| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹28.8 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹29.7 L+₹92,959.02 (3.23%)Rejected-Finance | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | AMEERALI P L1 | abdul kasim L2 |
|---|---|---|---|---|---|
| 1.00EARTH WORK | |||||
| 1.01 | 2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil | 179.52 | cum | 165 ₹29,621.3 Lowest | 170 ₹30,518.91 |
| 1.02RETAINING WALL,CULVERT, PROTECTION FOR EXISTING WELL | |||||
| 1.03 | 4.1.8 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size).Cement make: Use Malabar cement only as per Govt. direction and in case of non availabilty of Malabar cement use Ultra Tech, Dalmia, Ramco or eq. brand in the order of preference. | 44.24 | cum | 5,869 ₹2,59,626.95 Lowest | 5,870 ₹2,59,671.19 |
| 1.04 | 4.1.6 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 ( 1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size). Cement make: Use Malabar cement only as per Govt. direction and in case of non availabilty of Malabar cement use Ultra Tech, Dalmia, Ramco or eq. brand in the order of preference. | 176.43 | cum | 6,309.95 ₹11,13,283.41 Lowest | 6,370 ₹11,23,878.21 |
| 1.05 | 5.9.2 : Centering and shuttering including strutting, etc. and removal of form for:Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. (Centering and shuttering for different category of work may be considered separately.) | 764.2 | sqm | 496.19 ₹3,79,188.89 Lowest | 570 ₹4,35,594.57 |
| 1.06 | 5.2.2 : Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size). | 4.56 | cum | 9,365.29 ₹42,733.82 Lowest | 9,370 ₹42,755.31 |
| 1.07 | 5.22.6 : Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Thermo - Mechanically Treated bars of grade Fe-500D or more. Make: Tata,Vaishak, SAIL, JSW or eq primary make in the order of preference. | 1,747.2 | kilogram | 74.18 ₹1,29,607.3 Lowest | 75 ₹1,31,040 |
| 1.08 | 19.6.7 : Providing and laying non-pressure NP2 class (light duty) R.C.C. pipes with collars jointed with stiff mixture of cement mortar in the proportion of 1:2 ( 1 cement : 2 fine sand) including testing of joints etc. complete: 600 mm dia R.C.C. pipe. | 10 | metre | 1,831.04 ₹18,310.4 Lowest | 1,870 ₹18,700 |
| 1.09 | 60.6 : PVC WEEP HOLES- Providing weep holes using 75mm dia. PVC pipes working pressure 4kg /sq.cm including cost of materials, conveyance, labour charges etc. complete. | 67.2 | metre | 112.13 ₹7,535.14 Lowest | 170 ₹11,424 |
Tender Value
Refer Docs
EMD Value
₹50,000
Closing Date
18 Feb 2021, 5:00 pmClosed
Manager Subcontract
KEL Kochi
CONSTRUCTION OF VELAKKAD-KALANJIRAPADI ROAD IN THIRUVEGAPPURA GP PALAKKAD
2021_KEL_414308_1
KRO/ BDC/818/2020
Open Tender
Civil Works - Roads
Item Rate
150 days
KEL Kochi
As per NIT
6 documents required · 6 mandatory
₹2,950
₹50,000
Yes
20 Jul 2026
11 Feb 2021
20 Feb 2021
11 Feb 2021
18 Feb 2021
11 Feb 2021
11 Feb 2021 - 18 Feb 2021
Amount
EARTH WORK
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
RETAINING WALL,CULVERT, PROTECTION FOR EXISTING WELL
4.1.8 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size).Cement make: Use Malabar cement only as per Govt. direction and in case of non availabilty of Malabar cement use Ultra Tech, Dalmia, Ramco or eq. brand in the order of preference.
4.1.6 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 ( 1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size). Cement make: Use Malabar cement only as per Govt. direction and in case of non availabilty of Malabar cement use Ultra Tech, Dalmia, Ramco or eq. brand in the order of preference.
5.9.2 : Centering and shuttering including strutting, etc. and removal of form for:Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. (Centering and shuttering for different category of work may be considered separately.)
5.2.2 : Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size).
5.22.6 : Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Thermo - Mechanically Treated bars of grade Fe-500D or more. Make: Tata,Vaishak, SAIL, JSW or eq primary make in the order of preference.
19.6.7 : Providing and laying non-pressure NP2 class (light duty) R.C.C. pipes with collars jointed with stiff mixture of cement mortar in the proportion of 1:2 ( 1 cement : 2 fine sand) including testing of joints etc. complete: 600 mm dia R.C.C. pipe.
60.6 : PVC WEEP HOLES- Providing weep holes using 75mm dia. PVC pipes working pressure 4kg /sq.cm including cost of materials, conveyance, labour charges etc. complete.
SITE PREPARATION
3.1 : Excavation for roadway in soil using manual means including loading in truck for carrying of cut earth to embankment site with all lifts and lead upto1000 metres.
3.8.B : Excavation for roadway in hard rock (blasting prohibited) with rock breakers including breaking rock, loading in tippers and disposal within all lifts and lead upto 1000 metres, trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections. Manual Method
ROAD WORK
50.2.26.1 : Filling with contractor own earth (excluding rock) in open areas in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m as per direction of site Engineer-in-charge.
51.2.3 : Filling with Quarry Muck Filling up low lying and water logged areas with local material/ quarry muck, spreading in layers, leveling the top at site and consolidation by ramming, etc complete for improving the CBR value of subgrade.
16.42 : Cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 40 mm nominal size ) in pavements, laid to required slope and camber in panels as required including consolidation finishing and tamping complete. Cement make: Use Malabar cement only as per Govt. direction and in case of non availabilty of Malabar cement use Ultra Tech, Dalmia, Ramco or eq. brand in the order of preference.
3.15.1 : Compacting Original Ground (i)Compacting original ground supporting embankmentLoosening, Levelling and Compacting original ground supporting embankment to facilitate placement of first layer of embankment, scarified to a depth of 150 mm, mixed with water at OMC and then compacted by rolling so as to achieve minimum dry density as given in Tables 300.1 and 300.2 for embankment construction as per Technical Specification Clause 301.4.1. Quantity by level calculation and statutary reporting to CTE as per norms.
4.11.2 : Granular sub-base/base/surface course with local materials (Table 400.13) by mix in place method normal. Construction of granular sub-base by providing local material spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at once and compacting with smooth wheel roller to achieve the desired density complete as per Clause 401.4 as per Technical Specification Clause 408. (ii)Using Gravel mix soil.
PROVISION FOR GRANITE BOARD icluding its GI tube support and foundation as per the direction of the officer in charge, including lettering etc as per LSGD norms and direction of engineer in charge.
Note :1 All materials, Items, Equipment shall be best branded items with IS and approved by client/KEL
2:Rate should be inclusive of installation, testing and commissioning cost for all items
3.Rate should be Exclusive of GST.
4.Work should be executed as per DSR/PWD/Irrigation Dept. specification and direction of Engineer at site.
abdul kasim
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .