Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.3 LAccepted-AOC NEAR RELIANCE PETROL PUMP RAMGARH CANTT 829122 DIST RAMGARH JHARKHAND | RAMGARH CANTT | RAMGARH | JHARKHAND | 829122 | ₹5.3 L Quoted ₹4.5 L | L1 | Accepted-AOC as per WO |
| 2 | L2₹5.4 LRejected-Finance | ₹5.4 L | L2 | Rejected-Finance as per TCR |
| 3 | L3₹6.1 LRejected-Finance AT JANTA NAGAR BOKARO THERMAL DIST BOKARO PIN 829107 | BOKARO | JHARKHAND | 829107 | ₹6.1 L | L3 | Rejected-Finance as per TCR |
| Sl No | Description | Qty | Unit | Rajneesh Electricals L1 | SUMIT KUMAR ROY L2 | M/S SINGH ENTERPRISES L3 |
|---|---|---|---|---|---|---|
| 1.00 | (A) Repairing of 350KW, 3.3KV,1490RPM, Crompton make Motor Cost of DPC Copper Strip 40 mm x 6mm in size | 120 | Mtr | 1,800 ₹2.2 L | 2,261 ₹2.7 L | 2,261 ₹2.7 L |
| 2.00 | Cost of Moulding of H class insulation DGC with mica | 60 | Nos | 1,050 ₹63,000 | 810 ₹48,600 | 1,110 ₹66,600 |
| 3.00 | Cost of insulating material (15% of SI no. 1) | 1 | No | 32,400 ₹32,400 | 40,698 ₹40,698 | 40,698 ₹40,698 |
| 4.00 | Replacement of bearing NU 320 | 1 | No | 14,000 ₹14,000 | 26,014 ₹26,014 | 28,014 ₹28,014 |
| 5.00 | Replacement of bearing 3620 | 1 | No | 18,000 ₹18,000 | 11,300 ₹11,300 | 12,500 ₹12,500 |
| 6.00 | Bearing housing repairing NDE | 1 | No | 8,000 ₹8,000 | 10,800 ₹10,800 | 14,000 ₹14,000 |
| 7.00 | Bearing housing repairing DE | 1 | No | 8,000 ₹8,000 | 10,240 ₹10,240 | 12,240 ₹12,240 |
| 8.00 | Labour charge | 1 | No | 18,000 ₹18,000 | 41,897 ₹41,897 | 43,560 ₹43,560 |
| 9.00 | less scrap value of Si No. 1(60% Amount of SI no. 1) | 1 | No | 1,29,600 -₹1,29,600 | 1,62,792 -₹1,62,792 | 1,62,792 -₹1,62,792 |
| 10.00 | (B) Repairing of 260KW, 3.3KV,1486 RPM, Marathon make Motor Cost of DPC Copper Strip 40 mm x 6mm in size | 100.8 | Mtr | 1,800 ₹1.8 L | 2,261 ₹2.3 L | 2,261 ₹2.3 L |
Tender Value
₹7.7 L
EMD Value
₹9,700
Closing Date
27 May 2024, 5:00 pmClosed
PE(EnM) Officer SYL-D Project
PE(EnM) Office SYL-D Project
Rewinding/Repairing of 02 Nos. of 3.3 KV Motor(350 KW, Crompton make and 260 KW, Marathon make)of Sayal-D OCP.
2024_CCL_308006_1
PE(EnM)/SYL/e-Tender/24-25/04
Open Tender
Electrical and Maintenance Works
10 days
Sayal-D Project
please refer Tender document
2 documents required · 2 mandatory
₹9,700
25 Mar 2026
13 May 2024
28 May 2024
14 May 2024
27 May 2024
14 May 2024
14 May 2024 - 18 May 2024
Amount
(A) Repairing of 350KW, 3.3KV,1490RPM, Crompton make Motor Cost of DPC Copper Strip 40 mm x 6mm in size
Cost of Moulding of H class insulation DGC with mica
Cost of insulating material (15% of SI no. 1)
Replacement of bearing NU 320
Replacement of bearing 3620
Bearing housing repairing NDE
Bearing housing repairing DE
Labour charge
less scrap value of Si No. 1(60% Amount of SI no. 1)
(B) Repairing of 260KW, 3.3KV,1486 RPM, Marathon make Motor Cost of DPC Copper Strip 40 mm x 6mm in size
Cost of Moulding of H class insulation DGC with mica
Cost of insulating material (15% of SI no. 1)
Replacement of bearing NU 320
Replacement of bearing 6320
Labour charge
less scrap value of Si No. 1(60% Amount of SI no. 1)
Total impact of GST for the purpose of CTC
SUMIT KUMAR ROY
M/S SINGH ENTERPRISES
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_319157.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
BOQ_319157.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid