Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.4 LAccepted-AOC | ₹2.4 L | L1 | Accepted-AOC L1 |
| Sl No | Description | Qty | Unit | ARUN GOPAL L1 |
|---|---|---|---|---|
| 1.00ROAD WORK | ||||
| 1.00 | 75.5.5.A.1pb:Modified Penetration Macadam 50 mm thick using Bitumen S-65 - Packed Bitumen Rates Construction of penetration macadam over prepared base by providing a layer of compacted crushed coarse aggregate using chips spreader with alternate applications of bituminous binder and key aggregates and rolling with a three wheel 80-100 kN static roller to achieve the desired degree of compaction as per Technical Specification Clause 506. | 50.08 | sqm | 295 ₹14,773.60 |
| 1.00 | 75.5.5.B.2pb:Modified Penetration Macadam 75 mm thick using Bitumen S-65 - Packed Bitumen Rates Construction of penetration macadam over prepared base by providing a layer of compacted crushed coarse aggregate using chips spreader with alternate applications of bituminous binder and key aggregates and rolling with a three wheel 80-100 kN static roller to achieve the desired degree of compaction as per Technical Specification Clause 506. | 49.84 | sqm | 395 ₹19,686.80 |
| 1.00 | 75.5.2.2pb:Tack Coat - With Packed Bitumen Rates Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared dry and hungry bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503. | 690 | sqm | 18 ₹12,420 |
| 1.00 | 75.5.11.1.A.2pb:Mix Seal Surfacing - Manual Means - Type A - Bitumen S-65 - Packed Bitumen Rates Providing, laying and rolling of close-graded premix surfacing material of 20 mm thickness composed of 11.2 mm to 0.9 mm (Type-A) or 13.2 mm to 0.9 mm (Type-B) aggregates using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 8-10 kN static roller and finishing to required level and grades as per Technical Specification Clause 509 By Manual Means Type A (II) Bitumen (S-65) | 690 | sqm | 275 ₹1.9 L |
Tender Value
₹2.4 L
EMD Value
₹5,932
Closing Date
10 Mar 2026, 5:30 pmClosed
LID AND EW SECTION KODANCHERY
ASSISTANT ENGINEER OFFICE LID AND EW SECTION KODANCHERY
587/26-COLLEGEPADI DIP NJARAKKATTUPADI ITHAKKPADI ROAD RETARRING (RE-TENDER)
2026_LSGD_843086_1
AE/LIDEW/ETENDER/KRY/116/25-26
Open Tender
Civil Works - Roads
180 days
COLLAGEPADI
Please refer Tender documents.
7 documents required · 7 mandatory
₹555
Yes
₹5,932
Yes
29 Apr 2026
3 Mar 2026
11 Mar 2026
3 Mar 2026
10 Mar 2026
3 Mar 2026
ROAD WORK
75.5.5.A.1pb:Modified Penetration Macadam 50 mm thick using Bitumen S-65 - Packed Bitumen Rates Construction of penetration macadam over prepared base by providing a layer of compacted crushed coarse aggregate using chips spreader with alternate applications of bituminous binder and key aggregates and rolling with a three wheel 80-100 kN static roller to achieve the desired degree of compaction as per Technical Specification Clause 506.
75.5.5.B.2pb:Modified Penetration Macadam 75 mm thick using Bitumen S-65 - Packed Bitumen Rates Construction of penetration macadam over prepared base by providing a layer of compacted crushed coarse aggregate using chips spreader with alternate applications of bituminous binder and key aggregates and rolling with a three wheel 80-100 kN static roller to achieve the desired degree of compaction as per Technical Specification Clause 506.
75.5.2.2pb:Tack Coat - With Packed Bitumen Rates Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared dry and hungry bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503.
75.5.11.1.A.2pb:Mix Seal Surfacing - Manual Means - Type A - Bitumen S-65 - Packed Bitumen Rates Providing, laying and rolling of close-graded premix surfacing material of 20 mm thickness composed of 11.2 mm to 0.9 mm (Type-A) or 13.2 mm to 0.9 mm (Type-B) aggregates using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 8-10 kN static roller and finishing to required level and grades as per Technical Specification Clause 509 By Manual Means Type A (II) Bitumen (S-65)
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1422808.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.05 MB
INTEGRITY.pdf
Additional Documents • 0.23 MB
EPAY.pdf
Other Document • 0.23 MB
AFFIDAVIT.pdf
Tender Documents • 0.24 MB
PA.pdf
Additional Documents • 0.26 MB
TENDERFORM.pdf
Additional Documents • 0.25 MB
SBD.pdf
Additional Documents • 1.82 MB
BOQ_1422808.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid