| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.4 CrAccepted-AOC NANDNI VIHAR ADHOIWALA DEHRADUN | ₹4.4 Cr | L1 | Accepted-AOC AOC |
| 2 | L2₹4.7 Cr+₹26.7 L (6.07%)Rejected-Finance VILLAGE KAIRWAN KARANPUR PO RAJPUR DEHRADUN | DEHRADUN | DEHRADUN | UTTARAKHAND | ₹4.7 Cr+₹26.7 L (6.07%) | L2 | Rejected-Finance Second Lowest |
Tender Value
₹4.4 Cr
EMD Value
₹8.8 L
Closing Date
15 Sept 2022, 5:00 pmClosed
Superintending Engineer
Office of the Superintending Engineer Construction Circle Uttarakhand Peyjal Nigam New Tehri
Construction of PATA SANGRALI water supply scheme of Block Bhatwari District Uttarkashi
2022_MDPEY_48416_1
1796/508/160 Dated 24.08.2022
Open Tender
Civil Works
Item Rate
365 days
Block Bhatwari District Uttarkashi
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,900
Executive Engineer Construction Division UKPJN
₹8.8 L
New Tehri
29 Mar 2023
27 Aug 2022
19 Sept 2022
27 Aug 2022
15 Sept 2022
31 Aug 2022
30 Aug 2022
Amount
Distribution System and Gravity mains:- Supply , laying & jointing of G.I.(medum) screwed pipes (including supply of all jointing materials like specials, white lead, hemp and oil etc complete .) in trenches with its cutting, threading and testing of pipe line etc complete.
40 mm dia
65mm dia
80 mm dia
100 mm dia
Supply , laying & jointing of G.I.(Heavy Class) screwed pipes (including supply of all jointing materials like specials, white lead, hemp and oil etc complete .) in trenches with its cutting, threading and testing of pipe line etc complete.
65 mm dia
Providing of all materials,carting from site store to site of work,laying & jointing of MSERW pipes,including supply of all jointing materials such as welding rod,generator in trenches with its cutting, welding and testing of pipe line etc. complete.
65 mm dia 4.0 mm thick
65 mm dia 4.4 mm thick
Making briddle path 2.00 m wide for welding of 65 mm dia MSERW Pipes.
Painting of MSERW pipes outerside and innerside with black japan paint including supply of all materials,T&P etc complete.
Excavation of earth for pipe line in following strata lift upto 1.5m. Lead upto 30m. Including refilling,watering,ramming of excavated earth into the trenches and removal of surplus earth upto adistance of 60m. Fromtrenches including supply of labour,T&P.etc complete.Assuming that 90%pipe line is laid in trenches ,it is estimated that 75% exavation will be in soil mixed with shingle,bajri&boulders and rest 25%will be in soft rock.
Soil mixed with boulder and bajri
Soft rock
Supply and fixing of the following fittings including cartage of materials, labours, T&P etc complete. (Gate valves (Class-I) as per I S 778/1997)
80 mm dia
100 mm dia
Supply and fixing of the following fittings including cartage of materials, labours, T&P etc complete. (High head cast iron air valves (Class-I) as per I S 778/1997)
15 mm (T.P-10 kg/sqcm)
Supply of all materials, labours, T&P etc and construct gate valve chamber as per type design complete.(.60x0.6x0.75)
Supply of all materials, labours, T&P etc and construct gate valve chamber as per type design complete.(0.45x0.45x0.75)
Supply of all materials,labours,T&P etc.repairing of existing R.C.C.C.W.R 20 KL capacity
Excavation in ordinary soil mixed with shingle, boulder requiring special T&P like pickaxe, crowbar etc. for foundation including lift upto 1.5 m. and Lead upto 30 m. Including refilling, watering, ramming of excavated earth into the trenches or space between the sides of foundation trenches or in to the plinth and removal and disposal of surplus earth upto a distance of 60 m. from trenches nearby sources, along the pipe line .
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - -All work upto plinth level 1:4:8 (1 Cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size).
Random Rubble stone masonry in 1:6 with cement and sand mortar including supply of all materials, labour, T&P etc. complete.
Random Rubble stone masonry laid dry including supply of all materials, labour, T&P etc. complete.
Construction of B.F.G. WITH 4.0 M cross wall at tapping point for collection of waater including supply of all materials,labour T&P etc complete.
Construction of B.F.G. WITH extra length tapping point for collection of waater including supply of all materials,labour T&P etc complete.
Construction of R.C.C. roughening filter cum screening chamber near by tapping point of under existing water supply scheme, for collection of water including supply of all materials, labour , T&P etc.(2x1)mtr size
Construction of cross wall including supply of all materials , labour ,T&P ect complete as per direction of engineer incharge
P.C.C. Drain
SAKLA NAND LAKHERA
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .