| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.3 CrAccepted-AOC | ₹1.3 Cr Quoted ₹1.4 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹1.6 CrRejected-AOC | ₹1.6 Cr | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | SABU K.S. L2 | A AJI L1 |
|---|---|---|---|---|---|
| 1.00Working Charges | |||||
| 1.00 | 15.59:Dismantling of flexible pavement ( bituminous courses ) by mechanical means and disposal of dismantled material up to a lead of 1 kilo metre, as per direction of Engineer-in-charge. | 100 | cum | 490 ₹49,000 | 450.45 ₹45,045 |
| 1.00 | 100.1.1:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50m, in all kinds of soil. | 2,823.3 | cum | 775 ₹21.9 L | 700.19 ₹19.8 L |
| 1.00 | 100.1.13:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50m, in Hard Rock where Blasting is Prohibited. | 29.53 | cum | 2,266 ₹66,910.45 | 1,991.12 ₹58,793.79 |
| 1.00 | 100.8.1:Fencing one side of trenches, 1.50m height with two rows of 10cm plastic caution tape in vertical casuarina pole (girth 15cm to 24cm) fixed at 2m intervals. | 1,800 | metre | 36 ₹64,800 | 33.07 ₹59,526 |
| 1.00 | 100.14.5:Conveying and laying S&S Centrifugally Cast (Spun) / Ductile Iron Pipes conforming to IS: 8329 excluding cost of pipes and specials: 300mm diameter Ductile Iron Class K-9 Pipes. | 1,500 | metre | 292 ₹4.4 L | 263.32 ₹3.9 L |
| 1.01 | 18.83.7:Labour for cutting C.I. pipe with steel saw.300 mm diameter C.I. pipe | 35 | Each Cut | 863 ₹30,205 | 778.89 ₹27,261.15 |
| 1.01 | 18.70.5:Providing push - on-joints to Centrifugally (Spun) Cast Iron Pipes or Ductile Iron Pipes including testing of joints and including the cost of rubber gasket:300 mm dia pipe | 290 | joint | 522 ₹1.5 L | 462.98 ₹1.3 L |
| 1.01 | 100.9.8:Laying uPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipeline to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipeline with water to the required test pressure (excluding cost of pipes and specials): 90 mm nominal outside diameter pipes. | 1,785 | metre | 114 ₹2.0 L | 107.7 ₹1.9 L |
| 1.01 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 238.72 | sqm | 449 ₹1.1 L | 398.69 ₹95,174.08 |
Tender Value
₹1.3 Cr
EMD Value
₹50,000
Closing Date
23 Mar 2026, 3:00 pmClosed
Superintending Engineer
PH Circle, TVPM
State plan supply and laying pipe line at various places in Varkala legislative constituency budget outlay under the head in state plan 2021 2022 Appendix 4 replacement of old damaged 300 mm AC pipe with 300 mm DI K9 pipe from Kannamba to Guruman
2026_KWA_847505_1
25/2025-26/KWA/PHC/D1/TVM- RT 1
Open Tender
Civil Works - Water Works
365 days
Varkala Muncipality
Please refer NIT
7 documents required · 7 mandatory
₹5,515
₹50,000
Yes
23 Jun 2026
13 Mar 2026
24 Mar 2026
13 Mar 2026
23 Mar 2026
13 Mar 2026
13 Mar 2026 - 23 Mar 2026
Working Charges
15.59:Dismantling of flexible pavement ( bituminous courses ) by mechanical means and disposal of dismantled material up to a lead of 1 kilo metre, as per direction of Engineer-in-charge.
100.1.1:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50m, in all kinds of soil.
100.1.13:Excavating trenches of required width for pipes, cables, etc., including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering, etc., and disposing of surplus excavated soil as directed, within a lead of 50m, in Hard Rock where Blasting is Prohibited.
100.8.1:Fencing one side of trenches, 1.50m height with two rows of 10cm plastic caution tape in vertical casuarina pole (girth 15cm to 24cm) fixed at 2m intervals.
100.14.5:Conveying and laying S&S Centrifugally Cast (Spun) / Ductile Iron Pipes conforming to IS: 8329 excluding cost of pipes and specials: 300mm diameter Ductile Iron Class K-9 Pipes.
18.83.7:Labour for cutting C.I. pipe with steel saw.300 mm diameter C.I. pipe
18.70.5:Providing push - on-joints to Centrifugally (Spun) Cast Iron Pipes or Ductile Iron Pipes including testing of joints and including the cost of rubber gasket:300 mm dia pipe
100.9.8:Laying uPVC pipes of class 2 to class 6 and specials, lowering to the trenches already made, placing in position aligning the pipeline to the lines and levels and jointing the pipes and specials with solvent cement and testing the pipeline with water to the required test pressure (excluding cost of pipes and specials): 90 mm nominal outside diameter pipes.
5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources)
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
OD109834/2025-2026:Inter connection with newly laid DI K9 pipe line with existing lines with suitable equal DI Tee with reducer including dismantling existing lines, cost of necessary fittings required for interconnection work, all labour charges etc complete
100.60.8.1:Replacing the chocked / damaged 15mm (1/2 inch) house connection with 15mm (1/2 inch) water meter from existing mains, up to a length of 5m using 20mm Indian Standard Class 6 uPVC pipe and uPVC / Brass specials viz. brass ferrule, Elbow, MTA, FTA, couplers etc. and connecting with the mains, testing the joints etc. complete including trenching and refilling in all kinds of soil up to a depth of 1.50m for main line tracing and trench of average cross section 0.3m x 0.75m for laying connection pipe and service pipe, safely removing & re-fixing existing water meter, lighting, watching, providing caution boards, traffic control etc. complete including cost of materials, hire for tools, cost of consumables and labour charges but excluding cost of water meter and meter box and excluding charges for cutting the concrete / tarred / bituminous roads and as per the directions of the department officers
100.35.5:Testing 300mm DI/CI pipeline with potable water to the required test pressure. 300 mm dia Observed Data derived from item no.1023 of PHED DATA
100.31.2.7:Conveying and fixing C.I. sluice valves (with cap) by providing bolts, nuts, rubber insertions etc., complete, but excluding the cost of the valve (tail pieces, if required, will be paid separately): 300mm diameter, Class II.
100.32.4:Conveying and fixing C. I. Double Acting Air Valve of approved quality with bolts, nuts, rubber insertions etc., complete, but excluding the cost of air valve (tail pieces, if required, will be paid separately): 80mm Double Acting Air Valve.
100.31.1.1:Conveying and fixing C.I. sluice valves (with cap) by providing bolts, nuts, rubber insertions etc., complete, but excluding the cost of the valve (tail pieces, if required, will be paid separately): 80mm diameter, Class I.
Material Cost
100.98.119:Supply of DI K9 Pipe Conforming to IS 8329/2000, 300mm Dia.
18.68.1:Providing and laying D.I specials of class K - 12 suitable for push - on jointing as per IS : 9523 :Upt 600 mm dia
18.69.1:Providing and laying D.I Specials of Class K - 12 suitable for mechanical jointing as per IS : 9523 :Upto 600 mm dia
100.98.223:Supply of PVC Pipe, 8kg/cm2, 90mm Dia.
OD201215/2025-2026:Cost of PVC specials (Bends,Tee,coupler, Tailpiece,end caps etc )3% cost of pipe.
100.98.463:Supply of CI Double Flanged Sluice Valve Conforming to IS 14846 - 2000, Sluice Valve with Cap PN 1.6, Size 300mm.
100.98.436:Supply of CI Air Valve, Conforming to IS 14848 - 2000, Kinetic Air Valve Type DK, Size 80mm.
100.98.457:Supply of CI Double Flanged Sluice Valve Conforming to IS 14846 - 2000, Sluice Valve with Cap PN 1.6, Size 80mm.
Fabricating and Erecting Name Board
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1432281.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
KWAGeneralConditionsforeTenderingV5.pdf
PDF • 0.69 MB
Tendernotice_1.pdf
PDF • 0.45 MB
NIT.pdf
Tender Documents • 1.39 MB
BOQ_1432281.xls
BOQ • 0.32 MB