Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.6 CrAccepted-AOC GIJROLI DY LIKELY RELATED TO THE WORK LOCATION MENTIONED SPECIFIC ADDRESS NOT PROVIDED FOR THE CONTRACTOR | DAMAN | THE DADRA AND NAGAR HAVELI AND DAMAN AND DIU | 396210 | ₹3.6 Cr Quoted ₹4.2 Cr | L1 | Accepted-AOC FIRST LOWEST |
| 2 | L2₹5.2 Cr+₹1.0 Cr (24.3%)Rejected-Finance 142 | ₹5.2 Cr+₹1.0 Cr (24.3%) | L2 | Rejected-Finance SECOND LOWEST |
| 3 | Rejected-Technical ALIGARH UTTAR PRADESH | ALIGARH | UTTAR PRADESH | 202001 | - | - | Rejected-Technical No similor work Expirence |
Tender Value
₹6.0 Cr
EMD Value
₹12.0 L
Closing Date
24 Aug 2024, 1:00 pmClosed
SE IWC MATHURA
SE IWC CIVIL LINE MATHURA
CONSTRUCTION WORK OF CROSS REGULATOR AT KM. 52.800 OF MAT BRANCH.
2024_UPIDC_944519_2
04/SE/2024-25
Open Tender
Civil Works
Item Wise
420 days
KHURJA (BULANDSHAHR)
Please refer Tender documents.
2 documents required · 2 mandatory
₹7,354
₹12.0 L
SE IWC MATHURA
2 Jan 2025
13 Aug 2024
24 Aug 2024
13 Aug 2024
24 Aug 2024
13 Aug 2024
13 Aug 2024
Amount
E/W IN EXCAVATION IN FOUNDATION IN ORDINARY SOIL I/C LIFT UP TO 1.5M & LEAD UP TO 30 M I/C ALL COST OF LABOUR,T&P ETC. COMPLETE.
P/L C.C.M15 (1:2:4) CEMENT,COARSE SAND AND 20 TO 40 MM SIZE STONE AGGREGATEI/C ALL COST OF MATERIAL,LABOUR,T&P ETC. COMPLETE.
P/L R.C.C M20 (1:1.5:3) (CEMENT,COARSE SAND AND STONE AGGREGATE OF SIZE 10 TO 20MM) I/C ALL COST OF MATERIALS, LABOUR AND T & P ETC. COMPLETE.
P/L C.C M25 (1:1:2) (CEMENT,COARSE SAND AND STONE AGGREGATE OF SIZE 10 TO 20MM) I/C ALL COST OF MATERIALS, LABOUR AND T & P COMPLETE.
P/L. R.C.C M25(1:1:2) (CEMENT,COARSE SAND AND STONE AGGREGATE OF SIZE 10 TO 20MM) I/C ALL COST OF MATERIALS, LABOUR AND T & P ETC. COMPLETE.
P/L Crushed Stone Agg. 10 to 25 mm. for Filter I/C ALL COST OF MATERIAL, LABOUR T&P ETC COMPLETE.
P/L STONE BOULDER 20-40 KG WT IN PITCHING IN SIDE SLOPE I/C LABOUR AND T&P ETC. COMPLETE.
P/L STEEL REINFORCEMENT FOR RCC WORK I/C CUTTING,BENDING, BINDING & PLACING I/C ALL COST OF MATERIAL,LABOUR, T&P ETC. COMPLETE.
CENTERING AND SHUTTERING FOR C.C. WORK I/C ALL COST OF MATERIAL,LABOUR AND T&P ETC. COMPLETE.
CENTERING AND SHUTTERING FOR R.C.C. WORK I/C ALL COST OF MATERIAL,LABOUR AND T&P ETC. COMPLETE.
S/F 20MM TH BITUMIN FILLING IN EXPANSION JOINT BETWEEN RCC SLAB I/CALL COST OF MATERIAL LABOUR, T&P ETC. COMPLETE.
DISMENTALLING 100 YEARS OLD BRICK MASONARY OF MAIN CANAL DAMAGED VRB & DISPOSAL SCOUR BEDWITH IN 60 M DISTANCE.
S/F. E.C.BEGS WITH EARTH AND PLACING WITH IN 60 M LEAD FOR MAKING BUNDH I/C ALL COST OF MATERIAL,LABOUR,T&P ETC. COMPLETE.
E/W IN REMOVE AND DISPOSAL OF BUNDH ,BANK, RAMP AND APPROACHWAY I/C LIFT UP TO 1.5 M & LEAD 30 M I/C ALL COST OF MATERIALS, LABOUR AND T&P ETC. COMPLETE.
SURFACE DEWATERING BY 5.00 HP DIESEL PUMP SET FOR CONSTRUCTION WORK ASSUME 10 PUMPS FOR 20 HRS AVERAGE /DAY FOR 30 DAYS FOR WORK----
S/F HOT ROLLED SHEETPILE/MT AS NEAR TO IS CODE SECTION Z 24-700 UP TO 5 M HEIGHT I/C ALL COST OF MATERIAL, LABOUR AND T&P ETC COMPLETE.
SUPPLYING/LAYING 110 MM DIA P.V.C.PIPE FOR WEEP HOLES ETC. COMPLETE.
E/W IN FILLING FOR STRENGTHENING OF BANKS I/C LIFT UP TO 1.5 M AND LEAD 30 M. I/C RAMMING, DRESSING ETC. COMPLETE
P/F IRON GATES I/C ALL MATERIALS,LABOUR,T & P ETC. COMPLETE.
COLOUR WASHING TWO COATS INCLUDING THE COST OF ALL MATERIALS, LABOUR AND T&P ETC COMPLETE.
S/F SIGN BOARD SIZE (0.90X0.60) I/C ALL COST OF MATERIAL LABOUR T&P ETC COMPLETE.
M/S SHIV SHAKTI CONSTRUCTION
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .