Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.2 LAccepted-Finance V P O JHAKRI TEHSIL RAMPUR DISTT SHIMLA | SHIMLA | HIMACHAL PRADESH | 171001 | ₹12.2 L | L1 | Accepted-Finance Due to L1 |
| 2 | L2₹12.2 L+₹0.03 (<0.01%)Rejected-Finance | ₹12.2 L+₹0.03 (<0.01%) | L2 | Rejected-Finance Due to L2 |
| 3 | L3₹14.6 L+₹2.4 L (19.7%)Rejected-Finance VILLAGE MATNOH P O SWARGHAT TEHSIL SH NAINADEVI JI DISTRICT BILASPUR HP | ₹14.6 L+₹2.4 L (19.7%) | L3 | Rejected-Finance Due to L3 |
Tender Value
₹17.4 L
EMD Value
₹33,600
Closing Date
10 Aug 2022, 11:00 amClosed
EE Bilaspur Division No. 2 HPPWD Bilaspur
EE Bilaspur Division No. 2 HPPWD Bilaspur
C/o link road from Tikker to Dauladhar Km. 0/0 to 2/525 (SH-P/L G-II and premix carpet in Km. 1/0 to 1/500).
2022_PWD_63334_2
PW-NBT/CB/Tender/2022/6167-71 dated 20.07.2022
Open Tender
Civil Works
Item Rate
90 days
Bilaspur
refer in SBD
8 documents required · 8 mandatory
₹500
₹33,600
Yes
12 Sept 2022
1 Aug 2022
10 Aug 2022
1 Aug 2022
10 Aug 2022
1 Aug 2022
Amount
Preparation and consolidation of sub grade with power road roller of 8 to 12 tonne capacity after excavating earth to an average of 22.5 cm depth, dressing to camber and consolidating with road roller including making good the undulations etc. and re-rolling the sub grade and disposal of surplus earth with lead upto 50 metres.including carriage of materials , within all leads and lifts and other incidentals as per direction of Engineer-in-Charge.. The rate includes octori, malkhana, toll tax, Goods Service Tax, building and other constrcution work, welfare cess royalty or any other tax, levy or cess in respect of input for or output by this contract shall be payable by the contractor and Government shall not entertain any claim whatsoever in this respect of the same.
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, stone screening/binding materials to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 1 as per Technical Specification Clause 405 of MORD specification 2014.including carriage of materials , within all leads and lifts and other incidentals as per direction of Engineer-in-Charge.. The rate includes octori, malkhana, toll tax, Goods Service Tax, building and other constrcution work, welfare cess royalty or any other tax, levy or cess in respect of input for or output by this contract shall be payable by the contractor and Government shall not entertain any claim whatsoever in this respect of the same.
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening/ binding materials to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 2 as per Technical Specification Clause 405 of MORD specification 2014 including carriage of materials , within all leads and lifts and other incidentals as per direction of Engineer-in-Charge.. The rate includes octori, malkhana, toll tax, Goods Service Tax, building and other constrcution work, welfare cess royalty or any other tax, levy or cess in respect of input for or output by this contract shall be payable by the contractor and Government shall not entertain any claim whatsoever in this respect of the same.
Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502 including carriage of materials , within all leads and lifts and other incidentals as per direction of Engineer-in-Charge.. The rate includes octori, malkhana, toll tax, Goods Service Tax, building and other constrcution work, welfare cess royalty or any other tax, levy or cess in respect of input for or output by this contract shall be payable by the contractor and Government shall not entertain any claim whatsoever in this respect of the same.
Providing and applying tack coat using bitumen emulsion conforming to IS: 8887, using emulsion pressure distributer including preparing the surface & cleaning with mechanical broom.With rapid setting bitumen emulsion on W.B.m /W.M.M @ 0.4 kg sqm (RS-1)including carriage of materials , within all leads and lifts and other incidentals as per techanical specification clause No 503 of MORD 2014 as per direction of Engineer-in-Charge. The rate includes octori, malkhana, toll tax, Goods Service Tax, building and other constrcution work, welfare cess royalty or any other tax, levy or cess in respect of input for or output by this contract shall be payable by the contractor and Government shall not entertain any claim whatsoever in this respect of the same.
2 cm premix carpet surfacing with 1.8 cum and 0.90 cum of stone chippingsof 13.2 mm size and 11.2 mm size respectively per 100 sqm and 52 kg and 56kg of hot bitumen of grade VG-10 per cum of stone chippings of 13.2 mm and 11.2 mm size respectively, including a tack coat with hot straight run bitumen, including respectively, including a tack coat with hot straight run bitumen, including consolidation with road roller of 6 to 9 tonne capacity etc. complete (tack coat to be paid for separately).including carriage of materials , within all leads and lifts and other incidentals as per techanical specification clause No 506 of Mord 2014 as per direction of Engineer-in-Charge.. The rate includes octori, malkhana, toll tax, Goods Service Tax, building and other constrcution work, welfare cess royalty or any other tax, levy or cess in respect of input for or output by this contract shall be payable by the contractor and Government shall not entertain any claim whatsoever in this respect of the same.
Providing and laying seal coat of premixed fine aggregate ( passing 2.36 mmand retained on 180 micron sieve) Type B with bitumen using 128 kg of bitumen ofgrade VG 10 bitumen per cum of fine aggregate and 0.60 cum of fineaggregate per 100 sqm of road surface, including rolling and finishing withincluding carriage of materials , within all leads and lifts and other incidentalsas per techanical specification clause 508 of Mord 2014 as per direction of Engineer-in-Charge.. The rate includes octori, malkhana, toll tax, Goods Service Tax, building and other constrcution work, welfare cess royalty or any other tax, levy or cess in respect of input for or output by this contract shall be payable by the contractor and Government shall not entertain any claim whatsoever in this respect of the same.
PURSHOTAM CHAND
Ram Murti Govt. Contractor
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .