| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.7 LAccepted-AOC | L1 | Accepted-AOC LOWEST RATE | |
| 2 | L2₹4.3 L+₹56,676 (15.2%)Rejected-Finance | L2 | Rejected-Finance Higher than L1 | |
| 3 | L3₹4.4 L+₹65,350 (17.5%)Rejected-Finance | L3 | Rejected-Finance Higher than L1 and L2 | |
| 4 | L4₹5.3 L+₹1.5 L (40.7%)Rejected-Finance | L4 | Rejected-Finance Higher than L1 , L2 and L3 |
Tender Value
Refer Docs
EMD Value
₹10,500
Closing Date
19 Sept 2024, 2:00 pmClosed
AGMMT
TCC LTD UDYOGAMANDAL P.O ELOOR ALUVA ERNAKULAM
Miscellaneous roof repair work inside TCC factory
2024_TCCL_688818_1
TCC/WC/C/992/2024
Open Tender
Civil Works - Others
Item Rate
180 days
THE TRAVANCORE COCHIN CHEMICALS LTD
Please refer Tender documents.
6 documents required · 6 mandatory
₹1,000
Yes
₹10,500
Yes
2 Dec 2024
4 Sept 2024
20 Sept 2024
4 Sept 2024
19 Sept 2024
4 Sept 2024
Amount
Dismantling A.C. roofing sheets of all sizes at all locations up to 20M from existing ground level by carefully unbolting, lowering, conveying and stacking them without damages at places inside factory compound within a lead of 1km, collecting, sorting and stacking roofing bolts of the dismantled sheets, including all labour charges, hire for hand cart/ tempo van / lorry, conveying charges, all safety protection works to workers including all safety measures like safety net, safety belt, helmet, goggles / face shield, safety shoes, life line for hooking safety belt at contractors risk and cost, approved by engineer in charge and safety engineer including obtaining safety permit approval from concerned sections before work starts on each day , machineries, pipe lines, cables etc., at contractors risk and cost, as per approval of TCC
Dismantling, lowering, removing MS. structural works of roof cladding partitions, bracings, platforms, stairs, hand rails of all sizes and shapes at all locations and elevations up to 20M from ground level, carefully lowering by standard methods,conveying dismantled materials in hand cart/tempovan/lorry, stacking the items category wise at places pointed out inside factory compound within a lead of 1km, including all labour charges, hire for tools, derricks, tackles etc., all safety protection works to workers including all safety measures like safety net, safety belt, helmet, goggles / face shield, safety shoes, life line for hooking safety belt at contractors risk and cost, approved by engineer in charge and safety engineer including obtaining safety permit approval from concerned sections before work starts on each day , machineries, pipe lines, cables etc., at contractors risk and cost, as per approval of TCC., machineries, equipment’s, pipe lines, cables etc., at contractors risk and cost approved by TCC, all hire for hand cart/tempo van/lorry etc., complete
Roofing, side cladding etc., with Galvalume sheets or any other roofing sheets like UPVC sheets, plastic sheets, Aluminum sheets, fiber sheets etc., supplied by TCC of all sizes at all locations and height up to 20M from existing ground level, using old/new A.C. roofing sheets, collecting, conveying sheets from store yard/ inside factory carefully, drilling/holes for bolding, fitting the roofing sheets in position with suitable G.I. bolts, nuts, G.I. washer, bitumen washer etc., covering bolt holes in old sheets with G.I. bolts, washers, roofing compound etc., including painting/dipping, roofing, bolting, anti-corrosive painting well before using them, all labour charges, hire for tools, plants, standard lifts, devices, scaffolding charges, all protection works to workers, materials, equipment’s, machineries, pipe lines, cables etc ,all safety measures including all safety measures like safety net, safety belt, helmet, goggles / face shield, safety shoes, life line for hooking safety belt at contractors risk and cost, approved by engineer in charge and safety engineer including obtaining safety permit approval from concerned sections before work starts on each day , machineries, pipe lines, cables etc., at contractors rick and cost, as per approval of TCC. (Old/new roofing sheets, roofing bolts, nuts, washers, roofing compound and paint will be issued free of cost by TCC)
Providing ridges or hips width 60 cm overall width plain Galvalume sheet fixed with self driven bolts of approved size and quality at corrugated portion only ncluding all safety precautions to men and materials, at contractor's risk and cost, all labour charges, all other incidentals etc.(Required quantity of sheet issued free of cost by TCC)
Fabricating, erecting, setting, bolting/welding in position M.S. structural with new M.S. angles, channels, plates, rods,ISA,pipe, ISMB, sections, joists etc., of all sizes for roof trusses, brackets, bracings, side cladding, platforms, hand rails, racks etc., as per instructions, drawings and maintenance of structures at all locations and elevations up to 20M from ground level, including straightening, marking, cutting, drilling, holing, welding, bolting etc., all as per standard practices, scrapping thoroughly to remove rust, painting one coat finish paint with chlorinated rubber or enamel paint, including all labour charges, hire for tools, plants, welding sets, gas cutting equipment’s, derricks, tackles, all safety precautions to workers including all safety measures like safety net, safety belt, helmet, goggles / face shield, safety shoes, life line for hooking safety net at contractors risk and cost, approved by engineer in charge and safety engineer including obtaining safety permit approval from concerned sections before work starts on each day , machineries, pipe lines, cables etc., at contractors rick and cost, as per approval of TCC., materials, pipe lines, cables, all cost of consumables such as welding rods, cutting gas etc., complete. (M.S. structural, M.S. bolts, nuts, washers and paint will be issued free of cost by TCC).
Structural steel fabrication and erection at site for roof purlins, truss members etc of all sizes for roof trusses, brackets, bracings, side cladding, platforms, hand rails, racks etc., as per instructions using light weight GI sections. supplied from Stores, including painting two coats with chlorinated rubber paint above one coat of primer, setting and fixing to position by welding/ bolting, all safety precautions to men and materials, at contractor's risk and cost, all labour charges, hire for tools and plants, all other incidental expenses etc., complete.
Replacing valley gutters, boundary wall gutters, curved gutters etc., of all sizes at all locations and elevations up to 20M from ground level, fitting and setting as per standard practices with G.I. Fasteners, roofing compound, asbestos rope, re-setting gutters, clamps etc., including all labour charges, hire for tools and plants, all safety precautions including all safety measures like safety net, safety belt, helmet, goggles / face shield, safety shoes, life line for hooking safety net at contractors risk and cost, approved by engineer in charge and safety engineer including obtaining safety permit approval from concerned sections before work starts on each day , machineries, pipe lines, cables etc., at contractors rick and cost, as per approval of TCC. etc., complete
Engaging Male workers for executing miscellaneous items of work at all locations and elevation, including all labour charges, ESI, PF KCWWF contributions and all other benefits payable, hire for tools and PPE's all safety precautions and work permit system etc. complete as per the instruction of Engineer-In-Charge.
K M Shajahan
KP Nazar
P M ABDULLA
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .