Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 4 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 5 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
EMD Value
₹12,000
Closing Date
6 Sept 2025, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
NITHIN C S
SM (P and P)-CD
Dismantling of existing W5 heat exchanger and erection of spare W5 along with its hook up work in SAP, FACT-CD
2025_FACT_874271_1
4097/2025-2026/E32017
Limited
Miscellaneous Works
Item Rate
6 days
AMBALAMEDU
This tender is issued on limited tender basis from the registered bidders of FACT (CD)
4 documents required · 4 mandatory
₹0
₹12,000
Yes
8 Sept 2025
22 Aug 2025
8 Sept 2025
22 Aug 2025
6 Sept 2025
22 Aug 2025
Dismantling of existing W5 heat exchanger and erection of spare W5 along with its hook up work in SAP, FACT-CD.
Dismantle the existing W5 and replace with spare W5. Arrange necessary tools and tackles required for the work. Make required site arrangements like scaffolding etc. Cut all the 1800mm ducts and 900mm bypass connection from existing W5 . Necessary temporary supports shall be provided for supporting the duct before cutting. Bellows , if any shall be clamped properly before cutting the ducts from W5. Unwanted assosiated structurals / any structural which are to be dismantled for smooth operation of the work shall also be dismantled as per instructions. FACT cranes will be made available for dismantling of ducts and structurals. After dismantling of ducts, existing W5 shall be lifted and moved from the foundation. New W5 shall be erected on same foundation. Arranging crane required for removing existing W5 and erecting new W5 is under the scope of contractor (min crane capacity shall be 300T). After erection of spare W5 in place, make necesaary pads out of BQ plate for welding all the existing ducts to newly erected W5. The ducts shall be made free from any strain and ovality. Any modifications at site shall be done as per instructions from engineer in charge and will fall under the scope of this contract. The temporary supports provided shall be removed and dismantled associated structures shall be fixed back after completing the replacement work of W5. Dismantled W5 shall be transported to the earmarked area/scrapyard as per instruction. Scope of collection,loading/unloading and transporation of dismantled ducts/structurals/any scrap arising out of dismantling and erection of subject work shall be under contractors scope. Approximate weight of W5 will be 75 tonnes.
M A ALI (BID ID -3277730)
M A Shamsudeen (BID ID -3277742)
K G SIVANANDAN (BID ID -3276870)
HASSAN MM (BID ID -3278167)
MBM ENGG WORKS (BID ID -3273821)
S K BOILERS PVT LTD (BID ID -3276794)
stage.html
html • 0.03 MB
finance_919037.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .