Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.1 LAccepted-AOC | ₹9.1 L | L1 | Accepted-AOC L1 |
Tender Value
₹9.3 L
EMD Value
₹18,673
Closing Date
5 Mar 2026, 3:00 pmClosed
Executive Engineer, Div-II, AMC
O/O the Executive Engineer, Div-II, AMC
Construction of drain with cover slab from the i. H.O Khirodh Debbarma to H.O Ananta Jamatia via ii. H.O Archana Chakraborty, under ward no.11, AMC
2026_SAMC_70924_1
73/Div-II/AMC/2025-26
Open Tender
Civil Works
120 days
Ward No.11, AMC
Please refer Tender documents.
4 documents required · 4 mandatory
₹1,000
₹18,673
12 May 2026
24 Feb 2026
5 Mar 2026
24 Feb 2026
5 Mar 2026
24 Feb 2026
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil.
Supplying and filling in plinth, under floor, foundations etc. with sand (fine) from local quarry with all lifts including spreading in horizontal layers, watering, grading to required slope, ramming, consolidating and compacting each layer by using plate compactor or by any suitable method complete
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering --All work upto plinth level: 1:3:6 ( 1 Cement: 3 fine sand : 6 graded well burnt brick aggregate 20 mm nominal size).
First class brick work in foundation and plinth including cost of all materials as required complete: In cement mortar 1:4 ( 1 cement : 4 fine sand ).
Half brickmasonryworkwith first class bricks in foundationandplinthincludingcostofallmaterialsas required complete: In cement mortar 1:4 ( 1 cement : 4 fine sand ).
12 mm cement plaster of mix: Cement mortar 1:4 (1 cement : 4 fine sand), Neat cement punning.
Centering shuttering including struttings, propping etc. and removal of form work for: Foundations, footings, bases for columns etc. for mass concrete with timber plank
Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more
Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement--All work upto plinth level. 1:2:4 ( 1 Cement: 2 fine sand : 4 graded stone aggregate 20 mm nominal size)
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering --All work upto plinth level: 1:2:4 ( 1 Cement: 2 fine sand : 4 graded stone aggregate 20 mm nominal size)
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_72165.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.39 MB
DNIet73.pdf
Tender Documents • 2.76 MB
BOQ_72165.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid