Sept 2024
9 Aug 2024
16 Aug 2024
9 Aug 2024
16 Aug 2024
9 Aug 2024
Amount
Dismantling and Repairing works at Site
Dismantling of Bushings and all accessories, Dismantling of Top cover, Disconnecting OLTC/OCTC, taking out Core & Winding unit from the main tank, Hot Oil Jet cleaning of Core & Winding, dismantling the top channels, dismantling /removing the top core from transformer, Removing all damaged insulation, Permali wood/corona ring. Inspecting the windings for any internal damage,if no major damage found in winding, re tapping the Damaged HV Leads with creep papers and replacing the insulation materials like Pre compressed board wherever missing , Repairing the damaged corona ring, Replacing all other damaged press boards / permali wood. Providng and fixing of Gaskets,oil seals and suport insulator (For LV Side ) .Assembling back the top core and top channels LT Testing of the winding (IR, PI, Ratio test, magnetic balance, winding resistance, vector group) Comparing the results with factory test reports, assembling back the core & winding unit inside main tank, Replacement of Gaskets of Top cover, man holes and Bushings. Assembling back the Top cover, Drying out of transformer Nitrogen purging until required values are achieved. Filling the filtered transformer oil under vacuum above core level, erection of HV & LV Bushings, conservators. Topping of transformer Oil in the main tank of transformer, Hot Oil Circulation of entire transformer until required BDV, PPM, DGA Values are achieved. Testing the transformer in Repair Bay . 1.Capacitance and Tan delta of Windings and Bushings, 2.SFRA Test, 3.Core insulation test (between core to clamp, clamp to tank and core to tank), 4.Bushing CT’s and neutral CT Testing (Ratio, Polarity, IR, secondary winding resistance and ratio error calculations) 5.Oil testing of Transformer Main tank and OLTC (BDV, DGA, Moisture content, Furan analysis, Flash point, pour point, Resistivity, Acidity, Sludge content, Interfacial tension (IFT), Density, Viscosity, Tan delta. 6.Continuity test of OLTC during one complete cycle of operation . and all other requiste test mentioned in Bid document.
Optional work ( If winding found damages )
Manfacturing of winding for one limb of transformer with new copper (consisting of H.V.L.V and tap coil). Provinding of insulation material for 1 Limb. To & Fro Transportation Charges of Old winding and new winding and Tanker. Labour Charges for taking out the old coil assembly & fixing/ assembling back the new coil. Note :- Credit on account of replacement of old coil will be given only if it is needed to be replaced with new one coil .The rate offered should be including the credit value of old /damge coil.
SHRI MEENATCHI ENGINEERING
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .