Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.8 LAccepted-AOC H NO 765 VPO BIHTA TEHSIL BARARA DISTRICT AMBALA 133101 | AMBALA | AMBALA | HARYANA | 133101 | L1 | Accepted-AOC LOA | |
| 2 | L2₹8.0 L+₹20,181 (2.60%)Rejected-Finance S O DALIP SINGH TEJA KHERA DABWALI 125101 | DABWALI | SIRSA | HARYANA | 125101 | L2 | Rejected-Finance Highest |
| Sl No | Description | Qty | Unit | GLOBAL POWER TECH L1 | Dekhora Power & Contructions Private Limited L2 |
|---|---|---|---|---|---|
| 1.00 | Supply, Erection, Testing and Commissioning P.C.C Pole 11 Mtr. Long with all labour and material required to complete the job in all respect upto entire satisfaction of Engineer-in-charge of work. | 9 | Each | 6,500 ₹58,500 Lowest | 6,515 ₹58,635 |
| 2.00 | Supply, Erection, Testing and Commissioning P.C.C Pole 09 Mtr. Long with all labour and material required to complete the job in all respect upto entire satisfaction of Engineer-in-charge of work. | 21 | Each | 3,300 ₹69,300 Lowest | 3,315 ₹69,615 |
| 3.00 | Supply, Erection, Testing and Commissioning ACSR 80mm2 ( plus for jumper of T/F`s) with all labour and material required to complete the job in all respect upto entire satisfaction of Engineer-in-charge of work. | 4,200 | Metre | 100 ₹4,20,000 Lowest | 103 ₹4,32,600 |
| 4.00 | Supply, Erection, Testing and Commissioning LT AB- Cable 3x95 plus 70MM2 with all labour and material required to complete the job in all respect upto entire satisfaction of Engineer-in-charge of work. | 250 | Metre | 410 ₹1,02,500 Lowest | 420 ₹1,05,000 |
| 5.00 | Supply, Erection, Testing and Commissioning V-Shape X-Arm with all labour and material required to complete the job in all respect upto entire satisfaction of Engineer-in-charge of work. | 18 | Each | 1,200 ₹21,600 Lowest | 1,230 ₹22,140 |
| 6.00 | Supply, Erection, Testing and Commissioning Top Hammer with all labour and material required to complete the job in all respect upto entire satisfaction of Engineer-in-charge of work. | 15 | Each | 230 ₹3,450 Lowest | 235 ₹3,525 |
| 7.00 | Supply, Erection, Testing and Commissioning Stay ROD 8` long with Elbow and X-Plate with all labour and material required to complete the job in all respect upto entire satisfaction of Engineer-in-charge of work. | 10 | Each | 1,400 ₹14,000 Lowest | 1,406 ₹14,060 |
| 8.00 | Supply, Erection, Testing and Commissioning Stay wire 7/8 SWG with all labour and material required to complete the job in all respect upto entire satisfaction of Engineer-in-charge of work. | 100 | Kg. | 90 ₹9,000 Lowest | 103 ₹10,300 |
| 9.00 | Supply, Erection, Testing and Commissioning 11 KV Pin Insulator with pin (polymer) with all labour and material required to complete the job in all respect upto entire satisfaction of Engineer-in-charge of work. | 57 | Each | 160 ₹9,120 Lowest | 170 ₹9,690 |
| 10.00 | Supply, Erection, Testing and Commissioning 11 KV Disc Insulator without fitting (Polymer) with all labour and material required to complete the job in all respect upto entire satisfaction of Engineer-in-charge of work. | 20 | Each | 470 ₹9,400 Lowest | 480 ₹9,600 |
Tender Value
₹7.7 L
EMD Value
₹15,420
Closing Date
10 Oct 2025, 3:00 pmClosed
NAVEEN RATHEE
ED - Ambala
Work Programme for Other District Roads (ODRs) for the year 2025-26 Shahbad-Barara-Kala Amb Road to Ugala (Pdg. Shifting of HT/LT Lines from Jalubi to Kaserla Kalan due to road widening by SDE PWD BandR Ambala Cantt under SDO (OP) Sub Division Barara
2025_HRY_474567_1
20254505CEFC DE38 4630 BD0A 77D2272C81A0663BAR
Open Tender
Civil Works
Works
495 days
Ambala Cantt
Work Programme for Other District Roads (ODRs) for the year 2025-26 Shahbad-Barara-Kala Amb Road to Ugala (Pdg. Shifting of HT/LT Lines from Jalubi to Kaserla Kalan due to road widening by SDE PWD BandR Ambala Cantt under SDO (OP) Sub Division Barara
2 documents required · 2 mandatory
₹1,000
₹15,420
Yes
15 Dec 2025
25 Sept 2025
10 Oct 2025
26 Sept 2025
10 Oct 2025
26 Sept 2025
Amount
Supply, Erection, Testing and Commissioning P.C.C Pole 11 Mtr. Long with all labour and material required to complete the job in all respect upto entire satisfaction of Engineer-in-charge of work.
Supply, Erection, Testing and Commissioning P.C.C Pole 09 Mtr. Long with all labour and material required to complete the job in all respect upto entire satisfaction of Engineer-in-charge of work.
Supply, Erection, Testing and Commissioning ACSR 80mm2 ( plus for jumper of T/F`s) with all labour and material required to complete the job in all respect upto entire satisfaction of Engineer-in-charge of work.
Supply, Erection, Testing and Commissioning LT AB- Cable 3x95 plus 70MM2 with all labour and material required to complete the job in all respect upto entire satisfaction of Engineer-in-charge of work.
Supply, Erection, Testing and Commissioning V-Shape X-Arm with all labour and material required to complete the job in all respect upto entire satisfaction of Engineer-in-charge of work.
Supply, Erection, Testing and Commissioning Top Hammer with all labour and material required to complete the job in all respect upto entire satisfaction of Engineer-in-charge of work.
Supply, Erection, Testing and Commissioning Stay ROD 8` long with Elbow and X-Plate with all labour and material required to complete the job in all respect upto entire satisfaction of Engineer-in-charge of work.
Supply, Erection, Testing and Commissioning Stay wire 7/8 SWG with all labour and material required to complete the job in all respect upto entire satisfaction of Engineer-in-charge of work.
Supply, Erection, Testing and Commissioning 11 KV Pin Insulator with pin (polymer) with all labour and material required to complete the job in all respect upto entire satisfaction of Engineer-in-charge of work.
Supply, Erection, Testing and Commissioning 11 KV Disc Insulator without fitting (Polymer) with all labour and material required to complete the job in all respect upto entire satisfaction of Engineer-in-charge of work.
Supply, Erection, Testing and Commissioning MS Channel 75x40x6 mm with all labour and material required to complete the job in all respect upto entire satisfaction of Engineer-in-charge of work.
Supply, Erection, Testing and Commissioning MS Angle 50x50x6 MM with all labour and material required to complete the job in all respect upto entire satisfaction of Engineer-in-charge of work.
Supply, Erection, Testing and Commissioning MS Flat 50x6 mm with all labour and material required to complete the job in all respect upto entire satisfaction of Engineer-in-charge of work.
Supply, Erection, Testing and Commissioning GSL wire 8 swg. with all labour and material required to complete the job in all respect upto entire satisfaction of Engineer-in-charge of work.
Supply, Erection, Testing and Commissioning MS Nut and Bolt of sizes. with all labour and material required to complete the job in all respect upto entire satisfaction of Engineer-in-charge of work.
Supply, Erection, Testing and Commissioning 11KV GO Switch with all labour and material required to complete the job in all respect upto entire satisfaction of Engineer-in-charge of work.
Supply, Erection, Testing and Commissioning T/F Plate form Set with J-Bolt all labour and material required to complete the job in all respect upto entire satisfaction of Engineer-in-charge of work.
Supply, Erection, Testing and Commissioning Earthing ROD with all labour and material required to complete the job in all respect upto entire satisfaction of Engineer-in-charge of work.
Dekhora Power & Contructions Private Limited (BID ID -1350680)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .