Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
Tender Value
₹33,000
Closing Date
30 Jul 2021, 6:55 pmClosed
Executive Engineer Mech. Irrig. Div. Baramulla
Mech. Irrig. Div. Baramulla
Repairs to 250 kVA Al wound HT/LT distribution transformer of Rebbon Lift Irrigation scheme of MISD Sopore.
2021_IFC_131689_2
eNIT 21 of 2021-22
Open Tender
Repair and Maintenance Works
Item Rate
3 days
Baramulla
Please refer Tender documents.
5 documents required · 5 mandatory
₹50
Yes
Executive Engineer Mech. Irrig. Div. Baramulla
Exempted
Mech. Irrig. Div. Baramulla
11 Aug 2021
24 Jul 2021
31 Jul 2021
24 Jul 2021
30 Jul 2021
24 Jul 2021
28 Jul 2021
Amount
Isolation of the 250 kVA Aluminium wound transformer from HT side by means of dropping the link set, discharging the HT cable, disconnecting the LT cable from bush rods lowering of transformer from bed at Rebbon LIS, loading in private vehicle carrying upto workshop unloading it for necessary repairs at workshop.
Opening the lid of transformer and draining the carbonized T-Oil discarding the LT/HT connections from LT/HT rods, taking out the assembly from tank. The job includes dismantling of core assembly and coils as well checking the damages.
Providing & fitting of fresh HT coils in appropriate size of Aluminium wire as per sample. The job includes providing & fitting of insulating material like HT paper, lathered, cotton tape, sleeves, varnishing of the coils etc.
Providing & fitting of insulation material such as separators, core sheets, card boards Bakelite tubes sleeves nuts and bolts connecting bars etc.
Topping of the transformer by providing & filling fresh T-Oil.
Filtration of the existing T-Oil.
Reassembling of transformer by way of fitment of HT coils, core after proper cleaning, clamping channels, nuts /bolts heat treatment of the assembled transformer, fitting of top transformer lid and testing on No load at workshop. Loading of the transformer in a private load carrier through skilled labourers by using tools and tackles at site and unloading and testing on full load.
Deduction cost of old scrap as 80% of weight of coil or as per actual.
M/S NEW BUHROO ELECTRICAL AND MECH ENGG WORKS
M/s SAJID ENGINEERING WORKS
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .