Loading…
Loading…
Tender Value
₹100.0 L
EMD Value
₹49,996
Closing Date
28 Sept 2026, 6:00 pmDue tomorrow
Dy.City Engineer
P/L Drainage Line, Repairing Strom Water, Drainage Line Breackdown and Repairing Machin hole, Chamber in Khadia Ward.
347107
Central Zone E-Tender Notice No.07/2026-2027 Tender No.216
Open
Civil Works - Others
Works
Ahmedabad
₹2,400
Municipal Commissioner, Ahmedabad
₹49,996
20 Sept 2026
20 Sept 2026
20 Sept 2026
28 Sept 2026
20 Sept 2026
Name of work: - FtzegtJtuzobtk swœt swœt htuz vh bNel ntuj, z[ulus jtRl <&t Mx[tub Jtuxh z[ulus jtRl vh &<t c{ufztWl hevuh
<&t lJe z[ulus jtRl ltkFJt <&t bNelntuj, auBch hevuhekd fhJtlt ftb ctc<.
Tender Invited on Behalf of AMC, Central Zone.
Assistant Manager, Central Zone,
Central Zone Zonal Office”, B – Wing,
Third Floor,Sardar Patel Bhavan,
Danapith, Ahmedabad-380001.
Ahmedabad Municipal Corporation
AHMEDABAD MUNICIPAL CORPORATION
Notice inviting Tender
Competent authority on behalf of Municipal Commissioner of A.M.C. invites percentage rate
sealed tenders from interested contractors for the following work at different locations within
the limit of A.M.C.
1 Name of work FtzegtJtuzobtk swœt swœt htuz vh bNel ntuj, z[ulus jtRl <&t Mx[tub Jtuxh z[ulus jtRl vh &<t
c{ufztWl hevuh <&t lJe z[ulus jtRl ltkFJt <&t bNelntuj, auBch hevuhekd fhJtlt ftb
2 Estimated Tender Amount Rs. 99,99,641.01 (excluding of GST). GST will be paid extra by
AMC/Authority at prevailing rate to the contractor.
3 Tender fee Rs. 2400/-
(Non refundable) (Demand Draft in favour of Municipal Commissioner,
Ahmedabad) Tender Fee shall be submitted physically along
with the Physical Submission.
4 Time Limit 12 Months
5 Download of Tender Tenders from the website www.nprocure.com or shall be
Documents down loaded mentioned AS PER TENDER NOTICE INVITED
6 Required registration Register “D” class having in Road Works in PWD in Govt. R&B /
CPWD / AMC or equivalent register with any other state Govt.
or institutions.
7 Earnest Money Deposit Rs. 99,996.00 (Demand Draft / pay order / Bank Guarantee in
(Bid security) favour of Municipal Commissioner, Ahmedabad is to be
(1 % of Estimate put to submitted as prescribed in 10.0 below. Demand Draft/Bank
tender) Guarantee shall be from approved list of AMC of banks and the
issuing branch of bank guarantee shall be of Ahmedabad city
only and it should be valid for 120 days. E.M.D. shall be
submitted physically along with the Physical Submission.
8 Submission of EMD and Tender Fee & EMD should Submitted physically along with
Tender Fees tender documents as described in the invitation of tender
should be submitted to Assistant Manager- Central Zone, 3rd
Floor, B – Wing, Sardar Patel Bhavan, Danapith, Ahmedabad-
Bid submitted without bid security & tender fee shall be
treated as non responsive and shall be summarily rejected.
9 Mode of sending the The whole tender shall be submitted by two modes.
Tender Documents • Whole tender shall be submitted only on
www.teder.nprocure.com website as per Schedule mentioned in
Notice inviting Tender.
• Tender Fee, EMD, technical bid and other relevant PQ
Documents as per check list given in tender shall be submitted
physically in two copies (Original & duplicate) in sealed envelope as
per Schedule mentioned in Notice inviting Tender.
10 Last date of receiving As per Notice inviting Tender / Addendum / Corrigendum. The
Tenders. tenders received after latest schedule date and time will not be
entertained under any circumstances.
11 Submission of Price Bid The Price bid shall be submitted online only. The bidder shall
Signature of Bidder Page 1 of
Ahmedabad Municipal Corporation
fill percentage rate on amount of BOQ online only until
Price Bid shall be submitted physically duly signed & seal
without mentioning quoted rated, else it shall be considered as
12 Opening of Technical bid As per Notice inviting Tender / Addendum / Corrigendum.
13 Tender validity period 120 days from the last date of submission of Tender.
14 Security Deposit 5 % of Contract Value to be submitted in the form of (Demand Draft
/ pay order / Bank Guarantee in favour of Municipal Commissioner,
Ahmedabad. Bank Guarantee shall be from approved list of AMC of
banks as per attched ANNEXURE - 1 finance dept. latest circular. and
the issuing branch of bank guarantee shall be of Ahmedabad City
only. The validity of the Security Deposit shall be up to valid till
days beyond Date of completion of work.
The Security Deposit shall be payable in 10 days (for tenders upto
Rs.10.0 Lacs) or 15 days (for tenders of Rs.10.0 Lacs and above) from
date of receipt of LOI failing which interest @ 4% per annum will be
charged by AMC.
15 Deductions from Running
a. Retention Money 2 % amount of each Running Bill shall be deducted as a Retention
Money. Such retention money shall be released in the final bill of the
b. Labour welfare cess Labour welfare cess as per the Act, 1996 (non refundable) shall be
deducted from each running bill.
16 Defect & Liability Period Not applicable in this case. If applicable than refer condition of
contract attached over rule as per form B-1 published by
17 Compansation for Delay 10 % of the actual balance work after Time limit expired.
• All the circulars which were published by Authorities of AMC time by time will be
applicable on said Tender and bound to bidder with out any condition.
• Conditional tenders will not be accepted in any case. Municipal Commissioner reserves
the rights to reject any or all the tenders without assigning any reasons thereof.
• The authorized signatory holding Power of Attorney shall only be the Digital Signatory.
In case authorized signatory holding Power of Attorney and Digital Signatory are not
the same, the bid shall be considered non-responsive.
Seal and Signature of the Bidder Additional City Engineer
Date: Ahmedabad Municipal Corporation
Signature of Bidder Page 2 of
Ahmedabad Municipal Corporation
(On contractor’s Letter Head / certified with Stamp and Sign with Contact Detail)
TENDER DECLARATION FORM
Additional City Engineer
Ahmedabad Municipal Corporation,
Name of Work:- FtzegtJtuzobtk swœt swœt htuz vh bNel ntuj, z[ulus jtRl <&t Mx[tub Jtuxh z[ulus jtRl vh &<t
c{ufztWl hevuh <&t lJe z[ulus jtRl ltkFJt <&t bNelntuj, auBch hevuhekd fhJtlt ftb ctc<.
I/We the undersigned have carefully gone through and clearly understood the Tender
documents of above mentioned project comprising of Notice Inviting tenders, Articles of
Agreement, Scope of work, Definition of terms, notes Instructions/Information to Bidder, Condition
of Contract, special condition of contract, Appendices, Specifications, Bill of Quantities, furnished by
AHMEDABAD MUNICIPAL CORPORATION.
I/We do hereby offer to execute and complete the whole of the work within the time
specified all in accordance with the specification, designs, drawing and instruction in writing referred
to in the said document and with such materials as mentioned for, at the respective rates which
I/we have quoted in the Price Bid or at such other rates as may be fixed under the provisions of
these conditions.
In the event of this tender being accepted I/We agree to enter into an agreement and when
required, execute the contract, according to your form 1 of agreement as or in default where of I/we
bound myself/ourselves to forfeit the "Earnest Money Deposit."
I/We understand that if I/We shall not enter in agreement within fifteen days or as decided
by AMC from the date of receipt of letter of acceptance, you will forfeit the earnest money paid by
me/us and take necessary action as deemed fit.
I/We have enclosed a Demand Draft / Bank Guarantee as an “Earnest Money Deposit", for
the sum as mentioned in NIT, the full value of which is to be absolutely forfeited to the Employer If
I/We fail to commence the work specified. Otherwise the Employer shall retain the said sum, as on
account of such Security Deposit as provided for in the aforesaid documents.
I/We agree not to employ sub-contractors other than those that may be approved in
accordance with conditions in the aforesaid documents.
I/We understand that Municipal Commissioner is not bound to accept the lowest or any
tender, which are received. I / We also understand & agree that Municipal Commissioner Reserves the
right to allot number of tenders to successful bidders at his sole discretion in case if I / We am/are
lowest in more than one tender.
I/We am/are bound to execute the job if the work order is issued within 120 days from the
date of opening of the tender.
I am bound to execute the work by maintaining all Quality aspects/parameters mentioned in
the tender terms and conditions. I am also bound to submit all supporting Genuine Original documents
as and when asked and if any discrepancy found in such documents as well as in the executed Work
with respect to Quality/Quantity at any stage of work or even after completion of work, it will be solely
my Responsibility. I am bound to prove originality of all documents submitted by me and if any
Signature of Bidder Page 3 of
Ahmedabad Municipal Corporation
Documents found false/fake then Municipal Commissioner/AMC has right to take any
action/penalty/punishment against me.
I am also bound that if I/we, indulged into any malpractice and/or used any inferior quality
and/or the construction of road is found to be of an inferior quality under this contract than in such
case Municipal Commissioner/AMC has right to debar/ blacklist permanently.
I/We agree to pay the Government income-Tax, GST/Sales-Tax (Central and State), Octroi
duties, Royalty on material (i.e. Aggregate, Sand etc.) And any other taxes prevailing and from time to
time on such items on which the same are leviable and the rates quoted by me/us are inclusive of the
Yours faithfully
Seal and Sign of Contractor
Signature of Bidder Page 4 of
Ahmedabad Municipal Corporation
INSTRUCTIONS TO BIDDERS
1. Scope of Bid
1.1 Competent authority on behalf of The Municipal Commissioner, Ahmedabad Municipal
Corporation (referred to as Employer in these documents) invites sealed bids for the
construction of works (as defined in these documents and referred to as “the work”)
detailed in the table given in the Invitation for Bid (hereinafter called as IFB.) from
competent bidder. The bidders may submit bids for the works detailed in the table
2.0 Source of Funds
Ahmedabad Municipal Corporation has arranged the fund for this project.
3.0 Eligible Bidders
3.1 The Invitation for Bids is open to all eligible bidders meeting the eligibility criteria as
defined in this tender.
3.2 All bidders shall provide Qualification Information and Forms of Bid mentioned in the
Clause-14. An agency that has been engaged by the Employer to provide consulting
services for the preparation or supervision of the works, and any of its affiliates, shall
not be eligible to bid.
3.3 Any entity which has been declared as non-performing by NHAI / GoG / AMC or the
firms those are blacklisted/ debarred for specified period by AMC, Governement of
Gujarat, Government of India or any other entity controlled by it, would not be eligible
to submit the Bid.
4.0 Qualification of the Bidder
4.1 Requires registration:- Register “D” class having in Road Works in PWD in Govt. R&B /
CPWD / AMC or equivalent register with any other state Govt. or institutions.
5.0 DISQUALIFICATION
Even though the bidders meet the above mentioned qualifying criteria, they are
subject to be disqualified if they have,
• Made misleading or false representations in the forms, statements, affidavits and
attachments submitted in proof of the qualification requirements; and/or
• Record of poor performance such as abandoning the works, not properly completing
the contract, inordinate delays in completion, litigation history, or financial failures etc.
or debarring from AMC work etc.
• Tampered the bid document in any manner.
• Colluded with other prospective bidders for this work to arrive at quoted prices for the
purpose of restricting competition.
• Indulged in inducement of any official of AMC and/or their consulting engineer and
other advisors in any manner whatsoever.
• Proposal not submitted in accordance with this tender.
• During validity of the proposal, or its extended period, if any, the bidder changes his
commercial terms.
• The bidder qualifies the proposal with his own conditions.
• Proposal is received after due date and time.
• Commercial proposal is enclosed with the same envelope as technical proposal
• The envelope does not show on the outside the reference of bid and thus gets opened
before the due date of opening.
Signature of Bidder Page 5 of
Ahmedabad Municipal Corporation
• The E.M.D. is not deposited in full and in the manner as specified in the clause of
Earnest Money Deposit.
• The tender is in a language other than English or dose not contains its English
Translation in case of other language adopted for tender preparation.
• The tender documents received are not duly signed by authorized person.
• The validity of tender is less than what is stated in the tender.
• Any of the page or pages of tender is/are removed or replaced.
• Any condition which affect the cost.
• If it is joint venture.
5.1 Debarment / Black listing
Notwithstanding the above, the Employer may debar or blacklist any of the bidder(s)
for their misleading or false representations in the forms statements etc. for the period
to be decided by the Employer.
6.0 Cost of Bidding
The bidder shall bear all costs associated with the preparation and submission of his
Bid. Employer will in no case be responsible and liable for those costs.
The Bidder, at his own cost, responsibility and risk, is encouraged to visit, examine and
familiarize himself with the site of Works and its surroundings including source of
earth, water, road aggregates etc. and obtain all information that may be necessary for
preparing the Bid and entering into a contract for construction of the Works. The costs
of visiting the Site shall be at the Bidder's own expense.
8.0 Bidders shall not have any dispute or claim for any kind of compensation in
• If the quantity stipulated in the tender items varies or the scope of work changes and
thereby total amount of work increases / decreases up to any extent.
thereby total amount of work increases / decreases up to any extent.
• If the works gets delayed / postponed for some administrative / technical decision
• If the items stipulated in the tender shall not be executed as per site condition/
requirements. No claim shall be entertained for the same.
• No idle charges shall be paid to contractor for machinery and man power if remain idle
and no claim shall be entertained for the same.
B. BIDDING DOCUMENTS
9.0 Content of Bidding Documents
9.1 The set of bidding documents comprises the documents listed below and addendum (if
1. Notice inviting e-Tender
2. Special conditions of Contract
3. Instructions to Bidders
4. Qualification Information
5. Conditions of Contract
6. Technical Specifications
7. Forms of Bid
8. Bill of Quantities
• The bidder is expected to examine carefully all instructions, conditions of contract, contract
data, forms, terms, technical specifications, forms, Annexes in the bid document.
Failure to comply with the requirements of bid documents shall be at the bidder’s own
Signature of Bidder Page 6 of
Ahmedabad Municipal Corporation
risk. Bids which are not substantially responsive to the requirements of the bid
documents shall be rejected.
10.0 Amendment of Bidding Documents
10.1 Before the deadline for submission of bids, the Employer may modify the bidding
documents by issuing addendum.
10.2 Any addendum thus issued shall be part of the bidding documents and shall be placed
on website www.nprocure.com The prospective bidder shall refer to website to check
any addendum before 24 hours of opening of bids. AMC will not give any
advertisement for the same.
10.3 To give prospective bidders reasonable time in which to take an addendum into
account in preparing their bids, the Employer may, at his desecration, extend as
necessary the deadline for submission of bids.
10.4 Prospective bidders should attach the addendum made for the work & if fails to do so
than also the changes made through such addendum shall be applicable & bound to
C PREPARATION OF BIDS
11.0 Language of the Bid
All documents relating to the bid shall be in the English language only.
12.0 Documents comprising bid
The e bid submitted by the bidder shall be in two separate parts.
• Technical Bid
• Financial Bid
To qualify for award of the contract, each bidder must submit the following documents
along with bid:
• Required Registration Certificate
• Other requested documents
• Any other material / information required to be submitted in accordance with these
Instructions to Bidders (ITB)
Failure to submit these certificates/documents shall make the bid non-responsive.
Above original documents in physical form in two copies, one marked as “original” and
other marked as “Duplicate”, shall be submitted in a sealed envelope by 18:00 Hrs on
the date of physical submission of bid and addressed to the addressee given in the NIT
duly super scribed “Name of Work, Bid due date and time, Name and address of the
13.0 Bid Prices
• The contract shall be for the whole works as described in Bill of Quantity based on the
percentage rate in the Bill of Quantities submitted by the bidder..
• All duties, taxes, and other levies payable by the contractor under the contract, or for
any other cause shall be included in the rates, prices and total Bid Price submitted by
the Bidder, except otherwise stated in the Bid document. Employer will not
compensate the bidder (contractor) for any change in duties, taxes and other levies
payable by the contractor under the contract and any other reasons.
Signature of Bidder Page 7 of
Ahmedabad Municipal Corporation
• The percentage rate and bid price quoted by the bidder shall be fixed up to the
completion of Work and shall not be subject to adjustment on any account, except
where expressly specified, otherwise, in the contract.
14.0 Currencies of Bid and Payment
The currency of bid and payment shall be in Indian Rupees. All payments shall be made
in Indian Rupees.
15.0 Bid Validity
15.1 Bids shall remain valid for 120 days from last date of submission of tender. A bid valid
for a shorter period shall be rejected by the Employer as non-responsive.
15.2 In exceptional circumstances, prior to expiry of the bid validity (120 days), the
Employer may request that the bidders may extend the period of validity for a
specified additional period. The request and the bidders' responses shall be made in
writing or by cable. A bidder may refuse the request without forfeiting his bid security.
A bidder agreeing to the request will not be required or permitted to modify his bid,
but will be required to extend the validity of his bid security for a period of the
16.0 Earnest Money / Bid Security
16.1 The Bidder shall furnish, a Bid Security of the amount as shown in the Table of IFB as
part of his bid, in the form of Demand Draft / pay order / Bank Guarantee in favour of
Municipal Commissioner, Ahmedabad valid for 120 days.
16.2 The issuing branch of the bank guarantee shall be of Ahmedabad / Gandhinagar City
A. As per Government of Gujarat G.R. No. - FD/MSM/e-file /4 /2023/ 4020/D.M.O. Date:
11/03/2024 & Circular of Finance Department, AMC no. 10 Date: 05-08-2024,
approved Banks are Guarantees issued by following banks will be accepted as SD/EMD
on permanent basis.
All nationalized Banks
B. Guarantees issued by following banks will be accepted as SD/EMD for the period up to
March- 31, 2025. The validity cut-off date in the GR is with respect to the date of issue
of Bank Guarantee irrespective of the date of termination of Bank Guarantee.
1. Commercial Banks :-
1. A U Small Finance Bank
3. Bandhan Bank
4. City Union Bank
6. DBS Bank India Limited
8. Equitas Small Finance Bank
9. Federal Bank
Signature of Bidder Page 8 of
Ahmedabad Municipal Corporation
14. IDFC First Bank
15. IndusInd Bank
16. Jana Small Finance Bank
17. Karnataka Bank
18. Karur Vysya Bank
19. Kotak Mahindra Bank
20. South Indian Bank
21. Tamilnadu Mercantile Bank
22. Utkarsh Small Finance Bank
2. Co-operative and Rural Banks Of Gujarat :-
1. The Ahmedabad Mercantile Co-operative Bank Limited
2. Kalupur Commerical Co-operative Bank Limited
3. Nutan nagrik Sahakari Bank Limited
4. Rajkot Nagarik Sahakari Bank Limited
5. Saraswat Co-operative Bank
6. SVC Co-operative Bank
7. The Cosmos co-opretive Bank
8. Baroda Gujarat Gramin Bank
9. Saurashtra Gramin Bank
10. The Gujarat State Co-Operative Bank
11. The Mehsana Urban Co-operative Bank Limited
12. The Surat District Co-operative Bank
13. The Surat Peoples Co-operative Bank
16.3 Any bid not accompanied by an acceptable Bid Security shall be rejected by the
Employer as non-responsive.
16.4 Any bid having bid security for lesser value and shorter validity period shall be treated
as non-responsive.
16.5 (a) The bid security of the unsuccessful bidders, except for L1, L2 and L3 bidders will be
returned as promptly as possible.
(b) The bid security of the successful bidder, along with second and third lowest tenders, will
be returned when the successful bidder has furnished the required security deposit
and signed the agreement.
16.6 The Bid Security of the Successful Bidder will be discharged when the bidder has signed
the Agreement and furnished the required security deposit.
16.7 The Bid Security shall be forfeited,
a) if the Bidder withdraws the Bid after Bid opening during the period of Bid validity;
b) in the case of a successful Bidder, if the Bidder fails within the specified time limit to
(i) sign the Agreement; or
(ii) Furnish the required security deposit.
(iii) commence the work after signing the agreement within 15 days
16.8 No interest shall be paid by the owner on any tender guarantee. The issuing branch of
the bank guarantee shall be of Ahmedabad City only.
16.9 Bank Guarantee for Earnest Money Deposit should be executed on non-judicial Stamp
papers of requisite value in accordance with the stamp Act applicable to that particular
state of Indian Union, where executed.
Signature of Bidder Page 9 of
Ahmedabad Municipal Corporation
16.10 The executing officers of the bank Guarantee for Earnest Money Bid Security shall
clearly indicate in (block letters) his name, designation, Power of Attorney No. / Signing
16.11 Each page of the bank guarantee for Earnest Money Deposit shall be duly
signed/initialed by the executing officers and the last page shall be signed in full,
indicating the particulars as aforesaid under the seal of the Bank.
D. SUBMISSION OF BIDS
17.0 Sealing and Marking of Bids
17.1 The bidder shall submit the Technical Bid only. The Bid shall be sealed in separate
envelopes and the three sealed envelopes shall be sealed in an outer envelope. The
Bid envelopes shall be marked as follows:-
• Complete Tender Document with stamp all necessary qualification related documents
Above two envelopes shall be kept in one envelope and it should be marked as
“Technical Bid” and sealed. This Outer envelope should mention the name of firm of
bidder, his address, contact details & name of the work.
17.2 The inner and outer envelopes
a) Shall be addressed to the Employer at the following address:
Assistant Manager- Central Zone,
3rd Floor, B – Wing, Sardar Patel Bhavan,
Danapith, Ahmedabad-380001.
c)Bear the following identification:
Indicate the name and address of the bidder.
• If the outer envelope is not sealed and marked as above, the Employer will assume no
responsibility for the misplacement or premature opening of the bid.
18.0 DEADLINE FOR SUBMISSION OF THE BID
18.1 Complete Bids (including Technical bid and necessary documents) must be received by
the Employer at the address specified in bid information not later than the date
indicated on the face sheet of the document. In the event of the specified date for the
submission of bids declared a holiday for the Employer, the Bids will be received up to
the appointed time on the next working day. The Bidder is further required to submit
Documents in Physical Form on or before the Bid Due Date and before the time of
submission as specified in NIT, at the following address:
Assistant Manager- Central Zone,
3rd Floor, B – Wing, Sardar Patel Bhavan,
Danapith, Ahmedabad-380001.
18.2 AMC assumes no responsibility for inability of a bidder to submit bids through (n)
procure e-tendering portal on account of delay in submission at bidder's end. Bidder
shall ensure that they submit the bid well before the "Due Date & Time of Bid-
Submission". AMC shall not be responsible if bidder is not able to submit the bid on
account of failure in network/internet connection or any other technical reason.
18.3 The Employer may extend the deadline for submission of bids by issuing an
amendment in accordance with respective Clause, in which case all rights and
obligations of the Employer and the bidders previously subject to the original deadline
will then be subject to the new deadline.
Signature of Bidder Page 10 of
Ahmedabad Municipal Corporation
18.4 All bidders are requested to see the website of (n) procure for amendment /
corrigendum if any.
18.5 Any Bid received by the Employer after the deadline prescribed in NIT will be rejected
and returned unopened to the bidder.
Any Bid received by the Employer after the deadline prescribed in NIT will be returned
unopened to the bidder.
20.0 NOTIFICATION OF AWARD & SIGNING OF AGREEMENT
The Bidder whose Bid has been accepted will be notified of the award by the Employer
prior to expiration of the Bid validity period by writing, facsimile or e-mail confirmed by
registered letter. This letter (hereinafter and in the Conditions of Contract called the
“Letter of Acceptance” will state the sum that the Employer will pay the Contractor in
consideration of the execution, completion, and maintenance of the Works by the
Contractor as prescribed by the Contract (hereinafter and in the Contract called the
“Contract Price”).
The notification of award will constitute the formation of the Contract, subject only to
the furnishing of a Security Deposit in accordance with the provisions of Clause.
The agreement will incorporate all correspondences between the Employer and the
Successful Bidder. It will be signed by the Employer and the Successful Bidder.
21.0 SIGNING OF CONTRACT AGREEMENT
21.1 The Employer and the successful bidder shall enter into a Contract Agreement within
28 days after the successful bidder (hereinafter called the Contractor) receives the
Letter of Acceptance, unless they agree otherwise, subject to furnishing the security
deposit before signing the Agreement with the Employer.
21.2 Upon issue of ‘Letter of Acceptance’ to the successful Bidder, the Employer will
promptly notify the other Bidders that their Bids have been unsuccessful and release
their Earnest Money Deposit / Bid Security.
22.0 SECURITY DEPOSIT
22.1 Within 15 days of receipt of the Letter of Acceptance, the Successful Bidder shall
deliver to the Employer a security deposit in the form of Bank Guarantee for an
amount equivalent to 5% of the Contract Price valid for the period of valid till 90 days
beyond Date of completion of work. The Security Deposit shall be payable in 10 days
(for tenders upto Rs.10.0 Lacs) or 15 days (for tenders of Rs.10.0 Lacs and above)from
date of receipt of LOA failing which interest @ 4% per annum will be charged by AMC.
22.2 The security deposit shall be in the form of a Bank Guarantee in the name of the
Employer, from Ahmedabad branch of any Banks mentioned in the clause no. 16.2 of
these tender documents.
22.3 This security deposit shall be released only after the clearance of final bill including pre
22.3 Interest @ 4 % per annum shall be deducted from contractor in case of late submission
of security deposit or late renewal of bank guarantee for the number of days delayed
for submission or discontinuity of the bank guarantee.
22.4 Bank Guarantee to be submitted in the prescribed format enclosed and shall be same
verbatim as per the format. Bank Guarantee shall be submitted on right value of stamp
paper and for correct value of contract.
Signature of Bidder Page 11 of
Ahmedabad Municipal Corporation
22.5 Failure of the Successful Bidder to comply with the requirements of Sub-Clause
shall constitute sufficient grounds for cancellation of the award and forfeiture of the
22.6 In case of any contract amendment during execution of the contract enhancing value
of the contract the BG value shall be enhanced accordingly. Validity of BG shall be
commercial terms and conditions of the tender.
22.7 All compensation or other sums of money payable by the Contractor to the Employer
under the terms of this Contract or any other contract or on any other account
whatsoever may be deducted from Security Deposit. Also in the event of the
Contractor's Security Deposit being reduced by reasons of such deductions, as
aforesaid, the Contractor shall, within 14 days of receipt of notice of demand from the
Engineer-in-Charge, make good the deficit in Security Deposit.
22.8 Should there arise any occasion under the Contract due to which the periods of
validities of Bank Guarantees as may have been furnished by the Contractor from time
to time, are required to be extended/renewed, the Contractor shall get the validity
periods of such guarantees extended/renewed, and furnish these to the Engineer-in-
Charge one month before the expiry date of the aforesaid Guarantees originally
furnished failing which the existing Bank Guarantees shall be invoked by the Engineer –
in – charge. Also in case of any deficit in securities on any account as might occur or is
noticed, the Contractor shall forthwith recoup/replace the same with acceptable
Security Deposit.
22.9 The Bank Guarantee shall be extended within the expiry dates wherever activities as
per contract are not completed in all respects.
22.10 The Security Deposit less any amount due shall, on demand, be returned to the
contractor after 45 days of completion date / Final Bill paid date which ever is later. No
interest on the amount of Security Deposit shall be paid to the Contractor at the time
of release of Security Deposit as stated above.
22.11 The successful bidder to whom ‘LOA’ has been issued shall enter into an agreement at
Employer’s office within 15 days of LOA.
23.0 Advance Payment and Security
The Employer will not provide any advance payment.
24.0 Dispute Review Expert
In case of all the disputes, decision of the Municipal Commissioner, Ahmedabad shall
be final and binding to the bidder.
25.0 LITIGATION HISTORY
The applicant should provide accurate information on litigation and/or arbitration
resulting from Contractors completed or under execution by him over last five years. If
the details of Litigation History are hidden by the Bidder and later on it comes to the
knowledge of the Employer, the Bidder shall be disqualified for the proposed work and
other appropriate actions shall be taken against the bidder.
DETAILS OF COMPLETED / ONGOING LITIGATION / ARBITRATION
Employ Value of the Reasons/Details for Remarks
Year Name of Project
er Project (Rs.) litigation/arbitration showing
Signature of Bidder Page 12 of
Ahmedabad Municipal Corporation
The bidder shall furnish separate table for individual project.
The above information shall be supported with necessary documents otherwise the
same shall be treat as null and void.
A consistent history of arbitration awards? Judgments against the applicants or any
partner of a joint venture may result in disqualification for proposed work.
If the details of litigation History is hidden by the applicant and later on it comes to
knowledge of the employer the bidder shall be disqualified for the proposed work and
other appropriate actions shall be taken against the bidder.
Seal and Signature of the Bidder Additional City
Date: Ahmedabad Municipal
Signature of Bidder Page 13 of
Ahmedabad Municipal Corporation
GENERAL CONDITIONS OF CONTRACT
1.0 Liquidated Damages
1.1 If the Contractor fails to complete the works within the original or extended time
limit, the Contractor shall pay penalty of 10% of amount of actual remaining work.
The amount of work for which the scope of contractor is reduced shall not be
considered for the calculation of Liquidated Damages.
1.2 Conditions mentioned in the AMC Finance Department Circular AMC no. 18 Date:
23/05/2017 and all latest Circulars shall be applicable.
2.0 Retention Money
2 % amount of each Running Bill shall be deducted as a Retention Money. Such
retention money shall be released in the final bill of the said work. AMC reserves
right to deduct any amount to compensate the poor performance of the contractor
i.e. poor quality or abandoned / incomplete work.
3.0 Subcontracting
3.1 Except where expressly specified in the Contract, the Contractor shall not
subcontract any portion of Work without the approval of the Employer’s
Representative. Any subcontracting shall not relieve the Contractor from any
contractual obligations or responsibility under the Contract.
3.2 The Contractor shall not be required to obtain consent for a subcontract for which
the name of the subcontractor and scope of works activities to be performed by
him is already stated in the contract or supply of material or engagement of labour.
4.1 The Contractor shall employ the key personnel named in the Schedule of Key
Personnel as referred to in the Bid document to carry out the functions stated in
the Schedule or other personnel approved by the Engineer. The Engineer will
approve any proposed replacement of key personnel only if their qualifications,
abilities, and relevant experience are substantially equal to or better than those of
the personnel listed in the Schedule.
4.2 If the Engineer asks the Contractor to remove a person, without assigning reasons
thereof, for his misconduct or inadequacy of technical skills and experience, who is
a member of the Contractor’s staff or his work force, the Contractor shall ensure
that the person leaves the Site within seven days and has no further connection
with the work in the Contract.
4.3 No residential accommodation is allowed at the site of work. The labour huts shall not
be erected on the site of work and contractor shall make his own arrangements to
provide such accommodations as per the rules of the local bodies. He shall make his
own arrangements for housing, stores, field office etc. He shall submit a site layout
plan indicating the location of various site facilities to be created by him at his cost
for the execution of work. The Owner shall in no way be responsible for any delay
on this account and no claim on this account whatsoever shall be entertained. All
Basic amenities shall be provided by the Contractor to Labours as per the prevailing
Signature of Bidder Page 14 of
Ahmedabad Municipal Corporation
5.1 The Contractor shall have full regard throughout execution, completion and defects
liability period to following safety aspects and shall take all necessary steps to
ensure that danger to safety is avoided all the time in respect of,
Safety of the works
• Safety of the Contractor’s employees and all the persons directly or indirectly
engaged by him for the works
• Safety of all the employees including persons working on other contracts of
Employer at the same site of the Employer and Engineers employees engaged at
• Any authorized third party persons on the site.
• Contractor’s plant and equipment
5.2 The Contractor shall provide and maintain at his costs all lights, guards, fencing,
warning signs, barricading, and cones; when and where necessary, or required by
Engineer in Charge or by any duly constituted authority for the protection of the
works or for the safety and convenience of the public or other.
5.3 The Contractor shall take all reasonable steps to protect the environment on and
off the site and avoid damage or nuisance to persons or property of the public and
others arising as a consequence of his method of operation.
5.4 The Contractor shall maintain in good condition all work throughout execution,
completion, and defects liability period. The contractor shall be responsible for and
to make good all injuries, damages and repairs, rendered necessary by fire, rain,
traffic, floods or other causes.
5.5 All the scaffolding work, wherever required for the execution of work, shall be
provided by the contractor. Nothing extra shall be payable on this account. It shall
be provided strictly with double scaffolding system with all the accessories etc. with
adjustable suitable working platforms to access the areas, with ease for working
and inspection. It shall be designed to take all incidental loads. It should cater to the
safety features for workmen. It shall be ensured that no damage is caused to any
structure due to scaffolding.
5.6 All temporary warning/ caution boards display shall be provided and displayed
during day as well as night time by the contractor, wherever required and as
directed by the Engineer.
5.7 Arrangement of temporary water and electricity and telephone connection
required, by him, shall be made by the Contractor at his own cost and also
necessary permissions directly from relevant Owners shall be obtained by him
under intimation to the Owner. Also all initial and running charges and security
deposit, if any in this regard shall be borne by him. The Contractor shall abide by all
the rules/ bye laws applicable in this regard and he shall be solely responsible for
any penalty on account of violation of any of the rules and byelaws in this regard.
5.8 In any case if any fatal accident (major or minor) occurs due to poor safety
precautions, the same shall be completely contractor’s responsibility. All the losses
due to such accidents and expenses of legal matters shall be borne by contractor.
5.9 The Contractor shall be responsible for maintenance and watch and ward of the
complete installation and shall also be responsible for any pilferage, theft, damage,
penalty etc. in this regard. The Contractor shall indemnify the Owner against any
claim arising out of pilferage / theft, damage, penalty etc. whatsoever on this
Signature of Bidder Page 15 of
Ahmedabad Municipal Corporation
5.10 The Contractor shall depute Site Engineer & skilled workers as required for the
work. Necessary protective and safety equipments shall be provided to them by the
Contractor at his own cost and used at site.
6.0 Contractor to keep site clean:
During the execution of the work, the Contractor shall keep the site clean. All
wreckage rubbish, excess materials, temporary works no longer required will be
removed from site immediately.
7.0 Clearance of site on completion:
The Contractor shall clear away and remove all Contractors equipment, surplus
materials, rubbish, temporary works of every kind.
A. COST CONTROL
8.0 Bill of Quantities
a.The schedule-B shall contain Memorandum showing items for the construction,
installation, testing, and commissioning work to be done by the Contractor.
b. The quantities stated in the schedule B are estimated quantities. The Contractor
shall be paid only quantities calculated after taking measurements of executed
work. The rate stated in the schedule B for each item of work shall apply. The works
shall be measured by the Contractor jointly with the authorized representative of
the Engineer and all particulars required by the representative of the Engineer shall
be supplied by the contractor.
c. The work shall be measured net. No allowance for general or local custom, working
space etc. is to be made.
9.1 The Engineer in Charge shall have power to make any variation of form, quality or
quantity of the works or any part thereof that may, in his opinion, be necessary and
for that purpose, or if for any other reason it shall, in his opinion, be appropriate, he
shall have the authority to instruct the Contractor to do and the Contractor shall do
any of the following:
Increase or decrease the quantity of any work up to any extent included in the
Omit any such work,
Change the character or quality or kind of any such work,
Execute additional work of any kind necessary for the completion of the Works or
Change any specified sequence or timing of construction of any part of work.
9.2 No such variation shall in any way vitiate or invalidate the contract, but the effects,
if any, of all such variations shall be valued in accordance with the following sub
clauses. Provided that where the issue of an instruction to vary the Works is
necessitated by some default or breach of contract by contractor or for which he is
responsible, any additional cost attributable to such default shall be borne by the
9.3 The Contractor shall not make any such variation without an instruction of the
Engineer. No instruction is required for quantities varying from those provided for
the items in the contract schedule B.
10.1 The basis for the valuation of variations for addition to the Contract Price shall be as
follows in the same order of priority.
Signature of Bidder Page 16 of
Ahmedabad Municipal Corporation
a) Variations in the quantities of work in schedule of quantities shall not vitiate the
b) The contractor shall be bound to execute extra items of work as directed by the
Engineer-in-charge.
c) Contract unit rates for individual items shall apply to varied quantities where there
is a quantity variation.
d) The price variations on extra item will not be given.
e) In case of other non tender items following procedure shall apply.
10.2 If any extra item crops up during the progress of work the same shall be carried out
by the Contractor and he shall be paid at the rate fixed by Employer which shall be
fixed as lowest of the rates derived by rate analysis based on the following three
methods. , the priority of the documents forming the Contract shall be as follows:
(i) If the extra item is included in the S.O.R. of Road & Building Department, Year
2021-22, the rate of extra item shall be that rate and premium (above or below)
quoted by contractor.
(ii) Rate analysis based on prevailing Govt. of Gujarat’s SOR rates.
(iii) Rate analysis based on current market rates. This shall be based on
The material costs, the labour costs, the cost of use of all plant, machinery and
equipment, the cost of all temporary and incidental works, the overheads and the
Contractors profit.
The overheads shall be taken at 5 % of the sum of material costs, the labour costs,
the cost of use of all plant, machinery, and equipment, the cost of all temporary
and incidental works.
10.3 In case of the rate is to be derived from prevailing market rate, the Contractors
profit shall be taken at 10 % of the final rate derived.
10.4 In the event of disagreement, the Engineer in Charge shall fix such rates and prices
as are, in his opinion appropriate and shall notify the Contractor accordingly with a
copy to the Employer.
10.5 The Engineer shall determine provisional rates and prices to enable on account
payments to be included in the Interim Payment Certificates, until rates and prices
are agreed as final by the Employer, the Contractor, and the Engineer.
10.6 The Contractor shall not be entitled to additional payment for costs, which could
have been avoided by giving early warning.
11.1 Payments shall be adjusted for deductions for advance payments, retention, other
recoveries in terms of the contract and taxes at source, as applicable under the law.
The Employer shall pay the Contractor the amounts certified by the Engineer.
11.2 If an amount certified is increased in a later date certificate due to corrections in
previous certificates or as a result of an award from disputes review experts,
Contractor shall be paid such amount only. The Contractor shall not be paid any
interest upon such delayed payment.
11.3 Items of the work for which no rate or price has been entered in will not be paid for
by the Employer and shall be deemed covered by other rates and prices in the
11.4 All payments shall be made in Ahmedabad.
12 Taxes and duties
12.1 The rates are inclusive of all the prevailing taxes and duties of the Central, State and
Signature of Bidder Page 17 of
Ahmedabad Municipal Corporation
Local Governing bodies prevailing on the date of award of the contract. The
Contractor will have to pay all such taxes and duties for the performance of this
Contract. The Employer will deduct from the Contractor’s monthly and other
payments all taxes and duties, which he is bound to recover in accordance with the
applicable law.
12.2 The Contractor shall keep himself fully informed of all acts and laws of the Central &
State and local Governing bodies, all orders, decrees of bodies, tribunals having any
jurisdiction or authority which in any manner affect those engaged or employed,
and anything related to carrying out the work. All the bye-laws lay down by
AMC/AUDA and any other local bodies while executing the work shall be adhered
to. All taxes of local bodies shall be borne by the contractor. The Contractor shall
arrange to give all notices required by any authority and to pay to such authority all
the fees that may have to be paid for the material, plants, equipments etc. The
Contractor shall also adhere to all traffic restrictions notified by the local
authorities. He shall protect and indemnify the Owner and its officials & employees
against any claim or liability arising out of violations of any such laws, ordinances,
orders, decree, whether by himself or by his employees or his authorized
representatives. Nothing extra shall be payable on these accounts.
13.0 Labour Welfare Cess
As per circular No. GHR/2005/04/CWA/2004/841/M-3 dt. 3/1/05 and G.R. No.
CWA/2004-1831-M(3) dt. 9/12/05 issued by G.O.G. (non-refundable) shall be
deducted from every bills which shall be deposited to Govt. Labour Department for
Labour welfare fund.
14.0 Currencies
All payments shall be made in Indian Rupees.
15.0 Advance Payment
No Advance Payment shall be made.
16.0 Cost of Repairs
Loss or damage to the Works or Materials to be incorporated in the Works between
the Start Date and the end of the Defects Correction periods shall be remedied by
the Contractor at the Contractor's cost if the loss or damage arises from the
Contractor's acts or omissions.
B. FINISHING THE CONTRACT
17.0 Completion
The Contractor shall request the Engineer to issue a Certificate of Completion of the
Works and the Engineer will do so upon deciding that the Work is completed.
18.0 Termination
18.1 The Employer shall be entitled to terminate the contract if the contractor:
(a) Fails to carry out any obligation under the contract.
(b) Without reasonable excuse fails –
Signature of Bidder Page 18 of
Ahmedabad Municipal Corporation
1. To commence the works on site within the period stated in the Appendix to Bid
after receipt by him of a Notice to this effect from the Engineer/Employer after
signing the agreement or
2. To proceed with the works, or any section thereof, within 28 days after received
3. Has failed to comply with a notice issued or an instruction issued within 28 days
after having received.
4. Abandons the works or otherwise plainly demonstrates the intention not to
continue performance of his obligation under the contract.
5. Sub-contracts the works or assigns the contract without the specific prior written
permission of the engineer.
6. Has failed to furnish the required securities or extension thereof in terms of the
7. Becomes bankrupt or insolvent, goes into liquidation, has a receiving or
administration order made against him, compounds with his creditors, or carries on
business under receive, trustee or manager for the benefit of his creditors, or if any
act is done or event occurs which (under applicable Laws) has a similar effect to any
of these acts of event.
18.2 In any of these events or circumstances, the Employer may, upon giving 14 days
notice to the contractor, terminate the contract and expel the contractor from the
site. However, in the case of sub-paragraphs (h), the Employer may be notice
terminate the contract immediately.
18.3 The Employer’s decision to terminate the contract shall not prejudice any other
rights of the Employer, under the contract or otherwise.
18.4 After termination, the Employer may complete the works and/or arrange for any
other entities to do so. The Employer and these entities may then use any goods,
contractor’s documents and other design documents made by or on behalf of the
18.5 The Employer or the Contractor may terminate the Contract if the other party
causes a fundamental breach of the Contract.
18.6 Fundamental breaches of Contract include, but shall not be limited to the
(a) the Contractor stops work for 14 days when no stoppage of work is shown on the
current Program and the stoppage has not been authorized by the Engineer;
(b) the Employer or the Contractor is made bankrupt or goes into liquidation other
than for a reconstruction or amalgamation;
(c) The contractor fails to fulfill requirements;
(d) the Engineer gives Notice that failure to correct a particular Defect is a fundamental
breach of Contract and the Contractor fails to correct it within a reasonable period
of time determined by the Engineer;
(e) the Contractor does not maintain a security which is required;
(f) the Contractor has delayed the completion of works by the number of days for
which the maximum amount of liquidated damages becomes payable as defined in
the Contract data;
(g) if the Contractor, in the judgment of the Employer has engaged in corrupt or
fraudulent practices in competing for or in the executing the Contract.
(h) For the purpose of this paragraph: “corrupt practice” means the offering, giving,
receiving or soliciting of anything of value to influence the action of a public official
in the procurement process or in contract execution. “Fraudulent practice” means a
misrepresentation of facts in order to influence a procurement process or the
execution of a contract to the detriment of the Borrower, and includes collusive
practice among Bidders (prior to or after bid submission) designed to establish bid
Signature of Bidder Page 19 of
Ahmedabad Municipal Corporation
prices at artificial non-competitive levels and to deprive the Borrower of the
benefits of free and open competition.”
18.7 When either party to the Contract gives notice of a breach of contract to the
Engineer for a cause other than those listed above, the Engineer shall decide
whether the breach is fundamental or not.
18.8 Notwithstanding the above, the Employer may terminate the Contract for
18.9 If the Contract is terminated the Contractor shall stop work immediately, make the
Site safe and secure and leave the Site as soon as reasonably possible and handover
the site to the Employer including all materials and plant and equipment existing
19.0 Contractor's own responsibility
The contractor is to set out and level the works and will be responsible for the
accuracy of the same. He shall also be responsible for the correctness of the
positions, levels, dimensions, and alignment of all parts of the structures as per
instructions given to him. If at any time any error shall appear during the progress
of any part of the work, the contractor shall at his own expense rectify such error if
called upon to the satisfaction of the Engineer in charge.
20.0 Overpayment & Underpayment
20.1 Whenever any claim Fifths payment of a sum to the Municipal Corporation arises
out of or under this Contract against the contractor the same may be deducted by
the Municipal Corporation from any sum then due or which at any time thereafter
may become due to the contractor under this contract and failing that under any
other contract with the Municipal Corporation or from any sum due to the
contractor with the Municipal Corporation (which may be available with Municipal
Corporation), or from his retention money, or he shall pay the claim on demand.
The Municipal Corporation reserves the right to carry out post payment audit and
technical examination of the final bill including all supporting vouchers, abstracts,
20.2 The Municipal Corporation further reserves the right to enforce recovery of any
over payment when detected notwithstanding the fact that the amount of the final
bill may be included by the Contractor.
20.3 If as a result of such audit and technical examination any over payment is
discovered in respect of any work done by the Contractor or alleged to have been
done by him under the contract, it shall be recovered by the Municipal Corporation
from the contractor by way of all the means prescribed above or if any under
payment is discovered by the Municipal Corporation, any amount due to the
contractor under this contract or under payment may be adjusted against any
amount then due or which may at any time thereafter become due before payment
is made to the contractor from him to the Municipal Corporation on any other
contract account whatsoever.
21.0 Materials obtain from dismantling
If the contractor, in the course of execution of work is called upon to dismantle any
part for reasons other than on account of bad or imperfect work, the materials
obtained from dismantling will be the property of the A.M.C. and will be disposed of
as per instruction of Engineer-in-charge in the best interest of the A.M.C.
Signature of Bidder Page 20 of
Ahmedabad Municipal Corporation
22.0 Dispute to be referred to Arbitrator
The disputes relating to this contract, so far as they relate to any of the following
matters, whether such disputes arise during the progress of the work or after the
completion or abandonment thereof, shall be referred an independent Arbitrator
appointed by AMC as far possible in consultation with the agency if it is necessary
and such disputes shall be settled in accordance with the arbitration and
conciliation Act.
(i) The rates of payment under clause 5 for any tools, materials and stores, in or
upon the works of the site thereof or belonging to the contractor or procured by
him and intended to be used for execution of the work or any part thereof
possession of which may have been taken by the Engineer-in-charge under the said
(ii) The reduction in rates made by the Engineer-in-charge under clause 9 from the
items of works not accepted as completed fully in accordance with the sanctioned
specifications.
(iii) The rate of part of payment for any class of work which is included in the
additional or altered work carried out by the contractor in accordance with the
instructions of the Engineer-in-charge under clause 14 and the rates for which is to
be determined under the said clause
(iv) The rates of payment for materials already purchased or agreed to be purchased
by the contractor before receipt of notice given by the Engineer-in-charge under
clause 15 and/or amount of compensation payable to the contractor under the said
clause for loss in respect of such materials.
(v) The amount of compensation which the contractor shall be liable to pay under
clause 17 in the event of this failure to rectify, remove or reconstruct the work
within the period specified in the written intimation or the amount of expenses
incurred by the Engineer-in-charge under the said clause17 in rectifying, removing
or re-executing the work or in removing and replacing the materials or articles
(vi) The reduction of rates as may be fixed by the Engineer-in-charge under clause
for the inferior work or materials as accepted or made use of.
(vii) The amount of compensation payable by the contractor for damages as estimates
and assessed under clause
(viii) The amount payable to the contractor for the work carried out under clause 33 in
accordance with the instructions and the requirement of the Engineer-in-charge in
case where there are no specifications.
(ix) The awards declared by the arbitrator shall be speaking award giving reasons and
calculations to every item of claims. The decision will have to be implemented by all
(x) In case of dispute leading to the contractor or Ahmedabad Municipal Corporation
approaching on Court of Law. It shall be within the jurisdiction where the site of
work is situated.
The reference to arbitration proceeding under this clause shall not:
i) Entitle the contractor to stop the Affect the right of the Engineer-in-charge under
clause 5 to take possession of all or any tools, plants, materials and stores in or
upon the works of site thereof belonging to the contractor or procured by him and
intended to be used for the execution of the work or any part thereof.
ii) Preclude the Engineer-in-charge from utilizing the materials purchased by the
contractor in any work or from removing such materials to other places, during the
period the work is stopped or suspended in pursuance, of notice given to the
contractor under clause
Signature of Bidder Page 21 of
Ahmedabad Municipal Corporation
iii) Progress of the work or the carrying out the additional or altered work in
accordance with the provisions of clause 14 or as the case may be, of clause
23.0 Drawings and Photographs of the Works
23.1 The contractor shall do photography/ videography of the site as and when asked by
AMC. No separate payment will be made to the contractor for this. . The contractor
shall have to submit the same in hard copy as well as soft copy as and when
demanded by the AMC.
23.2 No photograph of the works or any part thereof or plant employed thereon, except
those permitted under clause 59.1, shall be taken, or permitted to be taken by the
Contractor or by any of his employees or any employees of his sub-Contractors
without the prior approval of the Engineer in writing. No photographs/ videography
shall be published or otherwise circulated without the approval of the Engineer in
Seal and Signature of the Bidder Additional City Engineer
Date: Ahmedabad Municipal Corporation
Signature of Bidder Page 22 of
Ahmedabad Municipal Corporation
ybœtJtœ BGþrlrmvj ftuvtuohuNl
ftb btxuLþk xftJthe œhJt¤wk xuLzh ylu ftuLx[tfx
xuLzh btxule Nh<tu
(1) y:- yt xuLzh su <u Jdolt ybœtJtœ BGþrl.ftuvtuohuNl y&Jt fuLî{ y&Jt htsg mhfthle btLg
gtœelt ftuLx[fxhtu Che NfNu. dJobuLxlt btLg ftuLx[tfxhu ybœtJtœ BGþrl.ftuvtuohuNlbtk
btLg ftuLx[tfxhtule gtœebtk hSMxuNl fhtJJtlwk hnuNu.
c:- btLg ©uKelt ftuLx[tfxh <hefu ltuk^Kelwk «btKvºtle MJ «btKe< fhuj lfj xuLzh mt&u
stuzJtle hnuNu.
f:- xuLzhhle jtgft<
ftb sJtc>th xuLzhh <ubs su xuLzhh mwaJuj ftuLx[tfxhle ©uKe ytJ<t ntug <ubs ftb
fhJt mûtb ntug <ublu s ytvJtbtk ytJNu. ftb ytv<t vnujt ftuLx[tfxhu ftb mk<tu»tfthf
<ubs xtRb jebexbtk ÃþY fhJt sYhe mJj<,ylwCJ, ûtb<t ylu VtgltLmegj hemtumo
hsw fhJtlt hnuNu.
z:- ybœtJtœ Bgwrlrmvj ctuzo XhtJ lk - 3836,<t.25/11/2011 &e b¤uj bkswhe ylwmth
<&t mexe.Rsluh mh¾gwjh,lk -17,<t.09/12/2012 bwsc ybœtJtœ Bgwrlrmvj
ftuvtuohuNlbtk ftuLx[t¾xh hSMxuNl Ve, heLgwyj Ve <&t yvd{uzuNl Ve ylu btvœkztu ægtlbtk
htFe <u bwsc ybj fhJtltu hnuNu.
E. xuLzh Ch<t vnujt xuLzhhu mtRx rlheûtK fhe juJwk. xuLzhh ftblt «fth, ngt< hM<t, vtKe
btdo, mkath ylu JvhtNlt ceò hM<tytu&e mk<wÐ ntuJtlwk btle juJtbtk ytJNu. xuLzhhu
ftblu mtRx ylu rcÕzekd(fu su ftb fhJt, ftb ÃþY fhJt <&t ftblt buRxulLm btxu
cltJuj ntug).<ubs xuLzhhu yt mtRxlt ftb btxu, rcÕzekd btxu, gtzo, zevtu btxule søgt
vtu<tle he<u bu¤Je juJtle hnuNu. (xuLzhlwk ftb fhJt, ftb vwhwk fhJt <&t ftblt buRxulLm
(h) yt ftble mbg bgtoœt bubtuhuLzb (ltuxem RLJtRxuz xuLzh) btk sKtJuj «btKu le hnuNu.
(3) xuLzh Jujezexe rvhegz bubtuhuLzb (ltuxem RLJtRxuz xuLzh) btk sKtJuj «btKu le hnuNu.
(4) xuLzh Ch<e JF<u yluoMxble ChJtle hnuNu.
(5) xuLzh Vtubo
xuLzh Vtubo ylu ylwmwrabtkle œhufu œhuf Ftje søgt xuLzh Chlthu Chuje yt mt&u btufjujt
œM<tJus vh< fhJtlt hnuNu.
(6) ftuLx[tfxhtuyu leaule ctc<tu ft¤SÃËJof JtkaJt rJlk<e Au.
(1) ftuR fkvlelu ltbu xuLzh juJtbkt ytÔgwk ntug <tu fkvle J<e xuLzh vh mne fhlth Ôgrf<lu
yr^f]< fh<wk bwFðgthltbwk xuLzh mt&u hsw fhJtlwk hnuNu.
(2) Bgwrl.ftuvtuohuNllt «Joðbtl rlgbtu ylwmth yluMxble ChJtle hnuNu.ylu xuLzh mt&u
Signature of Bidder Page 23 of
Ahmedabad Municipal Corporation
(3) ftuLx[tfxhu RLfbxuût mkckr^< vtl lkch <&t cukf zexuRj ytvJtle hnuNu.
(4) ftuLx[tfxh vtmu ydtWlt ylwCJt ykdult «btKvºttule lfj xuLzh mt&u hsw fhe NfNu.
(5) xuLzh Nh<tu ylu MvuNeVefuNl <&t CtJ vºtflt œhuf vtlt ylu rJd<tu vh ftuLx[tfxhu mne
(6) <btb mw^tht, AufAtf ylu Dwkxujt jFtK vh ftuLx[tfxhu xwkfe mne fhJe.
xuLzh Chlthlu sKtJJtbtk ytJu Au fu xuLzh œM<tJustult jFtKbtk ftuR AufAtf fu VhuVth
fhJtbtk ytJtNu lrn ylu ytJe ftuR AufAtf fu VuhVth juJtNu lrn, <ultk jFtKbtk ftuR
Cwj ntug <tu <ult vh l Dwkx<t Ftuxt jFtK fu ytkfzt vh Auftu bthelu <ult mtawk jFtK fu
ytkfzt MvÐ Wfju <u he<u jFJt. «ðguf mw^tht vh xwkfe mne fhJe.
(8) y:- xuLzh hsw fh<tk vnujt Ftm fhelu xuLzhbtk œNtoJuj mwaltytulwk vtjl fhJtbtk ytÔgw lrn
ntug <tu xuLzh ybtLg dKJtbkt ytJNu <ule ltuk^ juJt rJlk<e Au. J¤e yt Vtubolwk bwFv]ƒ
ylu ftuLx[tfxhtult btdoœNol btxu mtbtLg rlgbtu ylu mwaltytu vK ft¤SvwJof JtkaJt
(1) ftuEvK fthK œNtoÔgt rmJtg ftuEvK fu c^t xuLzhtu yMJefthJtltu n¬ yctr^< hnu Au.
(h) xuLzhhu ctujvtuELx vullt c>ju NtneJt¤e vul&e Chujt xuLzhtu ðþkh< s ybtLg dKJtbtk
c:- Wvhle ctc<tu Wvhtk< xuLzh leault mkstudtubtk <h< ybtLg XhJtlu vtºt &Nu.
(1) xuLzh Chlth, rlg< ftb y&Jt ftb btxu bkswh fhuj y&Jt CtJ vºtflt ftuR ftuz y&Jt
vîr< y&Jt rJd<tubtk bwfuj Nh< y&Jt mw^thtbtk ftuR VuhVth mwaJ<t ntug.
(h) xuLzhlwk ftuR vtlwk fu vtlt ftZe ltkÏgwk/ltkÏgt ntug fu cœÕGþ / cœÕgt ntug.
(3) c^t mw^tht J^tht y&Jt atukxtzuje ftvjeytu Wvh xuLzh Chlthu xwkfe mne l fhe ntug.
(4) xuLzhbtk <ubKu ftuR AufAtf fhe ntug, ylu
(5) xuLzh Chlth y&Jt vuZele ctc<btk œhuf Ctdeœth y&Jt <u ykdulwk bwFðgthltbwk
^htJlth Ôgrf< mne l fhu y&Jt xuLzhbt <u btxu htFJtbtk ytJuje søgtbtk mne/mneytu
Wvh ftuR mtûteyu mtF fhe l ntug.
f:- Nh<e xuLzh MJefthJtbtk ytJNu lne.
z:- xuLzh MJefthJw, hœ fhJw, ftulu ytvJw ylu fgt CtJ&e ytvJw <u ykdu Bgwrl. frb§h©eltu
rlKog ytFhe hnuNu. ftuR fthKmh stu ftuLx[tfxhlu ftb l ytve Nftg <tu <u ykdu
ftuLx[tfxh ftuRvK «fthltu lwfNtle fu J¤<hltu nff œtJtuu fhe NfNu lrn fu ftgœtfeg
ftgoJtne yt ykdu &R NfNu lrn. xuLzh bkswh >ltu y&o ftb ytve œuJtLþk Au <uJtu &R
NfNu lrn.Nh<e xuLzh MJefthJtbtk ytJNu lne.
(9) rJmkdr< ylu rnmtc stud:
nt& ^hJtlt ftbtule ctc< œNtoJ<t CtJ vºtfbtklt sÚ&t ylu hfble ftuRvK
Cwjawf leault rlgbtu ylwmth mhCh fhJtbtk ytJNu.
Signature of Bidder Page 24 of
Ahmedabad Municipal Corporation
(1) xuLzh Chlthu œhuf Ftltbtk sKtJuj Nçœtu ylu ytkfzt Jåau ftuR ymkdr<lt fumbtk
Nçœtuubtk sKtJuj hfb btLg htFJtbtk ytJNu.
(2) yufb œh ylu sÚ&tlt Ftuxt dwKtfthlt fthKu ftble ctc<tu œNtoJ<e CtJ vºtflt
Ftltbtk&e hfbbtk Cwj sKtg <tu yufb œh btLg htFJtbkt ytJNu ylu œhlt yt^thu
dwKtfth mw^thJtbkt ytJNu.
(3) yufblt Ftltbtk&e <ubs ytd¤ Fuka<t mhJt¤tle <btb Cwjtu mw^thJtbkt ytJNu.
(4) ctc<tu y&Jt mhJt¤t mtbu vwhu ytkfzu fhuj ftuR vK ctc< ægtlbtk juJtbtk ytJNu lrn.
(10) y:- ftbltu «tud{um mbgbgtoœt bwsc fhJtltu hnuNu. yt mbgbgotœt 10 jtF mw^elt ftb btxu
yuj.ytu.ytR. ytÃgt <theF&e 10 rœJm <&t 10 jtF &e Wvhltk ftb btxu yuj.ytu.ytR.
ytÃg <theF&e 15 rœJm&e NY &guj dKJtbt ytJNu. <&t <u œhBgtl ftble 3% juFu zevtuÍex
Che fhthvºt fhJtltu hnuNu.
xuLzhbtk ftuLx[t¾xh îtht Chujt CtJ <btb «fthlt su <u «J<o<t mhfthe xuût
mrn<lt CtJ dKJtbtk ytJNu. ylu <ubtk atjw ftb œhBgtl su ftuR VuhVth &Nu <ultu
J^thtu awfJJtbtk ytJNu lrnk.
c:- mûtb m•tt îtht xuLzhle bkswheltu XhtJ vtzgt ctœ (LOI) ytvJtbtk ytJNu ðgth ctœ
rœl - 10 btk rm¾gtuhexe zevtuÍex sbt fhtJJtle hnuNu. rm¾gtuhexe zevtuÍex btuze
ChJtlt rfMmtbtk Bgwrl.ftuvtuohuNlbtk «Joðbtl rlgb ylwmth ftgoJtne fhJtbtk ytJNu.
f:- bkswh &guj xuLzhle mbgbgtoœtbtk ftbdehe vqKo l &tg <tu bubtuhuLzb (ltuxem RLJtRxuz
xuLzh) btk sKtJuj «btKu bkswh &guj mbgbgtoœt ctœlt FhuFh ctfe ftble hfblt
bn•tb 10% juFu (jefJezexe zubuSm) vulÕxe Jmwj fhJtbtk ytJNu.
z:- yu.yth.me. xuLzhbtk bkswh &guj sw>t sw>t yk>ts vifelt ftbtu Jfo ytuzoh b¤u&e NY
E:- yu.yth.me. xuLzhbtk yjd yjd ykkœtsle bkkswhe bégu&e btºt rmJej ftbdehelt ftb
«btKu yk>ts hfb Bþsc mbgbgto>t dKtNu.
(1) Yt.1,00,000.00 Mþ^elt ftbtu btxu 02 btm
(h) Yt.3,00,000.00 Mþ^elt ftbtu btxu 03 btm
(3) Yt.5,00,000.00 Mþ^elt ftbtu btxu 04 btm
(4) Yt.5,00,000.00 &e Wvhlt ftbtu btxu 06 btm
(11) y:- awfJKe:-
xuLzh Chlthu yu Jt< mbS juJtle hnuNu fu <uKu xtkfujt œh vwhtk &gujt ftb btxult Au ylu
<ubtk bswhe, vtjF, ÃjtLx, œuFhuF, mhJem-ftbdehe, Jes¤e, htugÕxe ylu ytufx[tug
Jduhu ykNu <btb Faoltu <&t sYh sKtg <tu ylu ðgthu ht<vt¤elt ftblu juJt c^t
J^thtlt Faoltu mbtJuN &Nu ylu xtkfujt CtJ fu œh fh<t J^thtle ftuR awfJKe ykdult
<ublt ftuR œtJt ægtlbtk juJtNu lnek ylu xuLzh Chlth Ftuxe hswyt<lu fthKu y&Jt ftuR
Signature of Bidder Page 25 of
Ahmedabad Municipal Corporation
Ôgrf<yu (vAe<u ctk^ftb rJCtdltu fboathe ntug fu l ntug) <ublu ytvuje btne<elu
yt^thu vtA¤&e ftuR œtJt hsw fhJt nfœth hnuNu lnek. <ublw xuLzh ChJt <&t <ubtk swœt
swœt CtJ ylu œh ChJt btxu sYhe yuJe <btb btne<e vtu<tlt vûtu l bu¤Je NfJtlu
fthKu vtu<u xuLzh hsw fhJtlu je^u y&Jt <ubtk&e WCt &<t ftuR stuFb fu sJtcœthebtk&e
Axfe NfNu lnek. mœh ftbbtk ftuR vK ò<lt ctk^ftblt bxehegj Wvh CtJ J^thtu
ytvJtbtk ytJNu lrnk.
c:- ftuLx[tfxhtulu vubuLx / hlekd cej Bgwrl. frb§h©elt su <u «J<obtl rlgb bwsc fhJtbt
ytJNu. <&t Bgwrl. frb§h©e/mexe Rsluh©e lt su <u JF<ltk mh¾gwjh «btKu
ftbdehe/ybj fhJt rcl Nh<e ckDlf<ot hnuNu.
f:- ftuLx[t¾xhlt œhuf hlekd cejbtk&e ftuLx[t¾xhlu awfJJtle &<e fwj hfb Wvh (xuLzh
bwsclwk vubuLx + yu¾x[t ytRxb) 2 % juFu hexulNl ble ftvJtbtk ytJNu su VtRlj
cejbtk vh< ytvJtbtk ytJNu.
z:- htsg / fuL÷ mhfth©elt JF<tuJF<lt ftgœt bwsc su ftuR hfble fvt< fhJtle &Nu <u
bwsc ftuLx[tfxhlt cejbtk&e fvt< fhJtbt ytJNu.
(12) yu:- fhth mkc^e œM<tJustu fhthlt ydðglt Ctd dKtNu ylu <u mD¤t mne<lt fhth mbd{
ftblu jtdw vzNu.
ce:- xuLzhbtk œNtoJuj ftb mkck^e œM<tJusbtk œNtoJuj rJd<btk rJmkd<<tlt rfMmtbtk leau
œNotJuj ¢btlwmth œM<tJusbtk œNtoJuj rJd< d{tng htFJtbkt ytJNu.fhth mkc^e
œM<tJustu fhthlt ydðglt Ctd dKtNu ylu <u mD¤t mne<lt fhth mbd{ ftblu jtdw
(yu) yufb ylu fœ:-
(2) xuLzh VtuboLþk CtJvºtf
(3) MvuNeVefuNl
z[tu#dbtk fœ, ytfth, ytkfzt fœta Ftuxt ntug <tu btvujt fœ, ytfthlu yLþmhÔþk
(2) xuLzh Vtubole yLþMþra-ce
(3) MvuNeVefuNl
Cwj Chujt fu Ftuxt JKollt rfMmtbtk yt mkck^e Wvhefûttyu rJmkd<<t ykdule
ltuk^ bwfe yuze.mexe yuLSlegh / zu.BGþrl.frbNlh©ele bkswhe bu¤JJtbtk ytJNu ylu <u
bwsc fhJtbkt ytJuj rlKog ykr<b dKJtbkt ytJNu.
(13) xuLzhhu z[tuRkd fu MvuNeVefuNlbtk hnuje ftuR ûtr< fu Ftbeltu duhjtC juJtle fturNN l fhJe
ylu Rsluh Rlatsuo Ãjtl <&t MvuNeVefuNlle ûtr<ytu mw^thJe <&t <ulwk mtawk y&oDxl
Signature of Bidder Page 26 of
Ahmedabad Municipal Corporation
(14) yt Wvhtk< y.Bgw. ftuvtuo. lt slhj ftuLx[tfx fLzeNl vK btLg htFJle hnuNu.
(15) yufe JF<u yuf fh<t J^w søgtytuyu ftb NY fhJtltu Jfo ytuzoh b¤u <tu ftb yuf mt&u s
c^u NY fhJw vzNu.
(16) atjw ftbu mrJom jtRllu lwfNtl l &tg <u he<u ftb fhJtlw hnuNu. stu ftuR mrJom jtRllu
lwfNtl &Nu <tu <ule mkvwKo sJtcœthe (òlbtj) ftuLx[tfxhle vtu<tle hnuNu. mtRx Wvh
ftb œhBgtl bswhtu fu sl<tlt ftuR btKmlt òlbtj lu lwfNtl &tg <ule sJtcœthe
ftuLx[tfxhle hnuNu. vtujem Vrhgtœ &tg <tu <ule sJtc>the vK ftuLxtfxhle hnuNu. CuFz
Dme l vzu <ule sJtc>the vK vtujem Vrhgtœbt ftuLx[tfxhle hnuNu. CuFz Dme l vzu <u
btxu mjtb<elt vdjt (suJt fu œtuhzwk ctk^e bswh Ftztbtk W<thJt, mtuhekd ylu Mx[xekd
fhJt rJduhu) je^t Jdh bsqhlu Ftztbtk W<thNu <tu ftuLx[tfxh s vtujem Vrhgtœbt
sJtcœth hnuNu ylu Bgwrl.ftuvtuohuNlltu ftuRvK MxtV ytlt btxu sJtcœth hnuNu lrn.
ytxjwk mbSlu s xuLzh ChJwk. œhuf ftb fh<t bswhtultu rJbtu vK W<thujtu ntuJtu stuRyu.
(17) bxehegÕm fu ceò xuMxed hevtuxo ftuLx[tfxhu vtu<tlt Fauo ftuvtuohuNl sKtJu <u søgtyu
fhtJJtlt hnuNu. bxehegÕm jtJJt fu jR sJtltu mkvwKo Fao ftuLx[tfxhu CtudJJtltu
hnuNu.<&t atjw ftb œhBgtl yuLSlegh Rlatso îtht ybœtJtœ Bgwrlmevj ftuvtuohuNlle
buxjzuvtu jucbtk xuMxekd fhtJJt sKtJJtbtk ytJu <tu ftuLx[t¾xh îtht <ulw vtjl fhJtlw
(18) M&¤ vrhrM&r< / sYhegt< bwsc ftb fhtJ<t xuLzhlt ytRxblt sÚ&tbtk J^ ^x &tg <tu
rlgb ylwmth <u ykdu ftb fhJt ftuLx[tfxh ck^tgujt Au.
(19) mtRx vh jtJJtbtk ytJuj btj mtbtl hesufx fhJtbt ytJu <tu <whk< rœl 1btk vh< jR
sJtltu hnuNu. yLg&t <ule lwfNtlle sJtc>the ftuLx[tfxhle hnuNu.
(20) ftuLx[tfxhlu su ftuLx[tfx ytvJtbtk ytJu Au. <ubt mhfth©elt «Joðbtl rlgb bwsc
ve.yuV/juch yufx <&t bswhtu <&t MxtVle Jebt vtujeme jElu <ult ftgœtlw vtjl
fhJtlwk hnuNu <&t yt ykdu Bgwrl.ftuvtuohuNl îtht su btne<e btkdJtbtk ytJu <u ytvJtle
hnuNu. bu.BGþrl.frbNlh©elt mh¾âwjh Bþsc sYhe ctknu^he vºtf ytvJtLþk hnuNu.
(21) ftuRvK ftgœtfeg jexeduNl ybœJtœ Nnuhle ftuxobt hnuNu.
(22) btj su <u Mxtumo Wvh y&Jt mtRx Wvh jtuftulu lz<h l &tg <u he<u mwalt bwsc
W<thJtltu <ubs dtuXJJtltu hnuNu.
(23) ftuR vK mhfthe fhJuht ChJtle <btb sJtcœthe ftuLx[tfxhle hnuNu.
(24) ftuLx[tfxh îtht xuLzhbt œNtoJuj MveNeVefuNl bwsc MxtLzzo bxehegÕm MvuNeVefuNl bwsc
jtJJtlt hnuNu.<&t xuMxekd fhtJJtlwk hnuNu.<&t y ykdu «Joðbtl Bgwrl.ftuvtuohuNlt
rlgbtulw vtjl fhJtlw hnuNu.
(25) yt xuLzhbtk stu ftuR ytRxb hne dR ntug <tu <u y&Jt M&¤ M&e<e bwsc xuLzhbtk mbtJuN
l ntug <uJe J^thtle ftbdehe fhJtle &tg <uJt rfMmbtk Bgwrl.ftuvtuohuNlt «Joðbtl rlgb
ylwmth J^thtle ytRxblt CtJ lffe fhJtbtk ytJNu ylu <u bwsc awkfJKe fhJtbtk
Signature of Bidder Page 27 of
Ahmedabad Municipal Corporation
(26) atjw ftb œhBgtl «tuxufNlle mkvwKo sJtcœthe ftuLx[tfxhle hnuNu. subtk vevzt, œtuhzt
Cgmwaf ctuzo, ÃjtMxef vèe, rJ. ftuLx[tfxhu jtJJtlwk ylu mtaJJtlwk hnuNu. ylu ftuRvK
yfMbt< &Nu <tu <ule mkvwKo sJtc>the ftuLx[tfxhle hnuNu.
(27) M&¤ Wvh atjw ftbdehe œhBgtl ftb fhlth ftuLx[tfxhlt bswh / fboathe y&Jt yLg
Ôgrf<lt yfMbt<lt rfMmbtk juch yufx bwsc fhJtle &<e ftgoJtne <&t vtujem
ftgoJtnele sJtc>the ftuLx[tfxhle hnuNu.
(28) stu MxtV mqalt ytvu <u bwsc mwalt vtu&e ftuLx[tfxhu htFJtle hnuNu. <ubtk œhhtus fhuj
ftbdehe <&t yr^ftheytuyu ftb mw^thJt fu «tud{um J^thJtlt ltuk^ fhuj ntug <tu <ulwk
ftuBÃjtgLm ytvJtlwk hnuNu ytJe ltu^lt sJtc l &gu fu <u «btKu M&¤ Wvh ybj l &gu
ftuLx[tfxhlu vulÕxe fhJtle m•tt yuze.mexe yuLSlehgh©elu hnuNu.
(29) œhuf ytRxblt MvuNeVefuNl ybœtJtœ Bgwrlrmvj ftuvtuohuNlltk bkswh &guj <&t btLg
htFuj MvuNeVefuNl Nh<tu bwsc hnuNu su ytRxbbtk MvuNeVefuNl l ntug <uJt mkstudtubtk
yuze.mexe.yuLSlegh©eltu rlKog ytFhe hnuNu.Jtuxhekd fhJtbtk lrn ytJu fu œhhtus
J^thtltu zucheÍ WvtzJtbtk lrn ytJu <tu ftuLx[tfxhlt Fauo ylu sutFbu Jdh ltuxemu
Jtuxhekd fhtJJtbtk <&t zucheÍ WvtzJtbtk ytJNu ylu cejbtk&e hfb ftve juJtbtk
(30) juch JuÕVuh Vkz btxu ntjbtk htsg mhfth©eyu fhuj nwfb bwscle hfb cejbtk&e ftve
(31) atubtmtltu vehegz <t.15 swl &e 14 ytufxtuch Mþ^eltu dKJtbtk ytJNu. yt mbg
œhBgtl ftuLx[tfxh îtht ftbdehe fhe Nftg <ub l ntug <tu <u Bþscle xtEb jebex J^the
ytvJtbtk ytJNu.
(32) muÕm xuût / Jux lkch / ve.yuV. ftuz lkch / vtl lkch / S.yum.xe. lkch rJduhu ftuLx[t¾xhu
VhSgt< ytvJtlt hnuNu.
(33) ltbœth ftuxo îtht fhuj nwfb <ubs rlœuo»ttulwk awM<vKu vtjl fhJtlwk hnuNu. subtk z[ulus lu
jd<tk ftb btk ftuRvK mkkstudtubtk bNel ntuj / dxh btk btKmlu W<thJtu lnek <ubs
buLgwyj M¾{uJSkd ykdule btdoœrNoft lwk vtjl fhJwk.
(34) mœh xuLzhle ytRxbtult CtJtu ltKt Ft<t lt mhfgwjh lk.38, <t.21/11/22 <&t mûtb
m•ttle b¤uj bkswhe bwsc GST rmJtg dKºtebtk juJtbt ytJuj <&t «Jo<btl rlgb
bwsc GST awfJJt vtºt &Nu su ægtlu jR <btb cezomu xuLzhtu ChJtlt hnuNu.
(35) mœh xuLzh yk<od<lt ftb mkjøl y.Bgw.ftu.btk vJo<btl <btb rlgbtu/mhfgwjhtu jtdw
vzNu <ubs JF<tu JF< <h mw^thtytu vK jtdw vzNu. sule ltuk^ jR xuLzhtu ChJtlt
(36) mœh xuLzh yu.yth.me. «fthlw Au ytvlu mtukvJtbtkk yuxju fu ytv îtht ChJtbtkk ytJuj
ftbdehelt sÚ&t bwsc mbg bgtoœt lffe fhe su <u mûtbm<tle yjd yjd ykkœtsle
Signature of Bidder Page 28 of
Ahmedabad Municipal Corporation
bkkswhe bégu&e Jfo ytuzoh ytvJtbtkk ytJNu ylu mbg bgtoœtbtkk ftbdehe vqKo fhJtlw awM<
vKu vtjl fhJtlw hunNu .
(37) mœhnw ftbbtkk Jtuzobtkk sYhegt< bwsc ytuAtbtkk ytuAe xuLzhle Nh< bwsc bkkswh <h
xuLzh vife yjd yjd ykkœtsle bkkswhe bu¤JJtbtkk ytJ<e ntuR, ytuAtbtkk ytuAe yuf mt&u
œN søgtyu sYhegt< bwsc ftbdehe NY fhJtle Nh<u ylu <u «btKu bulvtJh,
bNelhe, bxehegÕm <ubs ltkkKtfeg studJtRle vwh<t «btKbtkk ÔgJM&t fhe su <u xuLzhhu
xuLzh Cgto vqJuo ytdtu<Y ytgtuslle <igthe mt&u ftbdehe fhJtle &tg Au.
yufhthlwk Vtubo
(1) nwk/ybu yt&e yufhth fhwk Awk/fheyu Aeyu fu yt xuLzh hsw fh<tk vnujtk buk/ybu
M&¤le bwjtft< je^e Au ylu ftblu jd<t btjmtbtl, bswhe ylu ceS ctc<tulu
jd<e M&trlf vrhrM&r<le ò<-btne<e bu¤Je Au.
(2) nwk/ybu yt&e yufhth fhwk Awk/fheyu Aeyu fu yt ftuLx[tfxhtule Nh<tu rJd<tu ylu
xuLzhlu jd<t >M<tJustu ft¤SvwJof yÇgtm fgtuo Au ylu <u bwsc <ultu ybj fhJt
ftuLx[tfxhle mne ylu rmfft
Signature of Bidder Page 29 of
Ahmedabad Municipal Corporation
GENERAL DETAILS SPECIFICATION OF MATERIAL
1.1 Water shall not be salty or brackish and shall be clean reasonably clear and free from
objectionable quantities of silt and tract of oil and injurious alkalis, salts, organic mater and
other deleterious materials which will either weaken the mortar or concrete or cause
efflorescence of attach the steel in R.C.C. Container for transport, storage and handling of
water shall be clean. Water shall conform to the standards specified in I.S. 456-1978.
1.2 If required by the Engineer-in-charge it shall be tested by comparison with distilled
water. Comparison shall be made by means of standard cement tests for soundness, time of
setting and mortar strength as specified in I.S. 269-1976. Any indication of unsoundness,
change in time of setting of 30 minutes either more or decrease of more than 10 percent in
strength of mortar prepared with water sample when compared with the results obtained
with mortar prepared with distilled water shall be sufficient cause for rejection of water
1.3 Water for curing mortar, concrete or masonry should not be too acidic and also not too
alkaline. It shall be free of elements which significantly affect the hydration reaction or
otherwise interfere with the hardening of mortar or concrete during curing or those which
produce objectionable stains or other unsightly deposits on concrete or mortar surfaces.
1.4 Hard and bitter water shall not be used for curing.
1.5 Potable water will be generally found suitable for curing mortar for preparing or
2.1 Cement shall be Ordinary Portland, Ordinary Portland cement as per I.S. 269-1976 or
Portland slag cement as per I.S.455-1976.or Sulphate Resistant Cement as per IS-12330
latest Revision.
2.2 Testing of Cement : It should be specifically noted that the cement brought by the
contractor at site of work shall be used after the same is tested at the approved
laboratory as per the direction of the Engineer-in-charge. Such approved laboratory may be
located at Ahmedabad. All the charges for transport and testing of the samples shall have to
be borne by the contractor. The frequency of testing of such materials shall be in
accordance to the relevant Indian standard as directed by the Engineer-in-charge.
Sand shall be natural sand, clean, well graded, hard strong, durable and gritty particles free
from injurious of dust, clay, kankar nodules, soft or flaky particles shale, alkali salts, organic
matter, loam, mica or other deleterious substances and shall be got approved from the
Engineer-in-charge. The sand shall not contain more than 8 percent of silt as determined by
field test. If necessary the sand shall be washed to make it clean.
3.2 COARSE SAND :
The fineness modulus of coarse sand shall not be less than 2.5 and shall not exceed
3.0. The sieve analysis of coarse shall be as under:
I. S. Sieve Percentage by I. S. Sieve Percentage by
Designation weight passing Designation weight passing
sieve through sieve.
3.3 FINE SAND :
Signature of Bidder Page 30 of
Ahmedabad Municipal Corporation
The fineness modulus shall not exceed 1.0. The sieve analysis of fine sand shall
I. S. Sieve Percentage by I. S. Sieve Percentage by
Designation weight passing Designation weight passing
through sieve through sieve.
2.36 mm 100 300 Micron 5 -
M-4 STONE GRIT :
4.1 Grit shall consist of crushed or broken stone and be hard, strong dense,
durable, clean, of proper gradation and free from skin or coating likely to prevent
proper adhesion of mortar. Grit shall for as possible flaky elongated pieces shall
It shall generally comply with the provisions of I. S. 383-1970. Unless special stone of
particular quarried is mentioned. Grit special stone of particular quarries is
mentioned. Grit shall be obtained from the best black trap or equivalent hard
stone as approved by the Engineer - in - charge. The grit shall have no deleterious
reaction with cement.
4.2 The grit shall conform to the following gradation as per sieve analysis :
I. S. Sieve Percentage passing I. S. Sieve Percentage Passing
Designation through sieve Designation through sieve
4.3 The crushing strength of grit will be such as to allow the concrete in which it is
used to build up the specified strength of concrete.
4.4 The necessary tests for grit shall be carried out as per the requirements of I. S.
2386 (Parts I to VIII) 1963, as per instruction of the Engineer-in-charge. The
necessity of test will be decided by the Engineer-in-charge.
M-5A STONE COARSE AGGREGATE FOR NOMINAL MIX CONCRETE :
5A.1 Coarse aggregate shall be of machine crushed stone of black trap or
equivalent and be hard, strong, dense, durable, clean and free from skin and
coating likely to prevent proper adhesion of mortar.
5A.2 The aggregate shall generally be cubical in shape. Unless special stones of
particular quarries are mentioned, Aggregates shall be machine crushed from the
best black trap or equivalent hard stone as approved. Aggregate shall have no
deleterious reaction with cement. The size of the coarse aggregate for plain
cement concrete and ordinary reinforced cement concrete shall generally be as
per the table given below. However in case of reinforcement cement concrete
the maximum limit may be restricted to 6 mm less than the minimum lateral
clear distance between bars of 6 mm. less than the cover whichever is smaller.
I.S. Sieve Percentage Passing for I.S. Sieve Percentage Passing for
Designation single sized aggregates Designation single sized aggregates
of nominal size of nominal size
Signature of Bidder Page 31 of
Ahmedabad Municipal Corporation
NOTE :- The percentage may be varied by the Engineer-in-charge when
considered necessary for obtaining better density and strength of concrete
5A.3 The grading test shall be taken in the beginning and at the charge of source of
materials. The necessary tests indicated in I.S. 383-1970 I. S. 456-1978 shall have
to be carried out to ensure the acceptability. The aggregates shall be stored
separately and handled in such a manner as to prevent the inter mixed on
different aggregates. If the aggregates are covered with dust, they shall be
washed with water to make them clean.
M-5B BLACK TRAP OR EQUIVALENT HARD STONE COARSE :
5B.1 Aggregate for Design Mix concrete : Coarse aggregate shall be of machine
crushed stone of black trap or equivalent hard stone and be hard, strong, dense,
durable clean and free from skin and coating likely to prevent proper adhesion of
5B.2 The aggregates shall generally be cubical in shape. Unless special stones of
particular quarries are mentioned, aggregates shall be machine crushed from the
best, black trap or equivalent hard stones as approved. Aggregate shall have no
deleterious reaction with cement.
5B.3 The necessary tests indicated in I. S. 383-1970 and I.S.456-1978 shall have to
be carried out to ensure the acceptability of the material.
5B.4 If aggregate is covered with dust it shall be washed with water to make it
6.1 The bricks shall be hard or machine moulded and made from suitable soils and
kiln burnt. They shall be free from cracks and flaws and nodules of free lime. The
shall have smooth rectangular faces with sharp corners and shall be of uniform
The bricks shall be moulded with a frog of 100 mm x 40 mm and 10 mm to 20 mm
deep on one of its flat sides. The bricks shall not break when thrown on the
ground from a height of 600 mm.
6.2 The size of modular bricks shall be 190 mm x 90 mm.
6.3 The size of the conventional bricks shall be as under :
6.4 Only bricks of one standard size shall be used on one work.The following
tolerance shall be permitted in the conventional size adopted in a particular work.
Length : = 1/8" (3.0 mm) Width : = 1/16" (1.50 mm)
Height : = 1/16" (1.50 mm)
6.5 The crushing strength of the bricks shall not be less than 35 Kg/Sq.cm. The
average water absorption shall not be more than 20 percent by weight.
Necessary tests for crushing strength and water absorption etc. shall be carried
out as per I.S. 3495 (Part-I to IV) -
M-6A FLY-ASH LIME BRICKS :
The fly ash lime bricks shall conform to Grade-1 or Grade-2 of IS-3812-1981. The
frog of the 80 to 100 mm x 40 mm x 10 to 20 mm size.
The size of modular bricks shall be 190 mm x 90 mm x 90 mm.
The size of conventional brick shall be 225 mm x 110 mm x 75 mm.
Signature of Bidder Page 32 of
Ahmedabad Municipal Corporation
Only bricks of one standard size shall used on one work. The following tolerances
shall permitted in the conventional size adopted in a particular work:
Length : + 3 mm
Height : + 2 mm
The physical characteristic of bricks shall be as follows.
The minimum compressive strength of fly ash lime bricks shall not be less than
Kg/Sq.Cm. and the test shall be conform to IS-3495 (Part-I):1992.
The average drying shrinkage of the brick when tested by the method described in IS
4139-1989 being shall not exceed 0.15 percent.
The averages water absorption not more than 20 percentage by mass and the test
shall conform to IS-3495 (Part-3):1992.
M-7 MILD STEEL BARS :
7.1 Mild steel bars reinforcement for R.C.C. work shall conform to I.S. 432 ( Part-II
) 1966 and shall be tested quality. It shall comply with relevant part of I.S.456-
7.2 All the reinforcement shall be clean and free from dirt, paint, grease, mill scale
or loose of thick rust at the time of placing.
7.3 For the purpose of payment the bar shall be measured correct upto 10 mm
length and weight payable worked out the rate specified below :
1. 6 mm 0.22 Kg./Rmt. 8. 20 mm 2.47 Kg./Rmt.
2. 8 mm 0.39 Kg./Rmt. 9. 22 mm 2.98 Kg./Rmt.
3. 10 mm 0.62 Kg./Rmt. 10. 25 mm 3.35 Kg./Rmt.
4. 12 mm 0.89 Kg./Rmt. 11. 28 mm 4.83 Kg./Rmt.
5. 14 mm 1.21 Kg./Rmt. 12. 32 mm 6.31 Kg./Rmt.
6. 16 mm 1.58 Kg./Rmt. 13. 36 mm 7.31 Kg./Rmt.
7. 18 mm 2.00 Kg./Rmt. 14. 40 mm 9.86 Kg./Rmt.
M-8 TMT FE-500 STEEL BARS FOR REINFORCEMENT :
8.1 Reinforcement bars shall conform to IS-432, IS-226 or IS-1786 with its latest
amendment and welded wire fabrics to IS : 1566. Only TMT bars for
reinforcement in RCC duct shall be used which shall be clean, free from pitting,
oil, grease, paint, loose mill scale, rust, dirty dust or any other such substance
that will destroy or reduce bond.
It permitted by the Engineer-in-charge reinforcement shall be done in accordance
with IS-2751 or IS-9147 as applicable.
8.2 Other provision and requirements shall conform to specification No. M-7 for
mild steel bars.
M-9 MILD STEEL BINDING WIRE :
9.1 The mild steel wire shall be of 1.63 mm or 1.22 mm (16 or 18 gauge) diameter
and shall conform to I.S. 280-1972.
9.2 The use of black wire will be permitted for binding reinforcement bars. It shall
be free from rust, oil paint grease, loose mill scale or any other undesirable
coating which may prevent adhesion of cement mortar.
M-10 STRUCTURE STEEL :
10.1 All structural steel conform to I.S.226 - 1965. The steel shall be free from the
defects mentioned in I.S. 226-1975 and shall have a smooth finish. The material
shall be free from loose mill scale, rust pits or other defects affecting the strength
and durability. Rivet bars shall conform to I.S. 1148-1973.
10.2 When the steel is supplied by the contractor test certificate of the
manufacturers shall be obtained according to I.S. 226-1975 and other relevant
Indian Standards.
M-11 SHUTTERING :
Signature of Bidder Page 33 of
Ahmedabad Municipal Corporation
11.1 The shuttering shall be either of wooden planking of 30 mm. minimum
thickness with or without steel lining or of steel plates stiffened by steel angles.
The shuttering shall be supported on battens and beams and props of vertical
ballies properly cross braced together so as to make the centering rigid. In places
of bullie props, brick pillar of adequate section built in mud mortar may be used.
11.2 The form work shall be sufficiently strong and shall have camber, so that it
assumes correct shape after deposition of the concrete and shall be able to resist
forces caused by vibration of live load of men working over it and other incidental
loads associated with it. The shuttering shall have smooth and even surface and
its joints shall not permit leakage of cement grout.
11.3 If at any stage of work during or after placing concrete in the structure, the
form sags or bulges out beyond the required shape of the structure, the concrete
shall be removed and work redone with fresh concrete and adequately rigid form
work. The complete form work shall be got inspected by and got approved from
the Engineer-in-charge, before the reinforcement bars are placed in position.
11.4 The props shall consist of bullies having 100 mm minimum diameter measured
at mid length and 80 mm at thin end and shall be placed as per design
requirement. These shall rest squarely on wooden sole plates 40 mm thick and
minimum bearing area of 0.10 Sq.m. laid on sufficiently hard base.
11.5 Double wedges shall further be provided between the sole plate and the
wooden props so as to facilitate tightening and easing of shuttering without
jerking the concrete.
11.6 The timber used in shuttering shall not be so dry as to absorb water from
concrete and swell or bulge nor so wet to shrink after erection. The timber shall
be properly sawn and planned on the sides and the surface coming in contract
with concrete. Wooden form work with metal sheet lining or steel plates
stiffened by steel angles shall be permitted.
11.7 As far as practicable, clamps shall be used to hold the forms together and use
of nails and spikes avoided.
11.8 The surface of timber shuttering that would come in contact with concrete
shall be well wetted and coated with soap solution before the concreting is done.
Alternatively coat of raw linseed oil or oil of approved manufacture may be
applied in place of soap solution. In case of steel shuttering either soap solution
or raw linseed oil shall be applied after thoroughly cleaning the surface. Under no
circumstances black or burnt oil shall be permitted.
11.9 The shuttering for beams and slabs shall have camber of 4 mm per meter (1 in
250) or as directed by the Engineer-in-charge so as to offset of subsequent
deflection for cantilevers the camber at free end shall be 1/50 of the projected
length or as directed by the Engineer-in-charge.
M-12 HARD DRAWN WIRE :
The Hard drawn steel wire should confirming to IS-432 (Part 2), Hard drawn steel
wire shall be manufacture and its chemical composition should be as per para 3.0.
The finished wire should be free from defects and finished in a workman like
manner. Nominal sizes, Tolerances, Physical requirements are as per IS :
(Part-II) latest edition. Hard drawn steel wire should be tested as specified in IS :
432 (Part-II) latest edition.
Note : All the B.I.S. mentioned above shall be with its latest addition as well as
Signature of Bidder Page 34 of
Ahmedabad Municipal Corporation
ITEM TECHNICAL SPECIFICATIONS:
Name of work:- FtzegtJtuzobtk swœt swœt htuz vh bNel ntuj, z[ulus jtRl <&t Mx[tub Jtuxh z[ulus jtRl vh &<t c{ufztWl hevuh <&t
lJe z[ulus jtRl ltkFJt <&t bNelntuj, auBch hevuhekd fhJtlt ftb ctc<.
Item No : 01 Excavation for pipe line trenches for water supply, sewerage line, manhole etc. all with shoring
and struting if required as per required gradient and line including safety provisions using site
rails and stacking excavated stuff including up to all required lead cleaning the site etc.
complete for all lifts and strata as specified. In all sorts of soil and soft murrum.
0 to 1.5 meter depth.
1.5 to 3 meter depth.
3 to 4.50 meter depth.
4.50 to 6.00 meter depth
Any soil which generally yields to the application of ackaxes and shoves, phawaras rakes or any
such ordinary excavating implement or organic soil, gravel silt, sand turfloam, clay, peat etc., fall under
Clearing the site :
The site on which the structure is to be built shall be cleared and all obstructions, loose stone,
materials and rubbish of all kind, bush, wood and trees shall be removed as directed. The materials so
obtained shall be property of the Government and be conveyed and stacked as directed. within 50 M.
lead. The roots of the trees coming in the sides shall be cut and coated with a hot asphalt.
The rate of site clearance is deemed to be included in the rate of earth work for which no extra
After clearing the site, the center lines will be given by the Engineer-in-charge. The contractor
shall assume full responsibility for alignment, elevation and dimension of each and all parts of the work.
Contractor shall supply laborers, materials, etc. required for setting out the reference marks and bench
marks and shall maintain them as long as required and directed.
The excavation in foundation shall be carried out in true line and level and shall have the width
and depth as shown in the drawings or as directed. The contractor shall do the necessary shoring and
shutting or providing necessary slopes to a safe angle, at his own-cost. The payment for such
precautionary measures shall be paid separately if not specified. The bottom of the excavated area
shall be 1 evened both longitudinally and transversely. as directed by removing and watering as
required. No earth filling will be allowed for bringing it to level, if mistake or any other reason
excavation is made. deeper or wider that shown on the plan or directed. The extra depth or width shall
be made up with concrete of same proportion as specified for the foundation concrete at the cost of
the contractor. The excavation up to 1.5 m. depth shall be measured under this item.
Disposal of the excavated stud :
The excavated stuff of the selected type shall be used in filling the trenches and plinth or
leveling the ground in layer including ramming and watering etc.
The balance of the excavated quantity shall be removed by the contractor from the site of work
to a place as directed with lead upped 50 M. and all lift.
Mode of measurement and payment :
Signature of Bidder Page 35 of
Ahmedabad Municipal Corporation
The measurement of excavation in trenches for foundation shall be made according to the
sections of trenches shown on the drawing or as per sections given by the Engineer-in-charge. No
payment shall be made for surplus excavation made in excess of above requirements or due to slopping
and sloping back as found necessary on account of conditions of soil , and requirements of safety.
The rate shall be for a unit of one cubic meter.
Item No. 02 : Extra rate over item of excavation of earth if excavation is to be done in wet condition without
resorting to pumping but incl. of bailing out of water.
Extra rate over item of excavation of earth if excavation is to be done in wet condition without resorting
to pumping but incl. of bailing out of water.
Measurement shall be on per Cmt.
Item No : 03 Extra rate over item of excavation of earth for excavation of asphalt pavement / RCC of
thickness up to 0.20 meter including demolishing the asphalt carpet, metal, soiling/cutting
Reinforcement etc.comp. with stacking the material as directed.
up to 0.20 meter thickness (By Manual)
Up to 0.30 meter (By any type of Breaker Machine or R.C.C.Cutter machine including cost of operator,
fuel, & transportation etc complete.
0.30 meter & above (By any type of Breaker Machine or R.C.C.Cutter machine including cost of
operator, fuel, & transportation etc complete.
Under this item contractor shall demolish existing asphalt or WBM pavement met with during
laying of RCC pipe. Only area of pavement intercepted in pipe laying shall be demolished. If
excess area is demolished same shall be reinstated by the contractor. Demolished material like
asphalt pavement lump and metal shall be stacked separately as directed by the Engineer, so
that it can be reused in doing the pavement on completion of laying the pipe. Work done to the
extent of requirement for laying of pipeline and as per specifications shall be measured in sq.m.
and paid at the tender rate.
Item No : 04 Refilling in pipe line trenches ramming and watering, Consolidating, disposal of surplus stuff as
directed within 3 KM Area
As per GWSSB SOR 2022-23; Item No.14.1.
All fill material will be subject to Engineer’s approval. If any material is rejected by Engineer, contractor
shall remove the same forthwith from the site at no extra cost to the owner. Surplus fill material shall
be deposited / disposed off as directed by Engineer after the fill work is completed upto a distance of
Km for which separate payment will be paid under the corresponding item.
No earth fill shall commence until surface water discharges and streams have been properly intercepted
or otherwise dealt with as directed by Engineer.
To the extent available, selected surplus soils from excavated materials shall be used as backfill. Fill
material shall be free from clods, salts, sulphates, organic or other foreign material. All clods of earth
shall be broken or removed. Where excavated material is mostly rock, the bounders shall be broken into
Signature of Bidder Page 36 of
Ahmedabad Municipal Corporation
pieces not larger than 150 mm size, mixed with properly graded fine material consisting of murrum or
earth fill up the voids and the mixture used for filling.
If any selected fill material is required to be borrowed, Contractor shall make arrangements for bringing
such material from outside borrow pits. The material and source shall be subject to prior approval of
Engineer. The approved borrow pit area shall be cleared of all bushed, roots of trees, plants, rubbish etc,
top soil containing salts / sulphate and other foreign material shall be removed. The materials so
removed shall be burnt or disposed off as directed by Engineer. Contractor shall make necessary access
to borrow areas and maintain the same, if such access road does not exist, at his cost.
FILLING IN PITS AND TRENCHES AROUND FOUNDATIONS OF STRUCTURES, WALLS
As soon as the work in foundations has been accepted and measured, the spaces around the
foundations, structures, pits, trenches etc. shall be cleaned of all debris, and filled with earth in layers not
exceeding 20 cm, each layer being watered, rammed and properly consolidated, before the succeeding
one is laid. Each layer shall be consolidated to the satisfaction of Engineer. Earth shall be rammed with
approved mechanical compaction machines if instructed. Usually no manual compaction shall be
allowed unless Engineer is satisfied that in some cases manual compaction by tampers cannot be
avoided. The final backfill surface shall be trimmed and leveled to proper profile as directed by Engineer
or indicated on the drawing.
FILLING IN TRENCHES
Filling in trenches for pipes and drains shall be commenced as soon as the joints of pipes and drains have
been tested and passed. The backfilling material shall be properly consolidated by watering and
ramming, taking due care that no damage is caused to the pipes.
Where the trenches are excavated in soil, the filling from the bottom of the trench to the level of the
centreline of the pipe shall be done by hand compaction with selected approved earth in layers not
exceeding 8 cm; backfilling above the level of the centreline of the pipe shall also be done with selected
earth by hand compaction or other approved means in layers not exceeding 20 cm.
In case of excavation of trenches in rock, the filling upto a level 30 cm above the top of the pipe shall be
done with fine materials, such as earth, moorum etc. The filling up of the level of the centreline of the
pipe shall be done by hand compaction in layers not exceeding 20 cm. Also the filling above the centreline
of the pipe shall be done by hand compaction or approved means in layers not exceeding 20 cm. The
filling from a level 30 cm. Above the top of the trench shall be done by hand or other approved
mechanical methods with broken rock filling of size not exceeding 20 cm mixed with fine material as
available to fill up the voids.
Filling of the trenches shall be carried simultaneously on both sides of the pipe to avoid unequal pressure
GENERAL SITE GRADING
Site grading shall be carried out as indicated in the drawings and as directed by Engineer. Excavation shall
be carried out as specified in the specification. Filling and compaction shall be carried out as specified
elsewhere unless otherwise indicated below.
If no compaction is called for, the fill may be deposited to the full height in one operation and levelled. If
the fill has to be compacted, it shall be placed in layers not exceeding 200 mm and leveled uniformly and
compacted as indicated in before the next layer is deposited.
Signature of Bidder Page 37 of
Ahmedabad Municipal Corporation
To ensure that the fill has been compacted as specified, field and laboratory tests shall be carried out by
Contractor at his cost.
Field compaction test shall be carried out at different stages of filling and also after the entire height has
been completed. This shall hold good for embankments as well.
Contractor shall protect the earth fill from being washed away by rain or damaged in any other way.
Should any slip occur, Contractor shall remove the affected material and make good the slip at his cost.
The fill shall be carried out to such dimensions and levels as indicated on the drawings after the stipulated
compaction. The fill will be considered as incomplete if the desired compaction has not been obtained.
If specifically permitted by Engineer, compaction can be obtained by allowing loaded trucks conveying fill
or other material to ply over the fill area. Even if such a method is permitted, it will be for contractor of
demonstrate that the desired / specified compaction has been obtained. In order that the fill may be
reasonably uniform throughout, the material should be dumped in place in approximately uniform layers.
Traffic over the fill shall then be so routed to compact the area uniformly throughout.
If so specified, the rock as obtained from excavation may be used for filling and leveling to indicate grades
without further breaking. In such an event, filling layers not exceeding 50 cms approximately. After rock
filling the void in the rocks shall be filled with finer materials such as earth, broken stone etc. and the area
flooded so that the finer materials fill up the voids. Care shall be taken to ensure that the finer fill material
does not get washed out. Over the layer so filled, a 100 mm thick mixed layer of broken materials and
earth shall be laid and consolidation carried out by a 12 tonne roller. No less than twelve passes of the
roller shall be accepted before subsequent similar operations are taken up.
The compaction, only where so called for, in the schedule of quantities / items shall comply with the
specified (Standard Proctor / modified Proctor) density at moisture content differing not more than
percent from the optimum moisture content. Contractor shall demonstrate adequately at his cost, by field
and laboratory tests that the specified density has been obtained.
Lead for deposition / disposal of excavated material, shall be as specified in the respective item of
work. For the purpose of measurement of lead, the area to be excavated or filled or area on
which excavated material is to be deposited / disposed off shall be divided into suitable blocks and
for each of the blocks, the distance between centerlines shall be taken as the lead which shall be
measured by the shortest straight line route taken by Contractor. No extra compensation is
admissible on the grounds that the lead including that for borrowed material had to be
transported over marshy or ‘katcha’ land / route.
Measurement and Payment
Backfilling as per specifications on the sides of foundations of columns, footings, structures, walls, tanks,
rafts, trenches etc. with excavated material shall be done. As a rule, material to be backfilled shall stacked
temporarily within the basic lead of 90 meters unless otherwise directed by the Engineer. If Engineer
directs / permits a lead of over 90 meters for such material, the conveyance of the material for the extra
distance over the basic lead of 90 meters for backfilling will be paid for.
Actual quantities of consolidated back filing shall be measured and paid in cubic
Signature of Bidder Page 38 of
Ahmedabad Municipal Corporation
Penalty for improper watering and compaction will be Rs. 350/Tanker required and rent for roller @ Rs.
In case the watering and compaction of the backfilled material is not as per the specifications, AMC will
carry out the same through own resources. A rate of Rs. 350 per water tanker and Rs. 20 per sq.m. for
rolling and compacting will be recovered from the contractor.
The M/s shall be on CMT basis.
Item No.05 Dismantling the following including loading, unloading and disposal of unserviceable
material for all lead or as directed by Engineer-In-Charge and stacking the serviceable
material and backfilling the resulting trenches and pits complete.
a. Dismantling tiled or stone floors laid in mortar including stacking of serviceable
material anddisposal of unserviceable material with all lead and lifts.
b. Demolition including stacking of serviceable materials and disposal of
unserviceablematerials with all lead and lift. (I) R.C.C work.
c. Demolition of brick work & stone masonry including stacking of serviceable
materials anddisposal of unserviceable materials with all lead and lift. (II) In
The demolition shall consist of demolition of one or more parts of the structure as specified or
shown in the drawings. Demolition implies taking up or down or breaking up. This shall consist of
demolishing whole or part of work including all relevant item as specified or shown in the
The demolition shall always be planned before hand and shall be done in reverse order of the one
in which the structure was constructed. Contractor is fully responsible for proper and safe
Necessary dropping, shoring and under pinning shall be provided for the safety of the adjoining
work or property, which is to be left intact, before dismantling and demolishing is taken up and the
work shall be carried out in such a way that no damages is caused to the adjoining property.
Wherever required, temporary enclosures or partitions shall also be provide 1. Necessary
precautions shall be taken to keep the dust nuisance down as and where necessary.
Dismantling shall be commenced in a systematic manner. All materials which are likely to be
damaged by dropping from a height or demolishing roof, masonry etc. shall be carefully dismantled
first. The dismantled articles shall be properly stacked as directed.
All materials obtained from demolition shall be the property of Government unless otherwise d
shall be kept in safe custody until handed over to the Engineer-in-charge.
Any serviceable materials, obtained during dismantling or demolition shall be separated out and
stacked properly as directed, with all lead and lift. All unserviceable materials, rubbish etc. shall b
stacked as directed by the Engineer-in-charge.
On completion of work, the site shall be cleared of all debris rubbish and cleaned as directed.
Mode of measurements & payment :
Measurements of all work except hidden work shall be taken before demolition dismantling and no
allowance for increase in bulk shall be allowed. The demolition of lime concrete shall be measured
Signature of Bidder Page 39 of
Ahmedabad Municipal Corporation
under this item. Specification for deduction for voids, openings etc. shall be on same basis as that
employed for construction of work.
All work shall be measured in decimal system as fixed in its place subject to the following limits,
unless otherwise stated hereinafter : (a) Dimensions shall be measured to the nearest 0.01 mt. (b)
Area shall be worked out to the nearest 0.01 sq. mt. (c,d,e) Cubical connection shall be worked out
to the nearest 0.01 Cu.m.
The rate shall include cost of all labour involved and tools used in demolishing and dismantling
including scaffolding. The rate shall also include the charges for separating out and stacking the
serviceable materials properly and disposing the unserviceable materials with all lead and lift. The
rate also includes for temporary storing for the safety of the portion not required to be pulled
down or of adjoining property and providing temporary enclosures or partitions where considered
The rate shall be for a unit of one cubic metre. For Dismantling of Tiled Floor:
The relevant specifications shall be followed except the dismantling of tiled or stone floors laid on
mortars shall be done Dismantling implies carefully taking up or down or these are fixed by nail
screws bolts etc. the shall be taken out with proper tools.
Mode of measurement & Payment :
The supporting materials such as joints beams if any etc. shall be measured separately. The rate shall
includestacking the unserviceable materials as directed will lead and lift.
The rate shall be for a unit of (a) RMT (b) one sq. Meter (C) CMT(d)Cu.m(e)Cu.m
Item No : 06 Conveyance of lime murrum building rubbish earth manure or sludge & execavated rockand
rubbish [Lime murrum building rubbish]. Up to 5.0 Km. lead
(Building SOR 2023-24 Statement No.5 Item No. 030201A1 ; Page no.6)
Disposal of earth, lime, murrum, building rubbish, manure, garbage, sludge,
excavated rock, fly ash, aggregates of any kind is subject to the following :
Unsuitable materials obtained from clearing site and excavation shall be
disposed off within a lead of 50 meters as directed. useful materials obtained from clearing site and
excavation shall be stacked within a lead of 50 mt. beyond the work area as directed. Materials
suitable for back filling shall be stacked at convenient places within a lead of 50 mt. from the
structure for reuse. Useful stones from rock excavation shall be stacked neatly within a lead of
M. and will be allowed to be used by the contractor on payment at rates laid down in the contract
or if not so aid down, at schedule of rates of the Division or at a mutually agreed rates if there are
no such rates in the Schedule of rates.
If surplus materials are required to be conveyed beyond 50 M. conveyance
will be paid for under a separate item.
The M/s shall be on CMT basis.
Item No : 07 & 08 Providing and supplying ISI marked only Standard length Stoneware pipes in standard
lengths of following class and diameter including all taxes, insurance, transportation, freight
charges, octroi, inspection charges, loading, unloading, conveyance to departmental stores,
(IS - 651 / 1989) (Based on GWSSB SOR 2022-23, Item No. 11.0 P-17)
100mm, 150mm,230mm AA Class
Signature of Bidder Page 40 of
Ahmedabad Municipal Corporation
The pipes shall be of best quality stone ware pipes. The pipes shall be of approved quality and make
and shall be brought on site after approval. (The pipes shall be laid in grade as per instruction)
contractor shall have introduce bills for standard pipes.The joints shall be done in cement prop. (1 :
1) (1 part cement : 1 part sand) using spun yarn dispend in hot asphalt and caulking tools. The
hydraulic pressured test shall be given be the contractor for testing pipes and jointing. No. trenches
shall be filed without the approval of the Engineer in charge. The rate of the pipes work are inclusive
of excavation and refilling. The excavation etc. shall be done as follows :
The sewet trench shall be excavated to the alignment and gradient shown on the plan and section. In
all storts soil including oil masonary asphalt roads and wet. excavation . The sewer excavation shall be
commenced at the down stream end of the sewer and be continued upto thegradient as directed. The
trench shall not open more than 60 meters in advace of the completed sewer only when directed by
the Engineer in charge looking to the progress of the work in obtaining the formation of the bottom of
the trenches the usual methods of suing sight rails and bonning roads shall be adopted during the
whole of the process. The center line of uniform height shall be carried clearly on each rail. The depth
of the excavation and invert of the sewer shall be checked by means of bonning road of appropriate
length and also straight edge. The bed of the trench be shall well remmed before starting laying of
sewer lines and cement concrete and masonary work. Where trenches are deep in bad grounds the
sides shall be supported by suitable timbering of shorting work looking to the nature of soil near big or
important structures, the sides of the trenches shall be closely and securely timbered. If any
settlement of the building is anticipated the timbering shall be left in the ground. The various
materials excavated shall be separately stacked so that in refilling the may be relaid on the same order
as before and least possible damage shall be done carpet on the public roads and private properties.
Surface covering consisting of asphalt carpet shall be kept on one side and preserved for
reinstatement. The excavated earth shall not heaped near the renchers so as to caused unnecessary
obstruction along the pulling inspection, trenches etc. shall be tunneled under only as necessary. The
side of the trenches shall be nearly vertical and plumb & red light shall be placed at each end at
intervals as instructed and further protested by rope fence. Necessary caution boards shall also be
erected and diaced as directed by the Engineer in charge. Wherever possible material excavated from
the trenches of whatever kind shall not placed nearer than 3 meters from the outer edge of the
excavated trench. The utmost shall have to be taken in refilling the trenches so that no damage may
be done no sewer no lump shall be allowed to be put around the sewer. The remming of the filling
shall be done and well watered. The surplus earth shall be removed directed within 30 meters lead.
The measurement of the work shall be exact length and width of the trench as specified or as per City
Engineer instruction and depth shall be measured vertical as per section upto invert or the pipe lind
The City Engineer reserves the right of extra excavation on either side if considers necessary for the
safely of the work. The bottom and sides of the trench shall be dressed in level and plumb in all
directions before any concrete in India. In case the excavation is done deeper than required no filling
shall be allowed to bring the formation to proper level but contractor shall have to lay cement or lime
be concrete of filling or other acceptable materials as directed by C.E. at contractor won cost so as to
come to proper information, in case bas formation are met with the work shall have be done as per
instruction of C.E. necessary arrangements for watering trenches must be provided be contractor and
without proper watering trenches will not be allowed to be tilled to further. Contractor shall have to
make arrangement for acees to invert of the sewer and for inspection of the ware as ordered by the
Engineer. If is required to shired or after the alignment section of diameter of the pip the contractor
shall carry or altered the alignment section or diameter of the pipe the contractor shall carry out the
Signature of Bidder Page 41 of
Ahmedabad Municipal Corporation
altered work at the rates quoted by him for the original work for items and contractor shall not claim
any expenses due to the changes made. In case no work shall be done at night or on Sundays & other
holidays and during the recess time except in and other holiday the case of bad grounds such as
running sand where the work must be executed various day night without intruption when so ordered
by the Engineer. All existing water pipe storm drains sewer line railway tract, electric cables etc. which
do not in the opinion of Engineer required to be charged in location shall be supported and protected
from injury by the contractor. The contractor shall be liable to pay all damages to water pipe, drains
electric and telephone cables and to private property during the execution of this contract and the
same will be recovered from the running bills or the deposit of work whenever it becomes necessary
in the opinion of the Engineer in charge location of any existing sewers drains etc. not otherwise from
in these specification the contractor shall do the work of making such change and the work shall be
paid for as extra work. All places of public utility etc. shall be kept accessible for use. No extra
payment shall be made for land sides and side slopes done without prior approval of the Engineer in
charge. Wherever natural soil commends winder excavation the mentioned above the same shall be
given after approved C.E. The rate for excavation for easy jointing and caulking nothing extra shall be
Refilling of trenches shall be done only after the grade of line and hydraulic test practicable of the
lines are checked and approved of and order given by the Engineer in charge. The refilling shall be
accompanied by through watering the layers of 0.50 metrs. Further refilling shall be done there after
and process should be repeated till trenches are completely refilled. Temping and ramming with
rammers shall have to be done at all place of important work where ordered by Engineer in charge.
After the trench is give the trenches shall have to be refilled within 4 days with complete watering. If
the contractor fails to do watering satisfactory corporation shall get it done at the risk and cost of the
contractor with or without giving any notice and the expenses incurred in doing so recovered from the
contactor either in cost or from his payment through bills.
The rate shall be for a unit of one Rmt basis.
Item No.09: Manufacturing, testing, supplying, loading, transporting to worksite, unloading,
Lowering in trenches, laying and jointing RCC pipe of following class with Socket and
spigot joints with ISI Mark of IS 458 - 2003 including EPDM Rubber ring as per IS 5382-1985
etc. comp. As Directed by Engineering in charge.
The rate shall be for a unit of one Rmt basis.
Item No : 10 Constructing Chamber of following size including excavation, refilling, BBCC (1:5:10) for
foundation, C.C.Channel (1:2:4), finished 15 mm thick cement plaster inside in CM 1:3,
finishing with cement slurry, Brick masonary in CM 1:5 & excluding the cost of chamber
seat cover etc.completed.
0.60 X 0.45 mt. size Inside Clear, Depth from 0.0 to 0.90 meter
0.60 X 0.75 mt. size Inside Clear, Depth from 0.0 to 0.90 meter.
0.75 X 0.75 mt. size (Inside Clear) Depth from 0.0 to 1.20 meter.
The sewet trench shall be excavated to the alignment and gradient shown on the plan and section. In
all storts soil including oil masonary asphalt roads and wet. excavation . The sewer excavation shall be
Signature of Bidder Page 42 of
Ahmedabad Municipal Corporation
commenced at the down stream end of the sewer and be continued upto the gradient as directed. The
trench shall not open more than 60 meters in advace of the completed sewer only when directed by
the Engineer in charge looking to the progress of the work in obtaining the formation of the bottom of
the trenches the usual methods of suing sight rails and bonning roads shall be adopted during the
whole of the process. The center line of uniform height shall be carried clearly on each rail. The depth
of the excavation and invert of the sewer shall be checked by means of bonning road of appropriate
length and also straight edge.
The bed of the trench be shall well remmed before starting laying of sewer ines and cement concrete
and masonary work.
Where trenches are deep in bad grounds the sides shall be supported by suitable imbering of shorting
work looking to the nature of soil near big or important structures, the sides of the trenches shall be
closely and securely timbered. If any settlement of the building is anticipated the timbering shall be
left in the ground. The various materials excavated shall be separately stacked so that in refilling the
may be relaid on the same order as before and least possible damage shall be done carpet on the
public roads and private properties. Surface covering consisting of asphalt carpet shall be kept on one
side and preserved for reinstatement. The excavated earth shall not heaped near the trenchers so as
to caused unnecessary obstruction along the pulling inspection, trenches etc. shall be tunneled under
only as necessary. The side of the trenches shall be nearly vertical and plumb & red light shall be
placed at each end at intervals as instructed and further protested by rope fence. Necessary caution
boards shall also be erected and diaced as directed by the Engineer in charge.
Wherever possible material excavated from the trenches of whatever kind shall not placed nearer
than 3 meters from the outer edge of the excavated trench. The utmost shall have to be taken in
refilling the trenches so that no damage may be done no sewer no lump shall be allowed to be put
around the sewer. The remming of the filling shall be done and well watered. The surplus earth shall
be removed directed within 30 meters lead. The measurement of the work shall be exact length and
width of the trench as specified or as per City Engineer instruction and depth shall be measured
vertical as per section upto invert or the pipe lind The City Engineer reserves the right of extra
excavation on either side if considers necessary for the safely of the work.
The bottom and sides of the trench shall be dressed in level and plumb in all directions before any
concrete in India. In case the excavation is done deeper than required no filling shall be allowed to
bring the formation to proper level but contractor shall have to lay cement or lime be concrete of
filling or other acceptable materials as directed by C.E. at contractor won cost so as to come to proper
information, in case bas formation are met with the work shall have be done as per instruction of C.E.
necessary arrangements for watering trenches must be provided be contractor and without proper
watering trenches will not be allowed to be tilled to further. Contractor shall have to make
arrangement for acees to invert of the sewer and for inspection of the ware as ordered by the
Engineer. If is required to shired or after the alignment section of diameter of the pip the contractor
shall carry or altered the alignment section or diameter of the pipe the contractor shall carry out the
altered work at the rates quoted by him for the original work for items and contractor shall not claim
any expenses due to the changes made.
In case no work shall be done at night or on Sundays & other holidays and during the recess time
except in and other holiday the case of bad grounds such as running sand where the work must be
executed various day night without intruption when so ordered by the Engineer.
All existing water pipe storm drains sewer line railway tract, electric cables etc. which do not in the
opinion of Engineer required to be charged in location shall be supported and protected from injury by
Signature of Bidder Page 43 of
Ahmedabad Municipal Corporation
the contractor. The contractor shall be liable to pay all damages to water pipe, drains electric and
telephone cables and to private property during the execution of this contract and the same will be
recovered from the running bills or thedeposit of work whenever it becomes necessary in the opinion
of the Engineer in charge location of any existing sewers drains etc. not otherwise from in these
specification the contractor shall do the work of making such change and the work shall be paid for as
extra work. All places of public utility etc. shall be kept accessible for use.
No extra payment shall be made for land sides and side slopes done without prior approval of the
Engineer in charge.
Wherever natural soil commends winder excavation the mentioned above the same shall be given
after approved C.E. The rate for excavation for easy jointing and caulking nothing extra shall be paid
Refilling of trenches shall be done only after the grade of line and hydraulic test practicable of the lines
are checked and approved of and order given by the Engineer in charge. The refilling shall be
accompanied by through watering the layers of 0.50 metrs. Further refilling shall be done there after
and process should be repeated till trenches are completely refilled. Temping and ramming with
rammers shall have to be done at all place of important work where ordered by Engineer in charge.
After the trench is give the trenches shall have to be refilled within 4 days with complete watering. If
the contractor fails to do watering satisfactory corporation shall get it done at the risk and cost of the
contractor with or without giving any notice and the expenses incurred in doing so recovered from the
contactor either in cost or from his payment through bills.
The brickbats shall be of new bricks, hared well burnt and broken to 40 mm nominal size. These shall
be free from earth and shall be got app. use. Sand shall be clear coarse, sharp and free from earth and
other impurities. Mixing shall be done on brick or stone platform or of brickbats to mortar shall be
measured in heaps by brick height irregular measure. If ordered by C.E.
Concrete shall be laid in layers of 15 cms. and well consolidated maintained by the contractor for
before commencing the brick work. over boxes, concrete shall be well watered. The mix shall be done
in prop. of 1 : 5 :
Cement shall confirm to M-3, sand shall confirm to M-6, coarse agg. shall confirm to M-13, water shall
The prop. of the cement of sand coarse agg. shall be 1 : 5 : 10 i.e. 1 part of cement, 5 part of sand and
10 parts of coarse agg. by volume. and the work shall be carried out as per inst. of Engineer in charge
and as per C.3.
Brick work cement mortar :
Bricks shall be table brick confirming of approved kiln specifications as laid sown n PWD Hand book
NO. 2. These shall be well burnt and free from all defects and shall be got approved by the Engineer in
charge before the work is started. Cement to be used for mortar shall comply with PWD Hand book
specifications, cement mortar in the brick work shall be 1 part of cement, 5 parts of sand. Every brick
Signature of Bidder Page 44 of
Ahmedabad Municipal Corporation
well sacked in water is required to be laid I full & closed joints of cement mortar the thickness of which
shall not exceed 1.25 cms. If on removal of centering any open joint shall be found, these shall be
pointed immediately. Special care shall taken to make the face of brick work smooth brick work shall
be toothed or shall racked back in coarse.
All intrades of curves shall be worked from temple strictly made to dimensions as per 1974-75 latest
plan and section approved by C.E.
Brick work in general shall be of first class workmanship & shall be executed according to the plan
working proper dimention & as directed by the Office in charge from time to time. Brick should be
thoroughly wetted in water before use. All brick work to be cleaned & wetted before laying cement
mortar shall be prepared in special iron pals. And mixed bag of 1.25 cft. or 1 cft. as measured as the
case may be. All materials shall be stacked in one side so as not to obstruct traffic in any way. The
masonry should be constructed in proper workmanship like manner with jointing plumb etc. to
confirm with the general specification No. 45 PWD Hand Book. The face work should be nearly
finished. The shall be kept watered for a week at least three days after the date of completion.
Providing and laying cement concrete 1:2:4
(1 cement :2 coarse sand :4 graded stone aggregate 20 mm nominal size)
RCC Work :- In general, plain and reinforced concrete work for manholes shall be carried out in
accordance with latest version of IS 456 unless otherwise specified in this specification. The slab of
manhole shall be cast with shutters lined with plywood and shall be
smooth finished. For avoiding surface cracks due to variation in atmospheric temperature and
exposure to direct sunlight, RCC slab of manholes after casting shall be kept wet. M 15 grade of
concrete used for construction of RCC manholes shall have minimum cement content of 360 kg/cum
of concrete. Bar bending schedule for reinforcement shall be prepared by contractor and got approved
from owner/ engineer before proceeding with the work. Minimum cover to the reinforcement shall be
The rate includes cost of all labour, materials, tools and plant etc. required for satisfactory completion
of this item as described above.& the drawing as per A.M.C Dr. S.O.R shall be final. The rate shall be
for a unit of one number basis.
Providing TMT bar.
TMT bars shall conform to M-18. Mild steel binding wires shall conform to M-21
The work shall consist of furnishing and placing reinforcement to the shape and dimensions shows as
on the drawings or as directed.
Steel shall be clean and free from rust and loose mill scale at the time of fixing in position and
subsequent concreting.
Reinforcing steel shall conform accurately to the dimensions given in the bar bending schedules shown
on relevant drawings. Bars shall be bent cold to specified shape and dimensions or as directed using a
Signature of Bidder Page 45 of
Ahmedabad Municipal Corporation
proper bar bender, operated by hand or power to attain proper radius of bends. Bars shall not be bent
or straightened in a manner that will injure the material. Bars bent during transport or handling shall
be straightened before being used on the work. They shall not be heated to facilitate bending. Unless
otherwise specified, a ‘U’ type hook at the end of each bar shall invariably be provided to main
reinforcement. The radius of the bend shall not be less than twice the diameter of the round bar and
the length of straight part of the bar beyond the end of the curve shall be at least four times the
diameter of the round bar. In case of bars which are not round and in case of deformed bars, the
diameter shall be taken as the diameter of circle having an equivalent effective area. The hooks shall
be suitably encased to prevent any splitting of the concrete.
All the reinforcement bars shall be accurately placed in exact position shown on the drawing and shall
be securely held in position during, metal hangers, supporting wires or other approved devices at
sufficiently close intervals,. Bars shall not be allowed to sag between supports nor displaced during
concreting or any other operations of the work. All devices used for positioning shall be of
noncorrodible material. Wooden and metal supports shall no extend to the surface of concrete, except
where shown on drawings. Placing of broken stone or brick and wooden blocks shall not be allowed.
Pieces of broken stone or brick and wooden blocks shall not be used. Layers of bars shall be separated
by spacer bars, precast mortar blocks or other approved devices. reinforcement after being placed in
position shall be maintained in a clean condition until completely embedded in concrete. Special care
shall be exercised to prevent any displacement of reinforcement in concrete already placed. To
prevent reinforcement from corrosion, concrete cover shall be provided as indicated on drawings. All
the bars producing from concrete and to which other bars are to be spliced and which are likely to be
exposed for a period exceeding 10 days shall be protected by a thick coast of neat cement grout.
Bars crossing each other where required shall be secured by binding wires (annealed) of size not less
than 1 mm in such manner that they do not slip over each other at the time of fixing and concreting.
As far as possible, bars of full length shall be used. In case this is not possible, overlapping of bars shall
be done directed. When practicable, overlapping bars shall not touch each other, but be kept apart by
25 mm or 1.25 mm times the maximum size of the coarse aggregate whichever is greater by concrete
between them. Where not feasible, overlapping bars shall be bound with annealed wires not less than
1 mm thick twisted tight. The overlaps shall be staggered for different bears and located at points
along the span where neither shear nor bending movement is maximum.
Whenever indicated on the drawings or desired by the Engineer- in-charge, bars shall be joined by
coup lings which shall have a cross-section sufficient to transpit the full stresses of bars. The ends of
the bars that are joined by coupling shall be upset for sufficient length so that the effective cross
section at the base of threads is not less than norma l cross-section of the bar. Threads shall be
standard threads. Steel for coupling shall conform to I.S.
When permitted or specified on the drawings, joints of reinforcement bars shall be butt-welded so as
to transmit their full stresses. Welded joints shall preferably be located at points when steel will not be
subject to more than 75 percent of the maximum permissible stresses and welds so staggered that at
any one section not more than 20 percent of the rods are welded. Only electric are welding using a
process which excludes air from the molten metal and conforms to any or all other special provisions
for the work shall be accepted. Suitable means shall be provided for holding bars securely in position
during welding. It shall be ensured that no voids are left in welding and when welding is done in two or
three stages, previous surface shall be cleaned properly. Ends of the bars shall be cleaned of all loose
scale, rust, grease, paint and other foreign matter before welding. Only competent welders shall be
Signature of Bidder Page 46 of
Ahmedabad Municipal Corporation
employed on the work. the M.S. electrodes used for welding shall conform to I.S. 814. Welded pieces
of reinforcement shall be tested. Specimen shall be taken from the actual site and their number and
frequency of test shall be as directed.
R.C.C. Bedding :
Cement concrete for the bottom portion of manhole shall consist of one part of cement two parts of
sand four parts of black trap metal of other approved material of 0.6 to 2.5 cms size from well graded
as per instruction. The rate includes all necessary materials mixing lifting placing ramming watering
etc. the exposed faces to be neatly finished smooth with cement as per instructions. The concrete
work to kept constantly watered for at least fortnight.
Cement Plaster :
Cement plaster 15 mm thick shall be done using cement mortar of 1 part of cement & 3 parts of sand
in uniform thickness with surfaces trely in plums. The work in general shall comply with general
specifications for plaster No. 64 in PWD hand book. The plaster surfaces to be kept damp at least for a
fortnight. All internal sides of the manholes including soffit of the arch shall be provided with cement
FRC manhole cover with seat to be set in cement mortar with cement concrete of 1 : 2 : 4 prop.
alround. FRC cover shall be marked with year mar AMC. etc. & arrow showing the direction of flow.
Foot steps shall be of the best quality PVC as specified above true to dimensions. The rate includes
mixing the same in position as directed PVC foot steps of approved design and quality shall have to be
fixed if so ordered by C.E. without extra charges. PVC steps shall be fixed at interval of 37 cm. vertically
& 22 cm. horizontally starting from the invert of the line.
Mode Measurment
The mode of measurement shall be on Nos.
Item No : 10 & 11 Constructing Slab Type M.H. Chamber Of The Following Size Including Excavation,
Refilling, Brick Bats Cement Concrete (1:5:10) of thickness 15 C.M., CC Channel (1:2:4) of
thickness 10 C.M., finished 15 mm thick cement plaster inside & outside (Only for shaft) In
Cm 1:3, Finishing With Cement Slurry, P/F 4 Mm Dia M.S.Steel Hdpe Coated Steps 35 Cm C/C
At 35 Cm Staggered Masonary In Cm 1:5, Rcc Slab In Cc1:1.5:3 of thickness 15 C.M.,Including
Cantering & Reinforcement (Single jalli at 15 C.M. c/c bothway 10 mm dia.)But Excluding The
Cost Of Manhole Seat Cover Etc..Completed Of Size 0.75 X 1.00 Meter (Inside Clear, M.H.
length should be parallel to the flow)
(Based on Drainage SOR 2015-16; Item No.14)
1.00 to 2.00 meter depth, (Slab at Ground level)
2.00 to 3.00 meter depth, (Slab at below 0.60 mt. From G.L.)
Manhole shall be provided at every change of alignment, gradient or diameter of
sewer/storm water drains, Bends and junctions in the sewer/drain shall be grouped together
in manhole as far as possoble. The maximum distance between inspection chambers shall be
about 25 meters. Where the diameter of sewer/drain is increased, the soffit of the pipe shall
Signature of Bidder Page 47 of
Ahmedabad Municipal Corporation
be fixed at the same level and necessary slope given to the channel of manhole/inspection
chamber. The minimum internal sizes of manhole/inspection chamber shall be as per the
respective item of work. The manhole/inspection chamber shall be constructed as per the
detailed drawings and as directed by Engineer. The bed concrete and the brick masonry shall
be constructed of such thickness as shown on drawing. The brick masonry shall be
constructed in C.M. (1:5), plastered on both faces with 15 mm cement plaster in C.M. (1:3).
The channel shall be semicircular in the bottom half and of diameter equal to the sewer/drain.
Above the horizontal diameter, the sides shall be extended vertically to the same level as the
crown of the outgoing pipe and the top edge shall be suitable rounded off. The branch
channels shall also be similarly constructed with respect to the benching out at their junction
with the main channel as appropriate fall suitable rounded off in the direction of flow in the
main channel shall be given. The channel at the bottom of manhole / inspection chamber
shall be plastered with C.M. (1:3) and finished smooth. Rungs shall be provided in all
manholes/inspection chambers over 0.6 mtr in depth and shall be of cast iron conforming to
IS:5455. These rungs shall be fixed staggered in two vertical runs, 300 mm apart horizontally
and 300 mm c/c vertically. The top rung shall be 450 mm below the manhole/ inspection
chamber cover and the lowest not more than 300 mm above the benching. The
manhole/inspection chamber frame and cover shall be of cast iron of specified weight and
shall conform to the requirements given in IS:1726. The covers and frames shall be cleanly
cast and they shall be free from air and sand holes and from clod shuts. They shall be neatly
dressed and carefully trimmed. All castings shall be free from voids whether due to
shrinkage, gas inclusion or other causes.Covers shall have a raised chequered design on the
top surface to provide an adequered nonslip grip. Cover shall be capable of easy opening and
closing and it shall be fitted in the frame in workmanship like manner. The cover shall be gas
tight and water tight. The size of covers specified shall be considered as the clear
internal dimensions of the frame. Covers and frames shall be coated with a black bituminous
composition. The coating shall be smooth and tenaceous. The frame of manhole/inspection
chamber cover shall be firmly embeded to correct alignment and level in cement concrete on
the top of the masonry. The item shall be executed as per the detailed drawing and as
directed by Engineer. Precast R.C.C. cover of required size and thickness shall be provided if
specified in the item of work.
FRC SEAT COVER:
The frame shall be fixed in cement concrete of M15 grade all around and finished with neat
cement. The cover shall have a minimum thickness of 100 mm and weighing 78 kg. The fibers
shall constitute 1% of the weight of the concrete in the form of 50 mm to 100 mm long high
tensile steel wires. For the cover, MS sheet lapping of 3 gauge shall be provided to avoid
damage to the edges. Similarly for frame, MS angle/flat shall be provided along the edge.
Both MS sheet and angle shall be painted with black bituminous paint. The cover should have
suitable lifting arrangement. The fiber reinforced frame and cover shall be manufactured as
per the drawing approved by Owner/Engineer. The size, type, weight, and locking
arrangement for frame and cover shall be as specified
RCC Work :- In general, plain and reinforced concrete work for manholes shall be carried out
in accordance with latest version of IS 456 unless otherwise specified in this specification.
The slab of manhole shall be cast with shutters lined with plywood and shall be smooth
finished. For avoiding surface cracks due to variation in atmospheric temperature and
Signature of Bidder Page 48 of
Ahmedabad Municipal Corporation
exposure to direct sunlight, RCC slab of manholes after casting shall be kept wet. M
grade of concrete used for construction of RCC manholes shall have minimum cement
content of 360 kg/cum of concrete. Bar bending schedule for reinforcement shall be
prepared by contractor and got approved from owner/ engineer before proceeding with the
work. Minimum cover to the reinforcement shall be 40 mm.
The rate includes cost of all labour, materials, tools and plant etc. required for satisfactory
completion of this item as described above. The rate shall be for a unit of one number basis.
Rate reduction over item of Constructing Slab Type M.H. Chamber of size 1.00 x 0.75 mt for
constructing slab @ depth more than 0.60 mt below Ground Level (Max. 3 unit of DM should be
reduced in this item)
Item No : 12 & 14 Constructing Slab type M.H. Chamber of the following size including excavation, refilling,
brick bats cement concrete (1:5:10) of thickness 15 C.M., CC Channel (1:2:4) of thickness 10 C.M.,
finished 15 mm thick cement plaster inside & outside (Only for shaft) in CM 1:3, finishing with
cement slurry, P/F 4 mm dia M.S.Steel HDPE coated steps 35 cm c/c at 35 cm staggered in
masonary CM 1:5, RCC Slab in CC 1:1.5:3 of thickness 23 C.M., including Cantering & reinforcement
(double jalli at 15 C.M. c/c bothway 12 mm dia.) but excluding the cost of Manhole seat cover
etc..completed. of Size 1.00 X 1.40 meter (Inside Clear, M.H. length should be parallel to the
1.00 to 2.00 meter depth, (Slab at Ground level)
2.00 to 3.00 meter depth, (Slab at below 0.6 mt. From G.L.)
3.00 to 4.00 meter depth, (Slab at below 1.00 mt. From G.L.)
5.00 to 6.00 meter depth, (Slab at below 1.00 mt. From G.L.)
6.00 to 7.00 meter depth, (Slab at below 1.00 mt. From G.L.)
7.00 to 8.00 meter depth, (Slab at below 1.00 mt. From G.L.)
Rate reduction over item of Constructing Slab Type M.H. Chamber of size 1.00 x 1.40 mt for
constructing slab @ depth more than 0.60 mt for ( MH 2 to 3 mt depth) and 1.0 mt for (MH above
3.0 mt depth) below Ground Level (Max. 5 unit of DM should be reduced in this item)
Specification is same as specification of Item No 08, only the MH Chamber size is mentione in this
item is follows.
Mode Measurment
The mode of measurement shall be on Nos.
Item No : 15 Dismantling of existing Arch type manhole up to Arch and then Const. Slab type manhole of
following size incl. excavation, refilling and & finished 15 mm thick cement plaster inside in CM 1:3,
P/F 4 mm dia M.S.Steel HDPE coated steps 35 cm c/c at 35 cm staggered in masonry CM 1:5, incl.
cost of RCC Slab in CC 1:1.5:3, including Cantering & reinforcement as directed by engineer in
charge. Rate includes carting of debris and excavated soil
1.0 x 0.75 mt (inside clear) RCC Slab of thickness 15 C.M& reinforcement (Single jalli at 15 C.M.
c/c bothway 10 mm dia.) From 0 to 2 mt depth (Slab at Ground level)
1.00 x 0.75 mt (inside clear) RCC Slab of thickness 15 C.M& reinforcement (Single jalli at 15 C.M.
c/c bothway 10 mm dia.) From 2 to 3 mt depth (Slab at below 1.00 mt. From G.L.)
Signature of Bidder Page 49 of
Ahmedabad Municipal Corporation
1.40 x 1.00 mt (inside clear) RCC Slab of thickness 23 CM & reinforcement (double jalli at 15 C.M.
c/c bothway 10 mm dia.) From 0 to 2 mt depth (Slab at Ground level)
1.40 x 1.00 mt (inside clear) RCC Slab of thickness 23 CM& reinforcement (double jalli at 15 C.M.
c/c bothway 10 mm dia.) From 2 to 3 mt depth (Slab at below 1.00 mt. From G.L.)
1.40 x 1.00 mt (inside clear) RCC Slab of thickness 23 CM & reinforcement (double jalli at 15 C.M.
c/c bothway 10 mm dia.) From 3 to 4 mt depth (Slab at below 1.00 mt. From G.L.)
The manholes shall be Dismantling of existing Arch type manhole up to Arch and then Const. Slab
type manhole as per plan and section approved by the Addl. C.E. The specifications for different items
of manholes are as under :
Excavation: This shall be done as per specification mentioned in item No.1 Excavation.
Brickbats cement concrete in proportion (1:5:10) For detailed specification refer R & B Dept. booklet
for General Technical Specification for building works , Page no. 31 , Section.No. 5.3.8(a)
Brickwork(1:5):
For detailed specification refer R & B Dept. booklet for General Technical Specification for building
works ,Page no. 43 , Section. No. 6.12(B).
C.C. Channels :
Cement concrete for the inverts and channels of manholes shall consist of one parts of cement
parts of sand and 4 parts of aggregates of black trap metal of approved materials of sizes from 0.6 to
2.5 cm. well graded as per instructions.
The rate includes all necessary materials mixing, laying and ramming and watering. The exposed faces
to be finished with neat cement as per instructions. The channel shall be half round in lies with the
dia of pipe as per drawing and instruction of the engineer in charge. Proper benching shall be
provided at both sides of the channel.
Cement Plaster(1:3) :
For detailed specification refer R & B Dept. booklet for General Technical Specification for building
works , Page no. 104 , Section. No. 17.58(I) Except that the thickness of the plaster shall be 15 mm
instead of 10 mm.
4 mm dia M.S Steel HDPE coated steps 35 cm c/c at 35 cm staggered
For detailed specification refer R & B Dept. booklet for General Technical Specification for building
works , Page no. 159 , Section. No. 24.13 and fixation or any change at the site according to the
direction of Engineer-in-charge in charge
Carting of Surplus Earth :
The surplus earth which is left an site after refilling and proper watering of the trenches shall have to
be carted away upto a distance within 30 mts. & shall be spread at the site according to the direction
of Engineer-in-charge in charge.
RCC Work :- In general, plain and reinforced concrete work for manholes shall be carried out in
accordance with latest version of IS 456 unless otherwise specified in this specification. The slab of
manhole shall be cast with shutters lined with plywood and shall be smooth finished. For avoiding
surface cracks due to variation in atmospheric temperature and exposure to direct sunlight, RCC slab
of manholes after casting shall be kept wet. M 20 grade of concrete used for construction of RCC
manholes shall have minimum cement content of 360 kg/cum of concrete. Bar bending schedule for
reinforcement shall be prepared by contractor and got approved from owner/ engineer before
proceeding with the work. Minimum cover to the reinforcement shall be 40 mm.
Signature of Bidder Page 50 of
Ahmedabad Municipal Corporation
The rate includes cost of all labour, materials, tools and plant and size etc. required for satisfactory
completion of this item as described above.& the drawing as per A.M.C Dr. S.O.R shall be final.
The rate shall be for a unit of one number basis.
Item No : 16 Providing and fixing S.W. gully trap with C.I. grating\ brick masonry chamber and water tight
C.I. cover with frame of 300mm x 300mm size (inside) with standard weight.(i) Square mouth traps.
(A) 100mm x 100mm size P type (Based on Building SOR 2023-24, Item No. 24006AA, NBO Item
(1) Water shall conform to M-1. (2) Cement mortar of proportion 1 : 5 shall conform to to M-11. (3)
Burnt brick shall conform to M-15. (4) The S.W. Gulley trap of 100 mm. x 10-0 mm. size shall conform
Excavation for gulley trap shall be done true to dimensions and levels as indicated on plans or as
directed. The excavation work shall generally be done as per relevant specification of earth work.
The gulley trap shall be fixed over cement concrete 1 : 5 : 10 (1 cement : 5 sand : 10 graded brick bats
aggregate 40 mm. nominal size) foundation, 650 mm. square and 100 mm. thick. The depth of top of
concrete below the ground level shall be 675 mm. The jointing of gulley outlet to the branch drain
shall be done similar to jointing of S. W. pipe as described in item No. 24.1 (A).
Brick masonry chamber : After fixing and testing gulley and branch drain, a brick masonry 300 x
mm. inside with bricks in C. M. 1 : 5 (1 cement : 5 sand) shall be built be built with a 100 mm. brick
work round the gully trap from the top of bed concrete upto ground level. The space between the
chamber walls and the trap shall be filled with cement concrete 1 : 5 : 10. The upper portion of the
chamber i.e. above the top level of the trap shall be plastered inside with cement mortar 1 : 3 (1
cement : 3 sand) finished with floating coat of neat cement. The corners and bottom of the chamber
shall be rounded of so as to slope towards the grating.
Fixing FRC G.T. round cover with frame incl. fixing the same.
Mode of measurements & payment :
The rate includes cost of all labour, materials, tools and plant etc. required for satisfactory
completion of this item as described above.The rate shall be for a unit of one number basis.
Item No : 17 Making connection to the ex.M.H.in running sewer incl. Dewatering and other required
machinery etc. of following dia pipes at any convenient time. All damaged work shall be well
repaired as per instructions. etc..complete.
Making connections to the Ex. MH in running sewer of any dia pipes at any convenient time when MH
is found empty. All damage work shall be well repair instructions etc. comp.The pipes of any dia and
any material shall be cut as per requirement to make connection in existing manhole. Reinforcement
bars shall also have to be cut in existing manhole as per requirement and making good the same. The
dis-mental materials shall be carried to places at all lead as directed by Engineer-in-charge. If directed
the work shall have to be done at night.
The measurement, shall be as per No.
Signature of Bidder Page 51 of
Ahmedabad Municipal Corporation
Item No : 18 Cutting the pipes of following dia coming in the new M.H.in running sewer including cutting
bars, including removing debris /silt from the M.H. and carting at a suitable distance etc..complete
as directed. No payment for M.H. work will be made until pipe is not cut completely in all respect.
150 mm to 300 mm dia.
400 mm to 600 mm dia.
Cutting the pipe of dia 150 to 300 mm incl. cutting the bars, in new mm at any depth it read. And
finishing smooth. Removing any type debris form the MH and courting away at a suitable dist. The
cutting edge shall be finished smooth with CM 1:3 and CC 1:2:4.The M/s shall be on No. basis.
Item No : 19 Repairing damaged M.H. and rasing M.H. up to road level incl. removing damaged brick work
and repairing by brick masonry in C.M. 1:5 and plaster in C.M. 1:3 and fixing C.I. steps and existing
MH sheet cover, removing the debris from MH and carting the same as directed.
(A) up to 0.15 mt. (@ Two Coarse)
(B) up to 0.35mt. (@ Four Coarse)
(C) up to 0.65 mt. (@ Seven Coarse)
(D) up to 0.90 mt. (@ Ten Coarse )
Repairing damaged M.H. and rasing M.H. up to road level incl. removing damaged brick work and
repairing by brick masonry in C.M. 1:5 and plaster in C.M. 1:3 and fixing C.I. steps and existing MH
sheet cover, removing the debris from MH and carting the same as directed. Also
The M/s shall be on No. basis.
Item No : 20 Repairing damaged I.C./ Raising removing damaged brick work and repairing by brick
masonry in C.M. 1:5 and plaster in C.M. 1:3 and fixing C.I. steps and existing chamber sheet cover,
removing the debris from chamber and carting the same as directed.
Repairing damaged I.C./ Raising removing damaged brick work and repairing by brick masonry in
C.M. 1:5 and plaster in C.M. 1:3 and fixing C.I. steps and existing chamber sheet cover, removing the
debris from chamber and carting the same as directed.
The M/s shall be on No. basis.
Item No : 21 Providing F.R.C. MH seat cover incl. carting to the work site etc. comp. Directed.
F.R.C. Extra Heavy Duty (EHD-35) Manhole Covers & Frames Cover : 728mm ø & 100 mm thick
circular cover, 35.00 MT load design, 100x2mm MS flat allround, 16mm ø plain round bar for lifting
the cover & should be fitted with plastic cups. Frame : 560 mm ø clear opening, outer size-
888x888x175 mm. On the upper periphery of frame 25 x 3 mm wide MS flat should be well embed
in concrete to protect the edges of frame. FRC E.H.D.-35 manhole cover & frame described as
F.R.C. Heavy Duty [HD-20] Machinehole Covers - 560 mm ø clear opening, The dimension of frame
and cover as per mentioned in Amend No.1 to IS 12592 : 2002 table
F.R.C. Medium Duty [MD-10] Machinehole Covers - 560mm ø clear opening, The dimension of
frame and cover as per mentioned in Amend No.1 to IS 12592 : 2002 table 1..
F.R.C. Medium Duty [MD-10] Chamber Covers & Frame- 600 x 450 mm clear opening, The
dimension of frame and cover as per mentioned in Amend No.1 to IS 12592 : 2002 table
F.R.C. Light Duty [LD-2.5] Machinehole Covers & Frames-560mm ø clear opening, The dimension of
frame and cover as per mentioned in Amend No.1 to IS 12592 : 2002 table
Providing and Supplying Fiber reinforced concrete circular cover of following dia,thickness and Load
design, with minimum concrete grade M30 and minimum cement content shall be 360 kg / m3, with
maximum water cement ratio of 0.45, minimum reinforcement shall be 70 kg/cmt of bars or with
Signature of Bidder Page 52 of
Ahmedabad Municipal Corporation
welded wire mesh, The minimum volume of fibers shall be 0.5 % of the volume of the concrete.
equivalent dia of fiber shall not be greater than 0.75 mm, the length to eq.dia ratio of fiber shall be in
range of 50 to 80, 2mm th M.S. flat of full thickness around periphery of cover shall be provided, for
lifting arrangement 16 or 12 mm dia plain bar should be fitted with G.I. or plastic cup as per load
design incl. loading carting unloading stacking etc. complete as per IS 12592 & as directed. Other
specification is same as per AMC central store latest circuler.
The design load is as per mentione in the items.
The M/s shall be on NO basis.
Item No : 22 Providing Kachha of Pakka Dummy in the following dia pipes and removing the same after
completion of the connection work as directed. (GWSSB SOR 2022-23)
300 MM dia. And below sewer line
400 to 500 mm dia. Sewer line
600 to 700 mm dia. Sewer line
Temporary/ permanent plugging and blocking of sewer line, branch connections and diversion of
flows anremoval of all plugs, etc. The plugging in the line is temporary or permenent is desided by the
engineer incharge. And that plugging will be removed by agency as and when ask by the engineer
incharge. No extra cost for removing of plugging will given.
Item No : 23 Barricading the entire break down or excavated area on rental basis using wooden ballies /
M.S.angles at max. 2.00 meter centre to centre, C.G.I. Sheet, reflective paint / Board out side to
avoid accident & for smooth traffic diversion & movement including cautionary board etc. Item
also includes for making temporary sufficient nos of lighting arrangement through out the work
with necessary required arrangement. The same shall be removed after completion of work. (Only
for break down work from start to complete) (Based on Drainage SOR 2015-16)
For detailed specification refer5th revision of MORTH (2013) & also amendment shall be applicable to
the latest versions.
The M/s shall be on SMT basis.
Item No : 24 Constructing Bombay Pattern Type Catch Pit of size 0.60 x 0.60 depth up to 1 mt including
excavation, B.B.C.C. (1:5:10), 23 cms thick brick maso. wall in the prop. of CM (1:6) with 40 mm
thick IPS flooring in the prop M15 at bottom and 15 mm thick cement plaster inside the catch pit in
the proportion of CM (1:3) with out jali etc. comp. as directed.
Constructing Bombay Pattern Type Catch Pit of size 0.60 x 0.60 depth up to 1 mt including excavation,
B.B.C.C. (1:5:10), 23 cms thick brick maso. wall in the prop. of CM (1:6) with 40 mm thick IPS flooring
in the prop M15 at bottom and 15 mm thick cement plaster inside the catch pit in the proportion of
CM (1:3) with out jali etc. comp. as directed.
M/s. shall be on No basis.
Item No : 25 CatchPit Jali (Heavy duty) Fixing P/F FRC catch pit jali with frame 600mm x 600mm clear
opening etc. comp.. As directed by engineer in charge.
CatchPit Jali (Heavy duty) Fixing P/F FRC catch pit jali with frame 600mm x 600mm clear opening etc.
comp.. The cover and frame both are in heavy duty. No extra cost for the fitting of frame and cover
and carting and lifting will given.
M/s. shall be on No basis.
Signature of Bidder Page 53 of
Ahmedabad Municipal Corporation
Item No :26 Supplying Pneumatic Breaker Machine for RCC Slab or Asphalt Demolishing Work on site by
using Operator, fuel, power Supply etc. Complete as Directed. (No payment should be
allowed for non working condition of machinery and for pipe line excavation and M.H. work.
Allowed only for break down work) (Based on Previously approved rate by C E sir )
Unit shall be in Shift basis.
Item No : 27 Providing and laying cement concrete 1:5:10 (1- Cement : 5- fine sand : 10- graded brick bat
aggregates 40mm nominal size) and curing complete excluding cost of formwork in (A)
Foundation and Plinth
(Building SOR 2023-24 Item Code No. 05009A , as per NBO Item No. 5.8.3; Page no. 56)
1.0 Materials: Water shall conform to M-1. Cement shall conform to M-3. Sand shall conform to M-6,
Grit shall conform to M-8 Graded stone aggregate 20 mm nominal size shall conform to M-12.
2.1 The concrete mix is not required to be designed by preliminary tests. The proportion of the concrete
mix shall be 1:2:4 (1 cement :2 coarse sand : 4 graded stone aggregate 10 mm nominal size) by
volume. Concrete work shall have exposed concrete surface or as specified in the item.
2.2 The designation ordinary M-100, M-150, M-200, M-250 specified as per I.S Correspond
approximately to 1:3:6, 1:2:4, 1 1/2 :3 and 1:1:2 nominal mix of ordinary concrete by volume
2.3 The ingredients required for ordinary concrete containing one beg of cement of 50 Kg. by weight
(0.0342 Cu. M) for different proportions of mix shall be as under:-
Grade of Total quantity of dry Proportion of fine Quantity of
concrete aggregate by volume per 50 aggregate to coarse water per
Kgs, of cement to be taken as aggregate 50 Kgs. of
the sum of individual volume cement
of fine and coarse maximum.
aggregates, maximum
M-100 (1:3:6) 300 Liters Generally 1:2 for fine 34 Liters
aggregate by volume
M-150 (1:2:4) 220 ” but subject to and upper 32 “
limit of 1:1/2 and lower
2.5 The water cement ratios shall not more than those specified in the above table. The cement content
of the mix specified in the Table shall be increased if the quantity of water in a mix has to be
increased to overcome the difficulties of placement and compaction so that the water cement ratio
specified in the Table is not exceeded.
2.6 Work ability of the concrete shall be controlled by maintaining a water cement ratio that is bound to
give a concrete mix which is just sufficiently wet to be placed and compacted without difficulty with
the means available.
2.7 the maximum size of coarse aggregate shall be as large as possible within the limits specified but in
no case greater than surround all reinforcement thoroughly and to fill the corners of the form.
Signature of Bidder Page 54 of
Ahmedabad Municipal Corporation
2.8 For reinforced concrete work, coarse aggregates having a nominal size of 20mm are generally
considered satisfactory.
2.9 For heavily reinforced concrete members as in the case of ribs of main beams the nominal maximum
size of coarse aggregate should usually be restricted to 5 mm less than the minimum clear distance
between the main bars, or 5 mm less than the minimum cover to the reinforcement whichever is
2.10 Where the reinforcement is widely spaced as in solid slabs, limitations of size of the aggregate may
not be important and the nominal maximum size may sometimes be as greater than the minimum
2.11 Admixture may used in concrete only with approval of Engineer-in-charge based upon the evidence
that with the passage of time, neither the compressive strength of concrete is reduced nor are other
requisite qualities of concrete and steel impaired by the use of such admixtures.
3.0 Workmanship:
3.1 Proportioning: Proportioning shall be done by volume, except cement which shall be measured in
terms of bags of 50 Kg. weight. The volume of one such bag being taken as 0.0342 Cu. Meter. Boxes
of suitable sizes shall be used for measuring sand aggregate. The size of the boxes (internal) shall be
35 cms x 25 cms. and 40 cms deep. White measuring the aggregate and sand, the box shall be filled
without shaking ramming or hammering. The proportioning of sand shall be on the basis of its dry
volume and in case of damp sand, allowances for bulkage shall be made.
3.2.1 For all work, concrete shall be mixed in a mechanical mixer which along with other accessories shall
be kept in first class working condition and so maintained throughout the construction. Measured
quantity of aggregate, sand, cement required for each batch shall be poured into the drum of the
mechanical mixer while it is continuously running. After about half a minute of dry mixing, measured
quantity of water required for each batch of concrete mix shall be added gradually and mixing
continued for another one and half a minute. Mixing shall be continued till materials are uniformly
distributed and uniform color of the entire mass is obtained and each individual particle of the coarse
aggregate shows complete coating of mortar containing its proportionate amount of cement. In no
case shall the mixing be done for less than 2 minutes after all ingredients have been put into the
3.2.2 When hand mixing is permitted by the Engineer-in-charge for small jobs or for certain other reasons,
it shall be done on the smooth watertight platform large enough to allow efficient turning over the
ingredients of concrete before and after adding water. Mixing platform shall be so arranged that no
foreign material gets mixed with concrete nor does the mixing water flow out. Cement in required
number of bags shall be placed in a uniform layer on top of the measured quantity of fine and coarse
aggregate, which shall also be spread in a layer of uniform thickness on the mixing platform. Dry
coarse and fine aggregate and cement shall then be mixed thoroughly by turning over to get a
mixture to uniform color. Specified quantity of water shall then be added gradually through a rose-
can and the mass turned over till a mix of required consistency is obtained. In hand mixing quantity
of cement shall be increased by 10 percent above that specified.
3.2.3 Mixers which have been out of use for more than 30 minutes shall be thoroughly cleaned before
putting in a new batch. Unless otherwise agreed to by the Engineer-in-charge the first batch of
concrete from the mixture shall contain only two thirds of normal quantity of coarse aggregate.
Mixing plant shall be thoroughly cleaned before changing from one type of cement to another.
3.3 Consistency :
3.3.1 The degree of consistency which shall depend upon the nature of the work and methods of vibration
of concrete, shall be determined by regular slump tests in accordance with I.S. 1199-1959. The slump
of 10mm to 25mm. shall be adopted when vibrators are used and 80mm when vibrators are not
3.4 Inspection:
3.4.1 Contractor shall give the Engineer-in-charge due notice before placing any concrete in the forms to
permit him to inspect and accept the false work and forms as to their strength, alignment, and
general fitness but such inspection shall not relieve the contractor of his responsibility for the safety
Signature of Bidder Page 55 of
Ahmedabad Municipal Corporation
of men, machinery, materials and for results obtained. Immediately before concreting, all forms shall
be thoroughly cleaned.
3.4.2 Centering design and its erection shall be got approved from the Engineer-in-charge. One carpenter
with helper shall invariably be kept present throughout the period of concreting. Movement of
labour and other persons shall be totally prohibited for reinforcement laid in position. for access to
different parts, suitable mobile platforms shall be provided so that steel reinforcement in position is
not disturbed. For ensuring proper cover, mortar blocks of suitable size shall be provided so that steel
reinforcement in position is not disturbed. For ensuring proper cover, mortar blocks of suitable size
shall be cast and tied to the reinforcement. Timber kapachi or metal pieces shall not be used for this
3.5 Transporting and laying:
3.5.1 The method of transporting and placing concrete shall be as approved. Concrete shall be so
transported and placed that no contemination, segregation or loss of its constituent material takes
All form wok shall be cleaned and made free from standing water, dust, show or ice immediately
before placing of concrete.
No concrete shall be placed in any part of the structure until the approval of the Engineer-in-charge
has been obtained.
3.5.2 Concreting shall proceed continuously over the area between construction joints. Fresh concrete
shall not be placed against concrete which has been in position for more than 30 minutes unless a
proper construction joint is formed. Concrete shall compacted in its final position within 30 minutes
of its discharge from the mixer. Except where otherwise agreed to by the Engineer-in-charge
concrete shall be deposited n horizontal layers to a compacted depth of not more than 0.45 meter
when internal vibrators are used and not exceeding 0.30 meter in all other cases.
3.5.3 Unless otherwise agreed to by the Engineer-in-charge, concrete shall not be dropped into place from
a height exceeding 2 meters. When trunking or chutes are used they shall be kept close and used in
such a way as to avoid segregation. When concreting has to be resumed on a surface which has
hardened, it shall be roughened, swept clean, thoroughly wetted and covered with a 13 mm thick
layer of mortar composed of cement and sand in the same ratio as in the concrete mix itself. This
mm layer of mortar shall be freshly mixed and placed immediately before placing of new concrete.
Where concrete has not fully hardened, all laitance shall be removed by scrubbing the wet surface
with wire or bristle brushes, care being taken to avoid dislodgment of any particles of coarse
aggregate. The surface shall then be thoroughly wetted, all free water removed and then coated with
neat cement grout. The first layer of concrete to be placed on this surface shall not exceed 150 mm in
thickness and shall be well rammed against old work particular attention being given to corners and
3.5.4 All concrete shall be compacted to produce a dense homogeneous mass with the assistance of
vibrators, unless, otherwise permitted by the Engineer-in-charge for exceptional cases, such as
concreting under water, where vibrators cannot be used. Sufficient vibrators in serviceable condition
shall be kept at site so that spare equipment is always available in the event of breakdowns.
Concrete shall be judged to be compacted when the mortar fills the spaces between the coarse
aggregate and begins to cream up to form an even surface. Compaction shall be completed before
the initial setting starts i.e. within 30 minutes of addition of water to dry mixture. During compaction,
it shall be observed that needle vibrators are not applied on reinforcement which is likely to destroy
the bond between concrete and reinforcement.
3.6 Curing: Immediately after compaction, concrete shall be protected from weather including rain,
running water, shocks, vibration, traffic, rapid temperature changes, frost and drying out process. It
shall be covered with wet sacking, hassain or other similar absorbant material approved, soon after
the initial set and shall be kept continuously wet for a period of not less than 14 days from the date
Signature of Bidder Page 56 of
Ahmedabad Municipal Corporation
of placement. Masonary work over foundation concrete may be started after 48 hours of its laying
but curing of concrete shall be continued for a minimum period of 14 days.
3.7 Sampling and Testing of concrete:
3.7.1 Samples from fresh concrete shall be taken as per I.S. 1199-1959 and cubes shall be made, cured and
tested at 7 days or 28 days as per requirements in accordance with I.S. 516-1959. A random sampling
procedure shall be adopted to ensure that each concrete batch shall have a reasonable chance of
being tested i.e. the sampling should be spread over the entire period of concreting and cover all
mixing units. The minimum frequency of sampling of concrete of each grade shall be in accordance
with following:
Quantity of concrete No. of Quantity of concrete in the No. of samples
in the work samples works
51 and above 4+ one additional for each additional 50 M. or part thereof.
NOTE : At least one sample shall be taken from each shift. Ten test specimens shall be made from each
sample, five for testing at 7 days and the remaining five at 28 days. The samples of concrete shall be
taken on each day of the concreting as per above frequency. The number of specimens may be
suitably increased as deemed necessary by the Engineer-in-charge when procedure of tests given
above reveals a poor quality of concrete and in other special cases.
3.7.2 The average strength of the group of cubes cast for each day shall not be less than the specified cube
strength of 150 Kg/Cm2 at 28 days. 20% of the cubes cast for each day may have value less than the
specified strength provided the lowest value is not less than 85% of the specified strength. If the
concrete made in accordance with the proportions given for a particular grade, does not yield the
specified strength; such concrete shall be classified as belonging to the appropriate lower grade.
Concrete made in accordance with the proportions given for a particular grade shall not, however,
be placed in a higher grade on the ground that the test strength are higher than the minimum
3.8.1 The Engineer-in-charge shall be informed in advance by the contractor of his intention to strike the
form work. While fixing the time for removal of form work, due consideration shall be given to local
conditions, character for the structure, the weather and other condition that influence the setting of
concrete and of the materials used in the mix. In normal circumstances (generally where
temperatures are above 200 C) and where ordinary concrete is used, forms may be struck after expiry
of periods specified in item No 9.1(A) for respective item of form work.
3.8.2 All form work shall be removed without causing any shock or vibration as would damage the
concrete. Before the soffit and struts are removed, the concrete surface shall be exposed, where
necessary in order to ascertain that the concrete has sufficiently hardened. Centering shall be
gradually and uniformly lowered in such manner as to permit the concrete to take stresses due to its
own weight uniformly and gradually. Where internal metal ties are permitted, the or their removable
parts shall be extracted without causing any damage to the concrete and remaining holes filled with
mortar. No permanently embedded metal part shall have less than 25 mm cover to the finished
concrete surface. Where it is intended to re-use the form work, it shall be cleaned and made good to
the satisfaction of the Engineer-in-charge. After removal of form work and shuttering, the Executive
Engineer shall inspect the work and satisfy by random checks that concrete produced is of good
3.8.3 Immediately after the removal of forms, all exposed bolts etc., passing through the cement concrete
member and used for shuttering or any other purpose shall be cut inside the cement concrete
member to a depth of at least 25 mm below the surface of the concrete and the resulting holes be
filled by cement mortar. All fine caused by form joints, all cavities produced by the removal of form
ties and all other holes and depressions honeycomb spots, broken edges or corners and other defects
shall be thoroughly cleaned, saturated with water and carefully pointed and rendered true with
Signature of Bidder Page 57 of
Ahmedabad Municipal Corporation
mortar of cement and fine aggregate mixed in the proportions used in the grade of concrete that is
being finished and of as dry consistency as is possible to use. Considerable pressure shall be applied
in filling and pointing to ensure thorough filling in all voids. Surfaces which are pointed shall be kept
most for a period of 25 hours.
If rock pockets/honeycombs in the opinion of the Engineer-in-charge are of such an extent or
character as to effect the strength of the structure materially or to endanger the life of the steel
reinforcement, he may declare the concrete defective and require the removal and replacement of
the portion of the structure affected.
4.0 Mode of measurement and payment:
4.1 The consolidated cubical contents of concrete work as specified in item shall be measured. The
concrete laid in excess of section shown on drawings or as directed shall not be measured. No
deduction shall be made for –
(a) Ends of dis-similar materials such as joints, beams, posts, girders, rafters, purline trusses, corbels and
steps etc. up to 500 Sq. Cm. in section.
(b) Opening up to 0.1 Sq. M.
4.2 The rate includes cost of all materials, labour, tools and plant required for mixing, placing in position,
vibrating and compacting, finishing, as directed, curing and all other incidental expenses for
producing concrete of specified strength. The rate excludes the cost of form work.
4.3 The rate shall be for a unit of one cubic meter.
5.4.1 Providing and laying cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate
mm nominal size) and curing complete excluding cost of form work and reinforcement for reinforced
concrete work in :
(A) Foundation footing, base of columns and mass (B) Slabs, landings, shelves, balconies, internals beams
girders and cantilever up to floor two level (C) Columns, pillars, posts and struts up to floor two level
(D) Staircase up to floor two level (E) Vertical and horizontal fins up to floor two level.
1.0 Materials & Workmanship
1.1 The relevant specification of item No. 5.3.13 shall be followed except that the work shall be carried
out for reinforced concrete work for work as specified in item 1.2. In addition, the following
stipulations shall be followed for :
(a) The bars shall be kept in position by the following methods:
(i) In case of beam and slab construction, sufficient number of precast cover blocks in cement mortar
1:2 (1 cement : 2 coarse sand) about 4 cms x 4 cms section and of thickness equal to the specified
cover shall be placed between the bars and shuttering as to secure and maintain the requisite cover
of concrete over the reinforcement.
In case of cantilevered or doubly reinforce beams of slabs, the main reinforcing bars shall be held in
position by introducing chain spacers or supports bars at 1.0 to 1.2 meters centers.
(ii) In case of columns walls, the vertical bars shall be kept in position by means of timber temphtes with
slotes accurately out in them. The temphtes shall be removed after concreting has been done below
it. The bars may also be suitably tied by means of annealed steel wires to the shuttering to maintain
their position during concreting.
1.2 All bars projecting from pillars, columns beams, slabs etc., to which other bars and concrete are to be
attached or bounced to later on, shall be protected with a coat of thin neat cement grout, if the bars
are not likely to be incorporated with succeeding mass of concrete within the following 10 days. This
coat of thin neat cement shall be removed before concreting.
2.0 Mode of measurement and payment:
2.1 Relevant specifications of item No. 5.3.13 shall be followed.
2.2 The volume occupied by reinforcement shall not be deducted from R.C.C. work.
2.3 The rate shall be for a unit of one cubic meter.
Signature of Bidder Page 58 of
Ahmedabad Municipal Corporation
Item No : 28 Providing and operation dewatering Pump including fuelcharges & operator Charges etc. as
directed etc. comp.(Shift for Eight Hour) (For Each Pump Set, No paymentshould be allowed
for non working condition ofmachinery ) ( Based on Previously approved rate by C Esir )
(Based on Drainage SOR 2015-16) Machinery
Providing and operation dewatering Pump including fuel charges & operator Charges etc.
as directed etc. comp. (Shift for Eight Hour) (For Each Pump Set, No payment should be
allowed for non working condition of machinery )
M/s. shall be on Shift. basis.
Item No : 29 Providing & Supplying JCB Machine on rental basis in case of emergency situation and
break down type work & also during unavoidable condition as per instruction of
engg.incharge , rate includes all nece. shifting, fuel and operating charges and
stacking of useful & non-useful materials separately up to store. (No payment should
be allowed for non working condition of machinery and for pipe line excavation and
M/s. shall be on Hr. basis.
Item No : 30 Providing & Supplying Hitachi Machine following capacity on rental basis in case of
emergency situation and break down type work & also during unavoidable condition as per
instruction of engg.incharge , rate includes all nece. shifting, fuel and operating charges .
(With Special Long Arm and Long Boom ) 8 Hrs Shift calculate in ideal condition.
M/s. shall be on Hr. basis.
Item No : 31 Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam
specification including premixing the Material with water at OMC in mechanical mix plant
carriage of mixed Material by tipper to site, laying in uniform layers in sub-base/base course
on well prepared surface and compacting with vibratory roller to achieve the desired density
as per Codal Provision.
(RA Approved St.Com.Res. No.189,Dt.19/05/2022)
This work shall consist of laying and compacting clean, crushed, graded aggregate and
granular material, premixed with water, to a dense mass on a prepared
subgrade/subbase/ base or existing pavement as the case may be in accordance with
the requirements in these Specifications. The Material shall be laid in one or more layers
as necessary to lines, grades and cross-sections shown on the approved drawings or as
directed by the Engineer.
The thickness of a single compacted Wet Mix Macadam layer shall not be less than
mm.When vibrating or other approved types of compacting equipment are used,the
compacted depth of a single layer of the sub-base course may be increased to 200 mm
upon approval of the Engineer.
17.2.1. Aggregates
17.2.1.1. Physical requirements: Coarse aggregates shall be crushed stone.If crushed
travel/shingle is used, not less than 90 per cent by weight of the gravel/shingle pieces
retained on 4.7mm sieve shall have at least two fractured faces.The aggregates shall
conform to the physical requirements set forth in Table 400-10 below.
TABLE 400-10. PHYSICAL REQUIREMENTS OF AGGREGATES FOR WE
Signature of Bidder Page 59 of
Ahmedabad Municipal Corporation
MIX MACADAM FOR SUB-BASE/BASE COURSES
Test Requirements
* Los Angeles IS:2386 (Part-4) 40 per cent (Max.)
Abrasion value IS:2386 (Part-4) 30 per cent (Max.)
Combined Flakiness
2 and Elongation IS:2386 (Part-1) 30 per cent (Max)**
indices (Total)
* Aggregate may satisfy requirements of either of the two tests.
** To determine this combined proportion, the flaky stone from a representative sample
should first be separated out. Flakiness index is weight of flaky stone metal divided by
weight of stone sample.Only the elongated particles be separated out from the
remaining (non-flaky) stone metal. Elongation index is weight of elongated particles
divided by total non-flaky particles. The value of flakiness index and elongation index
so found are added up.
If the water absorption value of the coarse aggregate is greater than 2 per cent, the
soundess test shall be carried out on the material delivered to site as per IS:2386 (Part-
17.2.1.2. Grading requirements: The aggregates shall conform to the grading
given in Table 400-11.
TABLE 400-11. GRADING REQUIREMENTS OF AGGREGATES FOR WET MIX MACADAM
IS Sieve Per cent by
Designation weight
600.00 micron 8-22
75.00 micron 0-8
Materials finer than 425 micron shall have Plasticity Index (PI) not exceeding
The final gradation approved within these limits shall be well graded from coarse to fine
and shall not vary from the low limit on one sieve to the high limit on the adjacent or
17.3. Construction Operations
Signature of Bidder Page 60 of
Ahmedabad Municipal Corporation
17.3.1. Preparation of base: Clause 404.3.1. shall apply.
17.3.2. Provision of lateral confinement of aggregates:While constructing wet mix
macadam, arrangement shall be made for the lateral confinement of wet mix.This shall
be done by laying materials in adjoining shoulders along with that of wet mix macadam
layer and following the sequence of operations described in Clause 407.4.1.
17.3.3. Preparation of Mix: Wet Mix Macadam shall be prepared in an approved
mixing plant of suitable capacity having provision for controlled addition of water and
forced/positive mixing arrangement like pugmill or pan type mixer of concrete batching
plant. For small quantity of wet mix work, the Engineer may permit the mixing to be
done in concrete mixers.Optimum moisture for mixing shall be determined in
accordance with IS: 2720 (Part-8) after replacing the aggregate fraction retained on
mm sieve with material of 4.75 mm to 22.4 mm size. While adding water, due allowance
should be made for evaporation losses. However, at the time of compaction, water in
the wet mix should not vary from the optimum value by more than agreed limits.The
mixed material should be uniformly wet and no segregation should be permitted.
17.3.4. Spreading of mix: Immediately after mixing, the aggregates shall be spread
uniformly and evenly upon the prepared subgrade-sub-base/base in required quantities.
In no case should these be dumped in heaps directly on the area where these are to be
laid nor shall their hauling over a partly completed stretch be permitted.The mix may be
spread either by a paver finisher or motor grader. For portions where mechanical means
cannot be used, manual means as approved by the Engineer shall be used. The motor
grader shall be capable of spreading the material uniformly all over the surface. Its
blade shall have hydraulic control suitable for initial adjustments and maintaining the
same so as to achieve the specified slope and grade.
The paver finisher shall be self-propelled, having the following features:
(i) Loading hopper and suitable distribution mechanism.
(ii) The screed shall have tamping and vibrating arrangement for initial compaction to the
layer as it is spread without rutting or otherwise marring the surface profile.
(iii) The paver shall be equipped with necessary control mechanism so as to ensure that the
finished surface is free from surface blemishes.
The surface of the aggregate shall be carefully checked with templates and all high or low
spots remedied by removing or adding aggregate as may be required.The layer may be
tested by depth blocks during construction.No segregation of large and fine particles
should be allowed.The aggregates as spread should be of uniform gradation with no
pockets of line materials.
17.3.5. Compaction: After the mix has been laid to the required thickness, grade and
crossfall/camber the same shall be uniformly compacted, to the full depth with suitable
roller. If the thickness of single compacted layer does not exceed 100 mm, a smooth
wheel roller of 80 to 100 kN weight may be used. For a compacted single layer upto
mm, the compaction shall be done with the help of vibratory roller of mi8nimum static
weight of 80 to 100 kN or equivalent capacity roller. The speed of the roller shall not
exceed 5 km/h.In portions having unidirectional cross fall/super-elevation, rolling shall
commence from the lower edge and progress gradually towards the upper
edge.Thereafter, roller should progress parallel to the centre line of the road, uniformly
overlapping each preceding track by at least one third width until the entire surface has
been rolled. Alternate trips of the roller shall be terminated in stops at least 1 m away
from any preceding stop.In portions in camber, rolling should begin at the edge with the
roller running forward and backward until the edges have been firmly compacted. The
roller shall then progress gradually towards the centre parallel to the centre line of the
Signature of Bidder Page 61 of
Ahmedabad Municipal Corporation
road uniformly overlapping each of the preceding track by at least one-third width until
the entire surface has been rolled.Any displacement occurring as a result of reversing of
the direction of a roller or from any other cause shall be corrected at once as specified
and/or removed and made good.Along forms, kerbs, walls or other places not accessible
to the roller, the mixture shall be thoroughly compacted with mechanical tampers or a
plate compactor.Skin patching of an area without scarifying the surface to permit
proper bonding of the added material shall not be permitted.Rolling should not be done
when the subgrade is soft or yielding or when it causes a wave-like motion in the sub-
base/base course or subgrade.If irregularities develop during rolling which exceed
mm when tested with a 3 metre straight edge,the surface should be loosened and
premixed material added or removed as required before rolling again so as to achieve a
uniform surface conforming to the desired grade and cross fall.In no case should the use
of unmixed material be permitted to make up the depressions.Rolling shall be continued
till the density achieved is at least 98 per cent of the maximum dry density for the
material as determined by the method outlined in IS: 2720 (Part-8).
After completion, the surface of any finished layer shall be well-closed, free from
movement under compaction equipment or any compaction planes, ridges, cracks and
loose material.All loose, segregated or otherwise defective areas shall be made good to
the full thickness of the layer and re-compacted.
17.3.6. Setting and drying: After final compaction of wet mix macadam course,the
road shall be allowed to dry for 24 hours.
17.4. Opening to Traffic
Preferably no vehicular traffic of any kind should be allowed on the finished wet mix
macadam surface till it has dried and the wearing course laid.
17.5. Surface Finish and Quality Control of Work
17.5.1. Surface evenness: The Surface finish of construction shall conform to the
requirements of Clause
17.5.2. Quality Control: Control on the quality of materials and works shall be
exercised by the Engineer in accordance with Section
17.6. Rectification of Surface Irregularity
Where the surface irregularity of the wet mix macadam course exceeds the permissible
tolerance or where the course is otherwise defective due to subgrade soil getting mixed
with the aggregates, the full thickness of the layer shall be scarified over the affected
area, reshaped with added premixed material or removed and replaced with fresh
premixed material as applicable and recompacted in accordance with Clause 406.3.
The area treated in the aforesaid manner shall not be less than 5 m long and 2 m wide.In
no case shall depressions be filled up with unmixed and ungraded material or fines.
17.7. Arrangement for Traffic
During the period of construction, arrangement of traffic shall be done as per the
17.8. Measurements for Payment
Wet mix macadam shall be measured as finished work in position in cubic metres.
The Contract unit rate for wet mix macadam shall be payment in full for carrying out the
required operations including full compensation for all components listed in Clause
Signature of Bidder Page 62 of
Ahmedabad Municipal Corporation
Supplying, labour for break down repairing work for activities like excavation, disliting, removing
debris from trench back filling etc. comp. as directed by Eng.in charge.(Building SOR 2023-
24,(Basic rates for Labour work))
Labour charges - Mazdoor (Male) (Sr. No. 1051 Code L-22, Page No.39)
Labour charges - Mazdoor (Fe-Male) (Sr. No. 1050 Code L-21, Page No.39)
Labour charges - Supervision for Machinery (Sr. No. 1058 Code L-29, Page No.39)
Providing Labour for Mice. Work for Breakdown work releted job including required tools
etc.comp.Work with available equipment for breakdown type of work. No extra cost will be given for
the equpement used by the labour for the work.
The M/s shall be on No basis.
Seal and Signature of the Bidder Additional City Engineer (CZ)
Date: Ahmedabad Municipal Corporation
Signature of Bidder Page 63 of
Ahmedabad Municipal Corporation
AHMEDABAD MUNICIPAL CORPORATION
ENGINEERING DEPARTMENT
E TENDER NOTICE NO. – 07 /2026-27
Special Tender Clause For CCRS SLA
Ahmedabad Municipal Corporation has to make a special clause as per for SLA
Name of work :- FtzegtJtuzobtk swœt swœt htuz vh bNel ntuj, z[ulus jtRl <&t Mx[tub Jtuxh z[ulus jtRl vh &<t c{ufztWl hevuh <&t lJe
z[ulus jtRl ltkFJt <&t bNelntuj, auBch hevuhekd fhJtlt ftb ctc<.
<t.22.01.2026 lt htus bu.Bgwrlrmvjfrb§hmtnucle Jefje bexekdbtk &guj aatobtk bwÆt lk.21 bwsc
su <u me.me.yth.yum.le Vhegtœlu y.Bgw.ftu.îtht cltJuj Ôntuxmyuv d{wvbtk bwfgt ctœ «tuçjubJtRÍ yum.yuj.yu.lt mbgdt¤t ctœ fhuj
ftbdehe btxu,awftJJtlt &<t ltKtkbtk&e y.Bgw.ftu.lt rl<e-rlgb bwsc vulÕxe leau bwsc fhJtbtk ytJNu.
(A) Penlty For Maintenance and SLA Purpose
CCRS within SLA time (Category & Problem wise) CCRS After SLA time
(Category & Problem wise
Department Category Problem SLA Penalty Penalty Penalty
(Hours) (Hours) (Hours)
Engineering Water>>Engineering Water-low presure 240 Hours 240 480
Engineering Water>>Engineering Water-No Supply 240 Hours 240 480
Engineering Water>>Engineering Water-Other 72 Hours 72 144
Engineering Water>>Engineering Water-Leakage In 48 Hours 48 96
Engineering Water>>Engineering Water-Pollution In 24 Hours 24 48
Engineering Drainage>>Engineering Drainage-Manhole 24 Hours 24 48
Engineering Drainage>>Engineering Drainage-Other 48 Hours 48 96
Engineering Drainage>>Engineering Drainage-Choking Of 48 Hours 48 96
Engineering Drainage>>Engineering Drainage-Public 72 Hours 72 144
Toilets and Urinals-
Blockage or Choking
Signature of Bidder Page 64 of
Ahmedabad Municipal Corporation
Engineering Road Road-Other 48 Hours 48 96
Engineering Road Road-Bhuva On 48 Hours 48 96
Engineering Road Road-Repair Require 72 Hours 72 144
Engineering Storm Water Road-Water logged 24 Hours 24 48
Engineering Storm Water Road-Catch Pit 96 Hours 96 192
Engineering Public Building Public Building- 360 Hours 360 720
Public Toilets and
Urinals-Repairing of
Doors,Windows,Tiles
Engineering Footpath Road-Footpath 168 Hours 168 336
Engineering Building>>Engineering Building-Municipal 168 Hours 168 336
Schools Repairing
Wvhtuf< vulÕxele mbgbgtoœt ctœ vK ftbdehe fhJtbtk l ytJu <tu vwhuvwhe ftbdehele hfb suxje vulÕxe jtdw vzNu.
(A) Penalty 10% for New Allocated Works.
(B) The Work Order under this Annual Rate Contract (ARC) Tender shall be issued only
against the approved and sanctioned estimate for the respective work.
The time limit for execution of each work shall be specified in the respective Work
Order issued under this tender.
Any penalty for delay or non-compliance shall be calculated and imposed based on the
approved sanctioned estimate amount of the respective work and shall be governed by
the relevant terms, conditions, specifications, and penalty clauses of this tender.
Seal and Signature of the Bidder Additional City Engineer (CZ)
Date: Ahmedabad Municipal Corporation
Signature of Bidder Page 65 of
Ahmedabad Municipal Corporation
AHMEDABAD MUNICIPAL CORPORATION
ENGINEERING DEPARTMENT-CENTRAL ZONE
Name of Work:- FtzegtJtuzobtk swœt swœt htuz vh bNel ntuj, z[ulus jtRl <&t Mx[tub Jtuxh z[ulus jtRl vh &<t
c{ufztWl hevuh <&t lJe z[ulus jtRl ltkFJt <&t bNelntuj, auBch hevuhekd fhJtlt ftb ctc<.
Item Rate Amount
Excavation for pipe line trenches for water supply, sewerage
line, manhole etc. all with shoring and struting if required as per
required gradient and line including safety provisions using site
1 rails and stacking excavated stuff including up to all required
lead cleaning the site etc. complete for all lifts and strata as
specified. In all sorts of soil and soft murrum. (GWSSB SOR
2022-23; Item No. 1.A.1; Page No. 32)
a 200.00 0.00 to 1.50 meter depth 89.00 Cmt
b 180.00 1.50 to 3.00 meter depth 98.00 Cmt
c 60.00 3.00 to 4.50 meter depth 103.00 Cmt
d 20.00 4.50 to 6.00 meter depth 109.00 Cmt
Extra rate over item of excavation of earth if excavation is to be
2 20.00 done in wet condition without resorting to pumping but incl. of 17.86 Cmt
bailing out of water.
Extra rate over item of excavation of earth for excavation of
asphalt pavement / RCC of thickness up to 0.20 meter including
3 demolishing the asphalt carpet, metal, soiling/cutting -
Reinforcement etc.comp. with stacking the material as directed.
(Based on Previously approved rate by C E sir )
up to 0.20 meter thickness (By Manual) SOR - (Jan. 2016)
Rates for work of Drainage / SWD pipe line-4A
0.20 to 0.30 meter (By any type of Breaker Machine or R.C.C.
Cutter machine including cost of operator, fuel, & transportation
etc complete.) SOR - (Jan. 2016) Rates for work of Drainage
/ SWD pipe line-4B
0.30 meter & above (By any type of Breaker Machine or
R.C.C.Cutter machine including cost of operator, fuel, &
transportation etc complete.) SOR - (Jan. 2016) Rates for
work of Drainage / SWD pipe line-4C
Refilling in pipeline trenches ramming and watering,
4 20.00 Consolidating, disposal of surplus stuff as directed within 3 KM 22.00 Cmt
Area (GWSSB SOR 2022-23; Item No.14.1)
Dismantling the following including loading, unloading and
disposal of unserviceable material for all lead or as directed by
Engineer-In-Charge and stacking the serviceable material and
backfilling the resulting trenches and pits complete.
Dismantling tiled or stone floors laid in mortar including
stacking of serviceable material and disposal of unserviceable
material with all lead and lifts. Building S.O.R. 2023-24,
I.C.20005, Iteam No. As Per NBO
Demolition including stacking of serviceable materilas and
disposal of unserviceable materials with all lead and lift. (i)
R.C.C. work. Building S.O.R. 2023-24, I.C.20002, Iteam No.
Demolition of Brick work and stone masonry including stacking
of serviceable materilas and disposal of unserviceable materials
with all lead and lift. (ii) In Cement Mortar. Building S.O.R.
2023-24, I.C.20003B, Iteam No. As Per NBO
Signature of Bidder Page 66 of
Ahmedabad Municipal Corporation
Conveyance of lime murrum building rubbish earth manure or
sludge & execavated rock and rubbish [Lime murrum building
rubbish]. Up to 5.00 Km lead (Building SOR 2023-24
Statement No.5 Item No. 030201A1; Page no.6)
a 50.00 Lead up to 1.0 Km. lead 256.16 Cmt
b 20.00 Lead up to 2.0 Km. lead 278.18 Cmt
c 50.00 Lead up to 3.0 Km. lead 296.43 Cmt
d 10.00 Lead up to 4.0 Km. lead 312.45 Cmt
e 1000.00 Lead up to 5.0 Km. lead 326.73 Cmt
Providing and supplying ISI marked only Standard length
Stoneware pipes in standard lengths of following class and
diameter including all taxes, insurance, transportation, freight
charges, octroi, inspection charges, loading, unloading,
conveyance to departmental stores, stacking etc. (IS - 651 /
1989) (Based on GWSSB SOR 2022-23, Item No. 11.0 P-17)
a 500.00 100 mm dia 124.00 Rmt
b 300.00 150 mm dia 179.00 Rmt
c 250.00 200 mm dia 277.00 Rmt
d 750.00 230 mm dia 329.00 Rmt
Lowering, laying and jointing Stone Ware pipes of following
diameters with cement joints in C. M. 1:1 proportion in proper
position, grade and alignment at all level as directed by
Engineer-in-charge including conveyance from stores to site of
work, Jointing material etc. comp. (Based on GWSSB SOR
2022-23, Item No. 12; Page-40)
a 500.00 100 mm dia 58.00 Rmt
b 300.00 150 mm dia 88.00 Rmt
c 250.00 200 mm dia 113.00 Rmt
d 750.00 230 mm dia 128.00 Rmt
Manufacturing, testing, supplying, loading, transporting to
worksite, unloading, Lowering in trenches, laying and jointing
RCC pipe of following class with Socket and spigot joints
with ISI Mark of IS 458 - 2003 including EPDM Rubber ring as
per IS 5382-1985 etc. comp. As Directed by Engineering in
300 mm dia. 1,345.00 Rmt -
450 mm dia. 2,624.00 Rmt -
600 mm dia. 3,597.00 Rmt -
900 mm dia. 7,799.00 Rmt -
Constructing Chamber of following size including excavation,
refilling, BBCC (1:5:10) for foundation, C.C.Channel (1:2:4),
finished 15 mm thick cement plaster inside in CM 1:3, finishing
with cement slurry, Brick masonary in CM 1:5 & excluding the
cost of chamber seat cover etc.completed. (Based on Drainage
SOR 2015-16; Item No.11)
0.60 X 0.45 mt. size Inside Clear, Depth from 0.00 to
0.60 X 0.75 mt. size Inside Clear, Depth from 0.00 to
Signature of Bidder Page 67 of
Ahmedabad Municipal Corporation
0.75 X 0.75 mt. size (Inside Clear) Depth from 0.00 to
meter for pipe dia <=20 mm
Constructing Slab Type M.H. Chamber Of The Following Size
Including Excavation, Refilling, Brick Bats Cement Concrete
(1:5:10) of thickness 15 C.M., CC Channel (1:2:4) of thickness
10 C.M., finished 15 mm thick cement plaster inside & outside
(Only for shaft) In Cm 1:3, Finishing With Cement Slurry, P/F
4 mm Dia M.S. Steel Hdpe Coated Steps 35 Cm C/C At 35 Cm
Staggered Masonary In Cm 1:5, Rcc Slab In Cc1:1.5:3 of
thickness 15 C.M.,Including Cantering & Reinforcement
(Single jalli at 15 C.M. c/c bothway 10 mm dia.)But Excluding
The Cost Of Manhole Seat Cover Etc..Completed Of Size
X 1.00 Meter (Inside Clear, M.H. length should be parallel to
the flow) (Based on Drainage SOR 2015-16; Item No.14)
a 33.00 1.00 to 2.00 meter depth (Slab at Ground level) 5,651.79 No.
b 25.00 2.00 to 3.00 meter depth, (Slab at below 0.60 mt. From G.L.) 11,395.54 No.
Rate reduction over item of Constructing Slab Type M.H.
Chamber of size 1.00 x 0.75 mt for constructing slab @depth
more than 0.60 mt below Ground Level (Max. 3 unit of DM
should be reduced in this item)
Constructing Slab type M.H. Chamber of the following size
including excavation, refilling, brick bats cement concrete
(1:5:10) of thickness 15 C.M., CC Channel (1:2:4) of thickness
10 C.M., finished 15 mm thick cement plaster inside & outside
(Only for shaft) in CM 1:3, finishing with cement slurry, P/F
mm dia M.S.Steel HDPE coated steps 35 cm c/c at 35 cm
staggered in masonary CM 1:5, RCC Slab in CC 1:1.5:3 of
thickness 23 C.M., including Cantering & reinforcement
(double jalli at 15 C.M. c/c bothway 12 mm dia.) but excluding
the cost of Manhole seat cover etc..completed. of Size 1.00 X
1.40 meter (Inside Clear, M.H. length should be parallel to the
flow. (Based on Drainage SOR 2015-16; Item No.15)
a 35.00 1.00 to 2.00 meter depth, (Slab at Ground level) 10,177.68 No.
b 25.00 2.00 to 3.00 meter depth, (Slab at below 0.6 mt. From G.L.) 19,258.04 No.
c 15.00 3.00 to 4.00 meter depth, (Slab at below 1.00 mt. From G.L.) 26,867.86 No.
d 9.00 5.00 to 6.00 meter depth, (Slab at below 1.00 mt. From G.L.) 44,050.00 No.
e 5.00 7.00 to 8.00 meter depth, (Slab at below 1.00 mt. From G.L.) 66,632.14 No.
Rate reduction over item of Constructing Slab Type M.H.
Chamber of size 1.00 x 1.40 mt for constructing slab @ depth
14 10.00 more than 0.60 mt for ( MH 2 to 3 mt depth) and 1.0 mt for 578.00 DM
(MH above 3.0 mt depth) below Ground Level (Max. 5 unit of
DM should be reduced in this item)
Dismantling of existing Arch type manhole up to Arch and then
Const. Slab type manhole of following size incl. excavation,
refilling and & finished 15 mm thick cement plaster inside in
CM 1:3, P/F 4 mm dia M.S.Steel HDPE coated steps 35 cm c/c
15 at 35 cm staggered in masonry CM 1:5, incl. cost of RCC Slab -
in CC 1:1.5:3, including Cantering & reinforcement as directed
by engineer in charge. Rate includes carting of debris and
excavated soil (Based on Drainage SOR 2015-16; Item
1.00 x 0.75 mt (inside clear) RCC Slab of thickness 15 C.M. &
a 100.00 reinforcement (Single jalli at 15 C.M. c/c bothway 10 mm dia.) 5,892.85 No.
From 0 to 2 mt depth (Slab at Ground level)
Signature of Bidder Page 68 of
Ahmedabad Municipal Corporation
1.00 x 0.75 mt (inside clear) RCC Slab of thickness 15 C.M. &
b 50.00 reinforcement (Single jalli at 15 C.M. c/c bothway 10 mm dia.) 8,883.92 No.
From 2 to 3 mt depth (Slab at below 1.00 mt. From G.L.)
1.40 x 1.00 mt (inside clear) RCC Slab of thickness 23 C.M. &
c 55.00 reinforcement (double jalli at 15 C.M. c/c bothway 10 mm dia.) 8,080.35 No.
From 0 to 2 mt depth (Slab at Ground level)
1.40 x 1.00 mt (inside clear) RCC Slab of thickness 23 C.M. &
d 35.00 reinforcement (double jalli at 15 C.M. c/c bothway 10 mm dia.) 17,008.93 No.
From 2 to 3 mt depth (Slab at below 1.00 mt. From G.L.)
1.40 x 1.00 mt (inside clear) RCC Slab of thickness 23 C.M. &
e 25.00 reinforcement (double jalli at 15 C.M. c/c bothway 10 mm dia.) 24,776.79 No.
From 3 to 4 mt depth (Slab at below 1.00 mt. From G.L.)
Providing and fixing S.W. gully trap with C.I. grating/brick
masonry chamber and water tight C.I. cover with frame of
16 500.00 mm x 300 mm size (inside) with standard weight. (i) Square 1,279.40 Each
mouth traps. (A) 100 mm x 100 mm size P type (Based on
Building SOR 2023-24, Item No. 24006AA, NBO Item 24.19)
Making connection to the ex. M.H. in running sewer incl.
Dewatering and other required machinery etc. of following dia
17 pipes at any convenient time. All damaged work shall be well -
repaired as per instructions. etc. complete. (Based on Drainage
SOR 2015-16; Item No.19)
Cutting the pipes of following dia coming in the new M.H.in
running sewer including cutting bars, including removing
debris/silt from the M.H. and carting at a suitable distance etc.
complete as directed. No payment for M.H. work will be made
until pipe is not cut completely in all respect. (Based on
Drainage SOR 2015-16) Item No.20
Repairing damaged M.H. and raising M.H. up to road level incl.
removing damaged brick work and repairing by brick masonry
19 in C.M. 1:5 and plaster in C.M. 1:3 and fixing C.I. steps and -
existing MH sheet cover, removing the debris from MH and
carting the same as directed.
a 50.00 up to 0.15 mt. (@ Two Coarse) 732.14 No.
b 30.00 up to 0.35 mt. (@ Four Coarse) 1,160.71 No.
c 25.00 up to 0.65 mt. (@ Seven Coarse) 1,794.64 No.
d 10.00 up to 0.90 mt. (@ Ten Coarse ) 2,160.71 No.
Repairing damaged I.C./Raising removing damaged brick work
and repairing by brick masonry in C.M. 1:5 and plaster in C.M.
20 200.00 1:3 and fixing C.I. steps and existing chamber sheet cover, 401.79 No.
removing the debris from chamber and carting the same as
directed. (Based on Drainage SOR 2015-16 Item No.22)
Providing F.R.C. MH seat cover incl. carting to the work site
21 etc. comp. Directed. (As per Central Store Circular -
(SET cover and frame) F.R.C. Extra Heavy Duty [EHD-35]
Machinehole Covers & Frame - 560 mm ø clear opening, The
dimension of frame and cover as per mentioned in Amend No.
to IS 12592 : 2002 table
Signature of Bidder Page 69 of
Ahmedabad Municipal Corporation
(SET cover and frame) F.R.C. Heavy Duty [HD-20]
Machinehole Covers & Frames - 560 mm ø clear opening, The
dimension of frame and cover as per mentioned in Amend No.1
to IS 12592 :2002 table
(SET cover and frame) F.R.C. Medium Duty [MD-10]
Machinehole Covers & Frames - 560 mm ø clear opening, The
dimension of frame and cover as per mentioned in Amend No. 1
to IS 12592 :2002 table 1 (SET cover and frame)
(SET cover and frame) F.R.C. Light Duty [LD-2.5]
Machinehole Covers & Frames - 560 mm ø clear opening, The
dimension of frame and cover as per mentioned in Amend No. 1
to IS 12592 : 2002 table
(SET cover and frame) F.R.C. Medium Duty [MD-10] Chamber
Covers & Frame - 600 x 450 mm clear opening, The dimension
of frame and cover as per mentioned in Amend No. 1 to IS
(SET cover and frame) F.R.C. Light Duty [LD-2.5] Chamber
Cover & Frame - 600 x 450 mm clear opening,The dimension
of frame and cover as per mentioned in Amend No. 1 to IS
(SET cover and frame) F.R.C. Light Duty [LD-2.5] Chamber
Cover & Frame - 450 x 450 mm clear opening,The dimension
of frame and cover as per mentioned in Amend No.1 to IS
Providing Kachha of Pakka Dummy in the following dia pipes
22 and removing the same after completion of the connection work -
as directed. (GWSSB SOR 2022-23)
a 10.00 300 mm dia. and below sewer line 1,210.00 No.
b 5.00 400 to 500 mm dia. Sewer line 1,452.00 No.
Barricading the entire break down or excavated area on rental
basis using wooden ballies / M.S.angles at max. 2.00 meter
centre to centre, C.G.I. Sheet, reflective paint / Board out side to
avoid accident & for smooth traffic diversion & movement
including cautionary board etc. Item also includes for making
temporary sufficient nos of lighting arrangement through out the
work with necessary required arrangement. The same shall be
removed after completion of work. (Only for break down
work from start to complete) (Based on Drainage SOR
2015-16) Item No.29
Constructing Bombay Pattern Type Catchpit of size 0.60 x
mt. depth up to 1 mt. including excavation, B.B.C.C. (1:5:10),
23 cms thick brick maso. wall in the prop. of CM (1:6) with
mm thick IPS flooring in the prop M15 at bottom and 15 mm
thick cement plaster inside the catch pit in the proportion of CM
(1:3) without jali etc. comp. as directed. (AMC SOR)
CatchPit Jali (Heavy duty) Fixing P/F FRC catch pit jali with
25 48.00 frame 600 mm x 600 mm clear opening etc. comp. As directed 1,364.00 No.
by engineer in charge.
Supplying Pneumatic Breaker Machine for RCC Slab or
Asphalt Demolishing Work on site by using Operator, fuel,
power Supply etc. Complete as Directed. (No payment should
be allowed for non working condition of machinery and for pipe
line excavation and M.H. work. Allowed only for break down
work) (Based on Previously approved rate by C E sir )
Providing and laying cement concrete 1:5:10 (1- Cement : 5-
fine sand : 10- graded brick bat aggregates 40mm nominal size)
27 10.00 and curing complete excluding cost of formwork in (A) 2,457.01 Cmt
Foundation and Plinth (Building SOR 2023-24 Item Code No.
05009A , as per NBO Item No. 5.8.3; Page no. 56)
Signature of Bidder Page 70 of
Ahmedabad Municipal Corporation
Providing and operation dewatering Pump including fuelcharges
& operator Charges etc. as directed etc. comp.(Shift for Eight
Hour) (For Each Pump Set, No paymentshould be allowed for
non working condition ofmachinery ) (Based on Previously
approved rate by CE sir ) (Based on Drainage SOR 2015-16)
Machinery Item No.01
Providing & Supplying JCB Machine on rental basis in case of
emergency situation and break down type work & also during
unavoidable condition as per instruction of engg. in charge, rate
29 100.00 includes all nece. shifting, fuel and operating charges and 535.71 Hr
stacking of useful & non-useful materials separately upto store.
(No payment should be allowed for non working condition of
machinery and for pipeline excavation and laying work)
Providing & Supplying Hitachi Machine following capacity on
rental basis in case of emergency situation and break down type
work & also during unavoidable condition as per instruction of
engg.incharge , rate includes all nece. shifting, fuel and
operating charges . (With Special Long Arm and Long Boom )
8 Hrs Shift calculate in ideal condition.
(i) 5.00 Hitachi machine 110 to 140 (Regular Boom arms) 1,785.00 Hrs
(ii) 5.00 Hitachi machine 200 to 210 (Regular Boom arms) 2,410.00 Hrs
(iii) 24.00 Hitachi machine 110 to 140 (11.0 mt long Boom arms) 2,750.00 Hrs
(iv) 5.00 Hitachi machine 200 to 210 (16.0 mt long Boom arms) 3,200.00 Hrs
(v) 5.00 Hitachi machine 220 to 240 (21.0 mt long Boom arms) 3,500.00 Hrs
Providing, laying, spreading and compacting graded stone
aggregate to wet mix macadam specification including
premixing the Material with water at OMC in mechanical mix
plant carriage of mixed Material by tipper to site, laying in
uniform layers in sub-base/base course on well prepared surface
and compacting with vibratory roller to achieve the desired
density as per Codal Provision. (RA Approved St.Com.Res.
a 5.00 Production & Supply of WMM 1,708.13 Cmt.
b 5.00 Laying of WMM 31.25 Cmt.
Supplying, labour for break down repairing work for activities
like excavation, disliting, removing debris from trench back
filling etc. comp. as directed by Eng.in charge.(Building
SOR 2023-24,(Basic rates for Labour work))
Labour charges - Mazdoor (Male) (Sr. No. 1051 Code L-22,
Labour charges - Mazdoor (Fe-Male) (Sr. No. 1050 Code L-
21, Page No.39)
Labour charges - Supervision for Machinery (Sr. No.
Code L-29, Page No.39)
Seal and Signature of the Bidder Addl. City Engineer
Date: Ahmedabad Municipal Corporation
Signature of Bidder Page 71 of
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
TENDER NO.216.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .