| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.6 CrAccepted-AOC | ₹1.6 Cr | L1 | Accepted-AOC Being L1 |
| 2 | L2₹2.0 Cr+₹41.1 L (25.3%)Rejected-Finance 95B LENIN SARANI LENIN SARANI 95B LENIN SARANI VILLAGE TOWN KOLKATA CITY KOLKATA KOLKOTA WEST BENGAL 700013 INDIA | KOLKATA | WEST BENGAL | 700013 | ₹2.0 Cr+₹41.1 L (25.3%) | L2 | Rejected-Finance 2nd lowest Bidder |
| 3 | L3₹20.9 L−₹1.4 Cr (87.1%)Rejected-Finance 1ST FLOOR KRISHNA TOWERS OPP TO THRIKKAKARA TEMPLE THRIKKAKARA P O COCHIN 682 021 | ERNAKULAM | KERALA | 682021 | ₹20.9 L−₹1.4 Cr (87.1%) | L3 | Rejected-Finance 3rd lowest Bidder. |
| 4 | L4₹2.1 Cr+₹49.9 L (30.7%)Rejected-Finance | ₹2.1 Cr+₹49.9 L (30.7%) | L4 | Rejected-Finance 4th lowest Bidder |
Tender Value
₹2.1 Cr
EMD Value
₹4.3 L
Closing Date
16 Mar 2018, 6:00 pmClosed
Sr.Manager(E-E)
Airports Authority Of India NSCBI Airport Kolkata
M O Power Supply including stand by DG sets at NSCBI Airport during 2018 2019 2019 2020
2018_AAI_7939_1
AAI/KOL/MO-PS/18
Open Tender
Electrical Works
Works
730 days
Airports Authority Of India NSCBI Airport Kolkata
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,180
Airports Authority Of India
₹4.3 L
31 Jan 2020
22 Feb 2018
21 Mar 2018
23 Feb 2018
16 Mar 2018
9 Mar 2018
23 Feb 2018 - 2 Mar 2018
SH-A: Maintenance Cable line 1. Detecting and locating of cable fault for under ground cable upto 11 KV grade by using cable fault locator. (a) First Year.
1. Detecting and locating of cable fault for under ground cable upto 11 KV grade by using cable fault locator. (b) Second Year
2 . Identification of U.G. cable fault of 1.1 kv grade by excavation of soil i/c soil removing, sand cushioning, protective covering i/c dismantaling of cable from excavated trench , physical inspection of the cable and relaying the cable in the same trench by using old bricks but new sand and refilling the trench as reqd. (a) Not exceeding 120 sq mm. (i) First Year
2 . Identification of U.G. cable fault of 1.1 kv grade by excavation of soil i/c soil removing, sand cushioning, protective covering i/c dismantaling of cable from excavated trench , physical inspection of the cable and relaying the cable in the same trench by using old bricks but new sand and refilling the trench as reqd. (a) Not exceeding 120 sq mm. (ii) Second Year
2 . Identification of U.G. cable fault of 1.1 kv grade by excavation of soil i/c soil removing, sand cushioning, protective covering i/c dismantaling of cable from excavated trench , physical inspection of the cable and relaying the cable in the same trench by using old bricks but new sand and refilling the trench as reqd. (b) Above 120 sq mm but not exceeding 400 sq mm. (i) First Year
2 . Identification of U.G. cable fault of 1.1 kv grade by excavation of soil i/c soil removing, sand cushioning, protective covering i/c dismantaling of cable from excavated trench , physical inspection of the cable and relaying the cable in the same trench by using old bricks but new sand and refilling the trench as reqd. (b) Above 120 sq mm but not exceeding 400 sq mm. (ii) Second Year
3. Identification of U.G. cable fault of cables exceeding 1.1 kv grade but not exceeding 11 kv grade by excavation of soil i/c soil removing, sand cushioning, protective covering i/c dismantaling of cable from excavated trench, physical inspection of the cable and relaying the cable in the same trench by using old bricks but new sand and refilling the trench as reqd. (a) Not exceeding 120sq mm. (i) First Year
3. Identification of U.G. cable fault of cables exceeding 1.1 kv grade but not exceeding 11 kv grade by excavation of soil i/c soil removing, sand cushioning, protective covering i/c dismantaling of cable from excavated trench, physical inspection of the cable and relaying the cable in the same trench by using old bricks but new sand and refilling the trench as reqd. (a) Not exceeding 120sq mm. (ii) Second Year
3. Identification of U.G. cable fault of cables exceeding 1.1 kv grade but not exceeding 11 kv grade by excavation of soil i/c soil removing, sand cushioning, protective covering i/c dismantaling of cable from excavated trench, physical inspection of the cable and relaying the cable in the same trench by using old bricks but new sand and refilling the trench as reqd. (b) Above 120 sq mm but not exceeding 400 sq mm. (i) First Year
3. Identification of U.G. cable fault of cables exceeding 1.1 kv grade but not exceeding 11 kv grade by excavation of soil i/c soil removing, sand cushioning, protective covering i/c dismantaling of cable from excavated trench, physical inspection of the cable and relaying the cable in the same trench by using old bricks but new sand and refilling the trench as reqd. (b) Above 120 sq mm but not exceeding 400 sq mm. (ii) Second Year
4. The execution of items related to DSR (E&M)' 2016, CPWD as when required basis for repair and maintenance of all types of Internal and External Electrical Installations at different locations at NSCBI Airport under EMD - VIII Division as per the special terms and conditions of contract as directed by Engineer-in-charge (Quoting 0.90 in the rate stands for 10% below the estimated amount of Rs. 10,00,000.00 than net amount will be Rs. 9,00,000.00, similarly quoting 1.05 in the price component will result for 5% above the estimated cost of Rs. 10,00,000 then net amount will be Rs. 10,50,000.00) (a) First Year
The execution of items related to DSR (E&M)' 2016, CPWD as when required basis for repair and maintenance of all types of Internal and External Electrical Installations at different locations at NSCBI Airport under EMD - VIII Division as per the special terms and conditions of contract as directed by Engineer-in-charge (Quoting 0.90 in the rate stands for 10% below the estimated amount of Rs. 10,00,000.00 than net amount will be Rs. 9,00,000.00, similarly quoting 1.05 in the price component will result for 5% above the estimated cost of Rs. 10,00,000 then net amount will be Rs. 10,50,000.00) (b) Second Year
SH - B- SH:- Maintenance of Batteries i/c. repairing of Battery Charger sets, Filtration of Transformer oil, Maintenance of APFC Panel i/c. repairing, of Earth Pits and servicing towards arresting leakage of Transformer, maintenance of emergency lights etc. 1. Checking & maintenance of batteries & battery charger sets installed at different substations for HT switchgears i/c. checking control wiring, tightining of all terminals after cleaning of terminals, providing petrolium jelly. Top up the batteries with distilled water etc. i/c. minors hardwares and spares complete as required. (a) First Year
1. Checking & maintenance of batteries & battery charger sets installed at different substations for HT switchgears i/c. checking control wiring, tightining of all terminals after cleaning of terminals, providing petrolium jelly. Top up the batteries with distilled water etc. i/c. minors hardwares and spares complete as required. (b) Second Year
2. Filtration & dehydration of transformer oil to improve the breakdown voltage of oil up to 50KV by oil filtration machine, carrying out BDV test of oil i/c. transportation of filtration machine to site etc. as required. (a) First Year
2. Filtration & dehydration of transformer oil to improve the breakdown voltage of oil up to 50KV by oil filtration machine, carrying out BDV test of oil i/c. transportation of filtration machine to site etc. as required. (b) Second Year
3. Maintenance of APFC panel (monthly minimum one time and as and when required) installed in defferent substation in the airport area for improvement of power factor i/c. checking & tightening of the all terminals, checking, control wirings if required replace the faulty portion of control wiring. Providing necessary cleaning materials, insulating tapes, minor hardwares, wires, thimble/lugs, fennels etc as required (capacitors major components shall be supplied by the department) (Total 17 nos. APFC panel). (a) First Year
3. Maintenance of APFC panel (monthly minimum one time and as and when required) installed in defferent substation in the airport area for improvement of power factor i/c. checking & tightening of the all terminals, checking, control wirings if required replace the faulty portion of control wiring. Providing necessary cleaning materials, insulating tapes, minor hardwares, wires, thimble/lugs, fennels etc as required (capacitors major components shall be supplied by the department) (Total 17 nos. APFC panel). (b) Second Year
4. Taking out of old oil from oil circuit breaker, cleaning of breaker tank with new oil and filling new oil and carrying out necessary filtration & dehydration etc. as required so as to achieve the BDV of min 40KV for 1 min. (a) Out side operational area (i) First Year
4. Taking out of old oil from oil circuit breaker, cleaning of breaker tank with new oil and filling new oil and carrying out necessary filtration & dehydration etc. as required so as to achieve the BDV of min 40KV for 1 min. (a) Out side operational area (ii) Second Year
4. Taking out of old oil from oil circuit breaker, cleaning of breaker tank with new oil and filling new oil and carrying out necessary filtration & dehydration etc. as required so as to achieve the BDV of min 40KV for 1 min. (b) In side operational area (i) First Year
4. Taking out of old oil from oil circuit breaker, cleaning of breaker tank with new oil and filling new oil and carrying out necessary filtration & dehydration etc. as required so as to achieve the BDV of min 40KV for 1 min. (b) In side operational area (ii) Second Year
5. Cleaning of luminaries, maintaining serviceability of emergency light in and around S/S building / switch room i/c. Upkeeping of Electrical sub-station by i/c cleaning , up rooting of bushes / jungles etc. within the perifery of sub-station, as and when required as directed by Engg. I/C. (a) Out side operational area (i) First Year
5. Cleaning of luminaries, maintaining serviceability of emergency light in and around S/S building / switch room i/c. Upkeeping of Electrical sub-station by i/c cleaning , up rooting of bushes / jungles etc. within the perifery of sub-station, as and when required as directed by Engg. I/C. (a) Out side operational area (ii) Second Year
5. Cleaning of luminaries, maintaining serviceability of emergency light in and around S/S building / switch room i/c. Upkeeping of Electrical sub-station by i/c cleaning , up rooting of bushes / jungles etc. within the perifery of sub-station, as and when required as directed by Engg. I/C. (b) In side operational area (i) First Year
5. Cleaning of luminaries, maintaining serviceability of emergency light in and around S/S building / switch room i/c. Upkeeping of Electrical sub-station by i/c cleaning , up rooting of bushes / jungles etc. within the perifery of sub-station, as and when required as directed by Engg. I/C. (b) In side operational area (ii) Second Year
6. Topping up of transformer oil in the transformer / HT Switch gears etc. by oil filtering machine including transportation and opening and closing nut/bolts/valves etc. as required. (a) First Year
6. Topping up of transformer oil in the transformer / HT Switch gears etc. by oil filtering machine including transportation and opening and closing nut/bolts/valves etc. as required. (b) Second Year
7. Checking earth pit i/c measurering the earth resistance bimonthly and repairing of earth pit wherever required by making necessary work, replacement of watering funnel, nut and bolts washers etc. and change broken cover by new cover i/c cleaning, painting etc, as required. (a) First Year
7. Checking earth pit i/c measurering the earth resistance bimonthly and repairing of earth pit wherever required by making necessary work, replacement of watering funnel, nut and bolts washers etc. and change broken cover by new cover i/c cleaning, painting etc, as required. (b) Second Year
8. Overhauling & servicing of arresting leakage of transformer HT and LT side, conservator tank, Bucholz relay, top cover, all radiators, Bushing changing etc of transformers at various substation with dehydration/ filtration transformer oil etc. (a) Up to 500 KVA transformer. (i) First Year
8. Overhauling & servicing of arresting leakage of transformer HT and LT side, conservator tank, Bucholz relay, top cover, all radiators, Bushing changing etc of transformers at various substation with dehydration/ filtration transformer oil etc. (a) Up to 500 KVA transformer. (ii) Second Year
8. Overhauling & servicing of arresting leakage of transformer HT and LT side, conservator tank, Bucholz relay, top cover, all radiators, Bushing changing etc of transformers at various substation with dehydration/ filtration transformer oil etc. (b) Above 500 KVA and up to 2000 KVA Transformer. (i) First Year
8. Overhauling & servicing of arresting leakage of transformer HT and LT side, conservator tank, Bucholz relay, top cover, all radiators, Bushing changing etc of transformers at various substation with dehydration/ filtration transformer oil etc. (b) Above 500 KVA and up to 2000 KVA Transformer. (ii) Second Year
SH-C: Over haulling and servicing of ACBs, VCB's, Transformers etc. as reqd. 1. Overhaulling and servicing of existing LT ACB's of variouis makes up to 3200 Amp. Rating installed in different Sub-Stations at NSCBI Airport by the authorised service agent / peronal of the OEM of the ACB. (a) First Year
1. Overhaulling and servicing of existing LT ACB's of variouis makes up to 3200 Amp. Rating installed in different Sub-Stations at NSCBI Airport by the authorised service agent / peronal of the OEM of the ACB. (b) Second Year
2. Overhaulling and servicing of existing HT 6 KV / 11 KV OCB's / VCB's of various makes installed in different Sub-Stations at NSCBI Airport by the authorised service agent / peronal of the OEM of the OCB / VCB. (a) First Year
2. Overhaulling and servicing of existing HT 6 KV / 11 KV OCB's / VCB's of various makes installed in different Sub-Stations at NSCBI Airport by the authorised service agent / peronal of the OEM of the OCB / VCB. (b) Second Year
3. Replacement of faulty WTI & OTI of the existing transformer located in different Sub-Stations at NSCBI Airport. (a) First Year
3. Replacement of faulty WTI & OTI of the existing transformer located in different Sub-Stations at NSCBI Airport. (b) Second Year
4. SITC of silica gel breather as per sample in the existing transformer located in different Sub-Stations at NSCBI Airport. (a) First Year
4. SITC of silica gel breather as per sample in the existing transformer located in different Sub-Stations at NSCBI Airport. (b) Second Year
SH- D Callibration of Protective Relays. 1. Testing and callibration of following types relays located at different Sub-Stations at NSCBI Airport by the secondary injection method including submission of calibration and testing certificates. (a) CDG 61 (I) First Year
1. Testing and callibration of following types relays located at different Sub-Stations at NSCBI Airport by the secondary injection method including submission of calibration and testing certificates. (a) CDG 61 (ii) Second Year
1. Testing and callibration of following types relays located at different Sub-Stations at NSCBI Airport by the secondary injection method including submission of calibration and testing certificates. (b) CDG 31 (i) First Year
1. Testing and callibration of following types relays located at different Sub-Stations at NSCBI Airport by the secondary injection method including submission of calibration and testing certificates. (b) CDG 31 (ii) Second Year
1. Testing and callibration of following types relays located at different Sub-Stations at NSCBI Airport by the secondary injection method including submission of calibration and testing certificates. (c ) DTH 31 (i) First Year
1. Testing and callibration of following types relays located at different Sub-Stations at NSCBI Airport by the secondary injection method including submission of calibration and testing certificates. (c ) DTH 31 (ii) Second Year
1. Testing and callibration of following types relays located at different Sub-Stations at NSCBI Airport by the secondary injection method including submission of calibration and testing certificates. (d) IOC (i) First Year
1. Testing and callibration of following types relays located at different Sub-Stations at NSCBI Airport by the secondary injection method including submission of calibration and testing certificates. (d) IOC (ii) Second Year
1. Testing and callibration of following types relays located at different Sub-Stations at NSCBI Airport by the secondary injection method including submission of calibration and testing certificates. (e ) MBCH (i) First Year
1. Testing and callibration of following types relays located at different Sub-Stations at NSCBI Airport by the secondary injection method including submission of calibration and testing certificates. (e ) MBCH (b) Second Year
1. Testing and callibration of following types relays located at different Sub-Stations at NSCBI Airport by the secondary injection method including submission of calibration and testing certificates. (f) VAA 21 (i) First Year
1. Testing and callibration of following types relays located at different Sub-Stations at NSCBI Airport by the secondary injection method including submission of calibration and testing certificates. (f) VAA 21 (ii) Second Year
1. Testing and callibration of following types relays located at different Sub-Stations at NSCBI Airport by the secondary injection method including submission of calibration and testing certificates. (g) VAA 33 (i) First Year
1. Testing and callibration of following types relays located at different Sub-Stations at NSCBI Airport by the secondary injection method including submission of calibration and testing certificates. (g) VAA 33 (ii) Second Year
1. Testing and callibration of following types relays located at different Sub-Stations at NSCBI Airport by the secondary injection method including submission of calibration and testing certificates. (h) VAA 22 (i) First Year
1. Testing and callibration of following types relays located at different Sub-Stations at NSCBI Airport by the secondary injection method including submission of calibration and testing certificates. (h) VAA 22 (ii) Second Year
1. Testing and callibration of following types relays located at different Sub-Stations at NSCBI Airport by the secondary injection method including submission of calibration and testing certificates. (i) VAJH 13 (i) First Year
1. Testing and callibration of following types relays located at different Sub-Stations at NSCBI Airport by the secondary injection method including submission of calibration and testing certificates. (i) VAJH 13 (ii) Second Year
1. Testing and callibration of following types relays located at different Sub-Stations at NSCBI Airport by the secondary injection method including submission of calibration and testing certificates. (j) VAA 31 (i) First Year
1. Testing and callibration of following types relays located at different Sub-Stations at NSCBI Airport by the secondary injection method including submission of calibration and testing certificates. (j) VAA 31 (ii) Second Year
1. Testing and callibration of following types relays located at different Sub-Stations at NSCBI Airport by the secondary injection method including submission of calibration and testing certificates. (k) APR 31 LH (i) First Year
1. Testing and callibration of following types relays located at different Sub-Stations at NSCBI Airport by the secondary injection method including submission of calibration and testing certificates. (k) APR 31 LH (ii) Second Year
1. Testing and callibration of following types relays located at different Sub-Stations at NSCBI Airport by the secondary injection method including submission of calibration and testing certificates. (l) AHT - 1 H (i) First Year
1. Testing and callibration of following types relays located at different Sub-Stations at NSCBI Airport by the secondary injection method including submission of calibration and testing certificates. (l) AHT - 1 H (ii) Second year
1. Testing and callibration of following types relays located at different Sub-Stations at NSCBI Airport by the secondary injection method including submission of calibration and testing certificates. (m) AVX 1 H (i) First Year
1. Testing and callibration of following types relays located at different Sub-Stations at NSCBI Airport by the secondary injection method including submission of calibration and testing certificates. (m) AVX 1 H (ii) Second Year
1. Testing and callibration of following types relays located at different Sub-Stations at NSCBI Airport by the secondary injection method including submission of calibration and testing certificates. (n) AVA 22 (i) First Year
1. Testing and callibration of following types relays located at different Sub-Stations at NSCBI Airport by the secondary injection method including submission of calibration and testing certificates. (n) AVA 22 (ii) Second Year
1. Testing and callibration of following types relays located at different Sub-Stations at NSCBI Airport by the secondary injection method including submission of calibration and testing certificates. (o) AVA 32 (i) First Year
1. Testing and callibration of following types relays located at different Sub-Stations at NSCBI Airport by the secondary injection method including submission of calibration and testing certificates. (o) AVA 32 (ii) Second Year
1. Testing and callibration of following types relays located at different Sub-Stations at NSCBI Airport by the secondary injection method including submission of calibration and testing certificates. (p) AR 101 X 2 (i) First Year
1. Testing and callibration of following types relays located at different Sub-Stations at NSCBI Airport by the secondary injection method including submission of calibration and testing certificates. (p) AR 101 X 2 (ii) Second Year
1. Testing and callibration of following types relays located at different Sub-Stations at NSCBI Airport by the secondary injection method including submission of calibration and testing certificates. (q) B 62 X 3 (i) First Year
1. Testing and callibration of following types relays located at different Sub-Stations at NSCBI Airport by the secondary injection method including submission of calibration and testing certificates. (q) B 62 X 3 (ii) Second Year
1. Testing and callibration of following types relays located at different Sub-Stations at NSCBI Airport by the secondary injection method including submission of calibration and testing certificates. (r ) B 24 (i) First Year
1. Testing and callibration of following types relays located at different Sub-Stations at NSCBI Airport by the secondary injection method including submission of calibration and testing certificates. (r ) B 24 (ii) Second Year
1. Testing and callibration of following types relays located at different Sub-Stations at NSCBI Airport by the secondary injection method including submission of calibration and testing certificates. (s) MIT 103 (i) First Year
1. Testing and callibration of following types relays located at different Sub-Stations at NSCBI Airport by the secondary injection method including submission of calibration and testing certificates. (s) MIT 103 (ii) Second Year
1. Testing and callibration of following types relays located at different Sub-Stations at NSCBI Airport by the secondary injection method including submission of calibration and testing certificates. (t) B 33 (i) First Year
1. Testing and callibration of following types relays located at different Sub-Stations at NSCBI Airport by the secondary injection method including submission of calibration and testing certificates. (t) B 33 (ii) Second Year
1. Testing and callibration of following types relays located at different Sub-Stations at NSCBI Airport by the secondary injection method including submission of calibration and testing certificates. (u) ACDR 31 HS (i) First Year
1. Testing and callibration of following types relays located at different Sub-Stations at NSCBI Airport by the secondary injection method including submission of calibration and testing certificates. (u) ACDR 31 HS (ii) Second Year
1. Testing and callibration of following types relays located at different Sub-Stations at NSCBI Airport by the secondary injection method including submission of calibration and testing certificates. (v) 2TJM10 (i) First Year
1. Testing and callibration of following types relays located at different Sub-Stations at NSCBI Airport by the secondary injection method including submission of calibration and testing certificates. (v) 2TJM10 (ii) Second Year
1. Testing and callibration of following types relays located at different Sub-Stations at NSCBI Airport by the secondary injection method including submission of calibration and testing certificates. (W) VIP 35 (i) First Year
1. Testing and callibration of following types relays located at different Sub-Stations at NSCBI Airport by the secondary injection method including submission of calibration and testing certificates. (w) VIP 35 (ii) Second Year
1. Testing and callibration of following types relays located at different Sub-Stations at NSCBI Airport by the secondary injection method including submission of calibration and testing certificates. (x) ADR 141S (i) First Year
1. Testing and callibration of following types relays located at different Sub-Stations at NSCBI Airport by the secondary injection method including submission of calibration and testing certificates. (x) ADR 141S (ii) Second Year
1. Testing and callibration of following types relays located at different Sub-Stations at NSCBI Airport by the secondary injection method including submission of calibration and testing certificates. (y) VAA 32 (i) First Year
1. Testing and callibration of following types relays located at different Sub-Stations at NSCBI Airport by the secondary injection method including submission of calibration and testing certificates. (y) VAA 32 (ii) Second Year
SH- E: Painting & lettering of various panels, feeder pillars, transformers, DG sets etc. 1. Scrubbing, cleaning the existing surface of cubicle panel at different substations and feeder pillars & spray painting the same with two coats of ISI marked synthetic enamel paint of approved colour over one coat of red oxide metal primer etc. as required. (a) First Year
1. Scrubbing, cleaning the existing surface of cubicle panel at different substations and feeder pillars & spray painting the same with two coats of ISI marked synthetic enamel paint of approved colour over one coat of red oxide metal primer etc. as required. (b) Second Year
2. Cleaning the existing surface of cubicle panel at different substations and feeder pillars & spray painting the same with two coats of ISI marked synthetic enamel paint of approved colour etc. as required. (a) First Year
2. Cleaning the existing surface of cubicle panel at different substations and feeder pillars & spray painting the same with two coats of ISI marked synthetic enamel paint of approved colour etc. as required. (b) Second Year
3. Scrubbing, cleaning, the old paint from the existing surface of rolling shutters at different substations and painting the same with two coats of ISI marked synthetic enamel paint of approved colour etc. as required. (a) First Year
3. Scrubbing, cleaning, the old paint from the existing surface of rolling shutters at different substations and painting the same with two coats of ISI marked synthetic enamel paint of approved colour etc. as required. (b) Second Year
4. Scrubbing, cleaning the old paint from the existing surface of power transformer of following capacity located at different substations and spray painting the same transformers with two coats of ISI marked synthetic enamel paint / aluminum paint or as per existing paint of approved colour etc. as required. (a)Above 100KVA upto 500KVA Transformer. (i) First Year
4. Scrubbing, cleaning the old paint from the existing surface of power transformer of following capacity located at different substations and spray painting the same transformers with two coats of ISI marked synthetic enamel paint / aluminum paint or as per existing paint of approved colour etc. as required. (a) Above 100KVA upto 500KVA Transformer. (ii) Second Year
4. Scrubbing, cleaning the old paint from the existing surface of power transformer of following capacity located at different substations and spray painting the same transformers with two coats of ISI marked synthetic enamel paint / aluminum paint or as per existing paint of approved colour etc. as required. (b) Above 500 KVA upto 2000 KVA Transformer. (i) First Year
4. Scrubbing, cleaning the old paint from the existing surface of power transformer of following capacity located at different substations and spray painting the same transformers with two coats of ISI marked synthetic enamel paint / aluminum paint or as per existing paint of approved colour etc. as required. (b) Above 500 KVA upto 2000 KVA Transformer. (ii) Second Year
4. Scrubbing, cleaning the old paint from the existing surface of power transformer of following capacity located at different substations and spray painting the same transformers with two coats of ISI marked synthetic enamel paint / aluminum paint or as per existing paint of approved colour etc. as required. (c ) 20000 KVA Transformer. (i) First Year
4. Scrubbing, cleaning the old paint from the existing surface of power transformer of following capacity located at different substations and spray painting the same transformers with two coats of ISI marked synthetic enamel paint / aluminum paint or as per existing paint of approved colour etc. as required. (c ) 20000 KVA Transformer. (ii) Second Year
5. Lettering of maximum 2" size (Alpha / numerical) on the finished painted surface of feeder pillar / panel / earth pits with synthetic enamel paint of approved colour etc. as required. (a) First Year
5. Lettering of maximum 2" size (Alpha / numerical) on the finished painted surface of feeder pillar / panel / earth pits with synthetic enamel paint of approved colour etc. as required. (b) Second Year
6. Cleaning, rubbing the old paint from the existing surface of DG set installed at different power houses and painting the same with heat proof spray painting with two coats of synthetic enamel paint of approved colour i/c. lettering, numbering etc. as required. (a) Upto 500 KVA DG sets (i) First Year
6. Cleaning, rubbing the old paint from the existing surface of DG set installed at different power houses and painting the same with heat proof spray painting with two coats of synthetic enamel paint of approved colour i/c. lettering, numbering etc. as required. (a) Upto 500 KVA DG sets (ii) Second Year
7. vCleaning the surface of chequered plates at different sub-stations and painting with two coats of synthetic enamel black paint etc. as required. (a) First Year
7. Cleaning the surface of chequered plates at different sub-stations and painting with two coats of synthetic enamel black paint etc. as required. (b) Second Year
8. Supply and fixing of 6 mm thick chequerred plates i/c. welding, painting with a coat of red lead primer etc. as required and as per direction of Engineer-in-Charge. (a) First Year
8. Supply and fixing of 6 mm thick chequerred plates i/c. welding, painting with a coat of red lead primer etc. as required and as per direction of Engineer-in-Charge. (b) Second Year
9. Supply and fixing of MS channel of size 75 x 40 mm (ISMC 75) of suitable lengths i/c grouting on the roof/wall, welding, painting with a coat of red lead primer etc. as required and as per direction of Engineer-in-Charge. (a) First Year
9. Supply and fixing of MS channel of size 75 x 40 mm (ISMC 75) of suitable lengths i/c grouting on the roof/wall, welding, painting with a coat of red lead primer etc. as required and as per direction of Engineer-in-Charge. (b) Second Year
10. Supply and fixing of MS angle of size 50x50x6 mm i/c grouting on the roof/wall, welding, painting with a coat of red lead primer etc. as required and as per direction of Engineer-in-Charge. (a) First Year
10. Supply and fixing of MS angle of size 50x50x6 mm i/c grouting on the roof/wall, welding, painting with a coat of red lead primer etc. as required and as per direction of Engineer-in-Charge. (b) Second Year
11. Repairing of existing rolling shutter at different substations of various sizes after removing the same from existing frame and frame work, shutter rail, shaft, side guides and arrangement for inside operation etc. including all servicing, greasing, oiling, repairing of locking arrangement complete fixing as per direction of Engineer-in- charge . (a) First Year
11. Repairing of existing rolling shutter at different substations of various sizes after removing the same from existing frame and frame work, shutter rail, shaft, side guides and arrangement for inside operation etc. including all servicing, greasing, oiling, repairing of locking arrangement complete fixing as per direction of Engineer-in- charge . (b) Second Year
12. Supply and fixing of following spares of rolling shutters as required while repairing of rolling shutters as item no. 11 above. (a) 18 inch long 2 SWG steel wire spring. (i) First Year
12. Supply and fixing of following spares of rolling shutters as required while repairing of rolling shutters as item no. 11 above. (a) 18 inch long 2 SWG steel wire spring. (ii) Second Year
12.Supply and fixing of following spares of rolling shutters as required while repairing of rolling shutters as item no. 11 above. (b) Rolling shutter profile (i) First Year
12. Supply and fixing of following spares of rolling shutters as required while repairing of rolling shutters as item no. 11 above. (b) Rolling shutter profile (ii) Second Year
12. Supply and fixing of following spares of rolling shutters as required while repairing of rolling shutters as item no. 11 above. (c ) Worm with worm wheel and shaft. (i) First Year
12. Supply and fixing of following spares of rolling shutters as required while repairing of rolling shutters as item no. 11 above. (c ) Worm with worm wheel and shaft. (ii) Second Year
12. Supply and fixing of following spares of rolling shutters as required while repairing of rolling shutters as item no. 11 above. (d) Ball bearing with accessories. (i) First Year
12. Supply and fixing of following spares of rolling shutters as required while repairing of rolling shutters as item no. 11 above. (d) Ball bearing with accessories. (ii) Second Year
12. Supply and fixing of following spares of rolling shutters as required while repairing of rolling shutters as item no. 11 above. (e ) Gear box. (i) First Year
12. 12. Supply and fixing of following spares of rolling shutters as required while repairing of rolling shutters as item no. 11 above. (e ) Gear box. (ii) Second Year
SH- F: Reparing of Sump Pump 1. Dismantling of pump set (NS 40 / 200T, 2.2 KW / NS 50 / 200T, 3.7 KW) and reassembling of the same after rectification of fauls followed by necessary testing. (i) First Year
1. Dismantling of pump set (NS 40 / 200T, 2.2 KW / NS 50 / 200T, 3.7 KW) and reassembling of the same after rectification of fauls followed by necessary testing. (ii) Second Year
2. Rewinding of the stator along with necessary heat varnishing for pump type NS 40 / 200T, 2.2 KW of Kirlosker make. (i) First Year
2. Rewinding of the stator along with necessary heat varnishing for pump type NS 40 / 200T, 2.2 KW of Kirlosker make. (ii) SecondYear
2. Rewinding of the stator along with necessary heat varnishing for pump type NS 40 / 200T, 2.2 KW of Kirlosker make. (a) Replacement of thermostat sensor on winding. (i) First ear
2. Rewinding of the stator along with necessary heat varnishing for pump type NS 40 / 200T, 2.2 KW of Kirlosker make. (a) Replacement of thermostat sensor on winding. (ii) Second Year
2. Rewinding of the stator along with necessary heat varnishing for pump type NS 40 / 200T, 2.2 KW of Kirlosker make. (b) Replacement of "O" ring set, draining out of old lubricant and refilling new. (i) First Year
2. Rewinding of the stator along with necessary heat varnishing for pump type NS 40 / 200T, 2.2 KW of Kirlosker make. (b) Replacement of "O" ring set, draining out of old lubricant and refilling new. (ii) Second Year
2.Rewinding of the stator along with necessary heat varnishing for pump type NS 40 / 200T, 2.2 KW of Kirlosker make. (c ) Replacment of upper and lower mechanical seal. (i) First Year
2. Rewinding of the stator along with necessary heat varnishing for pump type NS 40 / 200T, 2.2 KW of Kirlosker make. (c ) Replacement of upper and lower mechanical seal. (ii) Second Year
2. Rewinding of the stator along with necessary heat varnishing for pump type NS 40 / 200T, 2.2 KW of Kirlosker make. (d) Replacement of bearing 6305 2 RS 252 00. (i) First Year
2. Rewinding of the stator along with necessary heat varnishing for pump type NS 40 / 200T, 2.2 KW of Kirlosker make. (d) Replacement of bearing 6305 2 RS 252 00. (ii) Second Year
2. Rewinding of the stator along with necessary heat varnishing for pump type NS 40 / 200T, 2.2 KW of Kirlosker make. (e ) Replacement of upper and lower mechanical seal. (i) Uper mechanical seal (a) First Year
2. Rewinding of the stator along with necessary heat varnishing for pump type NS 40 / 200T, 2.2 KW of Kirlosker make. (e ) Replacement of upper and lower mechanical seal. (i) Uper mechanical seal (b) Second Year
2. Rewinding of the stator along with necessary heat varnishing for pump type NS 40 / 200T, 2.2 KW of Kirlosker make. (e ) Replacement of upper and lower mechanical seal. (ii) Lower mechanical seal (a) First Year
2. Rewinding of the stator along with necessary heat varnishing for pump type NS 40 / 200T, 2.2 KW of Kirlosker make. (e ) Replacement of upper and lower mechanical seal. (ii) Lower mechanical seal (b) Second Year
3. Rewinding of the stator along with necessary heat varnishing for pump type NS 50 / 200T, 3.7 KW of Kirlosker make. (i) First Year
3. Rewinding of the stator along with necessary heat varnishing for pump type NS 50 / 200T, 3.7 KW of Kirlosker make. (ii) Second Year
3. Rewinding of the stator along with necessary heat varnishing for pump type NS 50 / 200T, 3.7 KW of Kirlosker make. (a) Replacement of thermostat sensor on winding. (i) First Year
3. Rewinding of the stator along with necessary heat varnishing for pump type NS 50 / 200T, 3.7 KW of Kirlosker make. (a) Replacement of thermostat sensor on winding. (ii) Second Year
3. Rewinding of the stator along with necessary heat varnishing for pump type NS 50 / 200T, 3.7 KW of Kirlosker make. (b) Replacement of "O" ring set, draining out of old lubricant and refilling new. (i) First Year
3. Rewinding of the stator along with necessary heat varnishing for pump type NS 50 / 200T, 3.7 KW of Kirlosker make. (b) Replacement of "O" ring set, draining out of old lubricant and refilling new. (ii) Second Year
3. Rewinding of the stator along with necessary heat varnishing for pump type NS 50 / 200T, 3.7 KW of Kirlosker make. (c ) Replacement of bearing 6307 2 RS 490 00. (i) First Year
3. Rewinding of the stator along with necessary heat varnishing for pump type NS 50 / 200T, 3.7 KW of Kirlosker make. (c ) Replacement of bearing 6307 2 RS 490 00. (ii) Second Year
3. Rewinding of the stator along with necessary heat varnishing for pump type NS 50 / 200T, 3.7 KW of Kirlosker make. (d) Replacement of bearing 6305 2 RS 252 00. (i) First Year
3. Rewinding of the stator along with necessary heat varnishing for pump type NS 50 / 200T, 3.7 KW of Kirlosker make. (d) Replacement of bearing 6305 2 RS 252 00. (ii) Second Year
3. Rewinding of the stator along with necessary heat varnishing for pump type NS 50 / 200T, 3.7 KW of Kirlosker make. (e ) Replacement of upper and lower mechanical seal. (i) Uper machanical seal. (a) First Year
3. Rewinding of the stator along with necessary heat varnishing for pump type NS 50 / 200T, 3.7 KW of Kirlosker make. (e ) Replacement of upper and lower mechanical seal. (i) Uper machanical seal. (b) Second Year
3. Rewinding of the stator along with necessary heat varnishing for pump type NS 50 / 200T, 3.7 KW of Kirlosker make. (e ) Replacement of upper and lower mechanical seal. (ii) lower mechanical seal (a) First Year
3. Rewinding of the stator along with necessary heat varnishing for pump type NS 50 / 200T, 3.7 KW of Kirlosker make. (e ) Replacement of upper and lower mechanical seal. (ii) lower mechanical seal (b) Second Year
SH- G: Callibration of Tools & Plants. 1. Insulation Tester, 500 Volt / 0 - 200 M Ω, Make CIE, (Sl. No. 84244). (a) First Year
1. Insulation Tester, 500 Volt / 0 - 200 M Ω, Make CIE, (Sl. No. 84244). (b) SecondYear
2. Insulation Tester, 1000 Volt / 0 - 500 M Ω, Make CIE, (Sl. No. 84174). (a) First Year
2.Insulation Tester, 1000 Volt / 0 - 500 M Ω, Make CIE, (Sl. No. 84174). (b) Second Year
3. Insulation Tester, 100 Volt / 0 - 1000 M Ω, Make CIE, (Sl. No. 84230). (a) First Year
3. Insulation Tester, 100 Volt / 0 - 1000 M Ω, Make CIE, (Sl. No. 84230). (b) Second Year
4. Motorised Insulation Tester, 5000 Volt / 0 - 10000 M Ω, Make CIE, (Sl. No. 18595). (a) First Year
4. Motorised Insulation Tester, 5000 Volt / 0 - 10000 M Ω, Make CIE, (Sl. No. 18595). (b) Second Year
5. Earth Tester, 0 - 10 Ω, Make CIE, (Sl. No. 21223). (a) First Year
5. Earth Tester, 0 - 10 Ω, Make CIE, (Sl. No. 21223). (b) Second Year
6. Digital Clamp Meter, AC / DC, 02 / 20 A to 400 A, Make CIE, (Sl. No. 140520260). (a) Firsst Year
6. Digital Clamp Meter, AC / DC, 02 / 20 A to 400 A, Make CIE, (Sl. No. 140520260). (b) Second Year
7. Digital Clamp Meter, AC / DC, 600 A to 2000 A, Make CIE, (Sl. No. 13080316). (a) First Year
7. Digital Clamp Meter, AC / DC, 600 A to 2000 A, Make CIE, (Sl. No. 13080316). (b) Second Year
A R Rural Electricals
Sterling And Wilson Pvt. Ltd
SHREE GOURI ELECTRIC ENTERPRISE
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .