| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.8 CrAdmitted-Finance | ₹1.8 Cr | L1 | Admitted-Finance |
| 2 | L2₹2.1 CrAdmitted-Finance | ₹2.1 Cr | L2 | Admitted-Finance |
| 3 | Rejected-Technical | - | - | Rejected-Technical Non-Responsive |
| 4 | Rejected-Technical OFFICE NA 302 3RD FLOOR THIRD EYE Z OPPOSITE PARIMAL GARDEN PANCHVATI | - | - | Rejected-Technical Non-Responsive |
| 5 | Rejected-Technical | - | - | Rejected-Technical Non-Responsive |
| Sl No | Description | Qty | Unit | ASHOK KUMAR GARG CONTRACTOR L2 | M/s Upendra Singh Thikedar L1 |
|---|---|---|---|---|---|
| 1.00Excavation of trenches | |||||
| 1.01 | Excavation of trenches in Normal/Soft Soil to a standard depth
of 1.65m as specified in laying practices of OF cable, and
backfilling the excavated trenches after laying the PLB pipe
with or without protection | 36,550 | Per meter | 122.75 ₹44,86,512.5 | 105 ₹38,37,750 Lowest |
| 1.02 | Excavation of trenches in Soft Rocky Soil to a standard depth of
1.65m as specified in laying practices of OF cable, and
backfilling the excavated trenches after laying the PLB pipe
with or without protection | 4,800 | Per meter | 332.89 ₹15,97,872 | 300 ₹14,40,000 Lowest |
| 1.03 | Excavation of trenches in Normal/Soft/Rocky area to a
standard depth of 90 Cm as specified in laying practices of OF
Cable and backfilling the excavated trenches after laying the
PLB in Nalikhal-Yamkeshwar | 5,000 | Per meter | 216.58 ₹10,82,900 | 200 ₹10,00,000 Lowest |
| 1.04 | Horizontal Directional Drilling for laying of U/G PLB/ HDPE
pipes to a standard depth of 1.65m as specified in laying
practices of OF Cable, by HDD method | 47,725 | Per meter | 176.76 ₹84,35,871 | 150 ₹71,58,750 Lowest |
| 2.00LAYING OF PLB Upto 50mm DIAMETER AND JOINTING WITH COUPLER (Material to be supplied by BSNL) | |||||
| 2.10 | 1st Pipe | 45,560 | Per meter | 12.76 ₹5,81,345.6 | 10 ₹4,55,600 Lowest |
| 3.00OFC PULLING (OF Cable & Accessories to be supplied by BSNL) Pulling of O.F Cabl , and allied works (VIZ. Replacing couplers and Bank filling in case of Manholes Sealing of PLB ends, refilling sand ,Refixing RCC cover and backfilling in case of joint chamber / Manhole). No. charges to be paid for opening of Manholes/Joint chamber. | |||||
| 3.10 | Up to 48F | 83,000 | Per meter | 16.69 ₹13,85,270 | 15 ₹12,45,000 Lowest |
| 3.20 | Up to 96F | 12,200 | Per meter | 21.6 ₹2,63,520 | 18 ₹2,19,600 Lowest |
Tender Value
₹2.5 Cr
EMD Value
₹5.0 L
Closing Date
24 Apr 2026, 6:00 pmClosed
AGM (MM)
O/o CGMT UKD Patel Nagar Dehradun
Tender for underground OFC Rehabilitation work in Haridwar BA of Uttarakhand Circle.
2026_BSNL_273019_1
Tender for underground OFC Rehabilitation work in Haridwar BA of Uttarakhand Circle.
Open Tender
OFC Laying Works
Works
365 days
Haridwar BA
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,950
Yes
AO (Cash) O/o CGMT Uttarakhand BSNL
₹5.0 L
Yes
DGM MM O/o CGMT UKD Patel Nagar Dehradun
11 Aug 2026
26 Mar 2026
25 Apr 2026
26 Mar 2026
24 Apr 2026
26 Mar 2026
26 Mar 2026 - 3 Apr 2026
10 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Excavation of trenches | |||||
| 1.01 | Excavation of trenches in Normal/Soft Soil to a standard depth
of 1.65m as specified in laying practices of OF cable, and
backfilling the excavated trenches after laying the PLB pipe
with or without protection | - | Per meter | 125 | - |
| 1.02 | Excavation of trenches in Soft Rocky Soil to a standard depth of
1.65m as specified in laying practices of OF cable, and
backfilling the excavated trenches after laying the PLB pipe
with or without protection | - | Per meter | 339 | - |
| 1.03 | Excavation of trenches in Normal/Soft/Rocky area to a
standard depth of 90 Cm as specified in laying practices of OF
Cable and backfilling the excavated trenches after laying the
PLB in Nalikhal-Yamkeshwar | - | Per meter | 220.55 | - |
| 1.04 | Horizontal Directional Drilling for laying of U/G PLB/ HDPE
pipes to a standard depth of 1.65m as specified in laying
practices of OF Cable, by HDD method | - | Per meter | 180 | - |
| 2LAYING OF PLB Upto 50mm DIAMETER AND JOINTING WITH COUPLER (Material to be supplied by BSNL) | |||||
| 2.1 | 1st Pipe | - | Per meter | 13 | - |
| 3OFC PULLING (OF Cable & Accessories to be supplied by BSNL) Pulling of O.F Cabl , and allied works (VIZ. Replacing couplers and Bank filling in case of Manholes Sealing of PLB ends, refilling sand ,Refixing RCC cover and backfilling in case of joint chamber / Manhole). No. charges to be paid for opening of Manholes/Joint chamber. | |||||
| 3.1 | Up to 48F | - | Per meter | - | - |
| 3.2 | Up to 96F | - | Per meter | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.53 MB
BOQ_318748.xls
BOQ • 0.31 MB
CorrigendumHWR.pdf
PDF • 0.32 MB
CorrigendumHWR.pdf
PDF • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].