| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹66.0 LAccepted-AOC | ₹66.0 L | L1 | Accepted-AOC Awarded the work as lowest bidder has quoted his rate nine point nine nine percent below. |
| 2 | L2₹67.1 L+₹1.1 L (1.60%)Rejected-AOC | ₹67.1 L+₹1.1 L (1.60%) | L2 | Rejected-AOC Not awarded due to higher rate compare to lowest bidder |
| 3 | L3₹69.7 L+₹3.7 L (5.54%)Rejected-AOC VILL P O ARALIA SONAMURA SONAMURA SEPAHIJALA TRIPURA | SEPAHIJALA | TRIPURA | 799011 | ₹69.7 L+₹3.7 L (5.54%) | L3 | Rejected-AOC Not awarded due to higher rate compare to lowest bidder |
| 4 | L4₹76.2 L+₹10.3 L (15.5%)Rejected-AOC GARJANMURA GARJANMURA GP UDAIPUR GOMATI PIN 799114 | UDAIPUR | GOMATI | TRIPURA | 799114 | ₹76.2 L+₹10.3 L (15.5%) | L4 | Rejected-AOC Not awarded due to higher rate compare to lowest bidder |
| 5 | L5₹77.0 L+₹11.0 L (16.6%)Rejected-AOC BANKAR SBC NAGAR BELONIA SOUTH TRIPURA PIN 799155 | BELONIA | SOUTH TRIPURA | TRIPURA | 799155 | ₹77.0 L+₹11.0 L (16.6%) | L5 | Rejected-AOC Not awarded due to higher rate compare to lowest bidder |
Tender Value
₹73.3 L
EMD Value
₹1.5 L
Closing Date
13 Feb 2026, 3:00 pmClosed
Executive Engineer
O/O. the Executive Engineer, PWD(RandB) Belonia Division, South Tripura
Stone grouting, Patch metalling (Jhama Brick), Re-carpeting using manual means and other allied works.
2026_CEPWD_69921_1
65/NIT/SE-III/R/PWDRandB/25-26
Open Tender
Civil Works - Roads
Percentage
90 days
B.C. Nagar R.D. Block area
Please refer Tender documents.
5 documents required · 5 mandatory
₹4,000
₹1.5 L
11 May 2026
5 Feb 2026
13 Feb 2026
5 Feb 2026
13 Feb 2026
5 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Maintenance of bituminous surface road
Repair to pot holes by removal of failed material, trimming the sides to vertical and levelling the bottom, cleaning the same with compressed air or any appropriate method, filled with 75 mm B.M, after applying bitumen emulsion prime coat at the bottom and bitumen emulsion tack coat on sides and on bottom as per MoRD technical specification Clauses 1900, 502, 503 and 504. | 25 | Cum | 18,324.5 | ₹4,58,112.5 |
| 2 | Road side Pucca Drains
Construction of road side pucca drain with M10 (1:3:6 with jhama brick aggregate) to specified lines, grades, levels and dimensions as per approved design and MoRD Technical Specification Clause 307, 1606. Excavated material to be used in embankment at site. (including centering, shuttering, etc. but excluding reinforcement)
a) Trapezoidal drain (top clear width 600 mm, bottom clear width 300 mm and clear depth of 400 mm)
i) In Ordinary Soil | 65 | Mtr | 3,540.13 | ₹2,30,108.45 |
| 3 | Construction of toe walls for protection of slopes as per Drawing and MoRD technical specifications Clause 1302.5 (including centering, shuttering staging etc. but excluding reinforcement)
a) Cement concrete grade M 10 (using jhama brick aggregate) in case of concrete block pitching
i) Nominal mix 1:3:6 | 40 | Cum | 9,820.38 | ₹3,92,815.2 |
| 4 | Excavation for Structures
A. Without dewatering.
Earthwork in excavation for structures as per drawing and MoRD technical specifications Clause 305.1 including setting out, construction of shoring & bracing, removal of stumps & other deleterious material and disposal upto a lead of 50 m, dressing of sides & bottom and backfilling in trenches with excavated suitable material.
(I) Ordinary Soil
(i)Upto 3 m depth | 82.2 | Cum | 458.2 | ₹37,664.04 |
| 5 | Filling in foundation trenches as per drawing & MoRD technical specification Clause 305.3.9, 1200
(I) Sand filling | 5.58 | Cum | 1,361.06 | ₹7,594.71 |
| 6 | Providing concrete for plain concrete ( using jhama brick aggregate ) in open foundations complete including formwork as per drawings & MoRD technical specifications Clauses 802, 803, 900, 1202 and 1203. (including centering, shuttering, staging etc. but excluding reinforcement)
(I) P.C.C grade M 10( using jhama brick aggregate)
(i) Nominal mix 1:3:6 | 5.58 | Cum | 9,484.8 | ₹52,925.18 |
| 7 | Plain/reinforced cement concrete in substructure complete including formwork as per drawings & MoRD technical specification Clauses 802, 804, 805, 806, 807, 900, 1202 & 1204. (including centering, shuttering, staging etc. but excluding reinforcement)
i) R.C.C grade M-25
a) upto 5 m height | 28.24 | Cum | 12,756.65 | ₹3,60,222.28 |
| 8 | Supplying, fitting & placing Thermo-Mechanically treated bar/ Cold twisted deformed steel bar in substructure complete as per drawings & MoRD technical specification Clauses 1002, 1005, 1010 and 1202. | 3.39 | Tonne | 91,869.48 | ₹3,11,345.67 |
| 9 | Brick masonry work in cement mortar in substructure complete excepting pointing & plastering, as per drawing & MoRD technical specification Clauses 602, 603, 604, 1202 and 1204.
(i) In 1:4 cement mortar | 8 | Cum | 10,172.19 | ₹81,377.52 |
| 10 | Plastering with cement mortar (1:4) 12 mm thick on brickwork / C.C. work including a finishing coat of neat cement punning with 2.75 Kg of cement per sqm in substructure as per MoRD technical specification Clauses 613.4 & 1204 | 31 | Sqm | 231.13 | ₹7,165.03 |
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_71156.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.53 MB
BOQ_71156.xls
BOQ • 0.29 MB
DNIeT65.pdf
Tender Documents • 2.49 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .