Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.1 LAccepted-AOC | L1 | Accepted-AOC LOWEST QOUTED HENCE ACCEPTED | |
| 2 | L2₹13.4 L+₹23,806.85 (1.81%)Rejected-AOC | L2 | Rejected-AOC HIGHER QOUTED HENCE REJECTED | |
| 3 | L3₹13.7 L+₹57,410.72 (4.37%)Rejected-AOC VADASSERIKKARA PO VADASSERIKKARA KERALA KL | PATHANAMTHITTA | KERALA | 689662 | L3 | Rejected-AOC HIGHER QOUTED HENCE REJECTED | |
| 4 | L4₹14.7 L+₹1.6 L (12.2%)Rejected-AOC VGP 2023 24 GENERAL CIVIL WORK | FARIDABAD | HARYANA | 121004 | L4 | Rejected-AOC HIGHER QOUTED HENCE REJECTED |
| Sl No | Description | Qty | Unit | K.L.GOPI L1 | KURIAN K VARGHESE L4 | mathew p.v L3 | SHERIN P REHIMAN L2 |
|---|---|---|---|---|---|---|---|
| 1.00Building | |||||||
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 32.16 | cum | 294.97 ₹9,486.24 Lowest | 330.94 ₹10,643.03 | 340 ₹10,934.4 | 302 ₹9,712.32 |
| 1.00 | 4.1.4:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (1 Cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded
stone aggregate 40 mm nominal size derived from natural sources) | 6.64 | cum | 7,431.38 ₹49,344.36 Lowest | 8,337.65 ₹55,362 | 7,500 ₹49,800 | 7,612 ₹50,543.68 |
| 1.00 | 7.1.1:Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand) | 32.16 | cum | 6,841.66 ₹2,20,027.79 | 7,676.01 ₹2,46,860.48 | 5,500 ₹1,76,880 Lowest | 7,008 ₹2,25,377.28 |
| 1.00 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | 4.82 | cum | 8,600.79 ₹41,490.21 Lowest | 9,649.67 ₹46,550.01 | 9,000 ₹43,416 | 8,810 ₹42,499.44 |
| 1.00 | 5.3:Reinforced cement concrete work in beams, suspended floors, roofs, having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with1:1.5:3 (1 cement : 1.5 coarse sand (Zone III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources). | 8.82 | cum | 11,022.55 ₹97,240.94 Lowest | 12,366.77 ₹1,09,099.64 | 11,400 ₹1,00,570.8 | 11,291 ₹99,609.2 |
| 1.01 | 5.9.16.1:Centering and shuttering including strutting, etc. and removal of form for:
Edges of slabs and breaks in floors and wallsUnder 20 cm wide | 31.6 | metre | 187.06 ₹5,911.1 Lowest | 209.88 ₹6,632.21 | 200 ₹6,320 | 191 ₹6,035.6 |
| 1.01 | 5.9.3:Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform | 61.92 | sqm | 788.21 ₹48,805.96 | 884.34 ₹54,758.33 | 900 ₹55,728 | 707 ₹43,777.44 Lowest |
| 1.01 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 30 | sqm | 625.56 ₹18,766.8 Lowest | 701.85 ₹21,055.5 | 740 ₹22,200 | 630 ₹18,900 |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 961.83 | kilogram | 92.19 ₹88,671.02 | 103.44 ₹99,491.59 | 90 ₹86,564.61 Lowest | 90 ₹86,564.61 Lowest |
Tender Value
₹16.0 L
EMD Value
₹40,040
Closing Date
8 Oct 2025, 4:00 pmClosed
Assistant Engineer
Office of the Assistant Engineer Vadasserikkara GP
civil works
2025_LSGD_802021_4
3/AE/LSGD/VGP/2024-25
Open Tender
Civil Works - Buildings
Item Rate
Office of the Assistant Engineer Vadasserikkara GP
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
Yes
₹40,040
Yes
5 Nov 2025
26 Sept 2025
9 Oct 2025
26 Sept 2025
8 Oct 2025
26 Sept 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1332531.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .