Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹3.4 Cr
EMD Value
₹10.1 L
Closing Date
15 Dec 2026, 6:30 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Chief Engineer (G), UTPS
Renovation work of E type (180) & Type IV (64) residential building incl. replacement of window, door, renovation of bath, WC & Kitchen etc of Urjanagar colony Ukai.(WT-4894-A civil colony).
368654
WT-4894-A
Open
Civil - Furniture maintenance, Carpentry, Plumbing, Sanitary Works
Works
Tapi
2 documents required · 2 mandatory
₹17,700
Gujarat State Electricity Corporation , Thermal Power Station,Ukai-394680
₹10.1 L
24 Nov 2026
24 Nov 2026
24 Nov 2026
15 Dec 2026
24 Nov 2026
180 days
respective tender. The Technical bid containing all the relevant documents will have to be uploaded
in PDF form through online on n-procure website only.
“Technical bid containing all the relevant documents of tender (PDF form with resolution
dpi or higher. The size of PDF not more than 3 MB) to be submitted through ONLINE process
only on (n) Procure.
“No any documents will be accepted in offline mode or hard copy (Except TF & EMD cover)”
Tender No. WT- 4894-A
Estimated Cost of the tender items. Rs. 33679320.72/-
Tender Fees Amount (Non-Refundable) By Rs.15000+2700(18%
D.D/NEFT/RTGS GST)=17700.00/-
Earnest Money Deposit Amount Rs. 1010379.62 (3% of The Tender
Online [e-tendering ] tender/offer submission last date up As per NIT Details
to 18:30 hrs only [This is mandatory]
The payment of EMD [Earnest Money Deposit] As per NIT Details
In case of payment through RTGS/NEFT/DD/Pay
order/Bank Guarantee, the scanned copy of original document
must be uploaded on (n) Procure and original copy of the
same must be submitted physically in cover. (TF & EMD
Date of opening of online Technical Bid, all relevant As per NIT Details
documents submitted through online process, submission of
original DD, Pay order & BG within 5 days from Online last
Bid submission date.
EMD Payment Details (Scan Copy must be required to
upload on (n) Procure)
Pre-Bid Meeting: Bidder shall submit points for prebid As per NIT Details
discussion indicating terms, clause No. etc. on or before in
advance to this office on mentioned e-mail on
[email protected]; and Copy to:
Pre-Bid Meeting for Clarifications and other aspects As per NIT Details
regarding this Tender at administration Office of the
CE (Gen), Ukai, TPS. Bidder may depute authorized
Representative for discussion.
Tentative date of on-line opening of Technical bid/price bid. As per NIT Details or By letter
Time Limit for completion of Work 18 (Eighteen) Months (From the Date
of Work Commencement), Detailed time
limit mentioned in tender.
Security Deposit 5% of contract Order (End value
including GST at prevailing rate)
value within a fifteen(10) days time
period on receipt of LOI or final work
order by D.D. drawn in favour of
GSECL payable at Bank of Baroda,
Ukai branch OR by in form of Bank
Guarantee OR NEFT/RTGS.
Penalty for late completion As per GSECL’s rules.
180 Days [From the date of opening of
Validity of tender Technical Bid].
Tender Fee will be accepted by Demand Draft on Bank of Baroda, Ukai Branch in favor of the
Gujarat State Electricity Corporation Ltd. OR NEFT/RTGS, Earnest Money Deposit will be accepted
DD/Pay order/Bank Guarantee OR by any other means accepted by our A/C section. Cheque or FDR
will not be accepted. Right to reject any or all tenders without assigning any reason there of is
reserved by the competent authority. Contractor should possess separate PF code number from
1. Bidders are requested to submit Technical & Price Bid through ONLINE (on (n)
Procure) only. Offline or hard copy of Bids will not be accepted (Except TF & EMD
cover). Further if the quantity quoted differs in any of the Technical bid and Price bid
forms, it is at the discretion of Competent Authority of GSECL to consider the quoted
I. In case of payment through DD/Pay order/ Bank Guarantee (Note: Bank
Guarantee may be applicable in case of EMD), the scanned copy of original
document must be uploaded on ((n) Procure) and original copy of the same
must be submitted physically in cover as per NIT Details.)
2. All such documents (Original DD, Pay Order & BG) should be strictly submitted by
RPAD / Speed post only. Otherwise the offer will not be considered or ignored and no
any further communication in the matter will be entertained.
“NO COURIER SERVICE OR HAND DELIVERY” will be accepted.
3. The details like Tender No., EMD, Name of bidder etc should be match on both On-line
offer (e-tendering) and submitted documents of EMD details. Any deviation found in
Data/Details/Documents between On-line offer (e-tendering) and submitted documents
of EMD details will not be considered and no any further communication in the matter
will be entertained.
The exemption in payment of EMD and tender fee shall be given to the,
a) Micro & small-scale enterprises which participate directly in tendering process
for the product which they are manufacturing / service which they are providing
and have Udyam registration for items / service under procurement.
b) Startups which participate directly in tendering process for the product which
they are manufacturing / service which they are providing and recognized by
DPIIT under the Start-up India Program and has obtained Udyam registration.
c) Organization which has registration certificate for the manufacturing product of
the tender, from Gujarat Khadi Gramodyog Board or Khadi and Village
Industries Commission (K.V.I.C) or Commissioner of Cottage Industries.
d) Board/Corporations/PSUs of the Central/State Government for their own
manufactured items.
e) State Government recognized organizations like (i) organizations for blinds,
dumb and deaf, disabled, mentally disabled persons; (ii) women's self-help group
recognized by Gujarat Livelihood Promotion Company; which participate
directly in tendering process for the product which they are manufacturing /
service which /they are providing.
f) In keeping with GeM guidelines, OEM and service providers rendering services
directly or by its own and having annual turnover of INR 500 Crore or more.
g) In keeping with GeM guidelines, Sellers/Service Providers holding BIS
license for the Primary Product Category whose credentials are validated
through BIS database.
Note: Agencies registered under Udyam in the capacity of Traders, Re-sellers, or
similar categories (i.e. other than Manufacturers/Service Providers) are not eligible
for EMD and Tender Fee.
4. Any deviation found in Data / Details / Documents between on line offer (e- tendering)
and submitted documents (Tender document fee, bidder, offer of the same bidder)
will not be considered and no any further communication in the matter will be
5. Any technical questions, information and clarifications that may be required pertaining
to this enquiry should be referred to the CHIEF ENGINEER (GEN) , GUJARAT
STATE ELECTRICITY CORPORATION , THERMAL POWER STATION,UKAI-
394680 , DIST-TAPI.
Tender Fee will be accepted by Demand Draft/RTGS/NEFT and EMD will be accepted DD/Pay
order/Bank Guarantee. Also, copy of the same is required to be uploaded in Preliminary stage in
The bank details are as under,
Beneficiary Name : M/s. Gujarat State Electricity Corporation Ltd.
Address : Urja Nagar, GEB Colony, Taluka: Songadh. Dist.: Tapi.,
Pin Code -394680.
Bank Name : Bank of Baroda Ukai,
Nature of A/C : Current Accounts. , Branch: Ukai,
IFSC CODE No. : BARB0UKAIXX (0 = ZERO)
MICR CODE No. :
Bidders should be in touch with the above websites for information regarding
revision/corrigendum/ amendment in tender till due date of on line submission and thereafter.
No separate correspondence will be done in this regard.
GSECL reserve the rights to accept/reject any or all tenders without assigning any reasons
1. Should the tender be accepted I/We here by agree to abide by and fulfill all the terms
and provisions of the tender and contractor for work/supply as applicable and in default
thereof to forfeit and pay to the Corporation the sums of money due.
2. The full value of the earnest money deposit paid herewith should be absolutely forfeited
to the Corporation should I/We not deposit the full amount of specified security deposit.
3. Bidder can not allow to withdraw their offer after opening of technical bid if withdraw
their offer then his EMD shall be forfeited and he will not allowed to participate in the
tenders invited from the same office for the period of one year for that place from where
tender is invited.
4. If participating bidder/agency have stake in one or more other agencies/bidders who are
participating in same tender and on account of submission of wrong information /
declaration in tender/enquiry certificate-A then the bidder will be declared as disqualified
automatically and EMD/SD will be forfeited.
CHIEF ENGINEER (GEN.)
GSECL, TPS, UKAI.
(1) I/We here by agree to abide by and fulfill all the terms and provisions of the tender and contractor
for work/supply as applicable and in default thereof to forfeit and pay to the Corporation the sums
(2) I/We hereby agreed to abide that the full value of the earnest money deposit paid herewith should
be absolutely forfeited to the Corporation if I / We would not deposit the full amount of specified
security deposit.
Seal and Signature of
Tenderer / Contractor
Following are the certifying agencies for obtaining the Digital Signature Certificates (DSC as
per category III).
Name of certifying agencies Web Site Address are as under,
1 Safescrypt www.safescrypt.com
2 TCS www.tcs-ca.tcs.co.in
3 MTNL www.mtnltrustline.com
4 (n)code Solutions (GNFC) www.nprocure.com
In Case Bidder needs any clarification or if training required for participating in on line tender,
they can contact the following office.
(n) Procure Cell,
(n)Code Solutions (A Division of GNFC Ltd.)
304, GNFC Infotower, Nr. Hotel Grand Bhagwati,
S G Highway, Bodakdev,
Gujarat, India.
Email: [email protected] , [email protected]
(n)Code Solutions (A Division of GNFC Ltd.)
14th Floor, Tower One, Road 5C, Zone
Gujarat International Finance Tech City (GIFT City) Gandhinagar - 382
Reverse Auction (RA) on n Procure
The Reverse Auction (RA) shall be conducted in accordance with the prevailing GeM guidelines
and applicable procurement policies.
The RA qualification rule shall be H1 (Highest Priced Bid Elimination). Accordingly, bidders
qualifying after price bid opening, as per the H1 elimination criteria, shall be applicable to
participate in the Reverse Auction.
The Reverse Auction process will be initiated by this office after opening of the Price Bid.
Eligible bidders are advised to regularly monitor the n Procure e-auction portal and ensure
compliance with all instructions, schedules, and procedures communicated by n Procure.
Bidders shall remain in touch with the n Procure portal (https://e-auction.nprocure.com) and
participate in the Reverse Auction on the date and time notified by n Procure. Failure to
participate in the Reverse Auction, if applicable, shall be at the bidder's own risk.
For technical support -Contact,
(n)Code Solutions (A Division of GNFC Ltd.)
14th Floor, Tower One, Road 5C, Zone
Gujarat Information Finance Tech City (GIFT City),
Gandhinagar - 382355. India.
Toll Free Number : 7359-021-663
Email : [email protected]
Bidders are requested to submit Technical bid & Price Bid through ONLINE (n-Procure) only before due
date of submission. Offline or hard copy of Bids will not be accepted.
All such documents should be strictly submitted online only. Otherwise the offer will not be considered
and no any further communication in the matter will be entertained.
1) The Tender Shall be opened of the paid EMD & Tender Fees Only.
2) In case Any deviation found in Data / Details / Documents between on line offer (e- tendering)
and physically submitted documents then such tender will not be considered and no any further
communication in the matter will be entertained. Tenders must be unconditional. Conditional Tenders
will be rejected..
3) Further bidders are requested to submit price – bid i.e. Schedule-B on line only and not to submit the price
bid in physical form. This is mandatory. If price bid is submitted in physical form, same will not be opened
and only on-line submitted price will be considered for evaluation. The bidder is requested not to submit
the hard copy of downloaded tender document, condition of the contract, specification & other
relevant documents. However, bidder may download tender document & preserve with them in
Hard Copy for their future reference.
4) It is mandatory for all the bidders to submit their tender documents viz. on-line (e-tendering) in scheduled
time. Offline or hard copy of Bids will not be accepted.
5) GSECL reserves the rights to reject any OR all tenders without assigning any reasons thereof.
6) Tender Notice Number & name of the work shall be clearly written on the covers containing the Tender
fee and EMD details.
7) Technical / Price Bids will be opened on the day and time indicated in the tender notice by an Officer
nominated by the Purchaser in the presence of such of the bidders who wish to be present.
8) If participating bidder/agency have stake in one or more other agencies/ bidders who are participating in
same tender and on account of submission of wrong information / declaration in the tender /enquiry
certificate – A, than the bidder will be declared as disqualified automatically and EMD/SD will be
forfeited. Further, GSECL shall take stern action including Stop dealing with their firms.
9) Tenders shall be evaluated on firm price and cost with GST and cess as applicable unless otherwise
mentioned in the tender documents.
10) Bidders are requested to mention applicable HSN/SAC code for each item at given column in attached
“Schedule – B”.
11) Bidders are requested to mention applicable GST rate in given column. In case of bidder opting for
composition scheme “0" (ZERO) shall be mentioned in the column of GST rate.
12) If the bidder have opted for the composition scheme of GST, the same must be clearly specified with valid
declaration and certificate from department .In the event of withdrawal /cessation of the bidder from
composition scheme during the tenure of the contract, the rate (i.e. Price) mentioned in the prices bid shall
be final and any additional GST will have to be borne by the bidder himself. In no case additional amount
toward GST or otherwise will be paid /reimbursed to bidder.
13) Every bidder should mention separate HSN/SAC Code and rate of GST and cess as applicable, if no
specifically mentioned then company will have the option to take the prices as exclusive of taxes and
duties at maximum higher slab rates for the evaluation of tenders.
Every bidder shall have to inform their GSTIN NO of the registered place where from the bidder intends
to supply the goods/services, meaning thereby the bidder has supply the Goods/ services from the relevant
declared /registered place(s) of supply only.
Any technical questions, information and clarifications that may be required pertaining to this tender should
be referred to the CHIEF ENGINEER (GEN.), UKAI, TPS. Also during pre-bid meeting (if arranged) the
same may please be discussed.
14) As per notification no. 50/2018 dated 13.09.2018 provision related to TDS on GST shall be made applicable
w.e.f. 01.10.2018. Hence TDS @ 2% shall be deducted in contract value.
Note: Engineer in Charge (EIC) of Subjected work is Mr. M.G.Parmar (Executive Engineer) (Civil)
CHIEF ENGINEER (Gen)
GSECL, UKAI, TPS
SIGNATURE OF CONTRACTOR
Gujarat State Electricity Corporation Limited
Ukai Thermal Power Station, Ukai Dam, Taluka : Fort Songadh,
Email: [email protected] Web site: www.gsecl.in
CIN: U40100GJ1993SGC019988
AN ISO-9001:2015&14001:2015 OHSMS 45001:2018 Certified Power Plant
SECTION-A : PRE - QUALIFICATION
CONDITIONS,PROJECT SYNOPSIS, RTGS DETAILS
“Renovation work of E type (180) & Type IV
(64) residential building incl. replacement of
window, door, renovation of bath, WC &
Kitchen etc of Urjanagar colony Ukai."
Gujarat State Electricity Corporation Limited
Ukai Thermal Power Station, Ukai Dam, Taluka : Fort Songadh,
Email: [email protected] Web site: www.gsecl.in
CIN: U40100GJ1993SGC019988
AN ISO-9001:2015&14001:2015 OHSMS 45001:2018 Certified Power Plant
“Renovation work of E type (180) & Type IV (64) residential building incl. replacement
of window, door, renovation of bath, WC & Kitchen etc of Urjanagar colony Ukai”
PRE-QUALIFICATION CONDITIONS FOR TECHNICAL BID:
The bidders who wish to participate in the bidding shall satisfactorily establish that they fulfill
the following Qualifying Requirements in addition to the satisfactory fulfillment of the
requirements stipulated under tender condition:
Technical qualification criteria:
1) The bidder should have executed / completed similar works during the last seven (7) years
in Government / semi government / state electricity board / private limited company / public
limited company / IPP , as on last date of the month preceding the month of publication of
tender, having minimum contract /order values as indicated below :
a) One order of value not less than the amount equal to 80% of the estimated cost.
b) Two orders, each of value not less than the amount equal to 50% of the estimated cost.
c) Three orders, each of value not less than the amount equal to 40% of the estimated cost.
Similar work means – “Work of Civil construction/ Building work / Renovation of Building
work / civil maintenance works”. The works like painting, housekeeping, fencing, landscaping
will not be considered.
Financial qualification criteria:
1) The Average Annual Turnover of the bidder, shall not be less than Rs. 10103796.00 (30
% of Estimated cost) during the preceding three (3) financial years as one date of Techno-
Commercial bid opening.
2) Net worth of bidder shall not be less than 100% of the bidder’s paid up share capital as on
the last day of the preceding financial year. In case the Bidder meets the requirement of Net
worth based on the strength of its Subsidiary (ies) and/or Holding company and/or
Subsidiaries of its Holding Companies wherever applicable, the Net worth of the Bidder and
its Subsidiary (ies) and/or Holding company and/or Subsidiary (ies) of the Holding
Company, in combined manner should not be less than 100% of their total paid up share
capital. However individually, their Net worth should not be less than 75% of their
respective paid share capitals.
Net worth in combined manner shall be calculated as follows:
Net worth (combined )= (x1+x2+X3)/(y1+y2+y3) X 100, where x1,x2, x3 are
individual net worth which shall not be less than 75 % of the respective paid up
share capitals and y1, y2, y3 are individual paid up share capitals.
3) In case the bidder is not able to furnish its audited financial statements on stand-alone
entity basis, the unaudited unconsolidated financial statements of the bidder can be
considered acceptable provided the bidder further furnishes the following documents for
substantiation of its qualification.
Copies of the unaudited unconsolidated financial statements of the bidder along with
copies of the Audited consolidated financial statements of its Holding Company.
A Certificate from the CEO/CFO of the Holding Company, stating that the unaudited
unconsolidated financial statements form part of the Consolidated Annual Report of
4) In cases where audited results for the last preceding financial year as on the date of techno-
commercial bid opening are not available, the financial results certified by a practicing
Chartered Accountant shall be considered acceptable. In case, Bidder is not able to submit
the Certificate from practicing Chartered Accountant certifying its financial parameters,
the audited results of three consecutive financial years preceding the last financial year
shall be considered for evaluating the financial parameters. Further, a Certificate would
be required from the CEO/CFO, stating that the Financial results of the Company are
under audit as on the date of Techno-commercial bid opening and the Certificate from the
practicing Chartered Accountant certifying the financial parameters is not available.
5) The bidder must submit Average Annual Turnover and Net worth Certificate in support
of Financial QR, duly certified and verified for authenticity from Independent Statutory
Auditor of their company / Practicing Charted Accountant/ C.A. Firms / TPIA (Third-
Party Inspection Agency ) empaneled / approved by GSECL along with copy of Annual
Audited Accounts of last three years.
Note for point No.1, 2, 3 &4:
i. Other income shall not be considered for arriving at annual turnover.
ii. “Holding Company" and “Subsidiary Company” shall have the meaning ascribed to
them as per Companies Act of India, in vogue.
iii. Net worth means the sum total of the paid up share capital and free reserves. Free reserve
means all reserves credited out of the profits and share premium account but does not
include reserves credited out of the revaluation of the assets, write back of depreciation
provision and amalgamation. Further, any debit balance of Profit and Loss account and
miscellaneous expenses to the extent not adjusted or written off, if any, shall be reduced
from reserves and surplus.
Other requirements:
1) Bidder should have a separate valid GST registration number and PAN Number.
2) Copy of P.F. code from the appropriate provident fund authorities.
3) Labour License for Labour Contract: The contractor on getting the work order but before
starting the work shall have to furnish the copy of Labour License under the Contract Labour
(Regulation & Abolition) from the appropriate authorities. Also required workman group
insurance policy covering labour engaged.
4) The bidder must submit performance certificates or satisfactory work completion certificates
(issued directly by the utility) or Copy of Processed Final Bill of the executed / submitted
PO from the utility. Bidders shall be required to submit all the documents, in support of
Technical QR (Such as copies of Purchase orders/work orders / Contract Agreements, Client
Certificates, etc), duly certified and verified for authenticity by the Independent Statutory
Auditor of their company / Practicing Charted Accountant/ C.A. Firms / TPIA (Third-Party
Inspection Agency) empaneled/approved by GSECL
5) Tender fee & EMD will be applicable as per NIT.
6) List of work in progress.
7) Details of equipment, tools and plants immediately available with the tenderer for use of
this work to be submitted. Details of Technical Personnel.
8) Attested copy of partnership deed to be submitted. [Applicable only to the partnership
9) Party should have to submit duly filled, sign and seal certificate “A” & ANNEXURE-5
along with bid.
10) Party has to submit/ upload either all documents duly stamped and signed. OR Declaration form
on the stamp paper of Rs.300/-.
11) Tenders must be unconditional. Conditional Tenders will be rejected.
12) If the bidder have opted for the composition scheme of GST, the same must be clearly
specified with valid declaration and certificate from department
13) Experience certificate of work executed with private firm shall not be accepted.
Experience as a joint venture or sub-contractor is not allowed and price bid of such bidders
will be rejected.
14) Any other documents required to verify technical, financial capability of the bidders &
other Credentials.
SIGN OF BIDDER CHIEF ENGINEER (GEN)
WITH SEAL AND DATE GSECL : UKAI : TPS
Project Synopsis and Data
1) Location :- Ukai TPS,GSECL Ukai -
2) Purchaser :- CE (Gen.), UKAI.
3) Engineer :- SE (Civil)
4) Site of Project :- Urjanagar colony, GSECL Ukai -
5) Nearest town :- Songadh
6) Nearest Railway Station :- Songadh/ Vyara / Surat.
7) Nearest Port :- Bombay
8) Nearest Air Port :- Surat
9) Access Road :- Surat-Bardoli-Vyara-Songadh-Ukai.
10) Site Elevation from MSL :-
11) Meteorological Data
Ambient Air temperature
1] Highest monthly mean of :- 410C
daily Max. Temperature
2] Maximum dry bulb :- 410C
Temperature ( In 0C)
3] Minimum dry bulb :- 240C
Temperature ( In 0C)
1] Average annual rainfall :- 1280.00 mm
2] For 01 hour ( In mm) :- 0.43 mm
3] For 24 hour ( In mm) :- 10.34 mm
Wind velocity
1] Maximum wind velocity :- 7.9 Km/hr.
2] Wind direction – N,NE & SW :- NW to SE
3] For 24 hour ( In mm) :-
Relative Humidity
1] Annual mean humidity ( In %) :-
2] Maximum humidity (In %) :- 80%
3] Minimum humidity (In %) :- 41%
4] Type of Atmosphere :- Fair
12) DESIGN DATA
Seismic Data :-
Intensity :- <
Ambient temperature :-
Other Data :-
Name of Work: “Renovation work of E type(180) & Type IV (64) residential building incl.
replacement of window, door, renovation of bath, WC & Kitchen etc of Urjanagar colony Ukai”
RTGS DETAIL OF BIDDER
Following RTGS details shall be submitted by agency along with the tender for direct
deposit of payment to the beneficiary account. Bidder has to submit the details as under:
1 Name of Bidder :-
2 Address for correspondence :-
4 Phone / Mobile No. :-
5 Name of Beneficiary :-
6 Bank Account Number of beneficiary :-
7 Name of Bank of beneficiary :-
8 Name of Bank, branch & address :-
9 Type of account :-
10 Bank Code :-
11 RTGS Code :-
12 IFSC Code :-
Gujarat State Electricity Corporation Limited
Ukai Thermal Power Station, Ukai Dam, Taluka : Fort Songadh,
Email: [email protected] Web site: www.gsecl.in
CIN: U40100GJ1993SGC019988
AN ISO-9001:2015&14001:2015 OHSMS 45001:2018 Certified Power Plant
SECTION-B : INSTRUCTION TO BIDDER
“Renovation work of E type(180) & Type IV (64)
residential building incl. replacement of window,
door, renovation of bath, WC & Kitchen etc of
Urjanagar colony Ukai.”
Gujarat State Electricity Corporation Limited
Ukai Thermal Power Station, Ukai Dam, Taluka : Fort Songadh,
Email: [email protected] Web site: www.gsecl.in
CIN: U40100GJ1993SGC019988
AN ISO-9001:2015&14001:2015 OHSMS 45001:2018 Certified Power Plant
“Renovation work of E type(180) & Type IV (64) residential building incl.
Tender for replacement of window, door, renovation of bath, WC & Kitchen etc of
Urjanagar colony Ukai.”
INSTRUCTION TO BIDDER:
1. Note: TPI clause:.
"All bidders shall submit the details/documents in support of Technical Qualification Requirements duly
certified and verified for authenticity from Specified Third-Party Inspection Agency (TPIA) along with
a certificate regarding verification of authenticity of documents as per the format placed at Annexur-
1. All the documents submitted by the bidder in support of the meeting Technical QR only shall be
digitally signed by the Specified Third-Party Inspection Agency (TPIA).
The verification and certification of authenticity of documents is acceptable from any of the following
1. M/s Competent Inspectorate and Consultants Pvt. Ltd. Hyderabad, India.
2. M/s Gulf Lloyds Industrial Service India Pvt. Ltd .- Ahmedabad.
3. M/s International Certifications Services.
4. M/s Intertek India Pvt. Ltd.
5. M/s SGS India Pvt. Ltd.
6. M/s Moody International (India) Pvt. Ltd.
7. M/s TUV SUD South Asia (P) Ltd.
8. M/s TUV Rheinland (India) Pvt. Ltd.
9. M/s Bureau Veritas (India) Pvt. Ltd.
10. Hertz Inspection & Services Pvt. Ltd.
11. IRCLASS Systems and Solutions Pvt. Ltd.
Bidders shall be responsible for getting their documents/ credentials verified & certified by the
Specified Third-Party Inspection Agency (TPIA) in support of Technical QR. All the costs pertaining
to third party verification and certification (including those by statutory auditors) shall be borne by
the Bidder. GSECL shall have no liability (financial or otherwise) towards the same and shall not be
liable for any claim/ dispute between the bidder and the Specified Third-Party Inspection Agency
The following website may be referred for contact details of above TPIAs:
http://nabcb.qci.org.in/accreditation/reg_bod_inspection_bodies.php
Party shall have to submit following documents with TPI. Also refer attached Appendix-1 and
submit with TPI.
1. Past order copies (other than GSECL)
2. Work experience certificates (other than GSECL)
3. Work completion certificates (other than GSECL)
4. Details of registered partnership deeds (in the case of partnership firms)
5. Average annual financial turnover for the last three years
6. Any other supporting documents related to pre-qualification criteria.
2. The undersigned reserves the right to accept / reject any or all tenders without assigning any
reason thereof.
3. Any alteration / addition / deletion will not be considered after opening of tender, unless called
for by the GSECL for negotiations.
4. Subletting of tender is not permitted, however sub-contracting is permitted with the consent of
Chief Engineer (Gen.), GSECL Ukai.
5. Validity : The tender shall remain open for acceptance for a period of at least 180 days from
the date of opening of technical bid.
6. Security Deposit to be paid mentioned as below:
Parties eligible for exemption from paying the EMD amount will not be required to
pay the SD. i.e. for order end cost values up to Rs.5 lakh, no security deposit is
However, these parties will still need to provide a security deposit.
For order end cost values above Rs.5 lakh, the security deposit will be 3% of the
order end cost values.
Remaining parties i.e. not eligible for EMD exemption will have to pay performance security
(Security Deposit) @ All orders: 5% of the order end cost values as security deposit.
7. Security Deposit will be collected from the successful tenderer at the rates mentioned in final work
contract. This may be recovered by deduction through running bills of the contractors and / or by treating
the Earnest Money Deposit (Bid Security) paid at the time of submission of the tender.
8. SD will be accepted by RTGS/NEFT also.
The bank details are as under,
Beneficiary Name : M/s. Gujarat State Electricity Corporation Ltd.
Address : Urja Nagar, GEB Colony, Taluka: Songadh. Dist.: Tapi.,
Pin Code -394680.
Bank Name : Bank of Baroda Ukai,
Nature of A/C : Current Accounts. , Branch: Ukai,
IFSC CODE No. : BARB0UKAIXX (0 = ZERO)
MICR CODE No. :
9. Relationship with employee:- Every bidder should, at the time of submission of bid, give a
declaration in their letterhead as under.
“If in any Bidder Company/ firm, the interest (i.e. Shareholding in company and share in
partnership firm) of any employee of the tendering Company or his/ her relative as
defined in Section 2(77) of the Company’s Act. 2013 is 10 percentages or more, the
tendering Company will not deal with such Company/ Firm at all.
Tenderer therefore, must specifically disclose this fact in his technical Bid. Non-disclosure
of such facts would immediately disqualify the Tenderer for further dealing with the
Tendering Company.”
10. Bidders are requested to submit Technical & Price Bid through n procure - ONLINE only.
Offline or hard copy of Bids will not be accepted( Except TF & EMD cover).
11. A. EMD Exemption for MSEs
Micro & Small Enterprises (MSEs) who participates directly in the tendering process as Manufacturers
or Service Providers, and holds a valid Udyam Registration, are eligible for exemption from payment of
Earnest Money Deposit (EMD).
Agencies registered under Udyam in the capacity of Traders, Re-sellers, or similar categories
(i.e. other than Manufacturers/Service Providers) are not eligible for EMD exemption.
B. Purchase Preference for Gujarat-Based MSEs
Purchase preference shall be extended to Gujarat-based MSEs whose goods or services are offered for
procurement through their production, manufacturing, or service activities within Gujarat, and
To qualify for purchase preference, such MSEs must possess:
1. A valid Udyam Registration for the product manufactured or service provided and address should be
2. A valid Central Stores Purchase Organization (CSPO) / National Small Industries Corporation (NSIC)
C: Migration period for Reclassification of MSMEs: -
In case of an upward change in terms of investment in plant and machinery or equipment or turnover or
both, and consequent re-classification, an enterprise shall continue to avail of all non-tax benefits of the
category (micro or small or medium) it was in before the re-classification, for a period of three years
from the date of such upward change.
SIGN OF BIDDER CHIEF ENGINEER (GEN)
WITH SEAL AND DATE GSECL : UKAI : TPS
Gujarat State Electricity Corporation Limited
Ukai Thermal Power Station, Ukai Dam, Taluka : Fort Songadh,
Email: [email protected] Web site: www.gsecl.in
CIN: U40100GJ1993SGC019988
AN ISO-9001:2015&14001:2015 OHSMS 45001:2018 Certified Power Plant
SECTION-C : SCHEDULE – A, GENERAL
SPECIFICATIONS & TECHNICAL
“Renovation work of E type(180) & Type IV (64)
residential building incl. replacement of window,
door, renovation of bath, WC & Kitchen etc of
Urjanagar colony Ukai.”
Gujarat State Electricity Corporation Limited
Ukai Thermal Power Station, Ukai Dam, Taluka : Fort Songadh,
Email: [email protected] Web site: www.gsecl.in
CIN: U40100GJ1993SGC019988
AN ISO-9001:2015&14001:2015 OHSMS 45001:2018 Certified Power Plant
Sub. : “Renovation work of E type(180) & Type IV (64) residential building incl. replacement
of window, door, renovation of bath, WC & Kitchen etc of Urjanagar colony Ukai.”
The main scope of the work is “Renovation work of E type(180) & Type IV (64) residential
building incl. replacement of window, door, renovation of bath, WC & Kitchen etc of
Urjanagar colony Ukai.” Under the scope of this tender the agency has to carry out the subject
work, various civil works as per all items of Schedule B and as per detail technical specifications of
the items. The quantities taken under individual items are very tentative. However the agency has
to carry out the works as per the Company’s requirements.
The agency has to carry out the works as per item & specifications of the tender by providing all
materials of best quality and of standard manufactures as the samples approved by EIC and
providing best workmanship through expert manpower.
The agency has to carry out the works as per the priority & schedule given by EIC time to time even
in on or off working hours of the office. The agency will take complete care and will not damage
any other structure in premises of company.
The agency has to carry out all the works by taking all due cares of safety, security norms, with all
risks including scaffolding, strutting, shoring, etc up to any height irrespective of quantum of the
Contractor has to make arrangement for workable site condition with the co-operation of
departments of company and agencies, all necessary arrangement to get work permit is to be made
by contractor. Day to day cleaning is required after completion of job. The removed materials and
any other unwanted materials are to be transported and taken away as instructed by E.I.C.
All safety measures shall be taken by the contractor with his own cost.
The scope of work to be carried out by the Contractor shall also include Clearance of the site,
Disposal of debris, excavated material etc,
The major works involvement generally mentioned as here under-
Demolition of RCC work, Brick work, Dismentling Doors, window C.I. pipes G.S.W.pipes etc
Removing damaged concrete
Providing and laying controlled cement concrete M25 slabs etc.
Providing and laying TMT bars in concrete structures, Steel work.
Brick work using common burnt clay building
Providing, laying AND jointing PVC pipes, U.P.V.C Pipe, reinforced concrete Light duty non-
pressure pipes I.S. class NP2 etc .
Providing and Fixing Indian Orissa pan type WC , PVC nani trap , Bib cock, Mirror etc .
Providing and laying polished kota stone flooring, Granite slab in skrting risers of steps etc.
Providing & Fixing Door, Window, Ventilation, Teakwood cupboard etc.
Labour charges for attending leakage & Labour charges for fixing old door
Constructing Fly Ash building brick inspection chamber
Providing and laying ceramic tiles
Providing & Fixing S.S Sink
Performing/Providing supplying any items in SOR 2023-2024 as in when required basis.
SIGN OF BIDDER CHIEF ENGINEER (GEN)
WITH SEAL AND DATE GSECL : UKAI : TPS
Gujarat State Electricity Corporation Limited
Ukai Thermal Power Station, Ukai Dam, Taluka : Fort Songadh,
Email: [email protected] Web site: www.gsecl.in
CIN: U40100GJ1993SGC019988
AN ISO-9001:2015&14001:2015 OHSMS 45001:2018 Certified Power Plant
GENERAL SPECIFICATIONS
1) In the specifications, “as directed”/”Approved” shall be taken to mean “as directed”/”approved”
by the Engineer-in-charge.
2) Wherever a reference to any Indian Standard appears in the specifications, it shall be taken to
mean as a reference to the latest edition of the same in force on the date of agreement.
3) In “Mode of Measurement” in the specification wherever a dispute arises in the absence of
specific mention of a particular point or aspect, the provisions on these particular points or aspects
in the relevant Indian Standards shall be referred to.
4) All measurements and computations, unless otherwise specified, shall be carried out as per Latest
5) The distance which constitutes lead shall be determined along the shortest practical route and not
necessarily the route actually taken. The decision of the Engineer-in-charge in this regard shall
be taken as final.
6) Where no lead is specified, it shall mean “all leads”.
7) Lift shall be measured from plinth level.
8) Up to “floor two level” means actual height of floor up to 6.5 Mt. Above plinth level.
9) Definite particulars covered in the items of work, though not mentioned or elucidated in it,
specification shall be deemed to be included therein.
10) Reference to specifications of materials as made in the detailed specification of the items of work
is in the form of a designation containing the number of the specification of the material and
prefix ‘M’ e.g. ‘M-5’.
11) Approval to the samples of various materials given by the Engineer-in-charge shall not absolve
the contractor from the responsibility of replacing defective material brought on site or materials
used in the work found defective at a later date. The contractor shall have no claim to any payment
or compensation whatsoever on account of any such materials being rejected by the Engineer-in-
12) The contract rate of the item of work shall be for the work completed in all respects.
13) No collection of materials shall be made before it is got approved from the Engineer-in-charge.
14) Collection of approved materials shall be done at site of work in a systematic manner. Materials
shall be stored in such a manner as to prevent damage, deterioration or intrusion of foreign matter
and to ensure the preservation of their quality and fitness for the work.
15) Cement, reinforcements bars & all other materials to be used shall be got approved from EIC
before starting of work. The cement, reinforcement steel & other materials to be brought at site
shall be entered at Ukai,TPS main entry gate.
16) Materials, if and when rejected by the Engineer-in-charge, shall be immediately removed from
the site of work.
17) No materials shall be stored prior to, during and after execution of a structure in such a way as to
cause or lead to damage or overloading of the various components of the structure.
18) All works shall be carried out in a workmanlike manner as per the best techniques for the
particular item.
19) All tools, templates, machinery and equipment for correct execution of the work as well as for
checking lines, levels, alignment of the works during execution shall be kept in sufficient numbers
and in good working condition on the site of the work.
20) The mode, procedure and manner of execution shall be such that it does not cause damage or over
loading of the various components of the structure during execution or after completion of the
21) Special modes of construction not adopted in general Engineering practice, if proposed to be
adopted by the Contractor, shall be considered only if the contractor provides satisfactory
evidence that such special mode of construction is safe, sound and helps in speedy construction
and completion of work to the required strength and quality. Acceptance of the same by the
Engineer-in-charge shall not, however, absolve the contractor of the responsibility of any adverse
effects and consequences of adopting the same in the course of execution of completion of the
22) All installations pertaining to water supply and fixtures thereof as well as drainage lines and
sanitary fittings shall be deemed to be completed only after giving satisfactory tests by the
23) The contractor shall be responsible for observing the rules and regulations imposed under ‘Minor
Minerals Act’ and such other laws and rules prescribed by Government from time to time.
24) All necessary safety measures and precaution [including those laid down in the various relevant
Indian Standards shall be taken to ensure the safety of men, materials and machinery on the works
as also of the work itself.
25) The testing charge of all materials shall be borne by the Contractor unless recovery at one percent
towards using charges is separately made.
26) Approval to any of the executed items for the work does not in any way relieves the contractor
of his responsibility for the correctness, soundness and strength of the structure as the drawings
and specification.
SIGN OF BIDDER CHIEF ENGINEER (GEN)
WITH SEAL AND DATE GSECL : UKAI : TPS
Gujarat State Electricity Corporation Limited
Ukai Thermal Power Station, Ukai Dam, Taluka : Fort Songadh,
Email: [email protected] Web site: www.gsecl.in
CIN: U40100GJ1993SGC019988
AN ISO-9001:2015&14001:2015 OHSMS 45001:2018 Certified Power Plant
TECHNICAL SPECIFICATIONS
NAME OF WORK: Renovation work of E type(180) & Type IV (64) residential building
incl. replacement of window, door, renovation of bath, WC & Kitchen etc of Urjanagar
NOTE: BOOKLET FOR “GENERAL TECHNICAL SPECIFICATIONS FOR BUILDING WORKS” OF R. & B.
DEPARTMENT, GOG, GUJARAT AND BOOKLET OF “GENERAL SPECIFICATION FOR CIVIL WORKS” OF
GSECL WILL BE AVAILABLE IN ADM CIVIL OFFICE AT UKAI TPS FOR REFERNCE OF RELEVANT DETAIL
SPECIFICATIONS OF ITEMS. SHALL BE CONSIDERED & ADOPTED IN WORK .
SPECIFICATIONS OF MATERIALS
1.1 Water shall not be salty or brackish and shall be clean, reasonably clear and free from
objectionable quantities of silt and traces of oil and injurious alkalies, salts, organic matter and
other deleterious material which will either weaken the mortar or concrete or cause efflorescence
or attack the steel in R.C.C Container for transport, storage and handling of water shall be clean.
Water shall conform to the standards specified I.S 456-1978.
1.2 If required by Engineer-in-charge it shall be tested by comparison with distilled water.
Comparison shall be made by means of standard cement tests for soundness, time of setting and
mortar strength as specified in I.S.269-1976. Any indication of unsoundness, change in time of
setting by 30 minutes or more or decrease of more than 10 per cent in strength of mortar prepared
with water sample when compared with the results obtained with mortar prepared with distilled
water shall be sufficient cause for rejection of water under test.
1.3 Water for curing mortar, concrete or masonry should not be too acidic or too alkaline. It
shall be free of elements which significantly affect the hydration reaction or otherwise interfere
with the hardening of concrete during curing or those which produce objectionable stains or other
unsightly deposits on concrete or mortar surfaces.
1.4 Hard and bitter water shall not be used for curing.
1.5 Potable water will be generally found suitable for curing mortar or concrete.
3.1 Cement shall be ordinary Portland slag cement as per I.S. 269-1976 or Portland slag
cement as per I.S. 455-1976.
M-4. White Cement:
4.1 The white cement shall conform to I.S. 80412-E
M-5. Colored Cement:
5.1 Colored cement shall be with white or gray Portland cement as specified in the item of
5.2 The pigments used for colored cement shall be of approved quality and shall not exceed
10% of cement used in the Mix. The mixture of pigment shall be properly grounded to have a
uniform color and shade. The pigments shall have such properties to provide for durability under
exposure to sunlight and weather.
5.3 The pigment shall have the property such that it is neither affected by the cement nor
detrimental to it.
6.1 Sand shall be natural sand, clean, well graded, hard strong durable and gritty particle free
from injurious amounts of dust clay, kankar nodules, soft or flaky particles shale, alkali, salts
organic matter, loam, mica or other deleterious substance and shall be got approved from the
Engineer-in-charge. The sand shall not contain more that 8 percent of silt as determined by field
test. If necessary the sand shall be washed to make it clean.
6.2 Coarse Sand: The fineness modulus of coarse sand shall not be less than 2.5 and shall
not exceed 3.0.
The sieve analysis or coarse shall be as under :
I.S. Sieve Percentage by I.S. Sieve Percentage by
Designation weight Designation weight
Passing sieve Passing sieve
6.3 Fine Sand: The fineness modulus shall not exceed 1.0. The sieve analysis of fine sand
shall be as under:
I.S. Sieve Percentage by I.S. Sieve Percentage by
Designation weight Designation weight
Passing through Passing through
M-10 Lime Mortar:
10.1 Lime shall conform to specification M-2. Water shall conform to specification M-1. Sand
shall conform to specification M-6.
10.2 Proportion of Mix : 10.2.1. Mortar shall consist of such proportions of slaked lime and
sand as may be specified in the item. The slaked lime and sand be measured by volume.
10.3 Preparation of Mortar : 10.3.1. Lime mortar shall be prepared by wet process as per I.S.
1625-1971. Power driven mill shall be used for preparation of lime mortar. The slaked lime shall
be placed in the mill in an even layer and ground for the 180 revolutions with a sufficient water.
Water shall be added as required during grinding (care being taken not to add more water) that
will bring the mixed material to a consistency of stiff paste. Thoroughly wetted sand shall then
be added evenly and the mixture ground for another 180 revolutions.
10.4 Storage : 10.4.1 Mortar shall always be kept damp, protected from sun and rain till used
up, covering it by tarpaulin or open sheds.
10.5 Use : 10.5.1 All mortar shall be used as soon as possible after grinding. It should be used
on the day on which it is prepared. But in no case mortar made earlier than 36 hours shall be
permitted for use.
M-11. Cement Mortar :
11.1 Water shall conform to specification M-1. Cement : Cement shall conform to specification
M-3. Sand : Sand shall conform to M-6.
11.2 Proportion of Mix : 11.2.1 Cement and sand shall be mixed to specified proportion, sand
being measured by measuring boxes. The proportion of cement will be by volume on the basis
of 50 Kg./Bag of cement being equal to 0.0342 Cu. M. The mortar may be hand mixed or
machine mixed as directed.
11.3 Preparation of Mortar:
11.3.1 In hand mixed mortar cement and sand in the specified proportions shall be thoroughly
mixed dry on a clean impervious platform by turning over at least 3 times or more till a
homogenous mixture of uniform color is obtained. Mixing platform shall be so arranged that no
deleterious extraneous material shall get mixed with mortar or mortar shall flow out. While
mixing, the water shall be gradually added and thoroughly mixed to form a stiff plastic mass of
uniform color so that each particle of sand shall be completely covered with a film of wet cement.
The water cement ratio shall be adopted as directed.
11.3.2 The mortar so prepared shall be used within 30 minutes of adding water. Only such
quantity of mortar shall be prepared as can be used within 30 minutes.
M-12 Stone Coarse Aggregate For Nominal Mix Concrete :
12.1 Coarse aggregate shall be machine crushed stone of black trap or equivalent and be hard,
strong, dense, durable, clean and free from skin and coating likely to prevent proper adhesion of
12.2 The aggregate shall generally be cubical in shape. Unless special stones of particular
quarries are mentioned aggregates shall be machine crushed from the best black trap or
equivalent hard stone as approved. Aggregate shall have no deleterious reaction with cement.
The size of the coarse aggregate for plain cement concrete and ordinary reinforced cement
concrete shall generally be as per the table given below, However in case of reinforced cement
concrete the maximum limit may be restricted to 6 mm. Less than the minimum lateral clear
distance between bars or 6 mm. Less than the cover, whichever is smaller.
I.S. Sieve Percentage passing for I.S. Sieve Percentage passing for
Designation single sized aggregates of Designation single sized aggregates of
nominal size Nominal size
Note : This percentage may be varied some what by Engineer-in-charge when considered
necessary for obtaining better density and strength of concrete.
12.3 The grading test shall be taken in the beginning and at the change of source of materials.
The necessary test indicated in I. S. 383-1970 and I.S. 456-1978 shall have to be carried out to
be carried out to ensure the acceptability. The aggregates shall be stored separately and handled
in such a manner as to prevent the intermixing of different aggregates. If the aggregates are
covered with dust, they shall be washed with water to make them clean.
M-14 Brick Bats Aggregate :
14.1 Brickbat aggregate shall be broken from well burnt or slightly over burnt and dense brick.
It shall be homogeneous in texture roughly cubical in shape, clean and free from dirt of any other
foreign material. The brickbats shall be of 40 mm. To 50 mm. Size unless otherwise specified in
the item. The under burnt of over burnt brick bats shall not be allowed.
14.2 The brickbats shall be measured by volume by suitable boxes or as directed.
15.1 The bricks shall be hand or machine molded and made from suitable soils and klin-burnt.
They shall be free from crack and nodules of free lime. They shall have smooth rectangular faces
with sharp corners and shall be of uniform color.
The bricks shall be molded with a frog of 100 mm. X 40 mm. And 10 mm. To 20 mm. Deep on
one of its flat sides. The bricks shall not break when thrown on the ground from a height of
15.2 The size of modular bricks shall be 190 mm. X 90 mm. X 90 mm.
15.3 The size of the conventional bricks shall be as under :
15.4 Only bricks of one standard size shall be used on one work. The following tolerances
shall be permitted in the conventional size adopted in a particular work.
Length : 1.8(3.0 mm.) Width : 1/6” (1.51 mm.) Height : 1/6” (1.50 mm.)
15.5 The crushing strength of the bricks shall not be less than 50 Kg./Sq. Cm. The average
water absorption shall not be more than 20 percent by weight. Necessary tests for crushing
strength and water absorption etc. Shall be carried out as per I. S. 3495 (Part-I to IV)
M-18 Mild Steel Bars :
18.1 Mild steel bars reinforcement for R.C.C. work shall conform to I.S. 432 (Part-II)
and shall be of tested quality. It shall also comply with relevant part of I.S. 456-1978.
18.2 All the reinforcement shall be clean and free from dirt, paint, grease, mill scale or loose
or thick rust at the time of placing.
18.3 For the purpose of payment, the bar shall be measured correct up to 100 mm. Length and
weight payable worked out at the rate specified below :
Kg./Rmt. Kg./Rmt.
Kg./Rmt. Kg./Rmt.
Kg./Rmt. Kg./Rmt.
Kg./Rmt. Kg./Rmt.
Kg./Rmt. Kg./Rmt.
Kg./Rmt. Kg./Rmt.
Kg./Rmt. Kg./Rmt.
M-19B TMT BARS:
19B.1 TMT BARS shall confirm to I.S. 1786-1985 OF Fe-415 Grade or above form Approved
19B.2 Other provision and requirements shall conform to specification No.M-18 for mild steel
M-22 Structural Steel:
22.1 All structural steel shall conform to I. S. 226-1965. The steel shall be free from the defects
mentioned in I. S. 226-1975 and shall have a smooth finish. The materials shall be free from
loose mill scale, rust pits or other defects affecting the strength and durability. Rivet bars shall
conform to I. S. 1148-1973.
22.2 When the steel is supplied by the Contractor test certificates of the manufactures shall be
obtained according to I. S. 226-1975 and other relevant Indian Standards.
M-29 Teak Wood :
29.1 The teak wood shall be of good quality as required for the item to be executed. When the
kind of wood is not specifically mentioned, good Indian teak wood as approved shall be used.
29.2 Teak wood shall generally be free from large, loose, dead or cluster knots, flaws, shakes,
warps, twists bends, or any other defects. It shall generally be uniform in substance and of
28traight fibres as far as possible. If shall be free from rot, decay, harmful fungi and other defects
if harmful nature which will affect the strength durability of its usefulness for the purpose for
which it is required. The color shall be uniform as far as possible. Any effort like painting, using
any adhesive or resins materials made to hide the defects shall render the pieces liable to rejection
by the Engineer-in-charge.
29.3 All scantlings, planks etc. Shall be sawn in straight lines and planes in the direction of grains
and of uniform thickness.
29.4 The tolerances in the dimensions shall be allowed at the rate of 1.5 mm. Per face to be
29.5 First class teak wood : 29.5.1 First class teak wood shall have no individual hard and sound
knots, more than 6 sq. Cm. Size and the aggregate area of such knots shall not be more than 1%
of area of piece. The timber shall be closed grained.
29.6 Second Class Teak Wood : 29.6.1 No individual hard and sound knots shall be more than
15 sq. Cms. In size and aggregate area of such knots shall not exceed 2% of the area of piece.
37.1 The plywood for general purpose shall conform I. S. 303-1975. Plywood is made by
cementing together thin boards or sheets of wood into panels. There are always an odd number
of layers 3,5,7,9 ply etc. The plies are placed so that grain of each layer is right angle to the grain
in the adjacent layer.
37.2 The advantages of plywood over a single board of the same thickness is the more uniform
strength of the plywood, along the length and width of the plywood and greater resistance to
cracking and splitting with change in moisture content.
37.3 Usually synthetic resins are used for gluing, pherolic resins are usually cured in a hot
press which compresses and simuftacously hers the phes between hot plates which maintain a
temperature of 90 degree. C. To 140 degree C. And a pressure of 11 to 14 Kg. Sq. Cm. On the
wood. The times of heating may be anything from 2 to 60 minutes depending up to
thickness.When water glue are used, the wood absorbs so much water that the finished plywood
must be dried carefully.
When synthetic resins are used as adhesive finished plywood must be exposed to an
atmosphere of controlled humidity until the
Proper amount of moisture has been absorbed.
37.4 According to I. S. 303-1975 the plywood for general purpose shall be of three grades
namely BWR, WWR and CWR depending upon the adhesives used for bonding and veneers,
and it will be further classified into six types namely AA, AB, AC, BB, BC and CC based on
the quality of the two faces, each face being of three kinds namely, A,B and C. After pressing
the finished plywood should be reconditioned to a moisture content not less than 8 percent and
not more than 16 percent.
37.5 Thickness of plywood Boards :
Board Thickness Board Thickness Board Thickness Board Thickness
3 ply 3 mm. 5 ply. 5 mm. 7 ply. 9 mm. 9 ply. 16 mm.
5 mm. 8 mm. 16 mm. 11 ply. 19 mm.
6 mm. 9 mm. 9 ply. 13 mm. 22 mm.
38.1 All glass shall be of the best quality, free from specks, bubbles, smokes, veins, air holes
blisters and other defects. The kind of glass to be used shall be mentioned in the item or
specification or in the special provisions or as shown in detailed drawings. Thickness of glass
panes shall be uniform. The specifications or different kinds of glass shall be as under :
38.2 Sheet Glass :
38.2.1 In absence of any specified thickness or weight in the item or detailed specifications
of the item of work sheet glass shall be
Weighing 7.5 Kg/Sq. M. For panes up to 600 mm x 600 mm.
38.2.2 For panes larger than 600 mm. X 600 mm. And up to 800 mm. X 800 mm. The glass
weighing not less than 8.75 Kg./Sq. M. Shall
Be used. For bigger panes up to 900 mm. X 900 mm. Glass weighing not less than
Kg./Sq. M. Shall be used.
38.2.3 Sheet glass shall be patent flattened glass of best quality and for glazing and framing
purposes shall conform to I. S. : 1761-
1960. Sheet glass of the specified colors shall be used, if so shown on detailed drawings
or so specified. For important
Building and for panes with any dimension over 900 mm. Plate glass of specified
thickness shall be used.
38.3 Plate Glass 38.3.1 When plate glass is specified, it shall be ‘Polished patent plate glass’
of best quality. It shall have both the surface ground flat and parallel and polished to obtain clear
undisturbed vision and reflection. The plate glass shall be of the thickness mentioned in the item
or as shown in the detailed drawing or as specified. In absence of any specified thickness, the
thickness of plate glass to be supplied shall be 6 mm. And a tolerance of 0.20 mm. Shall be
38.4 Obscured Glass : 38.4.1 This type of glass transmits light so that vision is partially or
almost completely obscured. Glass shall be plain rolled, figured, ribbed or fluted or frosted glass
as may be specified as required. The thickness and type of glass shall be as per details on
drawings or as specified or as directed.
38.5 Wired Glass : 38.5.1 Glass shall be with wire netting embedded in a sheet of plate glass
electrically welded 13 mm. Georgian square mesh may be used. Thickness of glass shall not be
less than 6 mm. Wired glass shall be of type and thickness as specified.
M-43 Fixtures and fastenings :
43.1.1 The fixtures and fastenings, that is butt, hinges, tee and strap hinges, sliding door bolts,
tower bolts, door latch, bath room latch,
Handles, door stoppers, casement window fasteners, casement stays and ventilators catch shall
be made of the metal as specified in the item or its specifications.
43.1.2 They shall be of iron, brass, aluminum, chromium plated iron, chromium plated brass,
copper oxidized iron, copper oxidized Brass or anodized aluminum as specified.
43.1.3 The fixtures shall be heavy, medium or light type. The fixtures and fastenings shall be
smooth finished and shall be such as will ensure case of operation.
43.1.4 The samples of fixtures and fastenings shall be got approved as regards quality and shape
before providing them in position.
43.1.5 Brass and anodized aluminum fixtures and fastenings shall be bright finished
43.2 Holdfasts : 43.2.1 Holdfasts shall be made from mild steel flat 30 cm. Length and one of
the hold fasts shall be bent at right angle and two nos. Of 6 mm. Diameter holes shall be made
in it for fixing it to the farme with screws. At the other end, the holdfast shall be forked and bent
at right angles in opposite directions.
43.3 Butt hinges :
43.3.1 Railway standard heavy type but hinges shall be used when so specified.
43.3.2 Tee and strap hinges shall be manufactured from M. S. Sheet.
43.4 Siding door bolts (Aldrops) : 43.4.1 The aldrops as specified in the item shall be used
and shall be got approved.
43.5 Tower bolts (Barrel Type) : 43.5.1 Tower bolts as specified in the item shall be used
and shall be got approved.
43.6 Door latch : 43.6.1 The size of door latch shall be taken as the length of latch.
43.7 Bathroom Latch : 43.7.1 Bathroom latch shall be similar to tower bolt.
43.8 Handle : The size of the handles shall be determinded by the inside grip length of the
handles. Handles shall have a base plate of length 50 mm. More than the size of the handle.
43.9 Door Stoppers : 43.9.1 Door stoppers shall be either floor door stopper type or door
catch type. Floor stopper shall be of overall size as specified and shall have a rubber cushion.
43.10 Door Catch : 43.10.1 Door catch shall be fixed at a height of about 900 mm. From the
floor level so that one part of the catch is fitted on the inside of the shutter and the other part is
fixed in the wall with necessary wooden plug arrangements for appropriate fixity. The catch shall
be fixed 20 mm. Inside the face of the door for easy operation of catch.
43.11 Wooden Door Stop with hinges : 43.11.1 Wooden door stop of size 100 mm x 60 mm
x 40 mm shall be fixed on the door frame with a hinge of 75 mm size and at a height of 900 mm.
From the floor level. The wooden door stop shall be provided with 3 coasts of approved oil
43.12 Casement window Fastener : Casement window fastener for single leaf window shutter
shall be left or right handled as directed.
43.13 Casement stays (Straight Peg Stay) : 43.13.1 The stays shall be made from a channel
section having three holes at appropriate position so that the window can be opened either fully
or practically as directed. Size of the stay shall be 250 mm. To 300 mm as directed.
43.14 Ventilator Catch : 43.14.1 The pattern and shape of the catch shall be as approved.
43.15 Pivot : 43.15.1 The base and socket plate shall be made from minimum 3 mm. Thick
plate and projected pivot shall not be less than 12 mm. Diameter and 12 mm. Length and shall
be firmly riveted to the base plate in case of iron pivot and in single piece base plate in the case
of brass pivot.
M-49 Polished Kotah Stones
49.1. Polished kotah stone shall have the same specifications as per rough kotah stone except as
mentioned below :
49.2. The stones shall have machine polished smooth surface. When brought on site, the stones
shall be single polished or double polished depending upon its use. The stones for paving shall
generally be single polished. The stones to be used for dedo, skirting, platforms, sink, veneering,
sills, etc. Where machine polishing after the stones are fixed in site is not possible, shall be double
M-52 Granite Stone Slab :
52.1 Granite shall be of approved color and quality. The stone shall be hard, even, sound
regular in shape and generally uniform in color. It shall be without anby soft veins, cracks
52.2 The thickness of the stone shall be as specified in the items.
52.3 All exposed face shall be double polished to tender truly smooth and the even reflecting
surface. The exposed edges and corners shall be rounded off as directed. The exposed edges
shall be machine cut and shall have uniform thickness.
M-57 Bib cock and stop cock :
57.1 A bib cock is a draw off tap with a horizontal inlet and free outlet. A stop cock is a
valve with a suitable means of connection for insertion in a pipe line for controlling or
stopping the flow.
57.2 They shall be of screw down type and of brass chromium plated and of diameter as
specified in the description of the item. They shall conform to I.S. 781-1977 and they shall
be of best Indian make. They shall be polished bright.
57.3 The minimum finished weight of bib cock and stop cock shall be as given below :
Diameter Bib cock Stop cock Diameter Bib cock Stop
M-59 White glazed porcelain wash basin :
59.1 Washbasin shall be of white porcelain first quality best Indian make and it shall conform
to I. S. 2566 (Part-IV) 1972 and I. S. 771-1979.
The size of the washbasin shall be as specified in the item, Washbasin shall be of one piece
construction with continued over-flow arrangements. All internal angles shall be designed so as
to facilities cleaning. Washbasin shall have single tap hole or two holes as specified. Each basin
shall have a circular waste hole which is either rebated or beveled internally with 65 mm.
Diameter at top and 10 mm. Depth to suit the waste fitting. The necessary stud slot to receive the
bracket on the under side of the basin shall be provided. Basin shall have an internal soap holder
recess which shall fully drain into the bowl.
59.2 White glazed pedestal of the quality and color as that of the basin shall be provided where
specified in the item. It shall be completely recessed at the back for reception of supply and wash
pipe. It shall be capable of supporting the basin rigidly and adequately and shall be so designed
as to make the height from floor to top of the rim of basin 750 mm. To 800 mm. As directed.
DETAILED TECHNICAL SPECIFICATION
Item no.1 Demolition including stacking of serviceable materials and disposal of
unserviceable materials with all lead and lift. (i) R.C.C. work.
1.0. Workmanship:
Area of plain cement and R.C.C. work to be dismantled, shall be separated by providing
necessary barricade and providing watchmen to avoid any accident in the area. All precaution
shall be taken to see that the structures, machinery, equipment in the area are not damaged. If
desired by authority, all equipments, machinery etc. shall be covered with tarpaulin or plastic
covering without any extra cost.
Rate quoted for the item shall be inclusive of providing all labour, tools, tackles and scaffolding,
where required.
2.0.Mode of measurements & payment:
Payment shall be made for actual cu. Meter of concrete dismantled as per drawing or as directed
or details furnished at site.(Area shall be cleaned every day, when work is to be stopped or even
when work is in progress during day, if required, in case of plant area or other places).
The rate shall be for a unit of one cubic Metre.
Item no.2 Demolition of Brick work and stone masonry including stacking of serviceable
materials and disposal of unserviceable materials with all lead and lift.(ii) In Cement
1.0. Workmanship:
1.1. The demolition shall consist of demolition of one or more parts of the building as specified
or shown in the drawings. Demolition implies taking up or down or breaking up. This shall
consist of demolishing whole or part of work including all relevant item as specified or shown
in the drawings.
1.2. The demolition shall always be planned before hand and shall be done in reverse order of
the one in which the structure was constructed. This scheme shall be got approved from the
Engineer-in-charge before starting the work. This, however will not absolve the contractor from
the responsibility of proper and safe demolition.
1.3. Necessary dropping, shoring and under pinning shall be provided for the safety of the
adjoining work or property, which is to be left intact, before dismantling and demolishing is
taken up and the work shall be carried out in such a way that no damages is caused to the
adjoining property.
1.4. Wherever required, temporary enclosures or partitions shall also be provided. Necessary
precautions shall be taken to keep the dust nuisance down as and where necessary.
1.5. Dismantling shall be commenced in a systematic manner. All materials which are likely to
be damaged by dropping from a height or demolishing, masonry etc. Shall be carefully
dismantled first. The dismantled articles shall be properly stacked as directed.
1.6. All materials obtained from demolition shall be the property of Government unless otherwise
specified and shall be kept in safe custody until handed over to the Engineer-in-charge.
1.7. Any serviceable material, obtained during dismantling or demolition shall be separated out
and stacked properly as directed, with all lead and loft. All unserviceable materials, rubbish etc.
Shall be stacked as directed by the Engineer-in-charge.
1.8. On completion of work, the site shall be cleared of all debris rubbish and cleaned as directed.
2.0. Mode of measurements & payment:
2.1. Measurements of all work except hidden work shall be taken before demolition or no
allowance for increase in bulk shall be allowed. The demolition of unreinforced cement concrete
shall be measured under this item. Specification for deduction for voids, openings etc shall be on
same basis as that employed for construction of work.
2.2. All work shall be measured in decimal system as fixed in its place subject to the following
limits, unless otherwise stated hereinafter: (a) Dimensions shall be measured to the nearest
mt. (b) Area shall be worked out to the nearest 0.01 sq. Mt
(c) Cubical connection shall be worked out to the nearest 0.01 Cu. M.
2.3. The rate shall include cost of all labour involved and tools used in demolishing and
dismantling in including scaffolding. The rate shall also include the charges for separating out
and stacking the serviceable materials properly and disposing the unserviceable materials with
all lead and lift. The rate also includes for temporary storing for the safety of the portion not
required to be pulled down or of adjoining properly and providing temporary enclosures or
partitions where considered necessary.
2.4. The rate shall be for a unit of one cubic meter.
Item no.3 Dismentling doors, windows, ventilators etc. (wood or steel) shutters including
chowkhats architraves, holdfasts and other attachment etc. complete and stacking them
within all lead and lift.(i) Not exceeding 3 Sq.M. in area
1.0. Workmanship:
1.1. The demolition shall consist of demolition of one or more parts of the building as specified
or shown in the drawings. Demolition implies taking up or down or breaking up. This shall
consist of demolishing whole or part of work including all relevant item as specified or shown
in the drawings.
1.2. The demolition shall always be planned before hand and shall be done in reverse order of
the one in which the structure was constructed. This scheme shall be got approved from the
Engineer-in-charge before starting the work. This however will not absolve the contractor from
the responsibility of proper and safe demolition.
1.3. Necessary dropping, shoring and under pinning shall be provided for the safety of the
adjoining work or property, which is to be left intact, before dismentaling and demolishing is
taken up and the work shall be carried out in such a way that no damages is caused to the
adjoining property.
1.4. Wherever required, temporary enclosures or partitions shall also be provided. Necessary
precautions shall be taken to keep the dust nuisance down as and where necessary.
1.5. Dismantling shall be commenced in a systematic manner. All materials which are likely to
be damaged by dropping from a height or demolishing, masonry etc. Shall be carefully
dismantled first. The dismantled articles shall be properly stacked as directed.
1.6. All materials obtained from demolition shall be the property of Government unless otherwise
specified and shall be kept in safe custody until handed over to the Engineer-in-charge.
1.7. Any serviceable material, obtained during dismantling or demolition shall be separated out
and stacked properly as directed, with all lead and loft. All unserviceable materials, rubbish etc.
Shall be stacked as directed by the Engineer-in-charge.
1.8. On completion of work, the site shall be cleared of all debris rubbish and cleaned as directed.
2.0. Mode of measurements & payment :.
2.1. The doors, windows, ventilators etc. Not exceeding 3 sq. Mt. In area (each) including
shutters and chowkhats Architraves, hold fasts and other attachments to grames etc. Will be
dismantled and measured under this item.
2.1. The rate includes stacking serviceable materials as and where directed with all leads and
2.3. The rate shall be for a unit of Each.
Item no.4 Removing and Scrapping of old deteriorated plaster of any thickness from wall
/R.C.C member including stacking of serviceable material and disposal of unserviceable
from site of work with lead and lift
1.0 Workmanship:
1.1. The demolition shall consist of demolition of one or more parts of the building as specified
or shown in the drawings. Demolition implies taking up or down or breaking up. This shall
consist of demolishing whole or part of work including all relevant items as specified or shown
in the drawings.
1.2. The demolition shall always be planned before hand and shall be done in reverse order of
the one in which the structure was constructed. This scheme shall be got approved from the
Engineer-in-charge before starting the work. This however will not absolve the contractor from
the responsibility of proper and safe demolition.
1.3. Necessary dropping, shoring and under pinning shall be provided for the safety of the
adjoining work or property, which is to be left intact, before dismantling and demolishing is
taken up and the work shall be carried out in such a way that no damages is caused to the
adjoining property.
1.4. Wherever required, temporary enclosures or partitions shall also be provided. Necessary
precautions shall be taken to keep the dust nuisance down as and where necessary.
1.5. Dismantling shall be commenced in a systematic manner. All materials which are likely to
be damaged by dropping from a height or demolishing, masonry etc. Shall be carefully
dismantled first. The dismantled articles shall be properly stacked as directed.
1.6. All materials obtained from demolition shall be the property of Government unless otherwise
specified and shall be kept in safe custody until handed over to the Engineer-in-charge.
1.7. Any serviceable material, obtained during dismantling or demolition shall be separated out
and stacked properly as directed, with all lead and lift. All unserviceable materials, rubbish etc.
Shall be stacked as directed by the Engineer-in-charge.
1.8. On completion of work, the site shall be cleared of all debris rubbish and cleaned as directed.
(The above relevant points shall be followed except demolition of brick or stone masonry in
cement mortar is to be done.)
2.0. Mode of measurements & payment:
2.1. The rate shall include cost of all labour involved and tools used in demolishing and
dismantling in including scaffolding. The rate shall also include the charges for separating out
and stacking the serviceable materials properly and disposing the unserviceable materials with
all lead and lift. The rate also includes for temporary storing for the safety of the portion not
required to be pulled down or of adjoining properly and providing temporary enclosures or
partitions where considered necessary.
2.2. The unserviceable materials shall be disposed off with all lead and lift.
2.3 The work shall be measured in actual area of the work done.The rate shall be for a unit of
Item no.5 Dismantling C.I. pipes G.S.W.pipes abd A.C. rain water pipes with fittings and
clamps including stacking the materials with all lead and lift ( for any dia, of pipe
Dismantling C.I. pipes, GI pipe, G.S.W. Pipes and A.C. rain water pipes with fittings and clamps
shall be done. These shall be taken out with proper tools and stacked at the location shown by
EIC with all lead and lift.
2.0. Mode of measurements & payment:
2.1. The rate shall include stacking the serviceable materials and disposing of unserviceable
materials as directed with all lead and lift.
2.2. Water pipes lines, including rain water pipes; with clamps and specials, sewer pipe lines,
(Salt glazed ware or concrete) etc. Shall be measured in running meter inclusive of joints (The
measurements shall be taken along the centre line of pipe and fittings.)
2.3. The rate shall be for a unit of one running meter.
Item no.6 Dismantling tiled of stone floors laid in mortar including stacking of serviceable
materials and disposal of unserviceable materials with all lead and lift.
11.0. Workmanship:
1.1. The demolition shall consist of demolition of one or more parts of the building as specified
or shown in the drawings. Demolition implies taking up or down or breaking up. This shall
consist of demolishing whole or part of work including all relevant item as specified or shown
in the drawings.
1.2. The demolition shall always be planned before hand and shall be done in reverse order of
the one in which the structure was constructed. This scheme shall be got approved from the
Engineer-in-charge before starting the work. This however will not absolve the contractor from
the responsibility of proper and safe demolition.
1.3. Necessary dropping, shoring and under pinning shall be provided for the safety of the
adjoining work or property, which is to be left intact, before dismentaling and demolishing is
taken up and the work shall be carried out in such a way that no damages is caused to the
adjoining property.
1.4. Wherever required, temporary enclosures or partitions shall also be provided. Necessary
precautions shall be taken to keep the dust nuisance down as and where necessary.
1.5. Dismantling shall be commenced in a systematic manner. All materials which are likely to
be damaged by dropping from a height or demolishing, masonry etc. Shall be carefully
dismantled first. The dismantled articles shall be properly stacked as directed.
1.6. All materials obtained from demolition shall be the property of Government unless otherwise
specified and shall be kept in safe custody until handed over to the Engineer-in-charge.
1.7. Any serviceable material, obtained during dismantling or demolition shall be separated out
and stacked properly as directed, with all lead and loft. All unserviceable materials, rubbish etc.
Shall be stacked as directed by the Engineer-in-charge.
1.8. On completion of work, the site shall be cleared of all debris rubbish and cleaned as directed.
2.0. Mode of measurements & payment:
2.1. The rate shall include stacking the unserviceable materials as directed will lead and lift.
2.2. The rate shall be for a unit of one sq. Metre.
Item no.7 Dismantling sanitary fittings like wash basin .W.C. pan Indian and European
type, flushing tank etc. including stacking the materials with all lead and lift.
1.0. Workmanship: 1.1. The relevant specification of above item No.6 shall be followed except
that the dismantling work of sanitary fittings such as wash basin, W.C. Pan (all types of pans),
flushing tank, etc. Shall be carried out.
2.0. Mode of measurements & payment:
2.1. The rate shall include stacking the unserviceable materials as directed will lead and lift.
2.2. The rate shall be for a unit of Each.
Item no. 8 Providing and laying controlled cement concrete M-25 or 1:1:2 and curing etc.
complete including the cost of form work of steel sheets for fair finish but excluding the
cost of reinforcement for reinforced concrete work in Slabs, Landings, Shelves, Balconies,
Lintels, Beams, girders and cantilever up to floor two level.
1.1 Water shall conform to M-1. Cement shall conform to M-3. Sand shall conform to M-6.
Aggregate of normal size shall conform to M-12.
2.0 Specification:
2.1 The relevant specifications of above item, of ordinary concrete shall be followed except
that the concrete mix shall be designed from preliminary tests, the proportioning of cement and
aggregates shall be done by weight and necessary precautions shall be taken in the production to
ensure that the required work cube strength is attained and maintained. The controlled concrete
shall be in grades of M-100, M-150, M-200, M-250, M-300, M-350 & M-400 with prefix
controlled added to it. The letter ‘M’ refers to mix and numbers specify 28 days works cube
compressive strength. Cubes of the mix expressed in Kg./Cmt.
2.2 The proportion of cement sand and coarse aggregates shall be determined by weight, the
weight batch machine shall be used for maintaining proper control over the proportion of
aggregates as per mix design. Minimum cement consumption for design mix concrete shall be
considered as per mix design done by agency or relevant booklet of PWD.
The strength requirements of different grades of concrete shall be as under :
Grade of Concrete Compressive strength of Cubes in Kg./Cmt. At with
15 cms.x 15 cm 28 days I. S. 516-1959.
conducted in accordance Min.
Preliminary test Work test
In all cases the 28 days compressive strength specified in above table the criteria for acceptance
or rejection of the concrete.
Where the strength of a concrete mix as indicated by tests, line in between the strength of any
two grades specified in the above table, such concrete shall be classified in for all purpose as
concrete belonging to the lower of the two grades between which its strength lies.
3.1 The water cement ratio shall not more than those specified in Design mix. The cement
content of the mix specified shall be increased if the quantity of water in a mix has to be increased
to overcome the difficulties of placement and compaction so that the water-cement-ratio
specified is not exceeded.
3.2 Workability of the concrete shall be controlled by maintaining a water-cement-ratio that is
bound to give a concrete mix which is just sufficiently wet to be placed and compacted without
difficulty with the means available.
3.3 For reinforced concrete work, coarse aggregates having a nominal size of 20 mm. Are
generally considered satisfactory.
3.4 Admixture may be used in concrete only with approval of Engineer-in-charge upon the
evidence that with the passage of time, neither the compressive strength of concrete is reduced
nor are other requisite qualities of concrete and steel impaired by the use of such admixtures.
4.0 Workmanship:
4.1 The proportions for ingredients chosen shall be such that concrete has adequate workability
for conditions prevailing on the work in question and can be properly compacted with means
available except where it can be shown to the satisfaction of the Engineer-in-charge that the
supply of properly graded aggregate of uniform quality can be maintained till the completion of
work. Grading of aggregate shall be controlled by obtaining the coarse aggregates in different
sizes and mixing them in the right proportions as required. Aggregate of different sizes shall be
stocked in separate stockpiles. The required quantity of material shall be stock piled several
hours, preferably a day before use. The grading of coarse and fine aggregate shall be checked as
frequently as possible the frequency for a given job being determined by the Engineer-in-charge
to ensure that the suppliers are maintaining the uniform grading as approved for samples used in
the preliminary tests.
4.2 In proportioning concrete the quantity of both cement and aggregate shall be determined by
weight. Where the weight of cement is determined by accepting the maker’s weight per bag a
reasonable number of bags shall be weighted separately to check the net weight. Where cement
is weighted from bulk stocks at site and not by bags it shall be weighted separately from the
aggregates. Water shall either be measured by volume in calibrated tanks or weighed. All
measuring equipments shall be maintained in clean and serviceable condition. Their accuracy
shall be periodically checked.
4.3 It is most important to keep the specified water cement ratio constant and at its correct value.
To this end moisture content in both fine and coarse aggregates shall be determined by the
Engineer-in-charge according to the weather conditions the amount of mixing water shall then
be adjusted to compensate for variations in the moisture content. For the determination of
moisture content in the aggregates I. S. 2389 (Part-III) shall be referred to suitable adjustments
shall also be made in the weights of aggregates due to variation in their moisture content.
5.1 For all work. Concrete shall be mixed in a mechanical mixer which along with other
accessories shall be kept in first class working condition and so maintained throughout the
construction. Measured quantity of aggregate, sand, cement required for each batch shall be
poured into the drum of the mechanical mixer while it is continuously running. After about half
a minute of dry mixing, measured quantity of water required for each batch of concrete mix shall
be added gradually and mixing continued for another one and a half minute. Mixing shall be
continued till materials are uniformly distributed and uniform color of the entire mass is obtained
and each individual particle of the coarse aggregate shows complete coating of mortar containing
its proportionate amount of cement. In no case shall the mixing be done for less than 2 minutes
after all ingredients have been put into the mixer.
5.2 When hand mixing is permitted by the Engineer-in-charge for small jobs or for certain other
reasons, it shall be done on the smooth watertight platform large enough to allow efficient turning
over the ingredients of concrete before and after adding water. Mixing platform shall be so
arranged that no foreign materials get mixed with concrete nor does the mixing water flow out.
Cement in required number of bags shall be placed in a uniform layer on top of the measured
quantity of fine and coarse aggregate, which shall also be spread in a layer of uniform thickness
on the mixing platform. Dry coarse and fine aggregate and cement shall then be mixed
thoroughly by turning over to get a mixture to uniform color. Specified quantity of water shall
then be added gradually through a rose-can and the mass turned over till a mix of required
consistency is obtained. In hand mixing, quantity of cement shall be increased by 10 percent
above that specified.
5.3 Mixers which have been out of use for more than 30 minutes shall be thoroughly cleaned
before putting in a new batch. Unless otherwise agreed to by the Engineer-in-charge the first
batch of concrete from the mixture shall contain only two thirds of normal quantity of coarse
aggregate. Mixing plant shall be thoroughly cleaned before changing from one type of cement
6.0 Consistency:
6.1The degree of consistency which shall depend upon the nature of the work and methods of
vibration of concrete, shall be determined by regular slumps tests in accordance with I. S. 1199-
1959. The slumps of 100 mm. To 125 mm. shall be adopted when vibrators are used and 80 mm.
When vibrators are not used.
7.0 Inspection :
7.1 Contractor shall give the Engineer-in-charge due notice before placing any concrete in
the forms to permit him to inspect and accept the false work and forms as to their strength,
alignment, and general fitness but such inspection shall not relive the contractor of his
responsibility for the safety of men, machinery, materials and for results obtained. Immediately
before concreting, all forms shall be thoroughly cleaned.
7.2 Centering design and its erection shall be got approved from the Engineer-in-charge. One
carpenter with helper shall invariably be kept present throughout the period of concreting.
Movement of labor and other persons shall be totally prohibited for reinforcement laid in
position. For access to different parts, suitable mobile platforms shall be provided so that steel
reinforcement in position is not disturbed for ensuring proper cover; mortar blocks of suitable
size shall be cast and tied to the reinforcement. Timber, kapachi or metal pieces shall not be used
for this purpose.
8.0 Transporting and laying:
8.1 The method of transporting and placing concrete shall be as approved. Concrete shall be so
transported and placed that no contamination, segregation or loss of its constituent material takes
All formwork shall be cleaned and made free from standing water, dust show or ice immediately
before placing of concrete.
No concrete shall be placed in any part of the structure until the approval of the Engineer-in-
charge has been obtained.
8.2 Concerting shall proceed continuously over the area between construction joints. Fresh
concrete shall not be placed against concrete which has been in position for more than 30 minutes
unless a proper construction joints is formed. Concrete shall be compacted in its final position
within 30 minutes of its discharge from the mixer. Except where otherwise agreed to by the
Engineer-in-charge concrete shall be deposited shall be deposited in horizontal layers to a
compacted depth of not more than 0.45 meter when internal vibrators are used and not exceeding
0.30 meter in all other cases.
8.3 Unless otherwise agreed to by the Engineer-in-charge, concrete shall not be dropped into
place from a height exceeding 2 meters. When trucking or chutes are used they shall be kept
close and used in such a way as to avoid segregation. When concreting has to be resumed on a
surface which has hardened, it shall be roughened, swept clean, thoroughly wetted and covered
with a 13 mm. Thick layer of mortar composed of cement and sand in the same ratio as in the
concrete mix itself. This 13 mm. Layer of mortar shall be freshly mixed and placed immediately
before placing of new concrete. Where concrete has not fully hardened, all laitance shall be
removed by scrubbing the wet surface with wire or bristle brushes, care being taken to avoid
dislodgement of any particles of coarse aggregate. The surface shall then be thoroughly wetted
all free water removed and then coated with neat cement grout. The first layer of concrete to be
placed on his surface shall not exceed 150 mm. In thickness and shall be well rammed against
old work, particular attention being given to corners and close spots.
8.4 All concrete shall be compacted to produce a dense homogeneous mass with the assistance
of vibrators, unless otherwise permitted by the Engineer-in-charge for exceptional cases, such as
concreting under water, where vibrators cannot be used. Sufficient vibrators in serviceable
condition shall be kept at site so that spare equipment is always available in the event of
Concrete shall be judged to be compacted when the mortar fills the spaces between the coarse
aggregate and begins to cream up to form an even surface. Compaction shall be completed before
the initial setting starts i.e. Within 30 minutes of addition of water to dry mixture. During
compaction, it shall be observed that needle vibrators are not applied on reinforcement which is
likely to destroy the bond between concrete and reinforcement.
Immediately after compaction, concrete shall be protected from weather, including rain, running
water, shocks, vibration, traffic, rapid temperature changes, frost and drying out process. It shall
be covered with wet sacking, hassain or other similar absorbant material approved soon after the
initial set and shall be kept continuously wet for a period of not less than 14 days from the date
of placement. Masonry work over foundation concrete may be started after 48 hours of its laying
but curing of concrete shall be continued for a minimum period of 14 days.
10.0 Sampling and Testing of concrete:
10.1 Samples from fresh concrete shall be taken as per I. S. 1199-1959 and cubes shall be
made, cured and tested at 7 days or 28 days as per requirements in accordance with I. S. 516-
1959. A random sampling procedure shall be adopted to ensure that each concrete batch shall
have a reasonable chance of being tested i.e. The sampling should be spread over the entire period
of concreting and cover all mixing units. The minimum frequency of sampling of concrete of
each grade shall be in accordance with following :
Quantity of No. Of samples Quantity of No. Of samples
concrete in the concrete in the
51 cmt and above + one additional for each additional 50 cmt. Or part thereof.
NOTE : At least one sample shall be taken from each shift. Ten test specimens shall be made
from each sample, five for testing at 7 days and the remaining five at 28 days. The samples of
concrete shall be taken on each day of the concreting as per above frequency. The number of
specimens may be suitably increased as deemed necessary by the Engineer-in-charge when
procedure of tests given above revels a poor quality of concrete and in other special cases.
10.2 The average strength of the group of cubes case for each day shall not be less than the
specified cube strength of 250 kg/Cm2 at 28 days. 20% of the cubes cast for each day may have
value less than the specified strength provided the lowest value is not less than 85% of the
specified strength. If the concrete made in accordance with the proportions given for a particular
grade, does not yield the specified strength, such concrete shall be classified as belonging to the
appropriate lower grade. Concrete made in accordance with the proportions given for a particular
grade shall not however, be placed in a higher grade on the ground that the test strength are
higher than the minimum specified.
11.0 Stripping :
11.1 The Engineer-in-charge shall be informed in advanced by the contractor of his intention to
strike the form work. While fixing the time for removal of form work due consideration shall be
given to local conditions, character of the structure the weather and other condition that influence
the setting of concrete and of the materials used in the mix in normal circumstances (generally
where temperatures are above 20ºc) and where ordinary concrete is used forms may be struck
after expiry of periods specified in item No. 9.1 (A) for respective item of form work.
a. All formwork shall be removed without causing any shock or vibration as would damage
the concrete. Before the soffits and struts are removed the concrete surface shall be exposed
where necessary in order to ascertain that the concrete has sufficiently hardened. Centering shall
be gradually and uniformly lowered in such manner as to permit the concrete to take stresses due
to its own weight uniformly and gradually. Where internal metal ties are permitted they or their
removable parts shall be extracted without causing any damage to the concrete and remaining
holes filled with mortar. No permanently embedded metal part shall have less than 25 mm. Cover
to the finished concrete surface. Where it is intended to re-use the formwork, it shall be cleaned
and made good to the satisfaction of the Engineer-in-charge. After removable of form work and
shuttering the Executive Engineer shall inspect the work and satisfy by random checks that
concrete produced is of good quality.
b. Immediately after the removal of forms all exposed bolts etc., passing through the cement
concrete member and use for shuttering or any other purpose shall be cut inside the cement
concrete members to a depth of at least 25 mm. Below the surface of the concrete and the
resulting holes be filled by cement mortar. All fine caused by form joints, all cavities produced
by the removal of forms ties and all other holes and depressions honeycomb spots broken edges
or corners and other defects shall be thoroughly cleaned, saturated with water and carefully
pointed and rendered true with mortar of cement and fine aggregate mixed in the proportion used
in the grade of concrete that is being finished and of as dry consistency as is possible to use.
Considerable pressure shall be applied in filling and pointing to ensure through filling in all
voids. Surfaces which are pointed shall be kept moist for a period of 24 hours.
If rock pockets honeycombs in the opinion of the Engineer-in-charge are of such an extent or
character as to affect the strength of the structure materially or to endanger the life of the steel
reinforcement he may declare the concrete defective and require the removal and replacement of
the portions of the structure affected.
12.0 Mode of measurement and payment:
12.1 The consolidated cubical contents of concrete work as specified in item shall be measured
the concrete laid in excess of section shown on drawings or as directed shall not be measured.
No deduction shall be made for
(a) Ends of dis-similar materials such as joints, beams, posts, girders, rafters, purling trusses,
corbels and steps etc Up to 500 Sq Cm In section.
(b) Opening up to 0.1 Sq. M.
12.2 The rate includes cost of all materials, labor, tools and plant required for mixing,
placing in position, vibrating and compacting, finishing as directed curing and all other
incidental expenses for producing concrete of specified strength.
12.3 The rate shall be for a unit of one cubic meter.
Item no. 9 Providing TMT (Thermo mechanically treated) Reinforcement FE 500D Bars
as per IS:1786 for R.C.C. Work including bending , binding and placing in position
complete as directed. Up to floor two level.
1.0 Materials :
TMT Bars shall conform to M-19B.
TMT BARS shall confirm to I.S. 1786-1985 OF Fe-500D Grade or above form Approved
Mild steel binding wires shall conform as below. The mild steel wire shall be of 1.63 mm. Or
1.22 mm. (16 or 18 gauge) diameter and shall conform to I. S. 280-1972.The use of black wire
will be permitted for binding reinforcement bars. It shall be free from rust, oil paint, grease, loose
mill scale or any other undesirable coating which may prevent adhesion of cement mortar.The
materials shall be procured & use from the recognized firms as mentioned in list attached with
2.0 Workmanship :
The work shall consist of furnishing and placing reinforcement to the shape and dimensions
shown as on the drawings or as directed.
2.1 Steel shall be clean and free from rust and loose mill scale at the time of fixing in position
and subsequent concreting.
2.2 Reinforcing steel shall conform accurately to the dimensions given in the bar bending
schedules shown on relevant drawings. Bars shall be bent cold to specified shape and dimensions
or as directed using a proper bar bender, operated by hand or power to attain proper radius of
bends. Bars shall not be bent or straightened in a manner that will injure the material. Bars bent
during transport or handling shall be straightened before being used on the work. They shall not
be heated to facilitate bending. Unless otherwise specified a ‘U’ type hook at the end of each bar
shall invariably be provided to main reinforcement. The radius of the bend shall not be less than
twice the diameter of the round bar and the length of straight part of the bar beyond the end of
the curve shall be at least four times the diameter of the round bar. In case of bars which are not
round and in case of deformed bars, the diameter shall be taken as the diameter of circle having
an equivalent effective area. The hooks shall be suitably encased to prevent any splitting of the
2.3 All the reinforcement bars shall be accurately placed in exact position shown on the
drawings and shall be securely held in position during placing of concrete by annealed binding
wire not less than 1 mm. In size and by using stay blocks or metal chair spacers, metal hangers,
supporting wires or other approved devices at sufficiently close intervals. Bars shall not be
allowed to sag between supports nor displaced during concreting or any other operations of the
work. All devices used for positioning shall be of non-corrodible material. Wooden and metal
supports shall no extend to the surface of concrete, except where shown on drawings. Placing
bars on layers of freshly laid concrete as the work progress for adjusting bar spacing shall not
allowed. Pieces of broken stone or brick and wooden blocks shall not be used. Layers of bars
shall be separated by spacebars, precast mortar blocks or other approved devices. Reinforcement
after being placed in position shall be maintained in a clean condition until completely embedded
in concrete. Special care shall be exercised to prevent any displacement of reinforcement in
concrete already placed. To prevent reinforcement from corrosion, concrete cover shall be
provided as indicated on drawings. All the bars producing from concrete and to which other bars
are to be spliced and which are likely to be exposed for a period exceeding 10 days shall be
protected by a thick coast of neat cement grout.
2.4 Bars crossing each other where required shall be secured by binding wires (annealed) of
size not less than 1 mm. In such manner that they do not slip over each other at the time
of fixing and concreting.
2.5 As far as possible bars of full length shall be used. In case this is not possible, overlapping
of bars shall be done as directed. When practicable, overlapping bars shall not touch each other
but be kept apart by 25 mm. Or 1.25 times the maximum size of the coarse aggregate whichever
is greater by concrete between them. Where not feasible overlapping bars shall be bound with
annealed wires not less than 1 mm. Thick twisted tight. The overlaps shall be staggered for
different bears and located at points along the span where neither movement is maximum.
2.6 Whenever indicated on the drawings or desired by the Engineer-in-charge bars shall be
joined by couplings which shall have a cross section sufficient to transpit the full stresses of bars.
The ends of the bars that are joined by coupling shall be upset for sufficient length so that the
effective cross section at the base of threads is not less than normal cross-section of the bar.
Threads shall be standard threads. Steel for coupling shall conform to I. S.
When permitted or specified on the drawings joints of reinforcement bars shall be butt-welded
so as to transmit their full stresses. Welded joints shall preferably be located at points when steel
will not be subject to more than 75 per cent of the maximum permissible stresses and welds so
staggered that at any one section not more than 20 percent of the rods are welded. Only electric
arc welding using a process which excludes air from the molten metal and conforms to any or
all other special provisions for the work shall be accepted. Suitable means shall be provided for
holding bars securely in position during welding. It shall be ensured that no voids are left in
welding and when welding is done in two or three stages previous surface shall be cleaned
properly. Ends of the bars shall be cleaned of all loose scale, rust, grease, paint and other foreign
matter before welding. Only competent welders shall be employed on the work. The M. S.
Electrodes used for welding shall conform to I. S. 814. Welded pieces of reinforcement shall be
tested. Specimen shall be taken from the actual site and their number and frequency of test shall
be as directed.
3.0 Mode of measurement and payment:
3.1 Reinforcement shall be measured in length wise in RMT including overlaps, separately for
different diameters as actually used in the work. Where welding or coupling is resorted to in
place of lap joints such joints shall be measured for payment as equivalent length of overlap as
per design requirement. From the length so measured the weight if reinforcement shall be
calculated in kg . Wastage and
annealed steel wire for binding shall not be measured and the cost of these items shall be deemed
to be included in the rate for reinforcement.
3.2 The rate for reinforcement includes cost of steel, binding wires its cutting, bending, placing,
binding and fixing in position as shown on the drawings and as directed. It shall also include all
devices for keeping reinforcement in approved position cost of joining as per approved method
and all wastage and spacer bars.
3.3 The rate shall be for a unit of One Kg.
Item no. 10 Brick work using Fly ash building bricks having crushing strength not less
than 50Kg./Sqcm. in cement mortar 1:6 (1cement: 6 fine sand).
1.1 Bricks shall conform to M-15.
1.2 Cement Mortar Shall Conform to M-11.
2.0 Workmanship:
2.1 Proportion:
2.1.1 The proportion of the cement mortar shall be 1: 6 (1 cement : 6 fine sand) by volume.
2.2 Wetting of bricks: 2.2.1 The bricks required for masonry shall be thoroughly wetted with
clean water for about two hours before use or as directed. The cessation of bubbles, when the
bricks are wetted with water is an indication of through wetting of bricks.
2.3.1 Bricks shall be laid in English bond unless directed otherwise. Half or cut bricks shall not
be used except where necessary to complete to bond closers in such case shall be cut to required
size and used near the ends of walls.
2.3.2 A layer of mortar shall be spread on full width for suitable length of the lower course, Each
brick shall first be properly bedded and set home by gently tapping lapping with handle of trowel
or wooden mallet. It side face shall be flushed with mortar before the next brick is laid and
pressed against it. On completion of course, the vertical joints shall be fully filled from the top
2.3.3 The walls shall be taken up truly in plumb. All courses shall be laid truly horizontal and all
vertical joint shall be truly vertical. Vertical joints in alternate course shall generally be directly
one over the other. The thickness of brick course shall be kept uniform.
2.3.4 The brick shall be laid with frog upwards. A set of tools comprising of wooden straight
edges, mason’s sprit level, square half meter rub, and pins, string and plumb, shall be kept on the
site of work for frequent checking during the progress of work.
2.3.5 Both the faces of walls of thickness greater than 23 cms. Shall be kept in proper place. All
the connected brick work shall be kept not more than one meter over the rest of the work. Where
this is not possible the work shall be raked back according to bond (and not left toothed) at an
angle not steeper than 45 degrees.
2.3.6 All fixtures, pipes, outlets of water, hold fasts of doors and windows etc. Which are
required to be built in wall shall be embedded in cement mortar.
2.4.1 Bricks shall be so laid that all joints are quite flush with mortar. Thickness of joints shall
not exceed 12 mm. The face joints shall be raked out as directed by taking tools daily during the
progress of work, when the mortar is still green so as to provide key for plaster or pointing to
2.4.2 The face of brick shall be cleaned the very day on which the brick work is laid and all
mortar dropping removed.
2.5 Curing 2.5.1 Green work shall be protected from rain suitably. Masonry work shall be
kept moist on all the faces for a period of seven days. The top of masonry work shall be kept
well wetted at the close of the day.
2.6 Preparation of foundation bed : 2.6.1 If the foundation is to be laid directly on the
excavated bed the bed shall be leveled, cleared of all loose materials, cleaned and wetted before
starting masonry. If masonry is to be laid on concrete footing the top of concrete shall be cleaned
and moistened. The contractor shall obtain the engineer’s approval for the foundation bed, before
foundation masonry is started. When puccas flooring is to be provided flush with the top to plinth
the inside plinth offset shall be kept lower than the outside plinth top by the thickness of the
3.0 Mode of measurements and payment:
3.1 The measurements of this item shall be taken for the brick masonry fully completed. The
limiting dimensions not exceeding those shown on the plans or as directed shall be final.
Battered, tapered and curved portions shall be measured net.
3.2 No deduction shall be made from the quantity of brick work, nor any extra payment shall
be made for embedding in masonry or making holes in respect of following item :
(1) Ends of joints, beams, posts, girders, rafters, purlins, trusses, corbel steps etc. Where
cross sectional area does not exceed 500 Sq. Cm.
(2) Opening not exceeding 1000 Sq. Cm.
(3) Wall plates and bed plates, bearing of slabs, chhajjas and the like whose thickness does
not exceed 10 Cms. And the bearing does not extend to the full thickness of wall.
(4) Drainage holes, and recesses for cement concrete blocks to embed hold fasts for doors,
(5) Iron fixtures, pipes upto 300 mm. Dia, hold fasts and doors and windows built into
masonry and pipes etc. For concealed wiring.
(6) Forming chases of section not exceeding 350 Sq. Cm. In masonry.
3.3 Apertures for fireplaces shall not be deducted nor shall extra labor required to make
splaying of jambs, threading and making Arches over the aperture be paid for separately.
3.4The rate shall be for a unit of one cubic meter.
Item no. 11 Providing 15 mm thick cement plaster in single coat on brick /concrete walls
for interior plastering up to floor two level and finished even and smooth with a neat cement
/ lime magia slurry in cement mortar 1:3( 1-cement : 3- fine sand) as directed. Item includes
required scaffolding, curing etc. complete as directed at all the height including making all
necessary arrangement for working up to floor two level.
1.0. Materials:
1.1. Water M-1. The cement mortar proportion 1:3 shall conform to M-11.
2.0. Workmanship:
2.1. Scaffolding: Wooden ballads, bamboos, planks, trestles and other scaffolding shall be
sound. These shall be properly examined before erection and use. Stage scaffolding shall be
provided for ceiling plaster which shall be independent of the walls.
2.2. Preparation of back-ground:
2.2.1. The surface shall be cleaned of all dust, loose mortar droppings, traces of algae,
efflorescence and other foreign matter by water or by brushing. Smooth surface shall be
roughened by wire brushing if it is not hard and by racking if it is hard. In case of concrete
surface, if a chemical retarder has been applied to the form work, the surface shall be roughened
by wire brushing and all the resulting dust and loose particles cleaned off and care shall be taken
that none of the retarders is left on the surface. Trimming of projections on brick/concrete surface
where necessary shall be carried out to get an even surface.
2.2.2. Racking of joints in case of masonry where necessary shall be allowed to dry out for
sufficient period before carrying out the plaster work.
2.2.3. The work shall not be soaked but only damped evenly before applying the plaster. If the
surface becomes dry such area shall be moistened again.
2.2.4. For external plaster, the plastering operation shall be started from top floor and carried
downwards. For internal plaster, the plastering operations may be started whenever the building
frame and cladding work are ready and the temporary supporting ceiling resting on the wall of
the floor have been removed. Ceiling plaster shall be completed before starting plaster to walls.
2.3. Applications of plaster:
2.3.1. The plaster about 15 x 15 cms. Shall be first applied horizontally and vertically at not more
than 2 meters intervals over the entire surface to serve as gauge. The surfaces of these gauges
shall be truly in plane of the finished plastered surface. The mortar shall then be applied in
uniform surface slightly more than the specified thickness, and then brought to a true surface by
working a wooden straight edge reaching across the gauges with small upward and sideways
movement at a time. Finally, the surface shall be finished off true with a trowel or wooden float
according as a smooth or a sandy granular texture is required. Excessive trowelling or
overworking the float shall be avoided. All corners, arises, angles and junctions be truly vertical
or horizontal as the case may be and shall be carefully finished. Rounding or chamfering corners,
arises junctions etc. Shall be carried out with proper templates to the size required.
2.3.2. Cement plaster shall be used within half an hour after addition of water. Any mortar or
plaster which is partially set shall be rejected and removed forthwith from the size.
2.3.3. In suspending the work at the end of the day, the plaster shall be left out clean to the line
both horizontally and vertically. When recommending the plaster, the edges of the old work shall
be scraped clean and wetted with cement putty before plaster is applied to the adjacent areas to
enable the two to properly join together. Plastering work shall be closed at the end of the day on
the body of the wall and nearer than 15 cm. To any corners or arrises. Horizontal joints in plaster
work shall not also as these invariably load to leakage. No portion of the surface shall be left out
initially to be packed up later on.
2.3.4. Each coat shall be kept damp continuously till the next coat is applied or for a minimum
period of 7 days. Moistening shall commence as soon as plaster is hardened sufficiently.
Soaking of walls shall be avoided and only as much water as can be readily absorbed shall be
used, excessive evaporation on the sunny or windward side of building in hot air or dry weather
shall be prevented by handing mattings or gunny bags on the outside of the plaster and keeping
3.0. Mode of measurements & payment:
3.1. The rate shall include the cost of all materials, labor and scaffolding etc. Involved in the
operations described under workmanship.
3.2. All plastering shall be measured in square meters unless, otherwise specified, Length, breath
or height shall be measured correct to a centimeter.
3.3. Thickness of the plaster shall be exclusive of the thickness of the key i.e. Grooves or open
joints in brick work, stone work etc. Or space between laths. Thickness of plaster shall be
average thickness with minimum 10 mm. At any point on this surface. Occur on parapet tops and
3.4. This item includes plastering up to floor two level.
3.5. The measurement of wall plastering shall be taken between the walls or partition (dimensions
before plastering being taken) for length and from the top of floor or skirting to ceiling for height.
Depth of cover of cornices if any shall be deducted.
3.6. Soffits of stairs shall be measured as plastering on ceilings. Flowing soffits shall be
measured separately.
3.7. For jambs, soffits, sills etc. For openings not exceeding 0.5 sq.mt. Each in area for ends of
joints, beams, posts, girders, steps, etc. Not exceeding 0.5 sq. Mt. Each in area and for
openings exceeding 0.5 sq. Mt. And not exceeding 3.00 sq. Mt. In each area deductions
and additions shall be made in the following manner:
(a) No deductions shall be made for ends of joints, beams, posts etc. And openings not exceeding
0.5 sq.mt. Each and no addition shall be made for reveals, jambs, soffits, sills etc. Of these
opening for finish to plaster around ends of joints, beams, posts etc.
(b) Deduction for openings exceeding 0.5 sq.mt. But not exceeding 3 sq.mt. Each shall be made
as follows and no addition shall be made for reveals, jambs, soffits, sills etc. Of these
(i) When both faces of all wall are plastered with same plaster, deduction shall be made for one
(ii) When two faces of wall are plastered with different types of plaster or if one faces is
plastered and the other pointed, deductions shall be made from the plaster or pointing on the side
of frame for door, window etc. On which width of reveals is less than that on the other side but
no deductions shall be made on the outer side. Where width of reveals on both faces of all are
equal, deductions of 50% of area of opening on each face shall be made from area of plaster
and/or pointing as the case may be.
3.8. For openings having door frames equal to projecting beyond the thickness of wall, full
deduction for opening shall be made from each plastered face of the wall.
3.9. In case of openings of area above 3 sq.mt. Each, deduction shall be made for opening but
jambs, soffits and sills shall be measured.
3.10. The rate shall be for unit of one sq. Meter.
Item no. 12 Providing, laying AND jointing to level and slope 110 mm dia ISI Supreme /
Finolex/Prince PVC pipes of working pressure 10.0 KG per Sq.cm in line including all
necessary fittings such as bends,'Y' door bend, tees, one way joints, two way joints, rubber
packing ring fixing the same concealed in the wall, in true line and level with help of PVC
clamps at every two meter including jointing with adhesive solvent cement including the
cost of all types of fixing materials and all other necessary fixtures, including fixing air and
water tight testing the line etc. complete as directed by EIC.
1.0. Materials: 1.1. The low density polythene pipe of specified diameter with 10 kgs/sq.cm.
Working pressure shall conform to I.S. 3076-1968. The specials and fitting required shall be of
2.0. Workmanship:
2.1. The P.V.C. pipes of specified diameter shall be fixed as directed. Due to thermal expansion
of rigid P.V.C. pipes, due allowance shall be made particularly in over round pipe lines for any
change in length of pipe line which may occur during installation or when pipe line is in service.
2.2. Above ground installation of rigid P.V.C. pipe should be undertaken after preparations are
observed for their protection against mechanical or any damage.
2.3. P.V.C. pipes shall be supported by clamp at interval of 1.5 mtre in horizontal and vertical
with wooden plugs and suitable plastic/MS clamps.
2.5. Closer support spacing shall be provided if recommended by the manufacturer.
2.6. The guide lines indicated by the manufacturer regarding, handling, transportation, storing
laying and jointing of pipes shall be kept in view during execution.
2.0. Jointing the pipes:
The pipes and sockets shall be accurately cut. The ends of the pipes and fittings should be
absolutely free from dirt and dust. The outside surface of the pipes and the inside of the fittings
shall then be roughened with emery paper, and then solvent cement joint. Since solvent cement
is aggressive to P.V.C. care must be taken to avoid applying excessive cement to the inside of
pipe sockets as any surplus cement cannot be wiped off after jointing. Empty solvent cement
tins, brushes rags, or paper with cement should not be buried in open area. They should be
gathered, not left scattered about, as they can prove to be a hazard to animals, which may chew
them.it should be disposed safely.
2.8.2. If manufacture recommends its own methods of jointing, the same shall be adopted after
necessary approval from the Engineer-in-charge.
3.0. Mode of measurements & payment:
Rate quoted shall be for all above specified and payment shall be made on running meter pipe
fixed. The rate includes cost of all material, fittings etc.
Item no.13 Providing, laying AND jointing to level and slope 110 mm dia ISI Supreme /
Finolex/Prince PVC pipes of working pressure 4.0 KG per Sq.cm for “drainage” line
including all necessary fittings such as bends,'Y' door bend, tees, one way joints, two way
joints, rubber packing ring fixing the same concealed in the wall, in true line and level with
help of PVC clamps at every two meter including jointing with adhesive solvent cement
including the cost of all types of fixing materials and all other necessary fixtures, including
fixing air and water tight testing the line etc. complete as directed by EIC..
1.1 It should be of Finolex/Supreme/Astral and of the following outside dia low density pipes
complete with special flange compression type fittings i.e. Y bend, Tee, Plug bend, wall clips
etc. including making good the wall ceiling and floor. For rainwater pipe from terrace to ground
floor and weep holes in compound wall as per site requirement.
1.2 P.V.C. rain water pipe shall be of approved make like Finolex/Supreme/Astral brand
confirming to I.S. specifications for the same. Pipe of 110mm dia, specified in the item shall be
used. Approval of make of pipe shall be obtained. In case, if necessary, manufacturers test
certificate shall be submitted. Pipe shall be handled carefully and cracked and damaged /cracked
pipe shall not be used. 3 coats of paint is to be carried out similar to surface paint,Pipes shall be
fixed in plumb and with all necessary fittings of same brand make like bend, tee, collar, shoe,
cowl ventilator at top. Pipe shall be fixed with wall/concrete surface with necessary wooden
blocks, clamps of 18 gauge GI sheet, approved quality nails etc. Clamps should be provided at
interval 1.5 to 2 mtr.
1.3 When the pipe laid checked and okayed, the joints of pipe shall be filled with solution and
joints made watertight. Cowl ventilator shall be provided on top in case of drainage pipe. For
rain water down take pipe, concrete apron of 300x300x75 mm. below shoe shall be provided for
protection of earth. So it is not washed away due to rain water.
1.4 Curing of apron for period of 7days and pipeline shall be given 3 coats of colour wash.
2.0 Mode of measurements & payment:
The rate shall be for a unit of Rmt including bend ,tee, coupling & shoe.
Item no.14 Labour charges for attending leakage/seepages WC/Bath anywhere & any
height quarter rate including material like cement, sand, water proofing solution and
demolition of tiles, w.c, nahni trap etc. if required & replacing the same filling the joints as
directed by E.I.C. (payment for the same will be paid irrespective item under items.)
including scaffolding, jullas, tools, tackles for completing the job. Rate is for one complete
attending leakage job.
Labour charges for attending leakage/seepages any where & any height of quarter including
material like cement mortar, water proofing solution, demolition of tiles, w.c, nahni trap etc. if
required & refixing the same filling the joints as directed by E.I.C. (payment for the same will
be paid separately under items) including scaffolding, jullas, tools, tackles for completing the
job. Rate is for one complete attending leakage job. Demolition work done carefully without any
damages. Filling joint with water proofing material added in cement.
The work includes the demolition of tile/ IPS/ kotah flooring of bath, kitchen, toilet etc inside
the quarter. Also the leakages of drainage pipe line are to be attended outside of block up to any
height. During demolition of flooring while attending the leakages from bath/W.C, the care
should be taken that the existing pipe line/WC pan/trap which is in good condition should not
Payment shall be made on Nos basis. The rate shall include the cost of all materials, labour and
scaffolding etc. Involved in the operations described under workmanship and floting coat.
Item no.15 Providing & Fixing Indian Orissa Pan type W.C. commode 580 MM make of
Kohler, Cera, Hindware, Bell including necessary `P' or `S' trap, bends , complete
including approved quality, P.V.C. Pipe connection up to manhole chamber for G.F. & up
to outside wall for other floors with bends with giving water tight test etc., complete, P&F
brass chromium plated half turn flush cock of 25 mm diameter Crown/Liberty/Prince
make including fixing in pipe line with union and connecting to pan with UPVC pipe of
mm diameter in working condition, etc. complete as directed by E.I.C.
The relevant specification shall be followed as per specification given in the item and as per
instruction of EIC.
1.0 General Specification:
1.1 The Indian Orissa Pan type W.C. make as approved by the Engineer-in-charge. The ‘P’ or
‘S’ trap shall be provided as required with water seal not less than 50 mm. The solid plastic seat
and cover shall be of the best Indian make conforming to I.S. 2548-1980. They shall be made of
moulded syntactic materials which shall be tough and hard with high resistance to solvents and
shall be free from blisters and other surface defects and shall have chromium plated brass hinges
and rubber buffer of suitable size. The pair of white vitreous China 250mm x 130mm x 30mm
1.2 W.C. shall be free from crack and other defects. W.C. shall be fixed as directed. The trap
shall be necessary ‘P’ or ‘S’ type and thoroughly self-cleaning. The seat shall be provided with
plastic ARAM' seat hollow type white seat cover, as approved by Engineer-in-charge. W.C. shall
be handed over perfectly clean and in working condition.
1.3 Connection from half turn flush cock to W.C. shall be provided with G.I Medium weight
Pipe of diameter of 25 mm to chamber or main line on wall with plug bend for inspection. All
joints shall be in C.M. (1:1).
2.0 Mode of measurements & Payment:
2.1 Rate quoted shall be for providing and fixing W.C. pan with all other accessories specified
and whole thing shall be paid per number of W.C. pan provided and fixed.
2.2 Payment shall be made per number of Indian Orissa Pan type W.C. fixed with all accessories
specified and handing over in working condition, leak proof.
Item no.16 Providing & Fixing 15mm.dia.brass C.P. Screw down bib cock of
Prince/Crown/KMP of approved quality having 250 to 300 grams weight etc., complete as
directed by E.I.C
1.1. Brass chromium plated screws down Bib Tap of Prince/Crown/KMP of approved quality
having 250 to 300 grams weight shall conform to I.S.781-1977. The bib cock shall conform to
M-57 be best Indian make and quality like and approved make of Prince/Crown/KMP.
2.0 Workmanship:
2.1 The screw down bib cock 15 mm. Dia as specified above shall be fixed as directed. The
threaded portion shall be smeared with taflon tape white or red lead /whole tight and around with
a few turns of fine spun yarn round the screwed end of the pipe. The bib cock shall be than
screwed and fixed to water tight position.
3.0 Mode of measurements & payment:
3.1 The rate includes cost of all labor, materials, tools and plant etc. required for satisfactory
completion of this item.
3.2 The rate shall be for a unit of Each.
Item no.17 Providing laying and jointing in true line and level 15mm dia. U.P.V.C. Pipe (
SCH- 40) for cold water including fittings as approved by Engineer In Charge. Pipe shall
be fixed on the wall with the help of clamp at every two meter C/C or shall be concealed as
directed including necessary fittings etc. including testing of pipe and joints and fixing the
same with adhesive solvent, including cost of all materials.
Materials : U.P.V.C. Pipe of PRINCE / SUPRIME / ASTRAL / FINOLEX make or equivalent
ISI approved brand pipe dia. 15 mm specified dia. Nominal bore shall confirm to (SCH-40).The
U.P.V.C. fittings, clamps etc. Required for specified dia. UPVC pipes and fittings shall be of
best quality and make as approved by the Engineer-in-charge.
2.1. Cutting, Laying and Jointing:
2.1.1. When the pipes are to be cut or rethreaded, the end shall be carefully filed out so that no
obstruction to bore in offered. The ends of the tubes shall then be threaded conforming to the
requirements of I.S. 554-1955 with pipe dies and taps carefully in such a manner as will not
result in slackness of joints when the two pieces are screwed together.
Pipe shall be fixed on wall with the help of clamp at every two meter C/C or shall be concealed
as directed including necessary fittings etc. including testing of pipe and joints and fixing the
same with adhesive solvent, including cost of all materials
2.1.2 The taps and dies shall be used only for straightening screw threads which have become
bent or damaged and dies shall not be used for turning of the threads so as to make them slacks
as the latter procedure may not result in watertight joints. The screw threads for tube and fittings
shall be protected from edge unit they are fitted.
2.1.3. In jointing the pipes, the inside of the socket and the screwed end of the tubes shall be
oiled and smeared with white or red lead and whole tight material / taflon tap wapping around
with a few turns of fine spun yarn round the screwed end of the tube. The end shall then be
tightly screwed in the socket, tees etc. With a pipe wrench. Care shall be taken that all pipes and
fittings are properly jointed so as to make the joints completely water tight and pipes are kept at
all times free from dust, and dirt during fixing. Burr joints shall be removed after screwing.
After laying, the open ends of the pipes shall be temporarily plugged to prevent access of water,
soil or any other foreign matter.
2.2. Testing of joints :
2.2.1.After laying and jointing, pipes and fittings shall be inspected under working conditions of
pressure and flow. Any Joints found leaking shall be redone, and all leaking pipes removed and
replaced without extra cost.
2.2.2. The pipes and fittings as they are laid shall be tested to hydraulic pressure of 6Kg./sq. Cm.
The pipe shall be slowly and carefully charged with water allowing all air to escape and avoiding
all stock and water hammer. The draw off takes and Stop cock shall then be closed and specified
hydraulic pressure shall be applied gradually. The pressure gauge must be accurate.
The pipes and fittings shall be tested section as the work of laying proceeds keeping the joints
exposed for inspection during the testing.
3.0. Mode of measurements & payment:
3.1. The description of each item shall unless otherwise stated, be held to include where
necessary, conveyance, and delivery, Handling, unloading, storing fabrication, hoisting, all
labour for finishing to required shape and size; testing, fitting in position, Straight, cutting and
waste , return of packing etc.
3.2. The length shall be measured in running meter basis of finished work, the length shall be
taken along the centre line of The pipe and fittings. The pipes fixed underground, to walls ceiling,
floors etc. Shall be measured and paid under this item.
3.3. All the work shall be measured in decimal system as fixed in its place, subject to tolerance
given below unless otherwise Stated :
(i) Dimension shall be measured to the nearest 0.01 meter.
(ii)Area shall be worked out to the nearest 0.01 sq.metre.
3.4. All measurement of cutting shall unless otherwise stated be held to include the consequent
3.5. In case of fitting of unequal bore, the largest bore shall be measured for the test.
3.6. Testing of pipe lines fittings and joints include for providing all plant and appliances
necessary for obtaining access to the work to be tested and carrying out the tests.
3.7.The rate includes UPVC pipe with screwed socket joints, together with all fittings (such as
bends, sockets, springs, elbows, tees, crosses short pieces, clamps and plugs unions etc.) And
fixing complete with clamping wall-hooks, wooden plugs etc. And also cutting, screwing and
waste and for making forged (or handmade) bends on piping as required. Connector shall be
inserted, where required or directed. The rate also includes cutting through walls, floors etc.
3.8. The rate shall be for a unit of one running meter.
Item no.18 Providing laying and jointing in true line and level 25mm dia. U.P.V.C. Pipe (
SCH- 40) for cold water including fittings as approved by Engineer In Charge. Pipe shall
be fixed on the wall with the help of clamp at every two meter C/C or shall be concealed as
directed including necessary fittings etc. including testing of pipe and joints and fixing the
same with adhesive solvent, including cost of all materials.
Material & workmanship Specification same as item no:17 but for 25 mm nominal outer dia
3.0. Mode of measurements & payment:
3.1. The description of each item shall unless otherwise stated, be held to include where
necessary, conveyance, and delivery, Handling, unloading, storing fabrication, hoisting, all
labour for finishing to required shape and size; testing, fitting in position, Straight, cutting and
waste , return of packing etc.
3.2. The length shall be measured in running meter basis of finished work, the length shall be
taken along the centre line of The pipe and fittings. The pipes fixed underground, to walls ceiling,
floors etc. Shall be measured and paid under this item.
3.3. All the work shall be measured in decimal system as fixed in its place, subject to tolerance
given below unless otherwise Stated :
(i) Dimension shall be measured to the nearest 0.01 meter.
(ii)Area shall be worked out to the nearest 0.01 sq.metre.
3.4. All measurement of cutting shall unless otherwise stated be held to include the consequent
3.5. In case of fitting of unequal bore, the largest bore shall be measured for the test.
3.6. Testing of pipe lines fittings and joints include for providing all plant and appliances
necessary for obtaining access to the work to be tested and carrying out the tests.
3.7.The rate includes UPVC pipe with screwed socket joints, together with all fittings (such as
bends, sockets, springs, elbows, tees, crosses short pieces, clamps and plugs unions etc.) And
fixing complete with clamping wall-hooks, wooden plugs etc. And also cutting, screwing and
waste and for making forged (or handmade) bends on piping as required. Connector shall be
inserted, where required or directed. The rate also includes cutting through walls, floors etc.
3.8. The rate shall be for a unit of one running meter.
Item no.19 Providing and fixing PVC SWR Nani Trap 100 mm diameter IS 14735 for darin
with jali of the following nominal diameter of self-cleansing design with C.I.Scread down
or hinged grating including the cost of cutting and making good the walls and jionted with
adhesive solvant cement including cost of materials,tools and Tackels.
1.0. Materials :
1.1. The Nahni trap shall be conform as below.
Nahni trap shall be of PVC SWR and shall be sound and free from porosity or other defects
which affect serviceability, The thickness of the base metal shall not be less than 6.5 mm. The
surface shall be smooth and free from craze, ships and other flaws or any other kind of defects
which affect serviceability. The size of Nahni trap shall be as specified and shall be of self-
cleansing design.
The Nahni trap shall be of quality approved by the Engineer-in-charge and shall generally
conform to the relevant Indian Standards.
The Nahni trap provided shall be with deep seal, minimum 500 mm. except at places where trap
with deep seal cannot be accommodated. The cover shall be cast iron. Perforated cover shall be
provided on the trap of appropriate size.
The C.I. hinged of screwed down cover shall be of best quality Or PVC heavy duty Nahni trap
of approved brand.
2.0. Workmanship:
2.1. The Nahni trap shall be jointed with pipe; the joints shall be done water tight.
3.0. Mode of measurements & payment:
3.1. The rate includes all labour, and materials, tools and plant etc. required for satisfactory
Completion of this item including lead jointing and testing.
3.2. The rate shall be for a unit of Each.
Item no.20 Providing and laying 25 mm thick polished kota stone slab flooring over
mm(average) thick base of cement mortar 1:6 (1 cement : 6 coarse sand) or L.M. 1:1.5 laid
over and jointed with grey cement slurry including rubbing and polishing etc. complete.
1.0 Materials: Water shall conform M-1. Lime mortar shall conform to M-10. Cement mortar
shall conform to M-11. Polished kotah stone shall conform to M-49.
2.0 Workmanship:
2.1.1 Each slab shall be cut to the required size and shape and fine chisel dressed at all the edges.
The sides thus dressed shall have a full contact if a straight edge is laid along. The sides shall be
table rubbed with coarse sand before paving. All angles and edges of the slabs shall be true square
and free from chippings and giving a plane surface. The thickness shall be 25 mm. (Average) as
specified in the item but not less than 20 mm. At any place of the slab.
2.1.2 Bedding for the kotah stone slabs shall be cement mortar 1 : 6 (1 cement : 6 coarse sand)
or L. M. 1 : 1.5 of average thickness 20 mm. As given in the description of the item. Sub grade
shall be cleaned, wetted and mopped. Mortar of the specified mix and thickness shall be then be
spread on an area sufficient to receive one kotah stone slab. The slab shall be washed clean before
laying. It shall be laid on top pressed, tapped gently to bring it in level with the other slabs. It
shall then be lifted and laid aside. Top surface of the mortar shall then be corrected by adding
fresh mortar at hollows or depressions. The mortar shall then be allowed to harden bit. Over this
surface, cement slurry of honey like consistency shall be applied. The slab shall then be gently
placed in position and tapped with wooden mallet till it is properly padded in level with and close
to the adjoining slab. The joint shall be as fine as possible. The slabs fixed in the floor adjoining
the wall shall enter not less than 10 mm. Under the plaster, skirting or dado. The junction between
the wall floor shall be finished neatly. The finished surface shall be true to levels and slopes as
2.1.3 The floor shall be kept wet for a minimum period of 7 days so that bedding and joints set
properly.Polishing shall be normally commenced after 14 days of laying the stone slab. First
polishing shall be done with carborundum stones of 120 grade grit fitted in the heavy machine
and then second polishing shall be done with carborundum stone of 220 to 350 grade grit fitted
in heavy machine. Water shall be properly used during polishing. The stone shall then be washed
clean with water. When directed by the Engineer-in-charge wax polish of approved quality shall
be applied on the surface with the help of soft cloth over a clean and dry surface. Then the polish
machine fitted with bobs shall be run over it.
The holes required for Nahni traps, pipes any other fittings shall be made without any extra cost.
3.0 Mode of measurements & payment:
The rate shall be for a unit of Sq. meter. The rate includes all labour, and materials, tools and plant
etc. required for satisfactory Completion of this item.
Item no.21 Providing and laying Granite Slab 18mm thick in shelves, platform, skirting
risers of steps, dedo and window jambs on 12 mm thick cement plaster 1:2 (1-cement : 2-
coarse sand) and jointed with white or colour cement slurry etc as directed EIC
1.1 Granite shall be conform to M-52. Cement shall conform to M-3. Sand shall conform to M-
6.White Cement shall conform to M-4
1.2 The thickness of the stone shall be specified in the description of the item All exposed face
shall be round moulding edges and double polished to tender truly smooth and the even reflecting
surface moulded patti to be fixed at all edge with araldite/ cement mortar as directed.
2.0 Workmanship
2.1 The background surface (wall/step/jamb) shall be cleaned thoroughly to remove dust, loose
particles, oil, paint, or laitance. Any undulation in surface shall be corrected with cement mortar
before installing the granite. The surface shall be roughened for ensuring better adhesion.
2.1 Granite shall be fixed in wall / bracket / RCC platform as per requirement by making grooves
2.2 Filling the grooves with cement mortar 1:2 and level the surface by plastering.
2.3 Filling of gap between Granite shall be made with epoxy mortar / white / colour cement as
per instruction of E.I.C.
3.0 Mode of measurements & payment
3.1 The rate includes cost of all labour, materials, tools and plant etc. required for satisfactory
completion of this item as specified in workmanship.
3.2 The rate includes cost of rubbing and polishing and including making half round moulding
to toe of treads etc
3.3 The rate shall be for a unit of smt of actual area finished with granite.
Item no.22 Providing & fixing of teakwood cup board having 50X50X5 mm MS angle
frame built in wall including one coat of priming and two coat of oil paint. The 03 to 04 nos
panel including with 25mm thick teak wood shutter , black enemelled M.S. butt hinges with
neccessary screw including20 cm long aldrop and stopper complete as per drawings and
directed by E.I.C.
The relevant specification shall be followed as per specification given in the item and as per
instruction of EIC
1.0 General Specification:
Built in wall, teakwood cupboard having 50x50X5mm. MS angle frame built in wall including
one coat of priming and two coat of oil paint. The 03 to 04 nos panel including with 25 mm
thick teak wood shutter , black enemelled M.S. butt hinges with neccessary screw including20
cm long aldrop and stopper complete as per drawings and directed by E.I.C.
Indian teak wood shall conform to M-29, Glass shall conform to M-38. Plywood M-37, Fixtures
and fastenings M-43.
General specifications of wood of above item shall be applicable panel should be of glass or
Weather proof plywood as directed . Weather proof plywood shall be of approved make and
quality confirming to I.S. 3087. Teak leaping shall be provided on all panels. The specifications
of doors shall be applicable. Hinges to be provided shall be as per listed in table. hinges of
approved make. Sample of hinges to be provided shall be got approved. All woodwork shall be
given 3 coats (Asian Appcolite) oil paint of approved brand, make & shade.
3.0 Mode of Measurement:
The rate includes the cost of all labour and materials, fitting involved in the operations described
under item.The rate shall be for a unit of Smt basis.
Item no.23 Providing & fixing glazed louvered glass standard extruded of alluminium
section of size 63mm x 38.10mm x 1.2mm (Jindal Section :2434, @ Wt.0.643kg per mt) with
colour anodized alluminium frame for ventilation & Jali with 5 mm thick frosted glass &
S.S.Jali as details etc complete for ventilation as per directed and drawing E.I.C.
1.0 Materials : Indian teak wood shall conform to M-29, Glass shall conform to M-38.
2.0 Workmanship:
2.1 The relevant specification shall be followed in the item and as per instruction of EIC.
2.2 Standard extruded aluminium sections of size 63 mm × 38.10 mm × 1.20 mm (Jindal Section
:2434, @ Wt.0.643kg per mt) with colour anodized alluminium frame shall be used for
fabrication of the ventilation frame.
2.3 The glass louvers shall be provided as directed. In the groove of 1.25 cms. depth made in
frames, the thickness of glass shall be 5 mm. and glass shall be glass of best quality. The
ventilation blades shall slope down towsardsthe outside at an angle of 45°.
2.4 S.S Jali of ventilator size fix with teakwood frame.
2.5 The completed ventilation unit shall be checked for proper fixing and neat finish.
3.0 Mode of measurements & payment:
3.1. The rate includes the cost of all labour and materials, fitting involved in the operations
described under item including testing.
3.2. The rate shall include all materials, fabrication, glazing, and fixing, S.S Jali with teakwood
frame complete as described.
3.3 The rate shall be for a unit of Smt basis.
Item no.24 Providing and fixing 35 mm thick shutters for Doors, windows and clerestory
windows including Indian teakwood frames 10 cm x 7 cm. size including black enamelled
iron oxidixed fixtures and fastenings including primer coat of approved quality and two
coats of oil painting etc, complete. (ii) Fully Panelled.
The timber shall be of best quality bulsari teak approved by Engineer-In-Charge. Decision of
E.I.C. in this connection will be final. If desired by EIC, contractor shall have to arrange testing
of wood samples selected by department at random, in the laboratory instructed by department.
Sample of wood approved shall be preserved and contractor shall procure wood of the approved
quality only. The source of wood shall be informed to the E.I.C.The timber to be used for wood
work shall be well seasoned, closed grains, uniform texture, free from knots, rots, soft, cracks,
menda, spongy spots etc. the size of frame and all members shall be final size after planning and
finishing. Undersized wooden members shall not be accepted. Wood of inferior quality,
undersize shall be liable to rejection.When frames or other members are ready they shall be got
checked from E.I.C. and got approved for quality and workmanship. Primer coat of paint shall
be applied only after clearance by E.I.C. if the wooden members are found warped, shrinked or
with bad workmanship within guarantee period, the same shall have to be replaced by contractor
without any extra cost and to the satisfaction of E.I.C.
The design to be provided and the faces of the doors shall be got approved from E.I.C before
execution of work.
Fixtures shall be provided in best workmanship, maintaining level and line with approved quality
and size screws. Screw shall be never hammered but driven with screw driver. The fixtures to
be used shall be got approved first and approved samples of all fixtures shall be kept on site
easily available for inspection.
Wooden surface shall be cleaned with sand paper, all loose materials, dust, grease etc. shall be
removed and all holes, crack etc. shall be filled with putty. Prepared surface shall be got approved
from Engineer. On this prepared surface, coat of yellow paint is applied and sand papered again
after its drying.
Materials: Indian teak wood shall conform to M-29,
Main entrance door shall be fixed with approved quality CP eye piece including cutting the wall
3.0 Workmanship:
3.1.1 The item covers the requirement of frames for doors, windows, clerestory windows their
supply and fixing.
3.1.2 All members of the frames shall be exactly at right angles. The right angle shall be checked
from inside surface of the respective members.
3.1.2 All members of frames shall straight without any warp or bow and shall have smooth
surface well planed on the three sides exposed at right angles to each other. The surface touching
the wall may not be planed unless it is required in order to straighten up the member or to obtain
the overall size within the tolerances specified.
3.1.3 Frame shall have dovetail joints. When clerestory windows are included, it shall be
provided by having full length one piece post for door or windows and clerestory window
extending the frame on top at the head to the required extent. Horns shall not be provided in the
head of the frame. When no sills are provided, the vertical posts of the frame in the ground floor
shall be embedded in the sill masonry for 10 cm. On upper floors, the vertical posts shall be fixed
in the floor or masonry by notches 10 mm. Deep. Slight adjustment of spacing as necessary shall
be done to have the hold fasts in the joints of masonry course. The frame shall be erected in
position and held plumb with strong support from both sides and built in masonry as it is being
built. The transom shall be through tanned into the mortises of the jamb post to the full width of
the jamb post and the thickness of the tenon shall be not less than 15 mm.
3.2.1 Tolerance: Unless specially mentioned otherwise tolerance of + 1.5 mm. Shall be
allowed for each wrought face.
3.2.2 The tenons shall be closely fitting into the mortises and suitably pinned with wood
dowels not less than 10 mm. Dia. Meter. The depth of rebates for housing the shutter shall be as
shown in the detailed drawing or as directed.
3.2.3 The contact surface of tenon and mortise shall be treated before putting together with an
adhesive of approved make.
3.2.4 Minimum number of three hold-fasts shall be fixed on each side of door and windows
frames, one at the center point and the other two at 30 cm. From the top and the bottom of the
frames. In case of windows and ventilators frames whose height is less 1 M. Two hold-fats, on
each side shall be fixed at quarter points of the frames. The size of each hold-fast shall be of
M.S.flat size 300 x 25 x 6 mm. with split end. The hold-fast shall be fixed with screws to frames.
3.2.5 Mild steel hold fasts shall be protected with a coating of coal asphalt tar. The surface of
frame abutting the masonry or concrete faces shall be properly treated by applying a coat of
approved coating.
3.3.1 Paneled shutters shall be constructed in the form of timber frame work of styles and rails
with panel inserted of type as specified in the detailed drawings. Panel shall be fixed by providing
groves in the style and rails. The styles and rails shall be joined to each other by mortise and
tenon joints at right angles.
3.3.2 All members of the shutters shall be straight without any warp or bow and shall have
smooth, well planed faces at right angles to each other.
3.3.3 The size of styles and trails shall be as per drawing or as directed. Styles and rails of
shutters shall be made of one piece only.
3.4 Timber paneling
3.4.1 Thickness of the panel shall be as specified in the item as shown in the drawing or as
directed. If the panel is made from one piece, the pieces shall be finished as shown in the detailed
drawings and shall be joined with continuous groove with specified size. The end pieces of the
panel of the panel and the top and bottom of the panel shall be provided with continuous tongue
to frame into groove of the frame shutter. An air space of 1.5 mm. shall be left in the groove of
frame shutter while fixing the panels in it.
3.4.2 The faces of the panel as well as various pieces of the panel shall be closely fitted to the
sizes of the grooves.
3.4.3 Finishing of the corners of raised panel edges shall be done as shown in drawings or as
3.4.4 All doors, windows, ventilators, cupboards shall be given 2 coats of paint, Asian apcolite
or approved quality brand and shade of oil paint and one coat of primer of approved quality.
Each coat of paint shall be allowed to dry thoroughly before next coat is applied. The work
shall not show any brush marks, ridges or drops of paint and no puddles in the corner of panels
or moulding etc. shall be left.
4.0 Fixtures & Fastenings: Fixtures as specified in item shall be provided in best workmanship,
maintaining level and line with approved quality and size screws. Screw shall be never
hammered but driven with screw driver. The fixture to be used shall be got approved first and
approved samples of all fixtures shall be kept on side easily available for inspection.
1. For main door
Sr. No Fixture Material Qty in No
1. 300 mm. lock 16 mm. dia aldrop Stainless steel
2 300 mm. long flat latch/aldrop “
3 150 mm. long butt or suitable “ 3 pair
parliamentary hinges
4 150 mm. long tower bolts “
5 150mm long handles “
6 Door catchers/magnet “
2. For internal door
Sr.No Fixture Material Qty in No
1. 300. long 16 dia aldrop Stainless steel 1or2 for balcony
2 250 mm. long flat latch/aldrop “
3 100 mm. long butt hinges or 150 “ 3 pair
mm. long or suitable
parliamentary hinges
4 150 mm. long tower bolts “
5 150 mm. long handles “
6 Door catchers/magnet “
For bath and W.C. door, 10 mm.dia 250 mm. long aldrop and one handle on both sides shall be
Sr.No Fixture Material Qty in No
1. 75 mm. long butt hinges Stainless steel 2 to 3pair
or 100. long or
suitable parliamentary
2 100 mm. tower bolts “ 2 No in 1 Flap
3 100 mm. handles “
4 150 mm. hook eye or stopper “
approved quality
5.0 Mode of measurements and payment
5.1 The rate shall be for a unit of one sq. meter.
5.2 The rate includes the cost of all labour and materials, fitting involved in the operations
described under item.
Item no.25 Providing and fixing window having extruded aluminium colour anodized
section frame main outer size 95 mm x 24 mm x 1.17 mm (of Jindal section no : 2459,@ Wt.
0.738 Kg/mt), horizontal Three track (Two shutters of glass full length of window and One
shutter of S.S. jali half-length of window) member size 92 mm x 31.75 mm x 1.30 mm (of
Jindal section no. 8688, @ Wt.1.07 Kg/mt), vertical member of size 92 mm x 31.75 mm x
1.50 mm (of Jindal section no. 8933, @ Wt. 1.06 Kg/mt),with sliding shutters of horizontal
member size 40mm x 18mm x 1.29mm (of Jindal section no. 8947, @ Wt. 0.456 Kg/mt)
vertical member size 40mm x 18mm x 1.29mm (of Jindal section no. 8949, @ Wt.
Kg/mt) including approved stainless steel mosquito wire jali shutter having alluminium
colour anodized section frame as approved and directed by EIC, with 5 mm thick
transparent bronze colour tinted float glass with powder coated aluminium fittings and
fixtures and transparent silicon sealant glass fixing to frame as per details etc
1.0 Specification:
1.1 Aluminum alloy used in the manufacture of extruded window section shall conform to I.S.
designation HEA-WP of I.S.: 733-1975 and also to I.S. Designation WVG-WP of I.S. 1285-
1975. The Section shall be as specified in the item description or drawing and design. The
fabrication shall be done as directed.
The hinges shall be cast or extruded aluminum hinge of same type as in window but of large
The hinges shall normally be of 50 mm. projecting type. Non-projecting type of hinges may also
be used if directed.
1.2 The handles of door/window shall be of specified design of powder coated aluminum. A
suitable lock for the door/window operatable either from outside/inside/sliding shall be provided.
The extruded aluminum colour anodized section frame main outer size 95 mm x 24 mm x
mm (of Jindal section no : 2459,@ Wt. 0.738 Kg/mt), horizontal Three track (Two shutters of
glass full length of window and One shutter of S.S. jali half-length of window) member size
92 mm x 31.75 mm x 1.30 mm (of Jindal section no. 8688, @ Wt.1.07 Kg/mt), vertical member
of size 92 mm x 31.75 mm x 1.50 mm (of Jindal section no. 8933, @ Wt. 1.06 Kg/mt),with
sliding shutters of horizontal member size 40mm x 18mm x 1.29mm (of Jindal section no.
8947, @ Wt. 0.456 Kg/mt) vertical member size 40mm x 18mm x 1.29mm (of Jindal section
no. 8949, @ Wt. 0.456 Kg/mt), with 5 mm thick transparent bronze colour tinted float glass
with powder coated aluminium fittings and fixtures and transparent silicon sealant glass fixing
to frame as per details etc.
1.3 The Item includes to provide glass shutter in two tracks which shall fully close the window
and one shutter S.S jail in half width of window.
2.0 Mode of measurements and payment
2.1 The measurement shall be paid on Smt basis.
2.2 The rate includes the cost of all labour and materials, fitting involved in the operations
described under item.
Item no.26 Providing & fixing MS Ornamental Grill of approved quality & design weighing
20 kg/smt. required pattern to granite frame of windows and ventilator with M.S.Flate
,round bar, square bar ,M.S.holo tube required spacing and frame as per drawing & as
directed with necessary one coat of primer and two coat of oil paint including welding or
bolted fixtures and fastening. (B) ornamental grill.
The structural steel shall conform to M-22.
All structural steel shall conform to I. S. 226-1965. The steel shall be free from the defects
mentioned in I. S. 226-1975 and shall have a smooth finish. The materials shall be free from
loose mill scale, rust pits or other defects affecting the strength and durability. Rivet bars shall
conform to I. S. 1148-1973.
When the steel is supplied by the Contractor test certificates of the manufactures shall be obtained
according to I. S. 226-1975 and other relevant Indian Standards.
2.0 Workmanship:
2.1 The M. S. Grill shall be prepared as per the drawings or as directed for fixing to wooden
frames of windows or any location directed by E.I.C etc.
2.2 The grill shall be fabricated to the designs and patterns shown in the drawings and the weight
shall be as directed and the joints shall be riveted or welded as shown in the plan or as directed.
The grill so formed shall be fixed into the frames of the windows etc. before they are erected in
position. The outside strip frame of the grill shall be housed to its full thickness into the recess
cut into the frame of the windows etc. The grill shall be fixed to the frame with number of bolts
and nuts of screws viz. bolt nut/screw per 30 cm. of the length of outer strip subject to a minimum
of 2 Nos. on each side of the frame or as indicated in the drawings or as directed.
2.3 The bolts and nuts or screws shall be counter sunk and shall be fixed with the top of their
heads flush with the face of frame strips.
3.0 Mode of measurements & payment:
3.1. No payment shall be made for weight of screws, bolts, nuts etc. Only weight of grill shall be
3.2. The rate inclusive 2 coat of oil painting and one coat of Red oxide primer.
3.3. The rate shall be for a unit of one Kg.
Item no.27 Providing and fixing FRP frame size 100x50 mm and 28mm thick FRP depress
panel shutter having extra reinforcement on sides & edges in Gel coat finish. The core of
the shutter & frame is to be filed up with injected fire retardant grade polyurethane foam
done in situ along with embedded wooden pieces for stiffening &also taking hinges &
fixtures. The whole FRP frame &shutter is to be water proof weather proof, termite Sqm
3283.00 proof & resistance to mild acid/alkali. Rates are to be inclusive of S.S hinges with
necessary screws & alluminium fixtures &fastenings & fastener sleeve.
FRP FRAME size 100x50 mm and 28mm FRP shutter having extra reinforcement on sides and
edges and in polish finish. The core of the shutter is to be filled up with injected fire extinguishing
grade polyurethane foam done in situ along with embedded wooden places for stiffening and
also for taking hinges and fixture. The whole FRP frame and shutter is to be water proof, weather
proof, termite proof and resistance to mild acid/Alkali. Rates are to be inclusive of S.S. hinges
with necessary screws and aluminum fixtures and fastening. Product should have 3 years
performance guarantee and company have ISO 9001-2008 certificate.
SHUTTER MATERIAL :
30 mm thick FRP shutter with wood grain raised pannel design shall be having size 90 x 45 mm
FRP thickness fire extinguishing grade FRP skin and embedded wooden piecesfor stiffening as
well as holding hinges and fixtures all moulded into one piece shutter. Core material shall be
injected fire extinguishing grade rigid polyurethane foam done in situ having density 35 to
Kg/m3, compressive strength 1.8 to 2.0 kg/cm2, flexural strength 3.5 to 4.5 kg/cm2. Whole
shutter shall be water proof, weather proof, termite proof and mild acid / alkali resistance.
28 mm thick with wood grain raised pannel design FRP shutter shall be jointless. It shall be
straight and smooth and of standard shape finished in gel coat. All necessary fixtures and
fastening shall be fixed where wooden piece provided.
SHUTTER WORKMANSHIP :
Shutter shall be fixed in line, level and proper manner having 2.0 to 3.0 mm play i.e. air space
for smooth and easy working. Three S.S. hinges shall be fixed properly with necessary screws.
SHUTTER TOLERANCE :
1.5 mm tolerance willbe allowed in thickness of shutter.
SHUTTER FIXTURES AND FASTENING :
All fixtures & fastening like S.S. aldrop, tadi or baby-latch, stopper, handle shall be fixed with
shutter in usual manner. The shutter shall be fixed to frame using fixing necessary Khila or
screws including drilling in granite frame as directed. During fixing of shutter if the frame is
damage the same willbe replaced by contractor's own cost without any extra payment. Product
is from reputed company having ISO 9001-2008 certificate and with three years performance
Mode of Payment:
The payment shall be given on actual work done in Smt basis.
Rates are to be inclusive of S.S. hinges with necessary screws and aluminum fixtures and
Product should have 3 years performance guarantee and company have ISO 9001-2008
Item no.28 Labour charges for fixing the old door/window/ventilator in position as directed
including removing old door, window, doing repairing, making grooves in the wall &
providing new hold fasts, fixing in C.C. including doing welding work for steel door,
window, providing and fixing new hinges, and supply and painting 2 coats of oil paint of
approved make etc. complete as directed by E.I.C.
Door, window, ventilator to be fixed shall be issued from dep't. Store. They shall be transported
to the place of fixing. Minor repairs to wood work shall be attended before fixing. Hold fast of
M.S. flat 20 mm x 4 m, 250 mm long shall be fixed as directed. Any missing screw etc shall be
provided and fixed by the contractor. Necessary opening in wall for fixing of frame shall be
made carefully so as not to damage masonry & other structure. The frame shall be fixed in line,
level and plumb in the wall. Two coats of approved quality tint and make, oil paint shall be
applied after fixing the shutters with frame and cleaning the old paint with sand paper, filling the
voids etc. with putty. Paining shall be carried out only after the same is cleared by competent
Mode of measurements & payment:
Rate quoted shall be inclusive of fixing the frame in C.C. 1:3 and smooth plastering on all sides;
welding work for steel door, window; providing and fixing new hinges.
Payment shall be made on square meter. If the window, ventilators are provided, with bars or
grill, the rate quoted shall be inclusive of oil painting the frame.
The payment shall be given on actual work done in Smt basis
Item no.29 Constructing Fly Ash building brick inspection chamber having crushing
strength not less than 50 Kg/cm2 in cm. 1:6 600 mm. X 850 mm X1000mm. Internal
dimensions, R.C.C. top cover with 1:1.5:3 mix(1 cement :1.5 coarse sand : 3 graded stone
aggregate 20 mm. size ) foundation concrete 1:4:8 inside plaster 15 mm. thick with cement
mortar 1:3 finished smooth with a floating coat of neat cement on walls & bed concrete,
including 3 coats of white or colour wash to all exposed finished surface etc. complete as
directed by E.I.C. Brick masonry upto depth 1000 mm for pipe lines with three of more
inlets. (For extra depth masonary & plaster will be paid under items.)
1.0 Materials :
1.1 Brick shall conform as per brick work item or fly ash brick of standard quality.
1.2 Water shall conform to M-1. Cement shall conform to M-3. Coarse sand shall conform to
M-6. Brick shall conform to M-15. Stone aggregate shall conform to M-12. Brick bat shaft
shall conform to M-14. M. S. Bar shall conform to M-18.
2.0 Workmanship :
2.1 The excavation shall be done true to dimensions and levels shown on the plans or as
directed. The relevant specification shall be followed as per item of excavation specification.
2.2 Bed concrete shall be of 150 mm. Thick C. C. 1 : 4 : 8 (1 cement : 4 coarse sand : 8 graded
Aggregates). The projection of bed concrete beyond the masonry walls shall be 7.5 cms. The
relevant specification shall be followed as per item of C.C 1:4:8
2.3 Masonry walls, plaster work and colour wash shall be carried out as per item description
and relevant specifications of item of masonry
2.4 The cover slab shall be constructed as per size described in item and relevant specifications
of concrete. Reinforcement will be as per instruction of EIC.
3.0 Mode of measurements & payment:
3.1 The rate includes cost of excavation ,all labor, materials, tools and plant etc. required for
satisfactory completion of this item as described above.
3.2 The rate shall be for a unit of one number.
Item no.30 Providing laying (to level or slopes) and jointing reinforced concrete Light duty
non-pressure pipes I.S. class NP2 of the following internal diameter with collars and butt
ends prepared for collar joints including testing of joints complete.(C) 300mm
1.0 Specification:
R.C.C. Hume pipe ‘A’ class shall be of specified diameter and confirming to I.S. specifications.
It shall be laid underground in shortest route, in perfect alignment and to true levels to get desired
slope. Trenches shall be excavated for sufficient width and required depth to ensure the
satisfactory laying and joining the pipe. Excavation and back filling shall be according to relevant
item specified. and C.C. 1:4:8 shall be laid on both sides of joint below joint and raised upto half
the height of joint. Joint shall be filled in C.M. (1:1). Joints and C.C. shall be cured for period of
7days before back filling. Before filling of earth in trench, water proof test be given for pipeline.
2.0 Mode of measurements & payment:
2.1 The rate includes cost of excavation, filing, all labor, materials, tools and plant etc. required
for satisfactory completion of this item as described above.
2.2 Payment shall be made per Rmt. of pipe laid, with all operations specified above.
Item no.31 Providing and laying ceramic tiles 6 mm thick of approved make Johnson /Icon
/Asian /Marbito /Varmora /City shade in flooring, treads of steps and landing laid on bed
of 12 mm thick cement mortar 1:3 ( 1 cement : 3 coarse sand) & jointed with white or
colour cement slurry.
The relevant specification shall be followed in the item and as per instruction of EIC.
1.1 Ceramic tiles shall conform as below.
The tiles shall be of best quality as approved by the Engineer-in-charge. They shall be flat and
true to shape. They shall be free from crakes, crazing, spots, chipped edges and corners. The
glazing shall be of uniform shade.
1.2 The size of ceramic tiles shall be as approved by the Engineer-in-Charge. The maximum
variation from the stated sizes, other than the thickness of tile, shall be plus or minus 1.5 mm.
1.3 The thickness of tile shall be 6mm except as above the tiles shall conform to I. S. 777-
1.4 Tiles shall be supplied from approved manufacturers and samples shall be got approved
prior to execution.
2.0 Workmanship:
2.1.1 The sub-grade shall be cleaned, wetted and mopped. The bedding shall then be laid even
lover the surface tamped and corrected to desired level and allowed to harden enough to offer
a rig cushion to tiles and to enable the mason to place wooden planks across and squat on it.
2.1.2 The Ceramic tiles shall be laid on cement mortar bedding of 12 mm .or required Thick
in C.M 1 : 3 The mortar shall have sufficient plasticity for laying and there shall be no hard
lumps that would interfere with the evenness of bedding. The base shall be cleared and well
wetted. The mortar shall then be spread in thickness not less than 12 mm. at any place.
2.2 Fixing tiles :
2.2.2 The tiles before laying shall be soaked in water for at least two hours. Neat gray cement
grout at 3.3 Kg/Cement/Sq. Mt. Of honey like consistency shall be spread over the mortar
bedding as directed. The edges of the tiles be smeared with neat cement slurry. The tiles shall
be well pressed and gently tapped with a wooden mallet till they are properly bedded and in
level with the adjoining tiles. There shall be no hollows in bed or joints. The joints between
the tiles shall be as thin as possible in straight line or as per pattern.
2.2.3 The tiles shall not have staggered joints. The joints shall be true to center line both ways.
The Nehni trap coming in the flooring shall be so positioned that its grating shall replace only
one tile as far as possible. Where full size tiles cannot be fixed, they shall be cut (Swan) to the
required size and the edges rubbed smooth to ensure straight and true joints. The joints shall
be filled with gray cement grout with wire brush of trowel to a depth of 5 mm. And loose
material removed. White/ color cement shall be used for pointing the joints. After fixing the
tile finally in an even plane the flooring shall be kept wet and allowed to nature undisturbed
2.3.1 The surplus cement grout that may have come out of the joints shall be cleared off before
it sets. Once the floor has set, it shall be carefully washed, cleared by dilute acid and dried.
Proper precaution and measures shall be taken to ensure that the tiles are not damaged in any
way till the completion of the construction.
3.0 Mode of measurements & Payment :
3.1 The work done shall be measured in S.M.T. for visible area of work done. The length and
width of the flooring shall be measured not-between the faces of skirting or dados or plastered
face of wall as the case may be. The paving under dado or skirting shall not be measured. No
deduction shall be made nor extra paid for any opening in the floor of area upto 0.1 sq. Mt.
Nothing extra shall be paid for laying the floors at different levels in the same rooms.
3.2 The rate shall be for a unit of one sq. Meter.
Item no.32 Providing and laying ceramic tiles 6 mm thick of approved make Johnson /Icon
/Asian /Marbito /Varmora /City & shade in skirting, riser of steps and dado in bath room,
W.C., & over kitchen platform laid on bed of 10 mm thick cement mortar 1:3 ( 1 cement :
3 coarse sand) & jointed with white or colour cement slurry.
The relevant specification shall be followed in the item and as per instruction of EIC.
1.1 Ceramic tiles shall conform as below.
The tiles shall be of best quality as approved by the Engineer-in-charge. They shall be flat and
true to shape. They shall be free from crakes, crazing, spots, chipped edges and corners. The
glazing shall be of uniform shade.
1.2 The size of ceramic tiles shall be as approved by the Engineer-in-Charge. The maximum
variation from the stated sizes, other than the thickness of tile, shall be plus or minus 1.5 mm.
1.3 The thickness of tile shall be 6mm except as above the tiles shall conform to I. S. 777-
1.4 Tiles shall be supplied from approved manufacturers and samples shall be got approved
prior to execution.
2.0 Workmanship:
2.1 The background surface of walls, stair risers and other surfaces on which the ceramic tiles
are to be fixed shall be thoroughly cleaned to remove dust, loose particles, oil, grease and other
foreign matter. Any unevenness shall be corrected before commencing the work.
2.2 A 10 mm thick layer of cement plaster in cement mortar 1:3 (1 cement : 3 coarse sand)
shall be provided over the prepared surface and finished to the required line, level and plumb
to receive the ceramic tiles.
2.3 Ceramic tiles shall be cut to the required size and shape and fixed over the prepared cement
plaster surface. The tiles shall be properly aligned and pressed firmly to ensure adequate
bonding, uniform joints and a neat finish.
2.4 Tiles shall be fixed on the skirting, stair risers and dado surfaces in straight lines and in the
approved pattern. The joints shall be uniform, properly aligned and kept as narrow as
practicable. Cut tiles shall be accurately shaped, and their exposed edges shall be finished
2.5 The joints between the tiles shall be thoroughly cleaned and filled with white cement slurry
to obtain a uniform and flush finish. Excess slurry shall be removed before it hardens, without
staining or damaging the tile surface.
2.6 The completed tile work shall be true to line, level, plumb and alignment, with even
surfaces, uniform joints and properly finished corners and junctions. The work shall be
executed as per the approved drawings, relevant specifications and directions of the E.I.C.
2.7 The finished tiled surfaces shall be cleaned and protected against damage, staining and
displacement until the completion of construction work and acceptance by the E.I.C.
3.0 Mode of measurements & Payment :
3.1 The work done shall be measured in S.M.T. for visible area of work done. The length and
width of the flooring shall be measured not-between the faces of skirting or dados or plastered
face of wall as the case may be. The paving under dado or skirting shall not be measured. No
deduction shall be made nor extra paid for any opening in the floor of area upto 0.1 sq. Mt.
Nothing extra shall be paid for laying the floors at different levels in the same rooms.
3.2 The rate shall be for a unit of one sq. Meter.
Item no.33 Providing and fixing C.P. brass towel rail complete with C.P. brass brackets
fixed to wooden plugs with C.P. brass scews.(B) 600mm x 20mm size.
1.0. Materials : 1.1. The C.P. brass towel rail shall be 600 mm. X 20 mm. Of best quality as
approved by the Engineer-in-charge. The brackets shall be of C.P. brass. The rail shall conform
2.0. Workmanship : 2.1. The brackets of the towel rail shall be fixed by means of C.P. brass to
screws wooden plugs firmly embedded in the wall with C.M. 1:3 (1 cement : 3 coarse sand). The
towel rail shall be fixed as and where directed.
3.0. Mode of measurements & payment :
3.1. The rate includes the cost of all labour, material tools and plant etc. Required for satisfactory
completion of this item.
3.2. The rate shall be for a unit of one Each.
Item no.34 Providing & fixing 10 TAKORA KHATAKA lock Vijay/Asiatic , of I.S.I.
approved quality etc., complete. Basic rate of lock should be Rs.750/-.
The item shall be followed as per description of item and approved sample by EIC.
2.0 Mode of measurements & payment:
The rate shall be for a unit of number as per description.
Item no.35 Providing & fixing best INDIAN make euro,cera,hinware,bel white porcelain
rectangular wash hand basin size 550X400mm. with C.I. M.S. Brackets fixed in wall
including approved quality of 1 No. of brass C.P. Pillar cock 15 mm dia (PRINCE TYPE)
. one brass C.P. with P.V.C. pipe connection for stop cock to pillar cock. PVC flexible Waste
pipe. etc., complete as directed by E.I.C.
1.0. Materials :
1.1. The white porcelain rectangular wash hand basin shall be 550 mm. X 400 mm.of 1st quality
and make as approved by the Engineer-in-charge.
The wash basin shall be conform to M- 59. and it shall conform to I.S.2556. (Part-IV) -1972 and
I.S.771-1979. The size of the washbasin shall be as specified in the item. Washbasin shall be of
one-piece construction with continued over flow arrangements. All internal angles shall be
designed so as to facilitate cleaning.
Washbasin shall have single tap hole or two holes as specified. Each basin shall have a circular
waste hole, which is either rebated or beveled internally with 65mm. diameter at top and 10-mm.
depth to suit the waste fitting. Basin shall rest on C.I.or MS brackets painted, which shall be
fixed in wall. And with long screw and wooden pieces embedded in wall of plugs. The necessary
stud slot to receive the bracket on the underside of the basin shall be provided Basin shall have
an internal soap holder recess, which shall fully drain, into the bowl.
1.2.Item include cost of One-brass C.P. pillar cock of PRINCE/Crown/KMP make approved by
EIC and confirming to I.S.I specification and make, shall be fixed with 15 mm PVC connection
pipe, 15 mm dia c.p. approved quality stopcock , one chromium plated bottle trap with necessary
couplings of approved quality ,one 32mm dia C.P. brass waste for washbasin and Waste Pipe for
Wash basin C.P. 32 mm dia. For drainage from wash basin, waste coupling, PVC flexible out let
pipe shall be provided for each washbasin & fixed with washbasin.
If the outlet drainpipe is to be taken concealed in wall, necessary groove shall be cut and finished
surface after lying of pipeline and for this no separate payment shall be made.
Watertight test shall be given and washbasin shall be cleaned and handed over, in working
condition. The height of the frond edge of the wash basin from the floor level shall be 85 cm or
as directed by EIC
2.0. Workmanship :
The wash hand basin shall be fixed firmly on the wall using heavy-duty C.I./M.S. brackets of
approved design and size, properly aligned, levelled, and securely anchored into the wall with
suitable rawl bolts, screws, and cement mortar as required. The basin shall be checked for cracks,
glaze defects, and proper outlet alignment before installation.
The item includes supply and installation of one brass chromium-plated pillar cock, 15 mm
diameter of approved make, fixed to the basin inlet, and one brass chromium-plated 15 mm
diameter stop cock, installed at an accessible location on the supply line. The connection between
stop cock and pillar cock shall be made using approved quality PVC pipe, ensuring leak-proof
A PVC flexible waste pipe of suitable diameter shall be provided and fixed from the basin outlet
to the existing waste connection, including necessary couplings, washers, and seals to ensure
proper drainage without leakage.
All joints shall be properly sealed, tested for water tightness, and rectified if required. The
installation shall include cutting, chasing, and making good the wall or floor, finishing to match
existing surfaces. The basin, fittings, and accessories shall be cleaned after installation and left
in proper working condition.
The entire work shall be carried out as per directions of the Engineer-in-Charge (E.I.C.),
complete in all respects.
3.0. Mode of measurements & payment:
3.1. The rate includes the cost of all labour and materials, fitting involved in the operations
described under item including testing.
3.2 The completed work shall be measured in Each.
3.3 Payment shall be made per Each basis.
Item no.36 Providing and fixing S.S. sink Glosy ASIS 304 Grade 1mm thick with overall
size 510 x 432 mm and bowl size 445 x 368 x 190 mm fixing the same in Granite making
required hole and jointed with gray cement slurry including rubbing, polishing including
waste coupling, Two nos C.P. Pillar cock 15 mm Heavy duty swan neck and C.P. 32 mm
dia drain out pipe upto Nahni trap with addition and alteration in existing taping etc.
complete as directed by EIC.
1.0. Materials:
1.1 S.S. sink Glosy ASIS 304 Grade 1mm thick with overall size 510 x 432 mm and bowl size
445 x 368 x 190 mm as per approved brand & approved by EIC.
1.2. waste coupling as per approved by EIC and approved quality. C.P. Pillar cock 15 mm Heavy
duty swan neck as per approved brand & approved by EIC. C.P. 32 mm dia drain out pipe as per
approved brand & approved by EIC
2.0 General Specification:
The work shall be Carried out as per description of item and instructed by EIC.
2.0. Mode of measurements & payment:
2.1. The rate includes the cost of all labour and materials, fitting involved in the operations
described under item including testing.
2.2 Rate is inclusive of making required hall in Granite, described Fittings & addition &
alteration in existing tapping.
2.2. The rate shall be for a unit of No
Item no.37 Performing/Providing, supplying and laying/labour charges etc. any item of
SOR 2023-2024 and Last two year approved P.O. Items as and when required basis for
unforseen works/events.
This item includes to carry out the one or more any item mentioned in PWD SOR 2023-2024
and Last two year approved P.O. and as per PWD technical specification and as directed by
EIC .the scope of work including providing ,fixing, supplying, laying, transporting, loading,
unloading of PWD items. The items to be carried out shall be as in where basis for unforeseen
works/events any time during the contract period. There shall not be any extra payment.
The contractor should be ready to carry out the Items of PWD SOR and Last two year approved
P.O. at any time in case of emergency. If for any PWD SOR item and Last two year approved
P.O. the technical specification is not available then the work shall be carried out as per the
directive of EIC.
Mode of Payment:
The payment shall be given in JOB basis. The amount of work done shall be calculated from
actual work done and rate as per PWD SOR 2023-2024 and Last two year approved P.O. The
calculated amount shall be converted into JOB and accordingly payment shall be made.
SIGN OF BIDDER CHIEF ENGINEER (GEN)
WITH SEAL AND DATE GSECL : UKAI : TPS
Gujarat State Electricity Corporation Limited
Ukai Thermal Power Station, Ukai Dam, Taluka : Fort Songadh,
Email: [email protected] Web site: www.gsecl.in
CIN: U40100GJ1993SGC019988
AN ISO-9001:2015&14001:2015 OHSMS 45001:2018 Certified Power Plant
SECTION-D : SCHEDULE – B (PRICE BID)
“Renovation work of E type (180) & Type IV (64)
residential building incl. replacement of window,
door, renovation of bath, WC & Kitchen etc of
Urjanagar colony Ukai.”
Gujarat State Electricity Corporation Limited
Ukai Thermal Power Station, Ukai Dam, Taluka : Fort Songadh,
Email: [email protected] Web site: www.gsecl.in
CIN: U40100GJ1993SGC019988
AN ISO-9001:2015&14001:2015 OHSMS 45001:2018 Certified Power Plant
Do not submit this Schedule - B in hard copy
Name of Work: “Renovation work of E type (180) & Type IV (64) residential building incl.
replacement of window, door, renovation of bath, WC & Kitchen etc of
Urjanagar colony Ukai.”
Tender No. : WT-4894-A
Name of Work: Renovation work of E type (180) & Type IV (64) residential building incl.
replacement of window, door, renovation of bath, WC & Kitchen etc of Urjanagar colony Ukai.
Description Qty UOM Rate Amount
Demolition including stacking of serviceable
1 materials and disposal of unserviceable 46.00 Cmt 1047.38
materials with all lead and lift. (i) R.C.C. work
Demolition of Brick work and stone masonry
including stacking of serviceable materials
2 and disposal of unserviceable materials with 56.00 Cmt 544.95
all lead and lift.(ii) In Cement Mortar
Dismantling doors, windows, ventilators etc.
(wood or steel) shutters including chowkhats
3 architraves, holdfasts and other attachment 2445.00 Each 185.85
etc. complete and stacking them within all
lead and lift.(i) Not exceeding 3 Sq.M. in area.
Removing and Scrapping of old deteriorated
plaster of any thickness from wall /R.C.C
4 member including stacking of serviceable 1200.00 Smt 19.38
material and disposal of unserviceable from
site of work with lead and lift.
Dismantling C.I. pipes G.S.W.pipes abd A.C.
rain water pipes with fittings and clamps
5 including stacking the materials with all lead 8400.00 Rmt 74.34
and lift ( for any dia, of pipe)
Dismantling tiled of stone floors laid in
mortar including stacking of serviceable
6 materials and disposal of unserviceable 3810.00 Smt 47.73
materials with all lead and lift
Dismantling sanitary fittings like wash basin
.W.C. pan Indian and European type, flushing
tank etc. including stacking the materials with
all lead and lift
Providing and laying controlled cement
concrete M-25 or 1:1:2 and curing etc.
complete including the cost of form work of
steel sheets for fair finish but excluding the
cost of reinforcement for reinforced concrete
work in Slabs, Landings, Shelves, Balconies,
Lintels, Beams, girders and cantilever up to
floor two level
Providing TMT (Thermo mechanically
treated) Reinforcement FE -500D Bars as per
9 IS:1786 for R.C.C. Work including bending , 500.00 KG 75.46
binding and placing in position complete as
directed. Up to floor two level.
Brick work using Fly ash building bricks
having crushing strength not less than
50Kg./Sqcm. in cement mortar 1:6 (1cement :
Providing 15 mm thick cement plaster in
single coat on brick /concrete walls for
interior plastering up to floor two level and
finished even and smooth with a neat cement
/ lime magia slurry in cement morter 1:3( 1-
cement : 3- fine sand) as directed. Item
includes required scaffolding, curing etc.
complete as directed at all the height
including making all necessary arrangement
for working up to floor two level.
Providing, laying AND jointing to level and
slope 110 mm dia ISI Supreme /
Finolex/Prince PVC pipes of working
pressure 10.0 KG per Sq.cm in line including
all necessary fittings such as bends,'Y' door
bend, tees, one way joints, two way joints,
rubber packing ring fixing the same concealed
in the wall, in true line and level with help of
PVC clamps at every two meter including
jointing with adhesive solvent cement
including the cost of all types of fixing
materials and all other necessary fixtures,
including fixing air and water tight testing the
line etc. complete as directed by EIC.
Providing, laying AND jointing to level and
slope 110 mm dia ISI Supreme /
Finolex/Astral PVC pipes of working
pressure 4.0 KG per Sq.cm for "Drainage"
line including all necessary fittings such as
bends,'Y' door bend, tees, one way joints, two
way joints, rubber packing ring fixing the
same concealed in the wall, in true line and
level with help of PVC clamps at every two
meter including jointing with adhesive
solvent cement including the cost of all types
of fixing materials and all other necessary
fixtures, including fixing air and water tight
testing the line etc. complete as directed by
Engineer In charge For 110 mm diameter
Labour charges for attending
leakage/seepages WC/Bath anywhere & any
height quarter rate including material like
cement, sand, water proofing solution and
demolition of tiles, w.c, nahni trap etc. if
14 required & replacing the same filling the 70.00 Nos. 919.07
joints as directed by E.I.C. (payment for the
same will be paid irrespective item under
items.) including scaffolding, jullas, tools,
tackles for completing the job. Rate is for one
complete attending leakage job.
Providing & Fixing Indian Orissa Pan type
W.C. commode 580 MM make of Kohler,
Cera, Hindware, Bell including necessary `P'
or `S' trap, bends , complete including
approved quality, P.V.C. Pipe connection up
to manhole chamber for G.F. & up to outside
wall for other floors with bends with giving
water tight test etc., complete, P&F brass
chromium plated half turn flush cock of
mm diameter Crown/Liberty/Prince make
including fixing in pipe line with union and
connecting to pan with UPVC pipe of 25 mm
diameter in working condition, etc. complete
as directed by EIC.
Providing & Fixing 15mm.dia.brass C.P.
Screw down bib cock of Prince/Crown/KMP
of approved quality having 250 to 300 grams
weight etc., complete as directed by E.I.C
Providing laying and jointing in true line and
level 15mm dia. U.P.V.C. Pipe ( SCH- 40) for
cold water including fittings as approved by
Engineer In Charge. Pipe shall be fixed on the
wall with the help of clamp at every two meter
C/C or shall be concealed as directed
including necessary fittings etc. including
testing of pipe and joints and fixing the same
with adhesive solvent, including cost of all
Providing laying and jointing in true line and
level 25mm dia. U.P.V.C. Pipe ( SCH- 40) for
cold water including fittings as approved by
Engineer In Charge. Pipe shall be fixed on the
wall with the help of clamp at every two meter
C/C or shall be concealed as directed
including necessary fittings etc. including
testing of pipe and joints and fixing the same
with adhesive solvent, including cost of all
Providing and fixing PVC SWR Nani Trap
100 mm diameter IS 14735 for drain with jali
of the following nominal diameter of self-
cleansing design with C.I. Scread down or
hinged grating including the cost of cutting
and making good the walls and jointed with
adhesive solvent cement including cost of
materials, tools and Tackles
Providing and laying 25 mm thick polished
kota stone slab flooring over 20 mm(average)
thick base of cement mortar 1:6 (1 cement :
coarse sand) or L.M. 1:1.5 laid over and
jointed with grey cement slurry including
rubbing and polishing etc. complete.
Providing and laying Granite Slab 18mm
thick in shelves, platform , skirting risers of
steps, dedo and window jambs on 12 mm
thick cement plaster 1:2 (1-cement : 2-coarse
sand) and jointed with white or colour cement
slurry etc as directed EIC.
Providing & fixing of teakwood cup board
having 50X50X5 mm MS angle frame built
in wall including one coat of priming and two
coat of oil paint. The 03 to 04 nos panel
22 including with 25 mm thick teak wood 350.00 Smt 4627.39
shutter , black enemelled M.S. butt hinges
with necessary screw including20 cm long
aldrop and stopper complete as per drawings
and directed by E.I.C.
Providing & fixing glazed louvered glass
standards extruded of alluminium section of
size 63mm x 38.10mm x 1.2mm (Jindal
Section :2434, @ Wt. 0.643kg per mt) with
colour anodized alluminium frame for
ventilation & Jali with 5 mm thick frosted
glass & S.S.Jali as details etc complete for
ventilation as per directed and drawing E.I.C.
Providing and fixing 35 mm thick shutters for
Doors, windows and clerestory windows
including Indian teakwood frames 10 cm x
cm. size including black enamelled iron
oxidized fixtures and fastenings including
primer coat of approved quality and two coats
of oil painting etc, complete. (ii) Fully
Providing and fixing window having extruded
aluminium colour anodized section frame
main outer size 95 mm x 24 mm x 1.17 mm
(of Jindal section no : 2459,@ Wt.
Kg/mt), horizontal Three track (Two shutters
of glass full length of window and One shutter
of S.S. jali half-length of window) member
size 92 mm x 31.75 mm x 1.30 mm (of Jindal
section no. 8688, @ Wt.1.07 Kg/mt), vertical
member of size 92 mm x 31.75 mm x 1.50 mm
(of Jindal section no. 8933, @ Wt.
Kg/mt),with sliding shutters of horizontal
member size 40mm x 18mm x 1.29mm (of
Jindal section no. 8947, @ Wt. 0.456 Kg/mt)
vertical member size 40mm x 18mm x
1.29mm (of Jindal section no. 8949, @ Wt.
0.456 Kg/mt) including approved stainless
steel mosquito wire jali shutter having
alluminium colour anodized section frame as
approved and directed by EIC, with 5 mm
thick transparent bronze colour tinted float
glass with powder coated aluminium fittings
and fixtures and transparent silicon sealant
glass fixing to frame as per details etc
Providing & fixing MS Ornamental Grill of
approved quality & design weighing
kg/smt. required pattern to granite frame of
windows and ventilator with M.S.Flate ,round
bar, square bar ,M.S.holo tube required
26 spacing and frame as per drawing & as 8425.00 KG 158.00
directed with necessary one coat of primer
and two coat of oil paint including welding or
bolted fixtures and fastening. (B) ornamental
Providing and fixing FRP frame size 100x50
mm and 28mm thick FRP depress panel
shutter having extra reinforcement on sides &
edges in Gel coat finish. The core of the
shutter & frame is to be filed up with injected
fire retardant grade polyurethane foam done
in situ along with embedded wooden pieces
for stiffening &also taking hinges & fixtures.
The whole FRP frame & shutter is to be water
proof weather proof, termite proof &
resistance to mild acid/alkali. Rates are to be
inclusive of S.S hinges with necessary screws
& alluminium fixtures & fastenings &
fastener sleeve.
Labour charges for fixing the old door/
window/ventilator in position as directed
including removing old door, window, doing
repairing, making grooves in the wall &
providing new hold fasts, fixing in C.C.
including doing welding work for steel door,
window, providing and fixing new hinges,
and supply and painting 2 coats of oil paint of
approved make etc. complete as directed by
Constructing Fly Ash building brick
inspection chamber having crushing strength
not less than 50 Kg/cm2 in cm. 1:6 600 mm.
X 850 mm X1000mm. Internal dimensions,
R.C.C. top cover with 1:1.5:3 mix(1 cement
:1.5 coarse sand : 3 graded stone aggregate
mm. size ) foundation concrete 1:4:8 inside
plaster 15 mm. thick with cement mortar 1:3
finished smooth with a floating coat of neat
cement on walls & bed concrete, including
coats of white or colour wash to all exposed
finished surface etc. complete as directed by
E.I.C. Brick masonry upto depth 1000 mm for
pipe lines with three of more inlets. (For extra
depth masonry & plaster will be paid under
Providing laying (to level or slopes) and
jointing reinforced concrete Light duty non-
pressure pipes I.S. class NP2 of the following
30 internal diameter with collars and butt ends 100.00 Rmt 658.89
prepared for collar joints including testing of
joints complete.(C) 300mm
Providing and laying ceramic tiles 6 mm
thick of approved make Johnson /Icon /Asian
/Marbito /Varmora /City shade in flooring,
31 treads of steps and landing laid on bed of 12 330.00 Smt 897.75
mm thick cement mortar 1:3 ( 1 cement :
coarse sand) & jointed with white or colour
Providing and laying ceramic tiles 6 mm
thick of approved make Johnson /Icon /Asian
/Marbito /Varmora /City & shade in skirting,
riser of steps and dado in bath room, W.C., &
over kitchen platform laid on bed of 10 mm
thick cement mortar 1:3 ( 1 cement : 3 coarse
sand) & jointed with white or colour cement
Providing and fixing C.P. brass towel rail
complete with C.P. brass brackets fixed to
33 wooden plugs with C.P. brass scews.(B) 244.00 Each 597.22
600mm x 20mm size.
Providing & fixing 10 TAKORA KHATAKA
lock Vijay/Asiatic, of I.S.I. approved quality
etc., complete. Basic rate of lock should be
Providing & fixing best INDIAN make
euro,cera,hinware,bel white porcelain
rectangular wash hand basin size
550X400mm. with C.I. M.S. Brackets fixed in
wall including approved quality of 1 No. of
brass C.P. Pillar cock 15 mm dia (PRINCE
TYPE) . one brass C.P. with P.V.C. pipe
connection for stop cock to pillar cock. PVC
flexible Waste pipe. etc., complete as directed
Providing and fixing S.S. sink Glosy ASIS
304 Gradex 1mm thick with overall size
x 432 mm and bowl size 445 x 368 x 190 mm
fixing the same in Granite making required
hole and jointed with gray cement slurry
36 including rubbing, polishing including wastw 244.00 No 3693.82
coupling, Two nos C.P. Pillar cock 15 mm
Heavy duty swan neck and C.P. 32 mm dia
drain out pipe upto Nahni trap with addition
and altration in existing taping etc. complete
as direted by EIC.
Performing/Providing, supplying and
laying/labour charges etc. any item of SOR
37 2023-2024 and Last two year approved P.O. 1 Job 500000.00
Items as and when required basis for
unforseen works/events.
In words: Rupees Three Crore Thirty Six Lakh Seventy Nine Thousand Three Hundred
Twenty Rupees And Seventy Two Paisa only.
(1) The responsibility and liability of labours engaged for this work will be totally of contractor, who has
been awarded this contract and he will take away all these labours to his own establishment on
completion of the contract. The GSECL will not held any responsibility and liable in any way in this
(2) All royalties, toll tax, local tax, development charges, and any other taxes including works contract tax
etc., in respect of this contract and also any statutory variation in future towards above mentioned taxes
& any other taxes if levied in future by statutory authority applicable to the this contract shall be payable
by the contractor and GSECL will not entertain any claim whatsoever in this respect.The rates will be
"GST'. The “GST" will be paid to the contractor as per Govt. Rules & Regulations. Contractor has to
ascertain that whether he is availing abatement for GST purpose or not. If no clarification is received, it
shall be assumed that the contractor is availing benefit of abatement.
(3) The rates of all above items are for any heights to carry out the various works at different elevation or
location irrespectively of quantum of work.
(4) The GSECL will not be held responsible for any accident that may occur during carrying out the works.
(5) The payment will be made on the base of quantity of actual work done.
(6) TDS and TCS will be applicable as per income tax and GST act.
(7) Tin invoice to be raised in case of supply of materials if not full vat at prevailing rate will be deducted
and deposited to the authorities.
(8) GST No. & SAC/ HSN Code must be required in invoice/bill.
(9) The party has to submit P.F. Challan, E.C.R. copy and Monthly Audit Compliance Report with each
month R.A. bill without fail.
(10) For registration in GSECL's VENDOR MANAGEMENT SYSYTEM (VMS) https://vms.guvnl.com,
vendor is required to submit details of PAN, GST, official email ID for receiving OTP, bank details,
and any other information as required.
After successful registration, the vendor will receive a VMS link, along with a login ID and password,
to process invoices.
Vendor must upload invoice of supplied material in VMS portal to process payment.
The SOPs for New Vendor Registration and Invoice Submission are available at the link above.
My Offer is _______ % higher than estimated cost of Schedule-B
My Offer is _______ % lower than estimated cost of Schedule-B
Note: (Percentage should be written in figure as well as in words)
Thus, my / our net offer is Rs._____________________ (In figure), Rupees____________
SIGN OF BIDDER CHIEF ENGINEER (GEN)
WITH SEAL AND DATE GSECL : UKAI : TPS
Gujarat State Electricity Corporation Limited
Ukai Thermal Power Station, Ukai Dam, Taluka : Fort Songadh,
Email: [email protected] Web site: www.gsecl.in
CIN: U40100GJ1993SGC019988
AN ISO-9001:2015&14001:2015 OHSMS 45001:2018 Certified Power Plant
SECTION-E : SPECIAL & COMMERCIAL TERMS
“Renovation work of E type(180) & Type IV (64)
residential building incl. replacemnt of
window,door, renovation of bath,WC & Kitchen
etc of Urjanagar colony Ukai.”
Gujarat State Electricity Corporation Limited
Ukai Thermal Power Station, Ukai Dam, Taluka : Fort Songadh,
Email: [email protected] Web site: www.gsecl.in
CIN: U40100GJ1993SGC019988
AN ISO-9001:2015&14001:2015 OHSMS 45001:2018 Certified Power Plant
SPECIAL & COMMERCIAL TERMS AND CONDITIONS
Sub. : “Renovation work of E type(180) & Type IV (64) residential building incl. replacemnt of
window,door, renovation of bath,WC & Kitchen etc of Urjanagar colony Ukai .”
1. SUBMISSIOIN OF TENDER.
The Technical bid containing all the relevant documents of tender will have to be
uploaded in PDF form through online on n-procure website only. (PDF form with
resolution 300 dpi or higher, the size of PDF not more than 3 MB). “No any
documents will be accepted in offline mode or hard copy except Tender Fee &
EMD” The physical receipt of Online payment (in case of Tender fee ) / Demand Draft (in case
of Tender fee and/or EMD) / Bank Guarantee (in case of EMD only) must also be submitted
physically in cover so that the same is received in this office on or before the due date and
time. Such documents should be strictly submitted by RPAD / Speed post only. Otherwise the
offer will not be considered and no any further communication in the matter will be entertained.
The details like Tender No., Tender fee, EMD, Name of bidder etc should match on both On-line
offer (e-tendering) and physically submitted documents of Tender fee and EMD details. Any
deviation found in Data/Details/Documents between On-line offer (e-tendering) and physically
submitted documents of Tender fee and EMD details will not be considered and no any further
communication in the matter will be entertained.
The price bid shall have to be submitted online only. The percentage rates and price shall be
written both in words, and figures and the units in words. In case of any ambiguity or mistakes,
the unit rates and prices written in words shall be considered as final.
Offered rate shall include cost of all Materials, wastage of material , Labours for all leads and
lifts, Supervision, setting out works, Machinery and equipment with its mobilization /
demobilization, transportation charges, Clearing of the site both prior to commencement and after
completion of work. Consumables such as, but not limited to petrol, oil, diesel, lubricants, drill
bits, pipes, ropes etc. Construction facilities such as scaffolding, tarpaulins, wind break, etc.,
Overheads / profits of Contractor for due performance of the work under this contract.
All royalties, sales tax, toll tax, local tax, development charges, and any other taxes including
works contract tax etc., in respect of this contract and also any statutory variation in future
towards above mentioned taxes & any other taxes if levied in future by statutory authority
applicable to the this contract shall be payable by the contractor and GSECL will not entertain
any claim whatsoever in this respect.
The rates will be "Excluding the GST. The “GST" will be paid to the contractor as per Govt.
Rules & Regulations. Contractor has to ascertain that whether he is availing abatement for GST
purpose or not. If no clarification is received, it shall be assumed that the contractor is availing
benefit of abatement.
Further information required, if any, can be had from the office of the Chief Engineer, GSECL,
Ukai TPS. But it must be clearly noted that the tenders must be received complete in every respect
by the due date and time.
i. The bidder must clearly quote rates in figure as well as in words. In case of any
discrepancy, whatever written in words shall prevail.
ii. No deviation in terms & conditions, Schedule-B and technical specifications will be
entertained. Any ignorance for this shall not relieve the contractor from his contractual
liability arising as per tender documents and conditions contained in it.
iii. The bidders are required to quote only firm prices. No variation will be accepted on price/
raw materials/ finished products or on any other cause.
iv. The bidders should note that the completion of above mentioned works in all respect in
accordance with the time limit given is very important and should be strictly adhered to.
The work is to be completed in time limit from the date of issue of written order to
commence the work by the Chief Engineer (Gen.), GSECL, Ukai TPS.
v. The bids should be valid for a minimum period of 180 Days from the date of opening of
technical bid. During this period tenderer shall not be allowed to withdraw their tender
and if withdrawn.
vi. The works covered under these specification shall be carried-out and governed by
“Tender and contract for Works” booklet appended herewith except where conditions
specified in this specifications.
vii. The complete specification comprises of the following.
Bill of Quantities (Schedule-B), instructions to the bidders, Tender specifications and
scope of work, Tender and contract for Works booklet, General Conditions, Instructions
to bidder & Technical specifications. All these sections are complimentary to each other.
The particulars and requirements contained herein shall cover the execution of the works
covered under these specifications.
viii. The tendered must visit the site of works and see for himself the site conditions regarding
availability of approach road during all seasons and other matters affecting the above
works before submitting the tender.
ix. The submission of tender by a contractor implies that he has read these instructions the
conditions of contract etc. and has himself aware of the scope and specifications of the
work to be done and of conditions and local conditions and other factors bearings on the
execution of the works. GSECL will not therefore after acceptance of contractor's rate
pay any extra charge for any other reason; in case the contractor is found later on to have
misjudged the site condition.
x. GSECL’s authorized officers who accepts tender, shall have the right of rejecting all or
any of the tenders and will not be bound to accept the lowest offer nor to assign any
reason whatsoever for the rejection of any tender or all tenders.
xi. Bidders shall provide evidence of their continued eligibility to the satisfaction of the
xii. Bidders shall not be listed under a declaration of ineligibility for corrupt or fraudulent
Practices issued by the Govt., the list of black listed Contractors announced by GSECL
(erstwhile GEB) Govt. of Gujarat or its Public Sector undertakings or the contractors
who are under stop dealing in GUVNL and /or their any subsidiary company viz.
GETCO/MGVCL/UGVCL/PGVCL/DGVCL.
xiii. The bid, and in case of a successful bid, the Form of Contract Agreement, shall be signed
with the name of Firm / company which will be legally binding on all partners / parties.
xiv. If the application is made by an individual, it shall be signed by the individual above his
full typed written name and current address.
xv. If the application is made by a proprietary firm. It shall be signed by the proprietor above
his full typed written name and the full name of his firm with its current address.
xvi. If the application is made by a partnership firm, it shall be signed by all the partners of
the firm above their full type written names and current addresses or alternatively by
partner holding power of attorney for the firm in which case a certified copy of the power
of attorney shall accompany the application. A certified copy of the partnership deed, full
names and current addresses of all the partners of the firm shall also accompany the
xvii. If the application is made by a limited company or a Corporation, it shall be signed by
the authorized person holding power of attorney for signing application in which case a
certified copy of the power of attorney shall accompany the application. Such Limited
company or Corporation may be required to furnish satisfactory evidence of its existence
before the pre-qualification evaluation. They should also furnish Articles of
Memorandum of Association. If the application is made by group of companies, it shall
be signed by the authorized person. The authority letter shall be accompanied with the
xviii. If participating bidder/agency have stake in one or more other agencies/ bidders who are
participating in same tender and on account of submission of wrong information/
declaration in the tender / enquiry certificate – A, then the bidder will be declared as
disqualified automatically and EMD/SD will be forfeited. Further, GSECL shall take
stern action including stop dealing with their firms.
2. SECURITY DEPOSIT
As per the prevailing rules of the GSECL, successful bidder has to pay Security Deposit (S.D.)
equivalent to 5 % of the contract end cost value. The same shall be paid in DD or in the form of
Bank Guarantee on any of the banks describe in Annexure-I as per the GOG notification issued
from time to time will be applicable. Total S.D. equivalent 5% of contract value End cost shall
be paid to GSECL within 10 days along with acceptance of LOI.
After lapse of 10 days, if successful bidder not paying SD then, RPAD notice will be issued to
the successful bidder mentioning that on failing to pay security deposit within next 07 days from
the date of issue of RPAD Notice the EMD will be forfeited. However, Tender inviting authority
at his discretion may decide and prolong the time period for paying of the Security Deposit as per
the urgency of the work.
In case successful bidder not at all responding within notice period or withdraws his offer
then his EMD shall be forfeited and he will not be allowed to participate in the tenders
invited from Ukai, TPS office for the period of One year.
The security deposit amounting to 5% of the contract value shall be released on finalization of
final bill OR after 12 (Twelve) months of successful completion of the work, whichever is later
OR on furnishing of the Performance Bond amounting to 5% of contract value against the defect
liability period as mentioned hereunder in Clause No. (3).
3. MAINTENANCE:
(A) The contractor shall be responsible to make good and remedy at his own expense any defect
which may develop or may be noticed before the period mentioned hereunder from the certified
date of completion. The same shall be attended within 15 days of receipt of the notice. In the
case of failure on the part of the contractor, the Engineer-in-charge may rectify or remove or
re-execute the work at the risk & cost of the contractor. The Engineer-in-charge shall be entitled
to appropriate the whole or any part of the amount of security deposit towards the expenses, if
any, incurred by him in rectification, removal or re-execution. The defects liability period shall
a) For major projects costing more than Rs. 1 crore (Work Order amount), the period shall be
12 months from the certified date of completion which should include one monsoon.
4. TIME LIMIT FOR WORK:
The scheduled time limit for the completion of work shall be 18 (Eighteen) Months from the
date of issue of order.
5. TERMS OF PAYMENTS:
Contractor shall be paid RA bill after observing GSECL’s general procedure and submission of bill
by the agency. Also, 75% payment shall be made immediately within a week period on receipt
of recorded bill by Account Section after observing statutory compliances related to taxes.
However, remaining balance 25% amount shall be released only after through checking of
detail bill and verification of all other required compliances within 30 days of receipt of bill
in accounts section. The above payment term is applicable up to 1st RA bill for general civil works
& up to 3rd RA bill for ARC/BRC works, provided the bills are recorded regularly and submitted
to Account Section within Sixty [60] days. The 4th or final bill shall not be processed if the previous
compliances are not made by the contractor. If the contractor fails to submit the bills regularly in
such a way so that the same cannot be recorded and submitted to account section within Sixty [60]
days, ad-hoc payment as stated above, may not be released and payment will be released as per
GSECL’s general procedure. The period of Sixty [60] days shall be considered from the date of
receipt of last R.A. Bill by Account Section. Amount of GST and applicable cess will be kept under
retention till submission of documentary proof of payment of GST or till reflection of payment of
GST pertain to respective bill amount in GST return.
The rights and liabilities of the contractor shall not be assigned or transferred by them without
the consent in writing of the GSECL to any other person, firm or organization.
7. The successful Bidder, on receipt of letter of intent will submit within a week's time his planning
/ programme of works, for scrutiny of the GSECL in a Bar Chart format, clearly indicating
GSECL's inputs also. Contractor will plan his works such that simultaneous work should progress
in such a way that entire job is completed in scheduled time limit on all the fronts released by
8. The successful bidder will have to depute his authorized representative to attend progress review
meetings to be held at GSECL, Ukai TPS without any extra cost.
9. The Contractor will be responsible for complying with all rules and regulations and labour laws
applicable to him and the GSECL will not be responsible for any lapses committed by them. If
there is any claim from any Government authority pertaining to the contract, the same amount
will be deducted from the Contractor's bill.
10. The time limit for completion of work is stipulated as in the tender will be adhered to.
11. The Contractor's rates should be firm and no variation clause is to be quoted by the Contractor
and GSECL will not accept the same, during contractual period including extended time limit if
12. BIDDER TO STUDY, ANALYSE & CONSIDER:
a) The information given in this specification is in good faith and meant to serve as a guide to
the Bidder. It is, therefore, imperative that Bidder shall obtain and examine for himself all
the data, information and particulars required for the satisfactory execution of the work under
this tender. The submission of a bid by Bidder implies that he has fully read the specifications,
bid drawings, instruction to the bidder along with Contract Document and Conditions of
Contract, applicable labour laws, safety norms etc., and has made himself aware of the scope
and the specifications for the work to be performed and local conditions and other features
which have a bearing on the cost and execution of the work. This specification is intended as
a general description of quality envisaged for materials and workmanship and of the finished
work. It is not intended to cover minute details. The work shall be executed in accordance
with the best modern practice and to the complete satisfaction of the Purchaser. Special
techniques approved by the Purchaser shall be used if and where found necessary. This
specification shall have precedence if anything contrary to this is stated elsewhere in the
contract documents. The Purchaser’s decision shall be final and binding on the contractor on
any issue arising out of such discrepancies.
b) Inspection of site by bidder:
Before submission of his bid, Bidder shall inspect the site, examine and obtain all
Required and satisfy himself regarding matters such as:
weather characteristics,
Location of site and access, right of way, means of communication & mode of
Transport to site,
The type and number of equipment and facilities required
The quantity of various items of the work.
The availability and rates of material.
Labours condition.
Local working conditions, obstructions and hindrances that may arise etc.
Power house, which is under running conditions.
Required GSECL’s security checks.
All materials brought to site only after making entries in security register at Control gate
c) These factors are likely to affect the satisfactory completion of work and or cost thereof. The
submission of a bid by the Bidder will be construed as evidence that such an examination
was made and any later claims/ disputes in regard to rates quoted shall not be entertained or
considered by the GSECL.
d) The site visit shall be done by the bidder on his own responsibility and all liabilities including
cash, arising out of the site visit shall be at the bidder’s account.
e) Contractor’s scope of work shall also include making all necessary arrangements for access
to work sites, stores and site offices etc. from the nearest approach road to facilitate
transportation of man power, machinery and equipment duly considering the existing site
conditions. No extra claims / costs will be entertained by GSECL.
f) The bidder shall carefully study the work to be carried out & consider all the factors & shall
take into account &consider all the factors such as lead, lift haulage of materials, sequence
of construction, etc. & shall allow for all such information / data in the rates quoted.
g) The GSECL will not pay any extra charges or rate for any reason in case the contractor claims,
after acceptance of contract to have misjudged the site condition. Ignorance of the intents and
contents of the specification document and site conditions shall not be accepted by the Owner
as basis for any claims for compensation.
h) BIDDER shall inspect the site, examine and obtain all information required and satisfy
himself regarding matters such as sub-surface conditions, water records, access to site,
communication, transport, right of way, the type and number of equipment and facilities
required for the satisfactory completion of work, the quantity of various items of the work,
the availability and rates of material, local working conditions, uncertainties of weather,
obstructions and hindrances that may arise etc. which may affect the work or cost thereof,
before submission of his bid. Ignorance of site conditions shall not be accepted by the
ENGINEER IN CHARGE as basis for any claim for compensation.
i) The rates quoted by BIDDER shall be based on his own knowledge and judgment of the
conditions and hazards involved and shall not be based on any representations of the Engineer
in Charge. No claim on this account shall be admitted by the GSECL.
j) The bidders shall submit their offer without any deviations in general terms and conditions
of the contract or in technical specifications.
k) Tenders received after the time and date specified in the tender notice will not be accepted.
Once the offer is submitted by bidder before due date of submission, the bidder shall not be
allowed to submit revised/ additional/ modified offer even before due date and time of
submission of tender. However, if the date of issue and/or submission of tender are extended
by the Corporation due to any reason, the bidder may submit if their wishes the
revised/additional/modified offer before extended due date and time of submission.
l) The Corporation reserves the right to accept any tender irrespective of whether it is lowest or
not or to reject all the tenders without assigning any reasons thereof. Tenders deferring from
the technical specifications or the method of bidding in a radical manner may also be rejected.
m) The bidder shall be presumed to have carefully examined the drawings, conditions &
specifications of work & to have fully acquainted themselves with all details of the site
conditions, locations, materials, geological & weather characteristics, labour conditions & in
general all the necessary information and data etc. pertaining to and need for the work.
n) This specification is intended as a general description of quality envisaged for materials and
workmanship and of the finished work. It is not intended to cover minute details. The work
shall be executed in accordance with the best modern practice and to the complete satisfaction
of the Purchaser. Special techniques approved by the Purchaser shall be used if and where
found necessary. This specification shall have precedence if anything contrary to this is stated
elsewhere in the contract documents. The Purchaser’s decision shall be final and binding on
the contractor on any issue arising out of such discrepancies.
o) Each bidder shall also submit a 'Declaration' to the effect that the tendered is an engineering
construction firm or an association of firm or firm which has successfully carried out large
works of this nature and has adequate organization and experienced personnel to handle this
type and magnitude of work. Information should also be given regarding the constitution of
the firm; it’s authorized, subscribed & paid up capital, the date & place of registration, the
place of business, the names of the directors and other relevant information.
p) It is the intent of the ENGINEER IN CHARGE to incorporate these specification documents
in the final ‘Contract’. BIDDERS are required to review these documents and clearly state in
their proposals their acceptance of the same.
q) Each page of the bid document including the bid drawings shall be signed, stamped and dated
in ink by the BIDDER as a token of having examined the same. Any correction in price and
the rates entered in the Schedule of Price shall also be signed and dated by the BIDDER in
ink, before submitting the bid. Non-compliance with this condition will make the bid liable
r) All safety measures as required to be adopted as per the Statutory Regulations and the
Safety Rules of the Plant shall be strictly followed by the Contractor during the
execution of the Contract. The Contractor shall set up a suitable safety organization of
his own in this regard.
s) In connection with the execution of the Contract, the Contractor shall comply with all
applicable statutory Rules & Regulations including employment of labours at site.
t) The Contractor shall carry out any and all such works, as may be required, for civil work
to be completed in all respect as per the Contract Specification.
u) If the GSECL Engineer-in-Charge is not satisfied with the progress of work at site, he
shall direct the Contractor to depute more numbers of supervisory personnel/workers to
meet the completion schedules as per the Contract. Upon receiving such direction,
Contractor shall deploy additional personnel within 7 days without any extra cost.
v) The GSECL may during the progress of work, order the removal of part or whole of the
work executed, found not in accordance with the specifications/ instructions. No extra
claims shall be entertained for re-executing or altering of such work.
13. SAFETY MEASURES
The contractor shall ensure the safety of workers, material and structure including existing
structures during execution of the contract. Safety measures shall be followed during operations
of equipment’s/machinery being used. No separate payment shall be made for the safety measures
and the quoted rates shall include the cost for all safety measures.
14. COMPLETENESS:
Any technical services as set forth herein above and which might not have been specifically
mentioned in this Contract relating to the work or in the specifications and which are not
expressly excluded therefore but which are necessary for the performance in accordance with
the specifications as an integral part of the painting and misc. Civil works shall be rendered
by the Contractor without any extra cost.
15. TOTAL RESPONSIBILITY
The Contractor shall be solely responsible for the entire technical works / services
irrespective of works / services have been made /rendered by him.
16. PAYMENT TO THE LABOURES:
(a) Contractor has to pay the CPF as well as salary to his skilled/unskilled manpower by cheque
A/c payee only, as per minimum wages & prevailing applicable rules on or before 7th day
(b) Contractor has to produce challan of PF with list of employees.
(c) Contractor shall have to make payment to his labours in presence of Personal Officer (Estt.)
GSECL, Ukai TPS.
17. CONTRACT AGGREMENT ON ACCEPTANCE:
The successful contractor will have to sign an agreement as per the Gujarat State Electricity
Corporation Ltd.'s rules on stamped paper and the necessary stamp duty charges shall be
borne by the contractor.
On acceptance of the tender the name (s) of the accredited representative (s) of the tenderer
who would be responsible for taking instructions from the Engineers of the GSECL shall
be communicated to Chief Engineer (Gen.) Ukai Power Station, Gujarat State Electricity
Corporation Limited.
18. Unsatisfactory progress of the work:
If the work is found not progressing as per the requirement or found not satisfactory then
GSECL will take such action to get the work done through the other agency at agency’s risk
and cost with 15% supervision charges and same will be recovered from agency.
19. The EMD will be returned promptly to the unsuccessful bidder except that of L1, L2 & L3 till
the successful contractor pays the Security Deposit as mentioned in tender document or after the
expiry of the validity of the offer, whichever is earlier.
The EMD will be returned to the successful tenderer after he furnishes the Security Deposit for
the tender work. If he fails to furnish the SD, his EMD shall be forfeited and the tenderer will
not be allowed to participate in the tenders invited by this office for a period of ONE Year in
respective Power Station.
The EMD in form of Bank Guarantee shall be valid for Ten Months from the date of
submission of the tender.
20. Effect and validity of Bid: The submission of bid with these documents and specification
shall constitute an agreement that bidder shall have no cause of action or claim against the
GSECL for rejection of his bid. The GSECL shall always be at liberty to reject or accept,
split any bid or bids at its sole discretion and any action will not be called into question and
the bidder shall have no claim in that regards against the GSECL.
21. Stop Deal / Banned for business dealing / Blacklisting :-
Has submitted fake, false or forged documents/certificates
Has revised/ withdrawn price bid after opening of Techno-commercial bid, until and
unless it is sought for,
Has tempered with the stipulated tendering procedure.
Has refused to accept Letter of Acceptance / Purchase order / Work Order after the
same is issued by the company within the validity period and as per agreed terms and
Has committed breach of contract or has failed to perform a contract or has
abandoned the contract,
Has failed to provide suitable expertise for the work as per pre-scheduled program.
Has failed to submit all the necessary tests reports / documents within time scheduled
/ as per company’s time limit, as mentioned in the LOA, if the Letter of Acceptance
(LOA) is placed subject to submission of type reports / documents to the firm.
Has indulged in construction and erection of defective works.
Has supplied inferior quality / defective materials and refused to replace with
stipulated time frame, as specified by the company.
Has substituted materials in lieu of materials supplied by the company or has not
returned or has short returned or has unauthorisely disposed of materials / documents
/ drawings / tools or plants or equipment supplied by the Company.
Has involved in malpractices such as bribery, corruption, fraud, canvassing and
Has unauthorisely obtained official company information or copies of documents, in
relation to the Tender / Contract .
Has failed to follow the stipulated mode of communication, if specified by the
tendering authority / Purchaser.
Has parted with, leaked or provided confidential / proprietary information of the
company given to the firm only for its use (in discharge of its obligations against an
order) to any third party without prior consent of the Company,
Any other ground for which in the opinion of the Company makes it undesirable to
deal with the Firm.
In case the state Government directs the Company to place a firm in stop dealing /
banned for business dealing / blacklisting.
Sign and seal of Contractor CHIEF ENGINEER (Gen)
GSECL, Ukai TPS
Gujarat State Electricity Corporation Limited
Ukai Thermal Power Station, Ukai Dam, Taluka : Fort Songadh,
Email: [email protected] Web site: www.gsecl.in
CIN: U40100GJ1993SGC019988
AN ISO-9001:2015&14001:2015 OHSMS 45001:2018 Certified Power Plant
SECTION-F : OTHER TERMS AND CONDITIONS
“Renovation work of E type(180) & Type IV (64)
residential building incl. replacemnt of
window,door, renovation of bath,WC & Kitchen
etc of Urjanagar colony Ukai.”
Gujarat State Electricity Corporation Limited
Ukai Thermal Power Station, Ukai Dam, Taluka : Fort Songadh,
Email: [email protected] Web site: www.gsecl.in
CIN: U40100GJ1993SGC019988
AN ISO-9001:2015&14001:2015 OHSMS 45001:2018 Certified Power Plant
OTHER TERMS AND CONDITIONS
Sub. : “Renovation work of E type(180) & Type IV (64) residential building incl. replacemnt of
window,door, renovation of bath,WC & Kitchen etc of Urjanagar colony Ukai.”
Additional Terms and Conditions for Contractor:
1. The contractor shall produce certified copies of following documents, in respect of workers
deployed by him at GSECL, Ukai before Dy. G.M. (HR/IRO/LWO/In-Charge of HR Dept.
A. List of documents to be produced on starting of contract:
1. Copy of Appointment letter of each worker deployed at GSECL, Ukai
2. Copy of labour license if required to be deploy 10 or more than 10 contract labours.
3. Copy of Insurance Policy for each worker deployed at UTPS under the workmen compensation
4. Copy of P.F. code allotment letter issued by P.F. Office.
B. List of documents to be produced on every month during the contract period:
1. Copy of Wage Register (Duly signed by representative of GSECL, Ukai)
2. Copy of Over Time Register (Duly signed by representative of GSECL, Ukai)
3. Copy of Attendance Register.
4. Original copy of provident fund deposition form dully signed and sealed for each month (In
format provided by GSECL: Ukai)
5. Copy of PF Challan.
6. ECR FORM (which reflect the amount of PF paid for each employee of Contract labour engaged
by contractor at GSECL, Ukai)
7. Copy of PF returns (From 5, 10,12A)
8. Copy of bank statement duly stamped by concern bank.
C. List of documents to be produced on every year during the contract period:
1. Copy of PF returns (From 6A, 3A)
2. Copy of Bonus Register (Patrak-C as per payment of Bonus act.)
3. Copy of Earned Leave Register (As per Factory Act 1948)
4. Copy of form no. 13 as per (As per Factory Act 1948)
5. Copy of form no 24 (Half yearly return under the as per Factory Act 1948)
6. Copy of Form no 25 (Yearly return under the as per Factory Act 1948)
In addition to above the contractor shall have to maintain all other legal documents documents require
to be maintain in prescribed forms under the various labour laws and keep original copies of above
mentioned documents at his site office which shall be produced before Dy.G.M./IRO/LWO/In-
Charge of H.R. Dept as and when demanded.
1. All payment to Contract Labour shall be disbursed through Bank only.
2. Bonus payment shall be made to contract labourers as per Bonus Act.
3. Contractor has to arrange in & out punching to all contract’ labours engaged by him in Bio-metric
punching machines kept at Security gate and for which Rs.10/- (Rupees Ten only) shall be
charged per labour per month as Administrative expenses.
SIGN OF BIDDER CHIEF ENGINEER (GEN)
WITH SEAL AND DATE GSECL : UKAI : TPS
Gujarat State Electricity Corporation Limited
Ukai Thermal Power Station, Ukai Dam, Taluka : Fort Songadh,
Email: [email protected] Web site: www.gsecl.in
CIN: U40100GJ1993SGC019988
AN ISO-9001:2015&14001:2015 OHSMS 45001:2018 Certified Power Plant
SECTION-G: GENERAL TERMS AND
CONDITIONS, GENERAL GUIDELINES
RELEVANT TO IS, SPECIAL CONDITIONS
FOR USE OF CEMENT, APPROVED NAME OF
MANUFACTURERS OF STEEL / CEMENT
“Renovation work of E type(180) & Type IV (64)
residential building incl. replacemnt of window,door,
renovation of bath,WC & Kitchen etc of Urjanagar
Gujarat State Electricity Corporation Limited
Ukai Thermal Power Station, Ukai Dam, Taluka : Fort Songadh,
Email: [email protected] Web site: www.gsecl.in
CIN: U40100GJ1993SGC019988
AN ISO-9001:2015&14001:2015 OHSMS 45001:2018 Certified Power Plant
GENERAL TERMS AND CONDITIONS
1. DEFINITIONS :
(a) The Contract means the documents forming the tender and acceptance thereof, together with
the documents referred to therein or individual work order in the case of term contract,
including these conditions, schedules and/or additional conditions attached to the form of
tender or individual works, order, rate schedule, the specifications and the drawings and all
these documents, as applicable, taken together shall be deemed to form the contract.
(b) The “Tender Document” means the form of tender, the applicable schedules and/or
additional conditions and the specifications and/or drawing as issued to the contractors for
the purpose of preparing tender.
(c) The expression “Works” or “Work” when used in the condition of contract shall, unless there
be something in the subject or context repugnant to such construction means, the works or
the work contracted to be executed under or in virtue of the contract whether original or
(d) The “Contractor” means the individual or firm or Corporation, whether incorporated or not,
undertaking the words and shall include his or its legal personal representatives, successors
and permitted assignees.
(e) “Corporation” means The Gujarat State Electricity Corporation Ltd. and the “Accepting
Officer” means the Officer who is authorized to sign and signs the contract on behalf of the
(f) The letter “EE” means Executive Engineer who in the case of measurement and lump sum
contract, direct the contract and the letters “SE” means Superintending Engineer and “GM”
means General Manager who administers and in the case of the term contracts, directs the
(g) The “Engineer-in-charge” means all officers of the Corporation appointed by the General
Manager to supervise the works or part of the works.
(h) “Approved” and “Directed” means the approval or direction of the Chief Engineer
(Gen),Ukai TPS to Superintending Engineer or the person deputed by him for the particular
(i) “BS.” means “British Standards” as issued by the British Standards Institution. “A.S.”
means the “American Standards” as issued by the American Standards Institution, and “I.S.”
means the “Indian Standards” as issued by the Indian Standards Institution. Wherever the
above-mentioned abbreviations are referred to, in the specifications and/or work orders, they
mean the addition with all amendments current at the date of issue of tender document of
(j) In the case of measurement and terms of contract “Specifications” mean those contained in
Gujarat State Electricity Corporation Ltd. scheduled together with any amendments etc.
embodied in the tender documents. “Drawing” refers to those incorporating the tender
documents and/or any work orders referred therein.
(k) The “Contract Sum” means the sum accepted or the sum calculated in accordance with the
prices accepted in the tender and/or the contract rate as payable to the contractor for the full
and entire executing and completion of works.
(l) “The date for completion” is the date or dates of completion of the work or any part of the
works set out or ascertained in accordance with the individual work orders and the tender
documents or any subsequent agreed amendments thereto.
2. CONTRACTOR TO INFORM HIMSELF FULLY:
A. Notwithstanding anything contained to the contrary in the specifications or tenders in
subsequent exchange of correspondence, the conditions of contract shall be binding on the
Contractor and any change or variation expressed or implied, however made in the said
conditions, shall not be valid or operative unless expressly sanctioned by the Corporation.
The Contractor shall be deemed to have fully informed himself and to have special
knowledge of the provisions of the conditions of the Contract herein contained.
B. The contractor shall be deemed to have carefully examined the work and site conditions, the
general conditions, the special conditions, specifications, schedules and drawing and shall
be deemed to have visited the site of the works and to have fully informed himself
regarding the local conditions.
C. If there shall have any doubt as to the meaning of any portion of these general conditions
or special conditions of the scope of work of the specifications or any other matter
concerning the contract, he shall in good time before submitting his tender, send for the
particulars thereof and submit them to the Engineer-in-charge in writing in order that such
doubt may be removed.
3. CONTRACT DRAWING AND SPECIFICATIONS:
The contractor will be entitled to receive one set of agreement along with one certified copy
of accepted tender.
The drawings which form part of these specifications show the work to be done in as much
detail as is possible at the present stage. They will be supplemented by such additional
detailed drawings as may be necessary as the work progresses. The contractor shall perform
the work on these features and in accordance with these additional or revised drawings as
the case may be and at the applicable rates as per the contract.
The contractor shall check all drawings carefully and shall bring to the notice to the
Engineer-in-charge immediately of any errors or omissions discovered. The contractor shall
not take advantages of errors or omissions of any kind in the drawings supplied.
4. INPUTS BY GSECL:
1. The electric power connection for above work will be taken from DISCOM by contractor at
his own cost .Further extension for construction site as well as bore well site for using
construction water will have to be carried out by the contractor as per requirement at their cost.
The necessary electric charges will be paid by the contractor as per rates prevailing from time
to time in the respective DISCOM. The contractor has to take NOC from DISCOM before
forwarding of final bill by this office
2. If there are any surplus quarters available after meeting the requirement of GSECL's staff, then
GSECL will consider allotment of quarters on rent as per GSECL's rule.
3. The contractor will have to make their own arrangement of water for construction work
as well as for their labourers at his own cost. If possible, water for construction purpose
only at one point may be given as decided by EIC and recovery for water charges shall
be affected at the rate of 2 % of the item in which water is used or quantity of water
measured by meter system installed by contractor, rate of water supply will be charged
at prevailing purchase rates of GSECL, for water supplied by GSECL is used as certified
by EIC. In case of agency is installing bore well and pumps at his cost, after completion
of work agency will hand over the bore well in good condition with pumps to the
5. DATA TO BE FURNISHED BY CONTRACTOR:
The contractor shall submit to the Executive Engineer for approval within one week of the
date of contract, a layout plan of construction plant and equipment for the execution
of work which the contractor proposes to adopt at site.
Prior to commencement of work, the contractor shall submit to the Executive Engineer for
approval, plans in triplicate showing the location of Major plant shop and storage
buildings, storage yards, offices, contractor's power house including its services and
housing facilities which he proposes to put up at site and also indicate the programme of the
The successful bidder on receipt of letter of intent will submit within a week's time his
planning/programme of works for scrutiny of GSECL in a PERT/Bar chart format, clearly
indicating GSECL inputs also.
Contractor will plan his works such that on all the fronts released by GSECL, simultaneous
work should progress in such a way that entire job is completed in scheduled time limit.
No change in the approved layout shall be carried out without specific written approval of
the Executive Engineer.
6. ERRORS, OMISSIONS AND DISCREPANCIES:
In all cases of errors, omissions, doubts or discrepancies in the dimensions, or discrepancies
in the drawings and items of work in specification, reference shall be made to the Executive
Engineer whose elucidation and elaboration shall be considered as authoritative. The
contractor shall be held responsible for any error that may occur in the work thorough lack
of such reference and precautions.
7. SECURITY DEPOSIT:
The contractor shall, within 10 days of the issue of letter of intent, pay 5% of the end cost
i.e. contract value + 18% GST in the form of the unconditional bank guarantee from
schedule bank in lieu of cash or Government securities towards Security Deposit which will
be accepted provided amount of security deposit payable exceeds Rs. 10,000/-.
After lapse of 10 days, if successful bidder not paying SD then, RPAD notice will be issued
to the successful bidder mentioning that on failing to pay security deposit within next 07 days
from the date of issue of RPAD Notice the EMD will be forfeited. However, Tender inviting
authority at his discretion may decide and prolong the time period for paying of the Security
Deposit as per the urgency of the work.
In case successful bidder not at all responding within notice period or withdraws his
offer then his EMD shall be forfeited and he will not be allowed to participate in the
tenders invited from Ukai, TPS office for the period of One year.
All damages, costs, charges, expenses and other sums which may be or may become due or
payable by the contractor to the Corporation under the terms of the contract, may be deducted
from the cash in the proceeds of sale of the securities/bank guarantee so deposited (which the
officer or person to whom the same may be endorsed as aforesaid is hereby authorized to
sell/to encase for that purpose) or from the interest of any such securities or from any sums
due or which may become due to the contractor by the Corporation or from the whole or the
balance unpaid as aforesaid of the encashed securities so deposited being repaid or transferred
and returned as the case may be, to the contractor on finalization of final bill OR after
(Twelve) months of successful completion of the work, whichever later OR on furnishing of
the Performance Bond amounting to 5% of contract value against the defect liability period
as mentioned in this document elsewhere.
Entire Security Deposit paid in approved form of Bank Guarantee should remain valid during
the contractual period and such bank Guarantee should not be reduced on the basis of the
work actually done.
8. USE OF LAND:
The land required for office, go downs and for labour camp if not available with GSECL,
then the contractor has to arrange the same at his cost. GSECL will give the land only if the
spare land is available with the following conditions.
The contractor shall be permitted to use for the bonafide purpose of execution of this contract
free of cost. The contractor shall be permitted to use for the bonafide purpose of execution
of this contract free of cost.
1. Site required for the construction of the work.
2. Required approach road. The contractor shall make their own arrangements for the
necessary approach, road, for transport of their materials and be responsible for the
compensation on account of damage to crop etc. and shall till completion of work.
3. He will be charged the rent at the annual rate of rupees one hundred per every acre or
part thereof, for the construction of temporary hutments and his store yard. However area
required for such purpose may be clearly indicated in this offer.
All areas of operation, including those for his staff and labour colonies handed
over to the contractor shall be cleared and handed over back in good condition to the
Engineer except areas under works as per this contract or those for which specific
approval has been obtained from the Engineer. The contractor shall make good to the
satisfaction of the Engineer any damage or alternation made to areas which he has to
hand over back or to other property land handed over to him for purpose of this work.
Temporary structures may be erected by the contractor for storage sheds, offices,
residence etc. for noncommercial use on the land, handed over to him at his own
expense and with the permission of the Engineer. These structures shall comply with
the regulation that may be in force and/or specified by the Engineer with regard, thereto.
In any circumstances for constructing temporary structures for contractor's use,
GSECL's free supply materials shall not be used. If it is found that GSECL's free supply
materials are used for other than approved project drawings work, same will be
recovered at penalized rate.
The contractor shall preserve all existing vegetation such as trees on or adjacent to
the sites which do not interfere with the construction as determined by the
The contractors shall take all possible precautions in felling trees authorized for
removal to avoid any unnecessary damage to vegetation and trees not to be felled
and to structures under construction, or to workmen, and shall be responsible for any
damage if it occurs in such operations
All produce from cutting of trees; grass etc. shall be the property of GSECL and
shall be stocked at the place specified by the Engineer. No claim shall be made for
such cutting and stacking of trees or grass etc. by the contractor
The contractors shall not unnecessarily or for use as fuel, cut any trees brush wood,
grass or other vegetation nor shall set fire there to without the written permission
of the Engineer. When such permission is given, the contractor shall take necessary
measures to prevent damage or to prevent fire spreading to surrounding property,
and shall be responsible for any such damage, if cause.
The land shall as herein before mentioned be handed back to Engineer in Charge
immediately after the completion of the work under this contract. Also no land
shall be held by the contractor longer than the Engineer shall deem necessary and
the contractor shall, on due notice by the Engineer, vacate and return the land which
the Engineer may certify as no longer required by the contractor for purpose of the
9. START OF WORK:
The contractor shall not enter upon or commence any portion of work except with the written
authority or instructions of the Executive Engineer or his subordinate in charge of the work,
failing such the contractor shall have no claim to ask for measurement or payment for work
and shall be responsible for any claims or damages that may arise due to such unauthorized
commencement or entry.
10. COMPENSATION FOR THE DELAY:
The time allowed for carrying out the work as entered in the tender shall be strictly observed
by the contractor and shall be reckoned from the date on which the order to commence work
is given to the contractor. The work shall throughout the stipulated period of contract be
proceeded with all due diligence (time being deemed to be the essence of contract) and for
delay, the contractor shall pay compensation, an amount equal to ½ (half) percent per one
week for the contract amount or part thereof, including taxes & duties ( i.e. End cost of
contract amount including taxes & duties) and maximum up to 10 % of the order value,
including taxes & duties ( i.e. End cost of contract amount including taxes & duties) or such
smaller amount as per the decision of the Competent Authority of the GSECL The penalty
will be invariably deducted from the bills of the contractor and no refund will be given unless
the competent authority approves the reduction. The reasons for delay, attributable to
GSECL as well as to party will be brought out clearly while putting the proposal for
waiver/reduction in penalty.
11. ACTION WHEN WHOLE OF SECURITY DEPOSIT IS FORFEITED:
In any case in which under any clause or clauses of this contract the contractor shall have
tendered himself to pay compensation amounting to the whole of his security deposit
(whether paid one sum) or in the case of abandonment for the work owing to serious illness
or death of the contractor or any other cause, the Executive Engineer on behalf of the
Corporation, shall have powers to adopt (a) below and any of the following courses under
(b) and (c) as he may deem best suited to the interest of the Corporation.
(a) To rescind the contract (for which rescission notice of 10 days) in writing to the
contractor under the hand of the Executive Engineer shall be conclusive evidence and
in that case the security deposit of the contractor shall stand forfeited and absolutely at
the disposal of the Corporation. To employ labour paid by the Corporation, to supply
materials, to carry out the works or any part of the work debiting the contractor with
the cost of the labour and the price of the materials (as to the correctness of which cost
and price, the certificate of the Executive Engineer shall be final and conclusive against
the contractor) and crediting him with value of the work done in all respects in the same
manner and at the same rates as if it had been carried out by the Contractor under the
terms of this contract and in that case the certificate of the Executive Engineer as to the
value of the work shall be final and conclusive against the contractor.
(b) To order that the work of the contractor be measured up and to take such part thereof,
as shall be unexecuted, out of his hands and to give it to another contractor to complete,
in which case, any expenses, which may be incurred in excess of the sum, which would
have been paid to the original contractor, if the whole work would have been executed
by him (as to the amount of which excess expenses, the certificate in writing of the
Engineer-in-charge shall be final, conclusive and shall be borne and shall be paid by
the original contractors and shall be deducted from any money due to him by the
Corporation under the contract or otherwise from his security deposit of his proceeds
sale thereof or a sufficient part thereof.
(c) In the event of the above courses being adopted by the Executive Engineer, the
contractor shall have no claim to compensation for any loss sustained by him by reason
of his having purchased or procured any materials or entered into any engagements or
made any advances on account of or with a view to the execution of the work or the
performance of the contract. And in case the contract shall be rescinded under the
provision aforesaid, the contractor shall not be entitled to recovery or be paid any sum
for any works thereof actually performed by him under this contract unless and until
the Executive Engineer shall have certified in writing the performance of such work
and the amount payable to him in respect thereof and he only be entitled to be paid the
amount so certified.
12. NOTICE UNDER UNSATISFACTORY PROGRESS:
If the progress of a particular portion of the work is unsatisfactory, and also if as per the
opinion/observation of the Executive Engineer (whose decision shall be final) in charge that
the general progress of work is not satisfactory, then Executive Engineer in charge shall be
be entitled to take action under clause 11 (c) after giving the contractor ten days’ notice in
writing and the contractor will have no claim for compensation for any loss sustained by him
owing to such action.
13. ACTION IN THE CASE OF DEFAULT BY THE CONTRACTOR :
In any case in which any of the powers conferred upon the Executive Engineer by Clauses
11 and 12 hereof shall have exercisable and the same shall not have been exercised, the non-
exercised thereof shall not constitute a waiver of any of the conditions hereof and such
powers shall not withstanding be exercisable in any further case of default by the contractor
of which, by any clauses hereof, he is declared liable to pay compensation amounting to the
whole of his security deposit and liability of the contractor for past and future compensation
shall remain unaffected in the event of the Executive Engineer taking action under sub-clause
(a) or (c) of Clause 11, he may if he so desires, take possession of all or any tools, plants,
materials, and stores in so upon the work or the site thereof belonging to the contractor, or
procured by him and intended to be used for the execution of the work of any part thereof
paying for allowing for the same in account at the contract rates, or in the case of a contract
rates not being applicable of current market rates to be certified by the Executive Engineer
whose certificate thereof shall be final. In the alternative, the Executive Engineer may by
notice in writing to contractor or his clerk of works, foreman or other authorized agent,
require him to remove such tools, plant, materials or stores from the premises within a time
to be specified in such requisition, the decision to the contractor failing to comply with any
such requisition, the decision of the Executive Engineer as to the expense of any such
removal and the amount of the proceed and expense of any such sale, be final and conclusive
against the contractor.
14. EXTENSION OF TIME LIMIT
If the contractor shall desire an extension of the time limit for completion of the work on the
ground of his having been unavoidably hindered in its execution or on any other ground, he
shall apply in writing to the Executive Engineer and the Executive Engineer may, if in his
opinion there are reasonable grounds for granting extension, recommend such extension as
he may think necessary or proper. The decision of the competent authority in this regard
shall be final, and binding to the contractor. Any delay attributed to Corporation, shall be
thus compensated only by way of extending the limit.
15. COMPLETION CERTIFICATE
On completion of the work, the Contractor shall be furnished with Completion Certificate
by the Executive Engineer. No such certificate shall be given nor shall be the work
considered to be completed until works are taken over and/or duly tested and put to operation
as the case may be, nor until the work shall have been measured by the Engineer-in-Charge
or where the measurement have been taken by his subordinates until they have received the
approval of the Executive Engineer the said measurement being binding and conclusive
against the contractor.
16. EFFECT OF THE CERTIFICATE :
No payment shall be made for any work estimated to cost less than `.1000 till after the whole
of said work shall have been completed and a certificate of completion given. But in the case
of works estimated to cost more than `.1000, contractor shall on submitting a monthly bill
thereof, be entitled to receive payments. Proportionate to the part of the work then approved
and passed by the Engineer-in-Charge, whose certificate of such approval and a passing of
the sum so payable shall be final and conclusive against the contract. All such intermediate
payment shall be regarded as payment by way of advance against the final payment only and
not as payments for work actually done or completed and shall not preclude the Engineer-
in-charge from requiring bad, unsound, imperfect or unskillful work to be removed and taken
away and reconstructed or re-erected nor shall any such payment be considered as admission
of the due performance of the contract or any part thereof in any respect of the occurring of
the claim nor shall conclude, determine or effect in any way the powers of the Engineer-in-
Charge as to the final settlement and adjustment of the accounts otherwise or in any other
way, vary or affect the contract. The final bill shall be submitted by the contractor within
one month of the date fixed for completion of work; otherwise the certificate of the Engineer-
in-charge of the measurement and of total amount payable for the work shall be final and
in-charge of the measurement and of total amount payable for the work shall be final and
binding on all parties.
17. PAYMENT TO CONTRACTORS :
The rates for several items of works estimated to cost more than `.1,000 agreed to within
shall be valid only when the item concerned is accepted, having been completed full, in
accordance with the sanctioned specification. In case, where the items of the work, are not
accepted, as so completed, the Engineer-in-charge, may make payment on account of such
items at such reduced rates, as he may consider reasonable in the preparation of final or
running accounts bills and it will be binding to the contractor.
The Bill Shall be submitted by the contactor each month on or before the date fixed by the
Engineer-in-charge, for all works, executed in the previous month and the Engineer-in-
charge shall take or cause to be taken the requisite measurement for the purpose or having
the same verified and the claim so far as it is admissible, shall be adjusted, if possible, within
Fifteen days from the presentation of the bills. If the contractor does not submit the bill,
within the time fixed, as aforesaid, the Engineer-in-charge may depute a subordinate to
measure up the said work in the presence of the contractor or his duly authorized agent,
whose counter signature in the measurement shall be sufficient warrant and the Engineer-in-
charge may prepare a bill from such list which shall be binding on the contractor in all
respects. In case if contractor/ representative does not remain present on specified date for
taking measurement than EIC may take the measurement one sided and the same shall be
binding to the contractor irrespective whether he has signed or not.
19. SUPPLY OF MATERIALS TO CONTRACTOR [APPLICABLE ONLY WHERE
MATERIAL IS TO BE SUPPLIED BY CORPORATION AS MENTIONED IN
If the specification of the estimated work provides for use of any special description of
material to be supplied from the Corporation’s stores or if it is required that the contractor
shall use certain stores to be provided by the Engineer-in-charge, (such material and stores
and the prices to be charged thereof as hereinafter mentioned being so far as practicable for
the convenience of contractor but not so as in any way to control, the meaning or effect of
this contract specified in the schedule or memorandum hereto annexed). The contractors
shall be supplied with such materials and stores as may be required from time to time be
used by him for the purpose of the contract only and the value of the full quantity of materials
and stores so supplied shall be set off or deducted from any sum due or thereafter to become
due to the contractor, under the contract or the proceeds of sale thereof if the deposit is held
in government securities the same or a sufficient portion thereof, shall be sold for the
purpose. All materials supplied to the contractor shall remain the absolute property of the
Corporation and shall on account be removed from the site of work and shall at all times be
open to inspection by the Engineer-in-charge. Any such materials unused and in perfectly
good condition at time of completion or determination of the contract shall be returned to
the Corporation’s store if the Engineer-in-charge so requires by notice in writing given under
his hand but the contractor shall not be entitled to return any such materials except with such
consent and he shall have no claim for compensation on account of any such materials
supplied to him as aforesaid but remaining unused by him or for any wastage in or damaged
thereto. The contractor shall be responsible for the loss, destruction or deterioration of the
materials, stores or articles supplied to him by the Corporation even if such loss, destruction
or deterioration has occurred under any circumstances whatsoever beyond his control as if
the materials, stores or articles so supplied were his property.
20. WORKS TO BE EXECUTED IN ACCORDANCE WITH SPECIFICATIONS,
DRAWING, ORDERS ETC.
The contractor shall execute the whole and every part of work in the most substantial and
workman like manner and both as regarding materials and in every other respect in strict
accordance with the specification. The contractor shall also confirm exactly, fully and
faithfully to the designs, drawings and instructions in writing relating to the work signed by
the Engineer-in-charge and lodged in his office and to which the contractor shall be entitled
to have access for the purpose of inspection at such office, or on the site of the work during
office hours and the contractor shall, if he so requires, be entitled at his own expense to make
or cause to be made copies of the specification and of all such designs, drawings and
instructions as aforesaid.
21. ALTERATIONS IN SPECIFICATIONS AND DESIGNS NOT TO INVALIDATE
The Executive Engineer shall have powers to make any alterations, or additions to the
original specification, designs and instructions that may appear to him to be necessary or
advisable during the progress of the work and the contractor shall be bound to carry out the
work in accordance with any instruction in this connection which may be given to him in
writing, signed by the Engineer-in-charge and such alterations shall not invalidate the
contract. Any additional work which the contractor may be directed to do in the manner
above specified as part of the work shall be carried out by the contractor on same conditions
in all respect on which he agreed to do the main works and at the same rates as are specified
in the tender for the main work.
Where, however, the work is to be executed according to the designs, drawings and the
specifications recommended by the contractor and accepted by the competent authority, the
alteration above referred to shall be within the scope of such designs, drawings and
specifications appended to the tender.
22. RATES FOR WORKS NOT ENTERED IN ESTIMATE OR SCHEDULE OF RATE
OF THE CORPORATION
If the additional and altered work includes any class of work for which no rate is specified
in this contract, then such class of work shall be carried out at the rates entered in the
Schedule of Rates of the Corporation or at the rate mutually agreed upon between the
Executive Engineer and the Contractor, whichever are lower. If the additional or altered
work for which no rate is entered in the Schedule of Rates of the Division is ordered to be
carried out before the rates agreed upon then the contractor within seven days of date of
receipt by him of the order to carry out the work should inform the Executive Engineer for
the rate which it is his intention to charge for such class of work and if the Executive
Engineer does not agree to this rate, he shall be noticed in writing, be at liberty to cancel his
order to carry out such class of work and arrange to carry it out in such manner as he may
consider advisable provided always that if the rates shall have been determined as lastly
herein before mentioned then in such case he shall only be entitled to be paid in respect of
the work carried out or expenditure incurred by him prior to the date of the determination of
the rate as aforesaid according to such rate or rates as shall be fixed by the Executive
Engineer in the event of disputes, the decision of the General Manager of the Corporation
23. EXTENSION OF TIME LIMIT IN CONSEQUENCE OF ADDITION OR
The time limit for the work shall be extended in the proportion that the increase in its cost
occasioned by alterations or additions bears to the cost of the original contract work and the
certificate of the Engineer-in-charge as to such proportions shall be conclusive.
24. NO COMPENSATION FOR ALTERATION IN OR RESTRICTION OF WORK TO
If at any time, after the execution of the contract documents, the Engineer-in-charge shall,
for any reason whatsoever, requires the whole or any part of the work, as specified in the
tender, to be stopped for any period or shall not require the whole or part of the work to be
carried out at all or to be carried out by the contractor, he shall give notice in writing of the
fact to the contractor who shall thereupon suspend or stop the work totally or partially as the
case may be in any such case, except as provided here under. The contractor shall have no
claim to any payment or compensation whatsoever on account of any loss in profit or
advantage which he might have derived from the execution, of the work in full but which he
did not so derive in consequence of the full amount of work not having been carried out or
on account of any loss that he may be put to on account of materials purchased or agree to
be purchased or for unemployment of labour recruited by him. He shall not also have any
claim for compensation by reason of any alterations having been made in the original
specification, drawings, designs and instructions which may involve any curtailment of the
work as originally contemplated. Where, however, materials have already been purchased
or agreed to be purchased by the contractor before receipt by him of said notice, the
Executive Engineer provided they are not in excess or requirement and are of approved
quality and/or shall be compensated for the loss, if any, that he may put to in respect of
materials agreed to be purchased by him. The amount of such compensation to be determined
by the Executive Engineer, whose decision shall be final. If the contractor suffers any loss
on account of his having to pay, his labour charges during the period, during which the
stoppage of work has been ordered under this clause the contractor shall on application be
entitled to such compensation on account of labour charges as the Executive Engineer whose
decision shall be final, may consider reasonable provided that the contractor shall not be
entitled to any compensation on account of labour charges if, in the opinion of the Executive
Engineer, the labour could have been employed by the contractor elsewhere for the whole
or part of the period during which the stoppage of the work has been ordered as aforesaid.
25. NO CLAIM FOR COMPENSATION ON ACCOUNT OF LOSS DUE TO DELAY IN
SUPPLY OF MATERIALS BY CORPORATION
The contractor shall not be entitled to claim any compensation from Corporation for the loss
suffered by him on account of delay by Corporation in the supply of materials entered in
Schedule A where such delay is caused by:
Difficulties relating to supply of railway wagons.
Force Majeure
Any other reasonable cause beyond the control of Corporation, including shortage of
materials to be supplied by the Corporation and difficulties in time by reaching at the site of
any materials equipment.
In the case of such delay in the supply of materials, Corporation shall grant such extension
of time for the completion of the works as shall appear to the Executive Engineer to be
reasonable in accordance with the circumstances of the case. The decision of the Executive
Engineer as to the extension of time shall be accepted as final by the contractor.
26. TIME LIMIT FOR COMPENSATION CLAIMS
Under no circumstances, whatsoever, shall the contractor be entitled to any compensation
from Corporation on any account unless the contractor has claimed in writing to the
Executive Engineer within one month of the cause thereof.
27. ACTION AND COMPENSATION PAYABLE IN CASE OF BAD WORK
If at any time, contractor shall appear to the Executive Engineer or his subordinate in charge
of the work that any work has been executed with unsound, imperfect or unskillful
workmanship or with materials of inferior quality or that any materials or articles provided
by him for the execution of the work are unsound or of inferior quality to that contract for
or are otherwise not in accordance with the contract, it shall be lawful for Engineer-in-charge
to intimate this fact in writing to the contractor and then notwithstanding the fact that the
work, materials, or articles complained of, may have been inadvertently passed, certified and
paid for, the contractor shall be bound forthwith to rectify or remove and reconstruct the
work so specified in whole or any part, as the case may require or if so required shall remove
the materials or articles so specified and provided other suitable materials or articles at his
own charge and cost, and in the event of his failing to do so within a period to be specified
by the Engineer-in-charge in the written intimation aforesaid the contractor shall be liable to
pay compensation at the rate of one percent on the amount of the estimate for every day not
exceeding ten days during which the failure so continues and in the event of any such failure
as aforesaid, the Engineer-in-charge may rectify or remove or re-execute the work or remove
and replace the materials or articles complained of, as the case may be, at the risk and
expense in all respects of contractor should the Engineer-in-charge consider that any such
inferior work or materials as described above may be accepted, or made use of, it shall be
within his discretion to accept the same as such reduced rates as he may fix thereof.
Provided that in the case of any work of which visible check is not possible if the Engineer-
in-charge or his subordinate in charge of the work feels that such work has been executed
with unsound, imperfect or unskillful workmanship or with materials of inferior quality, he
shall take sample tests at random, cost of which shall have to be borne by the contractor and
if after taking such test part of such work is found to be defective in any respect or to have
been executed with materials of inferior quality then the contractor shall pay for the whole
work such amount as may be fixed by the office of the Engineer-in-charge on the basis of
the lowest quality of work found by him in such sample tests.
28. WORK TO BE OPENED TO INSPECTION, CONTRACTOR OR RESPONSIBLE
AGENT TO BE PRESENT.
All works under execution or in pursuance of the contract shall at all times be open to the
inspection and supervision of the Executive Engineer and his subordinate and contractor
shall at all times, during the usual working hours and at all other times at which reasonable
notice of the intention of the Executive Engineer or his subordinate to visit the works shall
have been given to the contractor, during which period either he should be present to receive
order and instruction, or have a responsible agent duly authorized agent shall be considered
to have the same force and effect as if they had been given to the contractor himself.
29. NOTICE TO BE GIVEN BEFORE WORK IS COVERED UP
The contractor shall give not less than five days’ notice in writing to the Executive Engineer
or his subordinate in charge of the work, before covering up or otherwise placing beyond the
reach of measurement of any work, in order that the same may be measured and correct
dimensions thereof, taken before the same is so covered up or placed beyond the reach of
measurement and shall not be covered up or placed beyond the reach of measurement and
work without the consent in writing of Executive Engineer or his Subordinate in charge of
work. If any work shall be covered up or placed beyond the reach without such notice having
been given or consent obtained, the same shall be uncovered at the contractor’s expense and
in default thereof no payment or allowance shall be made for such work or for the materials
with which the same was executed.
30. CONTRACTOR’S LIABILITIES
The contractor shall supply, at his own cost, all materials (except such special materials, if
any as may be supplied from the Corporation stored in accordance with the contract). Plant,
tools, appliances, implements, ladders, cordage, tackle, scaffolding and any temporary works
which may be required for the proper execution of the work, in the original, altered or
substituted form and whether included in the specification and other document forming part
of the contract or referred to in these conditions or not and which may be necessary for the
purpose of satisfying and complying with the requirements of the Engineer-in-charge as to
any matter on which under these conditions, he is entitled to be satisfied or which he is
entitled to require together with carriage thereof to and from the work. The contractor shall
also supply without any charge the requisite number of persons of setting out works and
counting, weighting and assisting in the measurement of examination at the time and from
time to time of the work or materials, failing this the same may be provided by the Engineer-
in-charge at the expenses of the contractor and the expenses may be deducted from any
money due to the contractor under the contract or from his security deposit or the proceeds
of sale thereof or of a sufficient portion thereof, the contractor shall provide all necessary
fencing and light required to protect the public from accident and shall also be bound to bear
expenses of defense of every suit, action or other legal proceedings of law that may be
brought by any person for injury sustained. Owing to neglecting of the above precautions
and to pay any damage and cost which may be awarded in such suit, action or proceedings
to any such person or which may with the consent of the contractor be paid in comprising
any claim by any such person.
31. CONTRACTOR LIABLE FOR ALL DAMAGE
Compensation for all damage done intentionally or unintentionally by contractor’s laborer,
whether in or beyond the limit of Corporation’s property, shall be estimated by the Executive
Engineer or such other office as he may appoint and the estimates of the Executive Engineer,
subject to the decision of the Superintending Engineer, on appeal, shall be final and the
contractor shall be bound to pay the amount of the assessed compensation demand, failing
which, the same will be recovered from the contractor as damages or deducted by the
Engineer-in-charge from any sums that may be due to or become due from Corporation to
the contractor under this contract or otherwise.
The contactor shall bear the expenses of defending any action or other legal proceeding that
may be brought by any person for injury sustained by him owing to negligence of precautions
for prevent the spread of fire and he shall also pay any damage and cost that may be awarded
by the court, if in consequence.
32. RESCISSION OF CONTRACT AND FORFEITURE OF DEPOSIT
The contractor shall not assign or sublet, without the written approval of the Engineer-in-
charge and if the contractor assign, or sublet his contract, or attempt to do so or become
insolvent or commence any proceedings to be adjudicated as insolvent or make any
composition with creditors, attempt to do so, the Engineer-in-charge may, by notice in
writing rescind the contract. Also, if any bribe, gratuity, gift, loan, perquisite, reward or
advantage pecuniary or otherwise shall either directly or indirectly be given, promised or
offered by the contractor or any of his servants, or agents, or any person to the employee of
the Corporation in any way relating to his office or indirectly interested in the contract, the
Executive Engineer may, by ten days’ notice in writing, rescind the contract. In the event of
a contract being rescinded the security deposit of the contractor shall there upon stand
forfeited and be absolutely at the disposal of the Corporation and the same consequences
shall ensure as if the contract has been rescinded under Clause 11 thereof and in addition the
contractor shall not be entitled to recover or be paid for any work thereof actually performed
under the contract.
33. COMPENSATION
All sums payable by a contractor by way of compensation under any of these conditions
shall be considered as a reasonable compensation to be applied to the use of Corporation
without reference to the actual loss or damage sustained and whether any damage has not
been sustained.
34. CHANGE IN THE CONSTITUTION OF FIRM TO BE NOTIFIED
In case of tender by partners of a Firm, any change in constitution of firm shall be forthwith
notified by the contractor to the Executive Engineer for his information.
35. WORKS UNDER DIRECTION OF SUPERINTENDING ENGINEER
All works to be executed under the contract shall be executed under the direction and subject
to the approval of Superintending Engineer /Engineer-in-charge for the time being who shall
be entitled to direct at what point or points and in what manner they are to be commenced
and from time to time to be carried on.
36. DECISION OF SUPERINTENDING ENGINEER TO BE FINAL
Except where otherwise specified in contract and subject to the power delegated to him by
Corporation under the Corporation’s rules, then in force, the decision of the Superintending
Engineer/EIC for the time being shall be final, conclusive and binding on all the
specifications, designs, drawings and instructions herein before mentioned and as to the
quality of workmanship or material used on or as to any other question, claim, right matter
or thing whatsoever in any way arising out of or relating to the contract, designs, drawings,
specifications, estimates, instructions, orders or these conditions or otherwise concerning,
the works or the execution or failure to execute the same, whether arising during the progress
of the work or after the completion or abandonment thereof.
37. Dispute Resolution Mechanism
(1) Amicable Settlement
Any dispute, difference, controversy or claim between the Parties arising out of or relating
to this contract with reference to the construction, interpretation, breach, termination or
validity thereof (hereinafter referred as "the Dispute") shall, upon the written request of
either Party be referred to the authorized representatives of the Disputing Parties for
resolution. The authorized representatives shall promptly meet and attempt to negotiate in
good faith a resolution of the Dispute within thirty days of the service of the request.
(2) Arbitration
If the Parties fail to amicably resolve the disputes or differences or contrary claims as
indicated herewith in sub clause (1) of Clause 37, arising under or in connection with the
present works contracts, whether pertaining to works contracts alone or works and
procurement both, the same shall be referred to arbitration under the Gujarat Public Works
Contracts Disputes Arbitration Tribunal Act,
38. STORES TO BE OBTAINED FROM CORPORATION [APPLICABLE ONLY
WHERE MATERIAL IS TO BE SUPPLIED BY CORPORATION AS MENTIONED
The contractor shall obtain from the Corporation stores, such articles as are mentioned in
schedule “A” which may be required for the work or any part of the work or in making up
any articles required therefore or in connection therewith, unless he has obtained permission
in writing from the Executive Engineer or obtained such stores and articles from elsewhere.
The value of such stores and articles as may be supplied to the contractor by the Engineer-
in-charge will be debited to the contractor in his account at the rate shown in the schedule
“A” attached to the contract and if they are not entered in said Schedule, they shall be debited
to him at cost price which for the purpose of this contract shall include cost of carriage and
all other expenses whatsoever which may have to be incurred in obtaining delivery of the
same at the stores aforesaid and further overhead charges 15%.
The Contractor shall be responsible for the loss, destruction or deterioration of the materials,
stores or articles supplied to him by the Corporation, even if such loss, destruction or
deterioration has occurred under any circumstances whatsoever beyond his control as if the
materials, stores or articles so supplied were his property. The contractor shall be responsible
for returning the residual materials after completion of the contract and it fails to return, the
balance materials supplied to him by the Corporation, the cost of the residual materials will
be recovered from the contractor at the market rate or stock issue rate whichever be higher
at the time of materials account plus 15%.
39. LUMP SUMS IN ESTIMATE
When the estimate on which tender is made, includes lump sums in respect of parts of the
works the contractor shall be entitled to payment in respect of the items of works involved
or the part of the work in question at the same rates as are payable under this contract or such
items or if the part of work in question is not in the opinion of the Engineer-in-charge capable
of measurement the Engineer-in-charge may at his discretion pay the lump sum amount
entered in the estimate and the certificate in writing of the Engineer shall be final and
conclusive against the contractor with regard to any sum or sums payable to him under the
provision of this clause.
40. LUMP SUM TENDERS
Whenever lump sum tenders have been invited for buildings or other structures of the same
type, design, the contractor shall submit his bill stated in Clause No. 18 and the Engineer-in-
charge not below the rank of work, Executive Engineer shall certify by general measurement
or by other method considered suitable to him, the value of work done and the contractor
shall be paid monthly a sum equal to 90% of the total value the work so certified, since the
last payment, after deducting a part or whole of the secured advance if not already paid for
the materials utilized on the works. An additional secured advance for any fresh materials
utilized on the works. An additional secured advance for any fresh materials brought on site
will also be paid if certified by the officer not below the rank of Executive Engineer. After
the work is completed final bill would be paid on the certification of officer not below the
rank of Executive Engineer, that the work, is done according to drawing and specifications
attached to the tender. If any additions and alterations have been carried out, detailed
measurement in respect thereof shall be recorded and extra payment or deductions are
regulated as per item rates quoted by the contractor while submitting the tender and if there
are any items in the additions and alterations for which the contractor has not quoted a rate,
the payment shall be as per Clause 39 above.
41. ACTION WHERE NO SPECIFICATION
In the case of any class of work for which there is no such specification as is mentioned,
such work shall be carried out in accordance with the PWD and in the event of there being
no PWD specification, the work shall be carried out in all respects in accordance with the
instructions and requirements of the Engineer-in-charge of the Corporation etc.
42. NO CLAIM FOR VARIATION IN QUANTITIES OR WORK
Quantities shown in the tender are approximate and no claim shall be entertained for
quantities of work actually executed, being either more or less up to any extent than those
entered in the tender or less than those entered in the tender or estimate.
43. NO CLAIM FOR COMPENSATION FOR DELAY IN STARTING WORK
No compensation shall be allowed for any delay caused into starting of work on account of
acquisition of land and in the case of clearance for works or any delay in according sanction
44. NO CLAIM FOR COMPENSATION FOR DELAY IN EXECUTION OF WORK
No compensation shall be allowed for any delays in execution of the work on account of
water standing in borrow pits or compartment. The rates are inclusive for hard or cracked
soil, excavation in mud, sub-soil water or water standing in borrow pits and no claim for any
extra rate shall be entertained unless otherwise expressly specified and mentioned in the
45. EMPLOYMENT OF TECHNICAL PERSONS:
The contractor shall keep one full time qualified Civil Engineer at the site, who shall be fully
authorized to receive and comply with such instructions, as given by the Executive Engineer.
The contractor shall intimate the name of such Engineer with his qualifications and
experience. The Executive Engineer shall have the right to demand the removal of any
technical personnel, skilled or unskilled workmen, who in his opinion are considered to
cause bad workmanship in the execution of works or to cause indiscipline.
46. MATTERS RELATED TO EXECUTION OF WORK:
a) Work shall commence from the date given in letter to commence the work by EIC at
site. The Contractor shall make all necessary arrangements at site to mobilize labour,
operators, divers and materials and maintain necessary number of machinery and
equipment, barge, pontoons etc., to guarantee the agreed rate of progress of work as
b) A detailed work schedule showing how he proposes to carry out the work, specifically
mentioning time periods as well as date of commencement and completion of each
activity and such approved schedules must be strictly adhered to by the
CONTRACTOR. After the owner has agreed with the schedule, the Contractor shall
prepare detailed program of each work front/activity breaking it down giving daily
quantifiable/measure of progress. The schedules are to be reviewed periodically with
the OWNER / ENGINEER to ensure that the completion date will be met or to
institute corrective steps (at no extra cost to the ENGINEER) to adhere to the
completion dates. The OWNER reserves the right to revise the schedule at his
discretion in order to keep up to the completion date and to suit the project requirement
and such alterations shall not entitle the CONTRACTOR to any extra payment.
c) A work schedule with PERT / Bar Chart for carrying out the work in prescribed
time limit mentioning date of commencement, activity to be carried with its time
period, starting & finishing event for each activity, completion of total project in
critical path etc, shall be jointly fixed and approved by the GSECL. Such approved
schedules must be strictly adhered by the Contractor.
d) After the GSECL has agreed with the schedule, the Contractor shall prepare detailed
program of each work front / activity breaking it down to daily quantifiable measure
of progress. The schedules are to be reviewed periodically with the Owner / E.I.C to
ensure that the completion date will be met or to institute corrective steps (at no extra
cost to the GSECL) to adhere to the completion dates. The Owner reserves the right
to revise the schedule at his discretion in order to keep up to the completion date and
to suit the project requirement and such alterations shall not entitle the Contractor to
any extra payment.
e) The GSECL reserves the right to delete any item of schedule-B for which contractor
shall not have any right to claim on this account.
f) One permanent reference bench mark and a reference base line shall be given for lay
out of work, which shall be maintained without disturbance by the CONTRACTOR
during the tenure of the contract. CONTRACTOR shall establish local bench marks
as directed by the ENGINEER IN CHARGE.
g) The contract or any part thereof shall not be subject to change without the written
permission of the Chief Engineer (Gen.) GSECL, Ukai, TPS or his authorized
representatives.
h) During the execution of the work if it is found that the work is not progressing as per
the scheduled program approved by the GSECL & planned by the contractor, due to
the reasons attributable to the contractor, suitable action shall be taken as per Clauses
in this tender elsewhere & other relevant clauses appearing in the section of “Terms
& condition of tender & works contract, Legal conditions of works contract” of tender
document. And the GSECL may also take such action as it may deem fit to ensure
that the work is completed in time at Risk and Cost of the contractor.
i) Contractor shall attend meetings at EIC's office at site or any other place as fixed by
the EIC, as and when required for review, discussion, coordination etc. Attending
these meetings shall be obligatory on the part of the Contractor, at no cost to the
j) The Contractor shall take all requisite & necessary care to observe that no damage is
caused to the existing, pumps, existing works, service road, or any other structure etc.
For any damage to the existing structures of the GSECL, the Contractor shall be held
responsible and he will have to rectify the damage immediately up to the satisfaction
of Engineer in Charge, at his own cost.
k) The work shall be completed within the period stipulated in the contract. & site
clearance arranged according to the progress of work at site. Therefore, the contractor
has to organize & coordinate the work to suit these circumstantial conditions. In the
event of any delay due to the above or due to any other reason not attributable to the
contractor, reasonable extension in completing the work may be given at the discretion
and as decided by the GSECL but no compensation or idle charges will be payable to
the contractor on this account or any site conditions under any circumstances.
l) No idle charges shall be entertained by GSECL for any site condition or any
circumstances. The corporation will not pay any type of advances including
mobilization advance
47. RECOVERIES:
a) In case of any damage to equipment / machinery or structure / building of GSECL or
any public property due to negligence of contractor or any other reasons attributed to
contractor, the decision of E.I.C. regarding the amount of recovery shall be final.
b) If the contractor fails to execute the work as per direction of E.I.C. within the time
frame given, the GSECL shall get the work done through any other contractor at the
risk and cost of the contractor and the cost of execution of such work along with 15%
overhead charges shall be deducted from contractor’s monthly bill over and above
recovery as per rules.
c) Recoveries due from the contractor, up to the end of the month previous to the one
in which the bill is prepared shall be made from bills approved for payment every
month or at other periods when the bills are prepared, for the various items in the
following order of priorities and extents.
d) Penalty in full, if levied.
e) Expenditure, if any, incurred by the Corporation on Contractor’s behalf in labour or
materials in full.
f) Charges for services such as water and power supply etc. in full.
g) Charge on account of supply of materials like cement and steel in case of shortages
found in balance or excess consumption than specified.
h) Hire charges for Corporation or Government machinery if any.
i) Recoveries of advance and secured payment or payments for preliminary work in full
or the installment due if and as the same as may have been allowed.
j) Rent recovery on account of allotting quarters on rent as per Corporation’s rules.
k) Income tax and sales tax in full as per Government rules.
l) Outstanding recoveries in respect of other contracts awarded by the Corporation if
m) Other recoveries. (If any)
48. WORK TO BE EXECUTED TO THE SATISFACTION OF THE ENGINEER -IN-
The contractor shall proceed with the work with diligence and expedition and the
whole of the work herein specified as well as the mode of execution shall be
under the supervision and direction and shall be carried on to the entire satisfaction
of the Engineer-in-charge, who shall have full power to order the contractor to
alter, enlarge or diminish the form, dimensions, positions, or quantities of any of the
work or to make use of material and workman-ship of different descriptions and
qualities from this herein specified.
The whole of the works, together with any temporary works, associated therewith,
shall be carried on in the most substantial proper and mannered workman like
manner, with the best materials and workmanship and to the entire satisfaction of
the Engineer-in-charge and in such order of time as he may direct. The contractor
shall attend to and execute without delay all orders and instruction which may from
time to time be issued by the Engineer-in-charge.
49. MATERIALS WORKMANSHIP etc.:
The work shall be executed in thoroughly substantial manner with material and
workmanship of best quality and strictly in accordance with the specifications and
with the drawings, or with such other drawings or written instruction as may from
time to time be furnished to the contractor, in accordance with terms of this contract
and shall be completed in every respect with all materials and workmanship implied
and necessary according to the fair interpretation and meaning of the same and should
there be any discrepancy between the drawings and specifications or any difference
or disputes as to the dimensions to be worked to or the quality of the materials to be
used, or the mode of doing periodical quantity of the work to be executed or with
respect to any subject arising out of this contract, the decision of the Engineer-in-
charge shall be final and binding on all parties. Rejected material shall be so disposed
off as to obviate any possibility of their use on works. The place, method and period
of disposal shall be as directed by the Engineer-in-charge.
50. SAMPLES OF DESCRIPTIVE DATE:
Samples of descriptive date, requiring approval, shall be submitted by contractor to
the Engineer-in-charge in good time before the use of such material for inspection and
permission of testing if required. The samples shall be properly marked to show the
name of the material, manufacture, place of origin, and place where to be used
etc. Failure of any sample to pass specified tests will be sufficient cause for the refusal
to consider any further sample from the same source.
51. FENCING AND LIGHTING AND VENTILATION
Except as herein after provided, the contractor shall unless otherwise specified, be
responsible for the proper fencing, guarding, lighting and taking of the necessary
safety measures for all works comprised in the contract and or the proper provision
of temporary roadway, footways, guards fences, caution notices etc. as far as the
same may be rendered necessary by reasons for the work for the accommodation and
protection of workman foot passenger or other traffic and of the owners and
occupiers of adjacent property and of the public and shall remain responsible for
any accidents that may occur on account of his failure to take proper and timely
All the arrangements made for fencing, lighting and ventilation shall be maintained
by the contractor throughout the tendency of the contract till physical taking over
of the work by the department.
52. LIABILITY FOR DAMAGE TO WORKS OR PLANTS
The contractor shall during, the progress of the work, properly cover up and protect
the work, and plant, and materials placed at his disposal or acquired for him by
the Corporation, from injury by exposure to the weather, or any cause what so ever
and shall take every reasonable proper timely and useful precaution against accident
or injury to the same from any cause and shall be and remain answerable and liable
for all accidents, or injuries thereto which until the same be or be deemed to be, taken
over by the Corporation, may arise or be occasioned by the acts or omissions of the
contractor or his workmen of sub-contractors, and all losses and damages to the
works or such plant or material arising from such accidents or injuries as aforesaid
shall be made good in the most complete and substantial manner by and at the sole cost
of the contractor and to the reasonable satisfaction of the Engineer-in-charge. If the
contractor fails to make good such losses & damages within the time given by the
Engineer-in-charge, the Corporation shall be at liberty to recover the amount fixed by
the Engineer-in-charge for such losses or damages or any part thereof by deducting it
from any sum due by the Corporation to the contractor under this contract or otherwise.
Further the contractor shall, at all time, protect and preserve all materials, plant and
equipment that he may himself have procured for the execution of the work. All
reasonable requests of the Engineer-in-charge to enclose or especially protect any of
the above shall be expeditiously compiled with.
If the Engineer-in-charge considers that the work or materials or plant is not
sufficiently protected by the contractor, he shall be entitled to arrange for such
protection at his unfettered discretion and recover the cost thereof from the contractor.
Until the work shall be or be deemed to be taken, over as aforesaid, the contractor
shall also be liable for and shall be deemed to have indemnified the Corporation in
respect of all damage or injury to any person or any property of the Corporation or of
others, occasioned by the negligence of the contractor or his workmen, or his sub-
contractor, or by defective design, work or materials.
53. EXPLOSIVE PROCUREMENT AND STORAGE (IF APPLICABLE)
i) Explosives, petrol, oils, fuels and other inflammable materials shall be stored strictly in
accordance with the rule of the Explosive Department.
ii) The contractor shall at his own expense construct and maintain, proper magazines
which are required for the storage of explosive and arrange for proper storage facilities
for oils, fuels etc. for use in connection with the work.
iii) The contractor shall at his own expense obtain such license or licenses as may be
necessary for strong and using explosives, oils, fuels etc. The department shall not take
any responsibility whatsoever in connection with the storage or use of explosives on the
site, or any accident or occurrence whatsoever in connection therewith. All operation of
the contractor in which or for which Explosives are employed shall be at risk of
contractor and upon his own responsibility.
54. MATERIALS TOOLS AND PLANT BROUGHT ON THE SITE OF WORK
All materials, tools and tackle of the contractor brought to and delivered upon the site for the
purpose of the work shall from the time of their being so brought shall be deemed to be the
property of the Corporation in its possession to be used for the purpose of the work and for
that purpose only and shall not on any account be removed or taken away by the contractor
or any other person without the written permission of the Engineer-in-charge but the
contractor shall nevertheless be solely liable and responsible for and loss destruction
thereof or damage thereto. The Corporation shall have a lien on such materials, tools and
tackle for any sum of sums which may at any time prior to the completion of the works be
due or owing to the Corporation by the contractor, under in respect of and dispose of any
such materials, tools and tackle in such manner as the Corporation may think fit and to apply
the proceeding in or towards the satisfaction of such sum or sums so due or owing as
aforesaid but subject to such lien and power of sale and disposal such surplus materials,
tools and tackle shall belong to the contractor and may be removed and disposed off by him
as he may think fit.
55. ACCESS TO SITE AND WORK ON SITE
The Engineer-in-charge or his authorized representative may if he consider fit from time to
time enter upon any lands which may be in the possession of the contractor under this
contract, for the purpose of executing any work not included in this contract and may
execute such work not included in this contract by agents, or by other contractors at his
option and the contractor shall in accordance with the requirements of the Engineer-in-
charge, afford all reasonable facilities for execution of the works including occupation of
lands by structure or otherwise for any other contractor employed by the Corporation and
his workmen or for the workmen of the Corporation who may be employed in the execution
on or near the site of the work not included in the contractor’s any contract in connection
with or ancillary to the works and in default, the contractor shall be liable to the Corporation
for any delay or expense incurred by reason of such default. Provided always that if the
exercise of those power shall cause any damage to the contractor he may within fifteen days
of such damage arising make a statement of the same to the Engineer-in-charge who shall
from time to time assess the value in his Judgment of such damage and the Corporation shall
from time to time shall pay to the contractor the amounts (if any accepted as justified) by the
Engineer-in-charge. The contractor shall not however, on account of any such modified, new
or extra work executed by or for the same of the Corporation be entitled to claim relief from
the obligation to execute other works.
56. INSPECTION OF WORKS
The Engineer-in-charge or his duly authorized agent shall have at all time full power to
inspect the works, wherever in progress, either on the site, on the contractor's premises or
at the premises wherever situated, of any firm or Corporation where work in connection with
this contract may be in hand.
Further, the contractor shall not allow, without written authorization permit entry on site of
work, any person except authorized agents of the Corporation of the Engineer-in-charge or
the contractor's staff and labour directly engaged on and in connection with the work.
The contractor shall, during working hours, maintain supervisors having sufficient training
and experience to supervise the various items and operations of the work and the said
supervisors shall remain present during the inspections of the Engineer-in-charge. All orders
and directions given to such supervisors or other staff of the contractor shall be deemed to
have been given to contractor. Further the Engineer-in-charge may be due notice, desire a
higher ranking members of the supervisory staff of the contractor to be present on any
specified inspection and the contractor shall comply with such direction.
57. CLEANING UP
The contractor shall at all times keep the construction area and his power house and
storage areas free from accumulation of waste, or rejected materials.
Prior to the completion of the work the contractor shall remove all rubbish from and
about the premises, and all tools, scaffolding, equipment and materials which are not part
of permanent structure. The premise will be left in a manner fully satisfactory to the
Engineer-in-charge, thereafter only the completion certificate will be issued.
58. CONTRACTOR TO KEEP INVENTORY OF MATERIALS etc.
The contractor shall prepare and maintain an inventory of all materials temporary rolling
stock, plant purchased or hired for use of employment or for any of the purposed for this
contract and such inventory or a copy thereof shall at all times be available for inspection by
the Engineer-in-charge. A complete and up to date copy of the inventory shall be submitted
to the Engineer-in-charge in the beginning and once a year; thereafter changes in the interim
period, if any shall be communicated on every three months.
59. CONTRACTOR TO RESTORE PLANT
Upon completion of the work, the contractor shall deliver to the Corporation, all appliances,
materials, and plants which may have been loaned or hired to him by the Corporation and
make good all damages which may have occurred to them, except such as shall be caused
by fair wear and tear in execution of the works.
60. PROGRESS SCHEDULE
i) The contractor shall furnish, within one week unless extended by the Engineer of the
order to start the work, a progress schedule in quadruplicate indicating the date of start
the weekly progress expected to be achieved and the anticipated completion date of each
major items of work to be done by him, also indicating dates of procurement and setting
up of materials, plant and machinery. The schedule should be such as is practicable of
achievement towards completion of the whole work in the time limit and of the particular
items on due dates specified in the contract and shall have the approval of the Engineer.
Further, the dates for the progress as in this schedule shall be kept up-to-date. In case it
is subsequently found necessary to alter this schedule, the contractor shall submit in good
time a revised schedule incorporating necessary modifications proposed and get the same
approved by the Engineer. No revised schedule shall be operative within such acceptance
Detailed schedules for each week showing the progress proposed to achieve shall be
submitted to the Engineer and got approved. The Engineer is further empowered to ask
for more detailed schedule or schedules any week by week, for any items or items, and
the contractor shall supply the same as and when asked for.
ii) The Engineer shall have, at all times the right without in any way vitiating this contract,
or forming grounds for any claim to alter the order of the works or any part thereof and
the contractor shall after receiving such direction proceed in the order directed. The
contractors shall also revise the progress schedule accordingly and submit four copies of
the revised schedule to the Engineer within seven days of the Engineer's direction to alter
the order of works.
iii) The contractor shall furnish sufficient plant equipment and labour and shall work such
hours and shifts as may be necessary to maintain the progress on the work as per the
approved progress schedule. The working and shift hours shall comply with all GSECL's
regulations in force and shall be such as may be approved by the Engineer. They shall
not be varied without the prior approval of the Engineer.
iv) The contractor shall from time to time as may be required by the Engineer, furnish the
Engineer, with a statement in writing of the arrangement he proposes to adopt for the
execution of this contract and the Engineer may if he considers, necessary at any time
advise alteration in the same, which the contractor shall adopt on notice thereof.
v) The progress schedules shall be in the form of progress charts, forms, statement and/or
reports as may be approved by the Engineer. Further, the contractor shall submit four
copies showing the progress of work in forms and charts etc. at periodicals intervals as
may be specified by the Engineer.
61. DATE OF COMPLETION
The contractor shall supply, erect, equip and construct the whole of the works and hand
over them to the Corporation on or before the date specified in the tender document
including "Special Conditions" and save as herein provided, in no circumstances whatever
shall extend or alter the date for the completion of works. Provided always that if in the
opinion of the Engineer-in-charge the completion of the works shall be delayed by any
change of original design or by the order of the Engineer-in-charge, of any altered,
modified substituted or additional works or materials omitted or by strikes, lock outs or
stoppages of labour, or revolution, riots, civil or political disturbance or by causes directly
due to war or by the contractor not being given possession of the site or any part there-of or
by the Corporation taking possession of and using the site or any part thereof or the works
or any part thereof, whether any nonperformance of work under the powers herein
contained or otherwise or by any nonperformance of work or non-supply of materials to be
performed or supplied by the Corporation or by the contractor not receiving any orders,
drawings, instructions or directions in time or by the suspensions of the works or by fire,
flood exceptionally bad weather tempest, storm, or by from unforeseen circumstances
(and whether the same shall be due to any act or omission of the Corporation or its agents
or those in their respective service or not) the Engineer-in-charge may, if in his unfettered
discretion, he thinks fit either forthwith or at any later time and from time to time not
withstanding that the prescribed or extended time for completion has expired or that the
work have been completed, by writing under his hand, extend the time for the completion
of the works to such date as he shall appoint. Provided always that unless the contractor
makes a written application to the Engineer-in-charge within one month of the cause of delay
and unless the time is extended by the Engineer-in-charge, the prescribed time shall not be
extended notwithstanding delays from the aforesaid foregoing or any other causes of
whatsoever kind.
62. SUBLETTING OF CONTRACT
There will be generally no objection on the component parts for the work, being given over
to responsible sub-contractors but Corporation shall under no circumstances recognize these
sub-contractors and the responsibility of executing the work in the accordance with the
conditions of contract will entirely rest on the main contracts. The main contractors will
therefore always have the very responsible member, preferably a technical hand present
on the works with power to sign all work orders issued on the site of work and to take
requisite actions in the interest of very efficient execution of work. However, the
subletting of the contract can be made only with the prior approval of the competent authority
of the Corporation.
63. OTHERCONTRACTS FOR THE WORK SUSPENSION STOPPAGEOR
CURTAILMENTS OF WORK
If during the tendency of the contract the Engineer-in-charge shall for any reasons (which
shall be unquestioned) whatsoever require the whole or any part of the work as specified
in the contract to be suspended for any period or shall not require the whole or any part
of the work as specified in the contract to be carried out at all by the contractor, he shall
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
WT-4894A Tender Document.pdf
Tender notice_4894A.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .