Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹10.4 LAccepted-AOC AT DEBIANA P O NIRSA DIST DHANBAD 828205 | DHANBAD | JHARKHAND | 828205 | ₹10.4 L | L-1 | Accepted-AOC as per TC recommendation. |
| 2 | Rejected-Technical AT RAJPURA P O MAGMA DIST DHANBAD 828204 | DHANBAD | JHARKHAND | 828204 | - | - | Rejected-Technical As per TC recommendation. |
| 3 | Rejected-Technical AT PROFESSOR COLONY P O MAITHON DIST DHANBAD 828207 | DHANBAD | JHARKHAND | 828207 | - | - | Rejected-Technical As per TC recommendation. |
| Sl No | Description | Qty | Unit | m/s sanjay construction L3 | M/S OJHA AND SONS L2 | D K GHOSH L1 |
|---|---|---|---|---|---|---|
| 0.00Item Description/ Heading | ||||||
| 1.00 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil. | 50.1 | cum | 200 ₹10,020 | 210 ₹10,521 | 188 ₹9,418.80 |
| 2.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:1½:3 (1 Cement: 1½ coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 45.6 | cum | 6,007 ₹2.7 L | 6,460 ₹2.9 L | 6,458 ₹2.9 L |
| 3.00 | R.C.C. Standards post/ struts/rails/ pales of mix 1:1.5:3 (1 cement : 1.5 coarsesand : 3 graded stone aggregate 12.5 mm nominal size) with wooden plugs or 6mm bar nibs wherever required as per direction of Engineer-in- charge (cost of earth works in excavation, concrete works in foundation to be paid separately). | 18.03 | cum | 6,705 ₹1.2 L | 24,090 ₹4.3 L | 24,077 ₹4.3 L |
| 4.00 | Fencing with R.C.C. post placed at required distance, embedded incement concrete blocks, every 15th post, last but one end post andcorner post shall be strutted on both sides and end post one sideonly, provided with horizontal lines and two diagonals of barbed wireweighing 9.38 kg per 100 metres (minimum), between the two postsfitted and fixed with G.I. staples on wooden plugs or G.I. binding wiretied to 6 mm bar nibs fixed while casting the post (cost of R.C.C.posts, struts, earth work and concrete to be paid for separately) :-Payment to be made per metre cost of total length of barbed wire used.With G.I. barbed wire | 11,004 | metre | 50 ₹5.5 L | 15 ₹1.7 L | 10 ₹1.1 L |
| 5.00 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared. | 3,000 | sqm | 20 ₹60,000 | 15 ₹45,000 | 10 ₹30,000 |
| 6.00 | Total impact of GST for the purpose of CTC | 1 | Nos | 1,82,705.46 ₹1.8 L | 1,70,909.95 ₹1.7 L | 1,58,049.34 ₹1.6 L |
Tender Value
₹10.4 L
EMD Value
₹13,100
Closing Date
16 Sept 2024, 5:00 pmClosed
AE (Civil), Mugma Area
Office of The General Manager, Mugma Area, P.O-Mugma, Dist.- Dhanbad, 828204
Barbed wire fencing along Barmuri Mine drain at Barmuri OCP under Mugma Area.
2024_ECL_316336_1
ECL/GM/MA/CE/24-25/eTender/266 Dt. 30.08.2024
Open Tender
Civil Works - Others
45 days
Barmuri OCP
Please refer Tender documents.
4 documents required · 4 mandatory
₹13,100
23 Apr 2026
5 Sept 2024
17 Sept 2024
5 Sept 2024
16 Sept 2024
6 Sept 2024
6 Sept 2024 - 13 Sept 2024
Amount
Item Description/ Heading
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:1½:3 (1 Cement: 1½ coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)
R.C.C. Standards post/ struts/rails/ pales of mix 1:1.5:3 (1 cement : 1.5 coarsesand : 3 graded stone aggregate 12.5 mm nominal size) with wooden plugs or 6mm bar nibs wherever required as per direction of Engineer-in- charge (cost of earth works in excavation, concrete works in foundation to be paid separately).
Fencing with R.C.C. post placed at required distance, embedded incement concrete blocks, every 15th post, last but one end post andcorner post shall be strutted on both sides and end post one sideonly, provided with horizontal lines and two diagonals of barbed wireweighing 9.38 kg per 100 metres (minimum), between the two postsfitted and fixed with G.I. staples on wooden plugs or G.I. binding wiretied to 6 mm bar nibs fixed while casting the post (cost of R.C.C.posts, struts, earth work and concrete to be paid for separately) :-Payment to be made per metre cost of total length of barbed wire used.With G.I. barbed wire
Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared.
Total impact of GST for the purpose of CTC
M/S OJHA AND SONS
m/s sanjay construction
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 1.09 MB
Tendernotice_2.pdf
PDF • 0.66 MB
BOQ_327823.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid