| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹51,740Accepted-AOC | L1 | Accepted-AOC L1 |
| Sl No | Description | Qty | Unit | REJI JOSEPH L1 |
|---|---|---|---|---|
| 1.00Cutting down of trees and branches of trees | ||||
| 1.00 | 2.33.2:Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyound 60 cm girth up to and including 120 cm girth | 3 | each | 2,400 ₹7,200 Lowest |
| 1.00 | 2.33.3:Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyond 120 cm girth up to and including 240 cm girth | 1 | each | 11,200 ₹11,200 Lowest |
| 1.00 | 2.33.4:Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Above 240 cm girth | 1 | each | 22,000 ₹22,000 Lowest |
| 1.00 | 50.2.33.5:Cutting branches of trees overhanging above any structures of girth between 40cm to 60cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete. | 5 | each | 370 ₹1,850 Lowest |
| 1.00 | 50.2.33.6:Cutting branches of trees overhanging above any structures of girth between 60cm to 90cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete | 5 | each | 660 ₹3,300 Lowest |
| 1.01 | 50.2.33.7:Cutting branches of trees overhanging above any structures of girth between 90cm to 120cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete. | 4 | each | 880 ₹3,520 Lowest |
| 1.01 | 50.2.33.8:Cutting branches of trees overhanging above any structures of girth beyond 120cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete. | 5 | each | 1,200 ₹6,000 Lowest |
Tender Value
₹56,739
EMD Value
₹1,418
Closing Date
13 Aug 2025, 3:00 pmClosed
Assistant Executive Engineer
Assistant Executive Engineer, Irrigation Sub Division No.1, Chalakudy
cutting trees
2025_Irrig_779254_2
IRR/PII/TR/1382/2025_5_1_1/1
Open Tender
Civil Works - Others
Item Rate
365 days
Kodakara
Please refer Tender documents.
7 documents required · 7 mandatory
₹555
Yes
₹1,418
Yes
6 Oct 2025
6 Aug 2025
14 Aug 2025
6 Aug 2025
13 Aug 2025
6 Aug 2025
6 Aug 2025 - 13 Aug 2025
Amount
Cutting down of trees and branches of trees
2.33.2:Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyound 60 cm girth up to and including 120 cm girth
2.33.3:Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyond 120 cm girth up to and including 240 cm girth
2.33.4:Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Above 240 cm girth
50.2.33.5:Cutting branches of trees overhanging above any structures of girth between 40cm to 60cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete.
50.2.33.6:Cutting branches of trees overhanging above any structures of girth between 60cm to 90cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete
50.2.33.7:Cutting branches of trees overhanging above any structures of girth between 90cm to 120cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete.
50.2.33.8:Cutting branches of trees overhanging above any structures of girth beyond 120cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete.
Bidder Name
REJI JOSEPH
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1285550.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .