Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹39.5 LAccepted-Finance | L1 | Accepted-Finance L1 | |
| 2 | L2₹42.1 L+₹2.5 L (6.41%)Rejected-Finance | L2 | Rejected-Finance Quoted Rate More than L1 | |
| 3 | L3₹45.4 L+₹5.8 L (14.7%)Rejected-Finance | L3 | Rejected-Finance Quoted Rate More than L1 | |
| 4 | L4₹48.8 L+₹9.3 L (23.4%)Rejected-Finance GRAM TITOLI POST O KUHEEL DISTRICT ALMORA | L4 | Rejected-Finance Quoted Rate More than L1 | |
| 5 | L5₹57.6 L+₹18.0 L (45.6%)Rejected-Finance | L5 | Rejected-Finance Quoted Rate More than L1 |
| Sl No | Description | Qty | Unit | Mahesh Chandra Bhatt L2 | BORA CONSTRUCTION L4 | Shankar Singh Gaira L1 | Birendra Singh L5 | Nandan Singh Singwal L3 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Construction of coolie walling including supply of all material, labour, T&P etc. required for proper completion of the work as per direction of Engineerin- charge. (As per PWD Uttarakhand specifications) | 90 | Cum | 1,000 ₹90,000 | 1,200 ₹1,08,000 | 700 ₹63,000 | 1,594 ₹1,43,460 | 10 ₹900 Lowest |
| 2.00 | Excavation in foundation for retaining, breast walls etc, in all types of soils and rocks including all lead, lift and disposal of surplus material as per direction of engineer - in - charge, as per drawing and technical specifications Clause 305.1 of MORD Specifiction | 556.52 | Cum | 250 ₹1,39,130 | 350 ₹1,94,782 | 200 ₹1,11,304 | 436 ₹2,42,642.72 | 10 ₹5,565.2 Lowest |
| 3.00 | Excavation in Hard Rock (blasting prohibited) Excavation for roadway in hard rock (blasting prohibited) with rock breakers including breaking rock, loading in tippers and disposal with a lift upto 1.5 m and lead upto 1000 metres, trimming bottom and side slopes in accordance with requirements of lines, grades and cross- sections as per Technical Specification Clause 302.3.5 Manual Means | 124.8 | Cum | 1,000 ₹1,24,800 | 1,250 ₹1,56,000 | 600 ₹74,880 | 1,552.3 ₹1,93,727.04 | 10 ₹1,248 Lowest |
| 4.00 | Random Rubble Stone Masonry laid in 1:6 cement and sand mortar, in breast walls, retaining walls, parapets, scuppers, etc. including supply of all material, labour, T&P and royaltiies etc. complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203 of MORD Specifiction | 39.69 | Cum | 2,800 ₹1,11,132 Lowest | 3,800 ₹1,50,822 | 2,800 ₹1,11,132 Lowest | 4,201 ₹1,66,737.69 | 4,000 ₹1,58,760 |
| 5.00 | Stone masonry in cement mortar for substructure complete as per drawing & technical specification Clauses 702, 704, 1202 and 1204 Coursed Rubble masonry (2nd sort) In cement mortar (1:5) | 263.93 | Cum | 2,800 ₹7,39,004 Lowest | 4,200 ₹11,08,506 | 3,000 ₹7,91,790 | 4,746 ₹12,52,611.78 | 3,800 ₹10,02,934 |
| 6.00 | Random Rubble Stone Masonry laid Dry, in breast walls, retaining walls, etc. including supply of all material, labour, T&P and royaltiies etc. complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203 of MORD Specifiction | 79.68 | Cum | 1,500 ₹1,19,520 Lowest | 2,000 ₹1,59,360 | 1,900 ₹1,51,392 | 2,293 ₹1,82,706.24 | 2,000 ₹1,59,360 |
| 7.00 | Slip clearance (by manual means) of loose earth and other small loose materials including disposal complete as directed by the Engineer-incharge. | 27.6 | Cum | 100 ₹2,760 Lowest | 250 ₹6,900 | 100 ₹2,760 Lowest | 260 ₹7,176 | 260 ₹7,176 |
| 8.00 | Silt clearance in drain & without service road with its disoposal, ramming & dressing i/c lift up to 1.5 m & lead upto 30 m As per C D D drill irrigation Dept | 100.6 | Cum | 100 ₹10,060 | 110 ₹11,066 | 70 ₹7,042 Lowest | 134 ₹13,480.4 | 134 ₹13,480.4 |
| 9.00 | Providing and laying of wire crates 3.00x1.50x1.50 in size with GI wire conforming to IS: 280 & IS:4826 in 150mm x 150mm mesh laid with stone boulders. as per direction of Engineer-in- charge. (As per PWD Uttarakhand specifications) GI wire 8 gauge BWG | 60.75 | Cum | 1,500 ₹91,125 Lowest | 1,800 ₹1,09,350 | 1,800 ₹1,09,350 | 2,117 ₹1,28,607.75 | 2,000 ₹1,21,500 |
| 10.00 | Construction of toe walls for protection of slopes as per drawing and technical specifications Clause 1302.5 Cement concrete grade M 10 in case of concrete block pitching PCC Grade M-10 (Nominal mix 1:3:6) | 106.24 | Cum | 4,500 ₹4,78,080 Lowest | 6,500 ₹6,90,560 | 4,500 ₹4,78,080 Lowest | 7,211 ₹7,66,096.64 | 6,500 ₹6,90,560 |
Tender Value
Refer Docs
EMD Value
₹1.6 L
Closing Date
15 Oct 2026, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
E E Officer I D Almora
E E Officer I D Almora
Scheme for restoration and renovation of Balikhet and changethi canal in Dhauladevi development block under state sector item Nabard in Almora district lot2
2026_IRDCE_100488_1
05/EE/2026-27
Open Tender
Civil Works
Item Wise
180 days
Balikhet and changethi canal in Dhauladevi
Please refer Tender documents.
2 documents required · 2 mandatory
₹4,720
E E I D ALMORA
₹1.6 L
28 Oct 2026
23 Sept 2026
17 Oct 2026
23 Sept 2026
15 Oct 2026
23 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of coolie walling including supply of all material, labour, T&P etc. required for proper completion of the work as per direction of Engineerin- charge. (As per PWD Uttarakhand specifications) | 90 | Cum | 1,594.5 | ₹1,43,505 |
| 2 | Excavation in foundation for retaining, breast walls etc, in all types of soils and rocks including all lead, lift and disposal of surplus material as per direction of engineer - in - charge, as per drawing and technical specifications Clause 305.1 of MORD Specifiction | 556.52 | Cum | 436.9 | ₹2,43,143.59 |
| 3 | Excavation in Hard Rock (blasting prohibited) Excavation for roadway in hard rock (blasting prohibited) with rock breakers including breaking rock, loading in tippers and disposal with a lift upto 1.5 m and lead upto 1000 metres, trimming bottom and side slopes in accordance with requirements of lines, grades and cross- sections as per Technical Specification Clause 302.3.5 Manual Means | 124.8 | Cum | 1,552.3 | ₹1,93,727.04 |
| 4 | Random Rubble Stone Masonry laid in 1:6 cement and sand mortar, in breast walls, retaining walls, parapets, scuppers, etc. including supply of all material, labour, T&P and royaltiies etc. complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203 of MORD Specifiction | 39.69 | Cum | 4,201.61 | ₹1,66,761.9 |
| 5 | Stone masonry in cement mortar for substructure complete as per drawing & technical specification Clauses 702, 704, 1202 and 1204 Coursed Rubble masonry (2nd sort) In cement mortar (1:5) | 263.93 | Cum | 4,746.04 | ₹12,52,622.34 |
| 6 | Random Rubble Stone Masonry laid Dry, in breast walls, retaining walls, etc. including supply of all material, labour, T&P and royaltiies etc. complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203 of MORD Specifiction | 79.68 | Cum | 2,293 | ₹1,82,706.24 |
| 7 | Slip clearance (by manual means) of loose earth and other small loose materials including disposal complete as directed by the Engineer-incharge. | 27.6 | Cum | 260.5 | ₹7,189.8 |
| 8 | Silt clearance in drain & without service road with its disoposal, ramming & dressing i/c lift up to 1.5 m & lead upto 30 m As per C D D drill irrigation Dept | 100.6 | Cum | 134.77 | ₹13,557.86 |
| 9 | Providing and laying of wire crates 3.00x1.50x1.50 in size with GI wire conforming to IS: 280 & IS:4826 in 150mm x 150mm mesh laid with stone boulders. as per direction of Engineer-in- charge. (As per PWD Uttarakhand specifications) GI wire 8 gauge BWG | 60.75 | Cum | 2,117.14 | ₹1,28,616.25 |
| 10 | Construction of toe walls for protection of slopes as per drawing and technical specifications Clause 1302.5 Cement concrete grade M 10 in case of concrete block pitching PCC Grade M-10 (Nominal mix 1:3:6) | 106.24 | Cum | 7,211.45 | ₹7,66,144.45 |
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.87 MB
BOQ_118463.xls
BOQ • 0.29 MB
letterc.pdf
PDF • 0.68 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .