Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹10.5 CrAccepted-AOC | ₹10.5 Cr | L-1 | Accepted-AOC L-1 |
| 2 | L-2₹10.9 CrRejected-AOC 1397 STREET NO 20 TARNAKA SECUNDERABAD 500017 TELANGANA INDIA | HYDERABAD | TELANGANA | 500017 | ₹10.9 Cr | L-2 | Rejected-AOC L-2 |
| 3 | L-3₹11.3 CrRejected-AOC | ₹11.3 Cr | L-3 | Rejected-AOC L-3 |
| 4 | L-4₹13.3 CrRejected-AOC | ₹13.3 Cr | L-4 | Rejected-AOC L-4 |
| 5 | Rejected-Technical | - | - | Rejected-Technical Technically rejected. |
Tender Value
Refer Docs
EMD Value
₹11.0 L
Closing Date
9 Nov 2019, 3:00 pmClosed
Shri C.S. LALL
AGM (ELECT.) CONTRACTS, CPP, NALCO, ANGUL
MAINTENANCE OF NALCOS ROLLING STOCKS AT SMELTER AND POWER COMPLEX, ANGUL
2019_NALCO_509611_1
MC-4826
Open Tender
Miscellaneous Services
730 days
CPP, NALCO, ANGUL
Please refer Tender documents.
8 documents required · 8 mandatory
₹500
Yes
NATIONAL ALUMINIUM COMPANY LIMITED
₹11.0 L
Yes
24 Feb 2021
9 Oct 2019
14 Nov 2019
9 Oct 2019
9 Nov 2019
9 Oct 2019
Amount
Miaint.of WDS6 locomotive W/s equipment: Maintenance of WDS6 Locomotive and workshop Equipments including plant & machineries as per scope of work(Excluding that are covered in the following items) for 7 nos of WDS6 Locomotives. Noe:- LPE= Lump Sum per equipment per month
Maint. of WDG3A Locomotive as per SOW: Maintenance of WDG3A Locomotives as per scope of work for 03 numbers of WDG3A Locomotives Note:- UOM-LPE- Lump sum per month per equipment (i.eWDG3A Locomotive)
Miantenance of Surface Wheel lathe: Maintenance of CNC SurfaceWheel Turning Lathe Note:-UOM- LPE= Lump sum per month per equipment.
O&M of Godrej make 3Ton Forklift: Operation and Maintenance of Godrej Make Forklift. UOM Note:- LPE= Lump sum per month per equipment.
Miantenance of Overhead Crane-2 nos.: Maintenance of Overhead Cranes as per Scope of work for 2 numbers of crane. UOM Note:- LPE= Lump Sum per month per equipment.
Maintenance of Air Compressor-3 nos: Maintenance of Air Compressor as per scope of work-for 3 numbers of air compressor. UOM Note:- LPE= Lump sum per month per equipment (i.e compressor)
Maintenance of FIP test stand-1 no: Maintenance of FIP (Fuel Injection Pump) test stand. UOM Note: LPE= Lump sum per month per equipment.
POH of BTAP wagons: POH (Periodic Overhauling)of BTAP wagon
ROH of BTAP wagons: ROH ( Routine Overhauling ) of BTAP Wagon
Intensive Examination of BTAP Wagons: Intensive Examination (I.E) of BTAP Wagons as per scope of work.
Miantenance of Coal Wagon(Excluding POH): Maintenance of Coal Wagons (Excluding POH) as per scope of work.- 65 numbers UOM Note: LPE Lump sum per month per equipment (i.e Coal Wagon)
Daily Train Examination of Coal Wagon: Daily Train Examination of coal wagon in the coal rakes as per scope of work.
POH of Coal Wagon: POH (Periodic Overhauling of) of Coal wagon as per scope of work.
Painting of Coal Wagon: Painting of Coal wagon as per scope of work.
United Rail Road Consultants Private Limited
UNITED TECHNICAL AND ECONOMIC SERVICES P LTD
LIFT AND SHIFT
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid