| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹5.4 CrAdmitted-Finance | -25.00% | ₹5.4 Cr | L1 | Admitted-Finance |
| 2 | L2₹5.7 Cr+₹27.1 L (5.03%)Admitted-Finance | -21.23% | ₹5.7 Cr+₹27.1 L (5.03%) | L2 | Admitted-Finance |
Tender Value
₹7.2 Cr
EMD Value
₹14.4 L
Closing Date
10 Feb 2025, 6:00 pmClosed
DGM Housing Board Unit-II Srinagar
Office of the Deputy General Manager Housing Board Unit-II, Habitat Centre, Bemina, Srinagar, Kashmir, Jammu and Kashmir
CONSTRUCTION OF NEW DEGREE COLLEGE AT KEERI BARAMULLA (PHASSE Ist) BALANCE WORK
2025_HAUDD_270662_1
E-NIT No. 12 of 2024-25 Dated 18-01-2025
Open Tender
Miscellaneous Works
Percentage
365 days
Baramulla
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
Credited in A/c 1206040500005049(IFSC-JAKA0EJVBEM)
₹14.4 L
25 Feb 2025
18 Jan 2025
11 Feb 2025
18 Jan 2025
10 Feb 2025
18 Jan 2025
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing and laying of soling stone size on level (hand packed ) watering ramming complete below Foundation& rooms including carriage. | 36.3 | cum | 1,000 | ₹36,300 |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level 1:4:8 (1 cement : 4coarse sand : 8 graded stone aggregate 40 mm nominal size) PCC below Foundation& rooms-Mudmat including carriag | 24.2 | cum | 5,202.9 | ₹1,25,910.18 |
| 3 | Providing and laying in position specified grades of reinforced cement concrete M-25 grade in beams, slabs, walls(any thickness) including attached pillasters, buttresses, plinth and string courses, filets, columns, , stairs,pillars, piers, abutments, posts and struts etc. using 20mm thick crushed stone agg. Excluding the cost of centring, shuttering, finishing and reinforcement. All work upto roof level. | 517 | cum | 9,395.7 | ₹48,57,576.9 |
| 4 | Reinforcement for RCC works including straightening, cutting, bending, binding & placing in position all complete. HYSD reinforcement of grade Fe-500D steel bars at all levels. | 1,125.39 | Qtls | 12,350 | ₹1,38,98,566.5 |
| 5Centering and shuttering including strutting, propping etc. and removal of form work for:- | |||||
| 5.1 | Plinth beam, lintels, beams, Girders bressumers and Cantilevers. | 794.6 | sqm | 577.55 | ₹4,58,921.23 |
| 5.2 | Columns, pillers, piers, Abuments posts and struts. | 1,240.3 | sqm | 742.55 | ₹9,20,984.76 |
| 5.3 | Suspended floors, roofs, landings balconies and Access platform | 3,395.5 | sqm | 718.2 | ₹24,38,648.1 |
| 5.4 | Stair - Left Block (Waist Slab) | 161.3 | sqm | 851.5 | ₹1,37,346.95 |
| 5.5 | Edges of slab and breaks in floors and walls | 770 | sqm | 262.2 | ₹2,01,894 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.19 MB
Tendernotice_2.pdf
PDF • 3.37 MB
BOQ_836615.xls
BOQ • 0.61 MB
BOQ.xls
BOQ • 0.61 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .