Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical Responsive |
| 2 | Accepted-Technical | Accepted-Technical Responsive |
| 3 | Not Admitted-Fee/PreQual/Technical | Not Admitted-Fee/PreQual/Technical No EMD or Fee received |
| 4 | Rejected-Technical | Rejected-Technical Non Responsive |
Tender Value
₹17.9 L
EMD Value
₹3.5 L
Closing Date
4 Apr 2026, 5:00 pmClosed
Estate Officer AU Jodhpur
Estate office AU Jodhpur
Construction of PG Block at college of Agriculture Jodhpur
2026_AGUJD_548601_1
EO/NIT-41/2025-26
Open Tender
Civil Works
Percentage
365 days
Jodhpur
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,000
1500_MDRISL_JAIPUR_2000_Estateofficer_Jodhpur
₹3.5 L
Yes
10 Apr 2026
26 Mar 2026
6 Apr 2026
26 Mar 2026
4 Apr 2026
26 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Part A | |||||
| 1.01 | Surface dressing of the ground including removing vegetation and inequalities not exceeding 15cm deep and disposal of rubbish lead up to 50 Mtr. and lift up to 1.5 Mtr. : All kinds of soil | - | Sqm | - | - |
| 1.02 | Earth work in excavation by mechanical means (Hydraulic excavator )/ manual means over areas (exceeding 30cm in depth. 1.5m in width as well as 10 sqm on plan) including disposal of excavated earth, lead upto 50m and lift upto 1.5 m , disposed earth to be levelled and neatly dressed : All kinds of soil | - | Cum | - | - |
| 1.03 | Providing and laying in position cement concrete including curing compaction etc. of specified grade excluding the cost of centering and shuttering =All up to plinth leve1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size). | - | Cum | - | - |
| 1.04 | Providing and injection Chloropyrifous Emulsifiable concentrate 20 % with 1 % concentration for PRE-CONSGTRUCTIONAL Anti termite treatment as per IS 6313 part III and amended from time to time and creating a continous chemical barrier under and around the column pits, wall trenches, basement excavation, top surface of plinth filling, junction of wall and floor along the external perimeter of building expansion joints, over the top surface of consolidated earth of which aproch is to be laid surrounding of pipes and conduits etc. complete as per specification (Plinth floor area only shall be measured for payment.)Heptachlor E.C. 20% with 10% concentration | - | Sqm | - | - |
| 1.05 | Supplying chemical emulsion in sealed containers including delivery as specified. Chlorpyriphos/Lindane emulsifiable concentrate of 20% | - | litre | - | - |
| 1.06 | Centering and Shuttering with plywood or steel sheets including strutting, propping bracing both ways and removal of formwork for foundation , footings, strap beam, raft , bases of columns etc. | - | Sqm | - | - |
| 1.07 | Providing and laying in position specified grade of cement concrete for all RCC structural elements upto plinth level including curing, compaction, finishing with rendering in cement sand mortar 1:3 (1 cement: 3 coarse sand) and making good the joints and cost of plastizers( if required) excluding the cost of centering, shuttering and reinforcement.
M20 grade Nominal Mix / Design Mix.Add extra for providing richer mixes respectively at all floor levels. Providing M-25 grade concrete by using cement as per codal provision instead of M-20 grade design mix. | - | Cum | - | - |
| 1.08 | Centering & shuttering with plywood or steel sheets including strutting, propping bracing both ways with steel props and removal of formwork for upto floor five level forSuspended floors, roofs, landings, staircases, balconies, girders, cantilevers, bands, coping bed plates, anchor blocks, sills, chhajjas, lintel, beam, plinth beam etc. | - | Sqm | - | - |
| 1.09 | Centering & shuttering with plywood or steel sheets including strutting, propping bracing both ways with steel props and removal of formwork for upto floor five level forColumns, pillars, posts and struts etc. | - | Sqm | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.55 MB
Tender41.pdf
Tender Documents • 5.43 MB
Annexures.pdf
Other Document • 1.72 MB
BOQ_978044.xls
BOQ • 0.38 MB
corrigendum.pdf
PDF • 0.18 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .