Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹37.7 LAccepted-AOC UTTAR PRADESH | ₹37.7 L | L1 | Accepted-AOC L1 |
| 2 | L2₹40.0 LRejected-Finance D 128 SECTOR 10 NOIDA | GAUTAM BUDDHA NAGAR | UTTAR PRADESH | 201301 | ₹40.0 L | L2 | Rejected-Finance L2 |
| 3 | Rejected-Technical HIG 40 TYPE B DEV PRAYAGAM ADA COLONY JHALWA PRAYAGRAJ U P 211015 | PRAYAGRAJ | PRAYAGRAJ | UTTAR PRADESH | 211015 | - | - | Rejected-Technical Non-responsive |
| 4 | Rejected-Technical | - | - | Rejected-Technical Non-responsive |
Tender Value
₹40 L
EMD Value
₹4 L
Closing Date
22 Apr 2026, 12:00 pmClosed
SE mzp circle pwd mirzapur
SE mzp circle pwd mirzapur
Rohi najarpur marg ke km 1 me kshatigrast puliya ka vishesh marammat ka karya
2026_CEMRZ_1134077_1
1648/53M-mzp cir/2025-26 Date-06.04.2026
Open Tender
Civil Works - Bridges
90 days
bhadohi
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,720
Yes
₹4 L
Yes
SE mzp circle pwd mirzapur
22 May 2026
16 Apr 2026
22 Apr 2026
16 Apr 2026
22 Apr 2026
16 Apr 2026
20 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. | - | Cum | - | - |
| 2 | Sand Filling in Foundation Trenches as per Drawing & Technical Specification NO 304 | - | Cum | - | - |
| 3 | Plain/Reinforced Cement Concrete complete as per Drawing and Technical Specifications.21.03(PCC Grade M15 using batching plant & Concrete pump) | - | Cum | - | - |
| 4 | Brick Masonry Work in Cement Mortar 1:3 in Foundation complete excluding Pointing and Plastering, as per Drawing and Technical Specifications.1300&2200 | - | Cum | - | - |
| 5 | Flexible Apron-Construction of flexible apron 1 m thick comprising of loose stone boulder weighing not less than 40 kg beyond curtain wall. | - | Cum | - | - |
| 6 | Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 12.08 ( M-30 RCC in super-structure as per drawing and technical specification.) | - | Cum | - | - |
| 7 | Providing and laying cement concrete wearing course M 35 including reinforcement complete as per drawing and technical specifications clauses 12.09 | - | Cum | - | - |
| 8 | Providing weep holes in brick masonry/ Plain/Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1:20 (V:H) towards drawing force. Complete as per drawing and technical specifcations. | - | running meter | - | - |
| 9 | Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2 of MoRTH specification to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and technical specification. | - | Sqm | - | - |
| 10 | Drainage spouts complete as per drawing and technical specifications Clause 1209 | - | Nos | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.68 MB
Tendernotice_2.pdf
PDF • 1.30 MB
BOQ_2116998.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid