Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹47.4 LAdmitted-Finance | ₹47.4 L | L1 | Admitted-Finance |
| 2 | L2₹77 L+₹29.6 L (62.6%)Admitted-Finance | ₹77 L+₹29.6 L (62.6%) | L2 | Admitted-Finance |
| 3 | L3₹78.2 L+₹30.8 L (65.0%)Admitted-Finance 25 PURE CHANDU TEJGOAN RAEBARELI RAEBARELI UTTAR PRADESH 229215 | RAE BARELI | UTTAR PRADESH | 229215 | ₹78.2 L+₹30.8 L (65.0%) | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/S DEEPAK CONSTRUCTION L2 | WB INSULATION L1 | DB INSULATION AND ENGINEERING CO. L3 |
|---|---|---|---|---|---|---|
| 1.00Insulation work in Boiler & Turbine area as per the scope of work & BoQ. | ||||||
| 1.01 | Insulation Removal and fresh installatio | 10,000 | SQM | 575 ₹57,50,000 | 315 ₹31,50,000 Lowest | 599 ₹59,90,000 |
| 1.02 | Aluminum sheet removal and installation | 5,000 | SQM | 330 ₹16,50,000 | 255 ₹12,75,000 Lowest | 325 ₹16,25,000 |
| 1.03 | Cost of Transportation Charges (To & fro) for the scaffolding material | 1 | LOT | 3,00,000 ₹3,00,000 | 3,10,000 ₹3,10,000 | 2,00,000 ₹2,00,000 Lowest |
Tender Value
Refer Docs
EMD Value
₹1 L
Closing Date
15 Jun 2026, 6:00 pmClosed
Anikesh Shivhare
Anikesh Shivhare Manager C M Email [email protected] Mob 9009988207 JHABUA POWER LIMITED POST OFFICE-ATTARIA, TEHSIL-GHANSORE DIST-SEONI MADHYA PRADESH PIN 480997
Insulation work in Boiler Turbine area, AOH-2026 as per the scope of work and BoQ
2026_JPL_279904_1
JPL/CnM/26-27/1200008573
Limited
Miscellaneous Services
Lump-sum
365 days
JPL
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹1 L
18 Jun 2026
5 Jun 2026
16 Jun 2026
5 Jun 2026
15 Jun 2026
5 Jun 2026
5 Jun 2026 - 12 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Insulation work in Boiler & Turbine area as per the scope of work & BoQ. | |||||
| 1.01 | Insulation Removal and fresh installatio | 10,000 | SQM | 100 | ₹10,00,000 |
| 1.02 | Aluminum sheet removal and installation | 5,000 | SQM | 100 | ₹5,00,000 |
| 1.03 | Cost of Transportation Charges (To & fro) for the scaffolding material | 1 | LOT | 100 | ₹100 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.21 MB
GCC.pdf
Tender Documents • 3.81 MB
ITB.pdf
Tender Documents • 0.23 MB
Nodeviationcertificate.pdf
Tender Documents • 0.06 MB
SCC.pdf
Tender Documents • 0.29 MB
SOW.pdf
Tender Documents • 0.11 MB
BOQ_326667.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .