| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L 1₹52.9 CrAccepted-AOC 11 JAMES HICKEY SARANI 2ND FLOOR KOLKATA 700069 | KOLKATA | KOLKATA | WEST BENGAL | 700069 | ₹52.9 Cr | L 1 | Accepted-AOC AOC |
| 2 | L 2₹56.5 Cr+₹3.6 Cr (6.76%)Rejected-Finance PLOT NO HIG 7 CHUNVATI LANE GOPALGAN BALASORE 756001 | BALESHWAR | ODISHA | 756001 | ₹56.5 Cr+₹3.6 Cr (6.76%) | L 2 | Rejected-Finance Not being L1 |
| 3 | L 3₹57.6 Cr+₹4.6 Cr (8.76%)Rejected-Finance 26 340 4 D1 M S NAGAR NANDYAL KURNOOL 518502 | ₹57.6 Cr+₹4.6 Cr (8.76%) | L 3 | Rejected-Finance Not being L1 |
| 4 | L 4₹57.7 Cr+₹4.8 Cr (9.08%)Rejected-Finance | ₹57.7 Cr+₹4.8 Cr (9.08%) | L 4 | Rejected-Finance Not being L1 |
| 5 | L 5₹58.9 Cr+₹5.9 Cr (11.2%)Rejected-Finance D NO 58 21 50 BUTCHIRAJUPALEM VISAKHAPATNAM 530 027 | VISAKHAPATANAM | ANDHRA PRADESH | 530027 | ₹58.9 Cr+₹5.9 Cr (11.2%) | L 5 | Rejected-Finance Not being L1 |
| Sl No | Description | Qty | Unit | CH.VEERARAGHAVULU CONSTRUCTION PVT LTD L11 | SOOD ASSOCIATES PVT LTD L15 | jd constructions L4 | GOPAL TEKNOCON PRIVATE LIMITED L12 | Som Projects Pvt Ltd L13 | Indus Projects Private Limited L9 | DES RAJ AND SONS BUILDERS PVT LTD L7 | K KUMAR RAJA PROJECTS P LIMITED L6 | anjaliinfratech L8 | PJR PROJECT CONSTRUCTIONS PRIVATE LIMITED L5 | LIRA CONSTRUCTIONS PVT LTD L2 | D R STEEL CONSTRUCTION COMPANY PRIVATE LIMITED L1 | RAGHUSONS INFRA ENGINEERING PVT. LTD L10 | NJR Constructions Private Limited L3 | MUKUL BUILDERS LLP L14 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| .10Schedule "A" Part – I to Schedule "A" Part – XX: NOTE: Schedule "A" Part – I to Part – XX are prepriced by MES. Bidders shall insert their Lumpsum amount in Green coloured field under Column - 6 only | ||||||||||||||||||
| 1.00 | Lumpsum price worked out by the contractor for "Buildings/Structures" as listed in Schedule "A" Part – I | 1 | EACH BLOCK | 29,00,00,000 ₹29,00,00,000 | 35,83,10,531.7 ₹35,83,10,531.7 | 24,72,78,795.5 ₹24,72,78,795.5 | 35,34,83,000 ₹35,34,83,000 | 33,49,22,470.72 ₹33,49,22,470.72 | 28,10,45,313.81 ₹28,10,45,313.81 | 26,15,06,877.5 ₹26,15,06,877.5 | 27,38,00,000 ₹27,38,00,000 | 27,45,50,866.34 ₹27,45,50,866.34 | 25,34,83,000 ₹25,34,83,000 | 26,34,83,000 ₹26,34,83,000 | 22,43,77,787 ₹22,43,77,787 | 27,71,07,705.93 ₹27,71,07,705.93 | 19,58,10,064.78 ₹19,58,10,064.78 Lowest | 33,00,00,000 ₹33,00,00,000 |
| 2.00 | Lumpsum price worked out by the contractor for "SITE CLEARANCE & AREA DEVELOPMENT/ EARTH WORK/EXCAVATION", as listed in Schedule "A" Part – II | 1 | EACH JOB | 4,44,48,380 ₹4,44,48,380 | 4,63,16,245.81 ₹4,63,16,245.81 | 4,18,52,029.35 ₹4,18,52,029.35 | 5,58,02,705.8 ₹5,58,02,705.8 | 3,55,32,841.45 ₹3,55,32,841.45 | 5,26,56,428.69 ₹5,26,56,428.69 | 3,23,65,569.36 ₹3,23,65,569.36 | 4,50,00,000 ₹4,50,00,000 | 3,70,00,000 ₹3,70,00,000 | 5,10,00,000 ₹5,10,00,000 | 3,23,65,569.36 ₹3,23,65,569.36 | 2,54,32,270 ₹2,54,32,270 Lowest | 4,45,46,742.01 ₹4,45,46,742.01 | 4,00,00,000 ₹4,00,00,000 | 4,44,30,000 ₹4,44,30,000 |
| 3.00 | Lumpsum price worked out by the contractor for "PILE FOUNDATION" as listed in Schedule "A" Part – III | 1 | EACH JOB | 11,39,80,468 ₹11,39,80,468 | 14,43,29,791.54 ₹14,43,29,791.54 | 10,55,11,108.5 ₹10,55,11,108.5 | 11,75,61,123.68 ₹11,75,61,123.68 | 12,47,95,018.55 ₹12,47,95,018.55 | 10,14,22,455.54 ₹10,14,22,455.54 | 10,28,65,983.22 ₹10,28,65,983.22 | 10,00,00,000 ₹10,00,00,000 | 10,40,00,000 ₹10,40,00,000 | 11,75,61,123.68 ₹11,75,61,123.68 | 8,46,44,009.07 ₹8,46,44,009.07 Lowest | 8,60,41,525 ₹8,60,41,525 | 10,91,30,815.5 ₹10,91,30,815.5 | 11,75,61,123.68 ₹11,75,61,123.68 | 10,92,91,776.33 ₹10,92,91,776.33 |
| 4.00 | Lumpsum price worked out by the contractor for "INTERNAL WATER SUPPLY", as listed in Schedule "A" Part – IV | 1 | EACH JOB | 1,83,548 ₹1,83,548 | 1,48,104.26 ₹1,48,104.26 | 1,26,584.84 ₹1,26,584.84 | 1,26,584.84 ₹1,26,584.84 | 1,79,118.35 ₹1,79,118.35 | 1,09,324.92 ₹1,09,324.92 Lowest | 1,53,167.66 ₹1,53,167.66 | 2,15,000 ₹2,15,000 | 1,44,615 ₹1,44,615 | 1,26,584.84 ₹1,26,584.84 | 1,77,218.78 ₹1,77,218.78 | 1,84,875 ₹1,84,875 | 1,64,776.71 ₹1,64,776.71 | 1,68,169.1 ₹1,68,169.1 | 1,69,677 ₹1,69,677 |
| 5.00 | Lumpsum price worked out by the contractor for "INTERNAL ELECTRIFICATION", as listed in Schedule "A" Part – V | 1 | EACH JOB | 3,23,913.33 ₹3,23,913.33 | 3,78,978.6 ₹3,78,978.6 | 3,23,913.33 ₹3,23,913.33 | 3,23,913.33 ₹3,23,913.33 | 1,91,525.31 ₹1,91,525.31 | 3,14,005.95 ₹3,14,005.95 | 1,29,565.33 ₹1,29,565.33 Lowest | 3,35,000 ₹3,35,000 | 2,60,000 ₹2,60,000 | 3,23,913.33 ₹3,23,913.33 | 2,26,739.33 ₹2,26,739.33 | 3,56,485 ₹3,56,485 | 2,32,663.7 ₹2,32,663.7 | 3,07,543.5 ₹3,07,543.5 | 3,23,913 ₹3,23,913 |
| 6.00 | Lumpsum price worked out by the contractor for "ROAD/ PATH HARDSTANDING & CULVERT", as listed in Schedule "A" Part – VI | 1 | EACH JOB | 1,95,40,730 ₹1,95,40,730 Lowest | 2,49,41,344.09 ₹2,49,41,344.09 | 2,19,79,743.59 ₹2,19,79,743.59 | 2,26,59,529.47 ₹2,26,59,529.47 | 3,07,48,981.49 ₹3,07,48,981.49 | 2,11,28,501.99 ₹2,11,28,501.99 | 2,51,52,077.71 ₹2,51,52,077.71 | 2,20,00,000 ₹2,20,00,000 | 2,43,95,413 ₹2,43,95,413 | 2,26,59,529.47 ₹2,26,59,529.47 | 2,67,38,244.77 ₹2,67,38,244.77 | 2,27,43,610 ₹2,27,43,610 | 2,05,81,424.02 ₹2,05,81,424.02 | 2,00,00,000 ₹2,00,00,000 | 2,95,56,000 ₹2,95,56,000 |
| 7.00 | Lumpsum price worked out by the contractor for "SEWAGE DISPOSAL", as listed in Schedule "A" Part – VII | 1 | EACH JOB | 2,90,577 ₹2,90,577 | 3,27,741.48 ₹3,27,741.48 | 2,58,064.16 ₹2,58,064.16 | 2,58,064.16 ₹2,58,064.16 | 3,12,584.87 ₹3,12,584.87 | 2,88,206.51 ₹2,88,206.51 | 2,81,289.93 ₹2,81,289.93 | 3,40,000 ₹3,40,000 | 2,22,919 ₹2,22,919 Lowest | 2,58,064.16 ₹2,58,064.16 | 2,58,064.16 ₹2,58,064.16 | 2,70,865 ₹2,70,865 | 3,12,698.92 ₹3,12,698.92 | 2,34,477.21 ₹2,34,477.21 | 2,86,451 ₹2,86,451 |
| 8.00 | Lumpsum price worked out by the contractor for "AREA DRAINAGE", as listed in Schedule "A" Part – VIII | 1 | EACH JOB | 99,18,800 ₹99,18,800 | 1,23,48,241.59 ₹1,23,48,241.59 | 1,00,05,241.9 ₹1,00,05,241.9 | 1,05,54,052.64 ₹1,05,54,052.64 | 1,06,31,127.45 ₹1,06,31,127.45 | 93,64,147.6 ₹93,64,147.6 | 84,43,242.11 ₹84,43,242.11 | 1,00,00,000 ₹1,00,00,000 | 78,98,180 ₹78,98,180 | 1,05,54,052.64 ₹1,05,54,052.64 | 88,65,404.22 ₹88,65,404.22 | 74,39,360 ₹74,39,360 Lowest | 93,75,059.42 ₹93,75,059.42 | 75,00,000 ₹75,00,000 | 1,05,62,118 ₹1,05,62,118 |
| 9.00 | Lumpsum price worked out by the contractor for "EXTERNAL WATER SUPPLY", as listed in Schedule "A" Part –IX | 1 | EACH JOB | 4,22,635.93 ₹4,22,635.93 Lowest | 7,48,065.6 ₹7,48,065.6 | 4,22,635.93 ₹4,22,635.93 Lowest | 4,22,635.93 ₹4,22,635.93 Lowest | 6,22,391.38 ₹6,22,391.38 | 5,27,069.25 ₹5,27,069.25 | 6,12,822.1 ₹6,12,822.1 | 5,00,000 ₹5,00,000 | 4,98,700 ₹4,98,700 | 4,22,635.93 ₹4,22,635.93 Lowest | 5,91,690.3 ₹5,91,690.3 | 5,99,155 ₹5,99,155 | 6,47,355.68 ₹6,47,355.68 | 6,77,503.2 ₹6,77,503.2 | 6,09,727 ₹6,09,727 |
Tender Value
₹61.4 Cr
EMD Value
₹15 L
Closing Date
2 Jul 2026, 6:00 pmClosed
Chief Engineer (Navy), Visakhapatnam
Chief Engineer (Navy), Military Engineer Services, Station Road, Visakhapatnam-530 004
PROVISION OF DEFICIENT WORKSHOPS AND ALLIED FACILITIES AT NAD, VISAKHAPATNAM
2025_MES_745947_2
85465
Open Tender
Civil Works
Lump-sum
750 days
VISAKHAPATNAM
All as per NIT
12 documents required · 12 mandatory
₹3,000
Garrison Engineer (P) (Navy) Visakhapatnam
₹15 L
Yes
18 Sept 2026
27 May 2026
9 Jul 2026
27 May 2026
2 Jul 2026
22 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.1 | Schedule "A" Part – I to Schedule "A" Part – XX:
NOTE: Schedule "A" Part – I to Part – XX are prepriced by MES. Bidders shall insert their Lumpsum amount in Green coloured field under Column - 6 only | - | - | - | - |
| 1 | Lumpsum price worked out by the contractor for "Buildings/Structures" as listed in Schedule "A" Part – I | 1 | EACH BLOCK | 26,34,83,000 | ₹26,34,83,000 |
| - | Lumpsum price worked out by the contractor for "SITE CLEARANCE & AREA DEVELOPMENT/ EARTH WORK/EXCAVATION", as listed in Schedule "A" Part – II | 1 | EACH JOB | 5,58,02,705.8 | ₹5,58,02,705.8 |
| - | Lumpsum price worked out by the contractor for "PILE FOUNDATION" as listed in Schedule "A" Part – III | 1 | EACH JOB | 9,29,27,518.84 | ₹9,29,27,518.84 |
| - | Lumpsum price worked out by the contractor for "INTERNAL WATER SUPPLY", as listed in Schedule "A" Part – IV | 1 | EACH JOB | 1,22,737.34 | ₹1,22,737.34 |
| - | Lumpsum price worked out by the contractor for "INTERNAL ELECTRIFICATION", as listed in Schedule "A" Part – V | 1 | EACH JOB | 3,23,913.33 | ₹3,23,913.33 |
| - | Lumpsum price worked out by the contractor for "ROAD/ PATH HARDSTANDING & CULVERT", as listed in Schedule "A" Part – VI | 1 | EACH JOB | 2,25,66,218.77 | ₹2,25,66,218.77 |
| - | Lumpsum price worked out by the contractor for "SEWAGE DISPOSAL", as listed in Schedule "A" Part – VII | 1 | EACH JOB | 2,58,064.16 | ₹2,58,064.16 |
| - | Lumpsum price worked out by the contractor for "AREA DRAINAGE", as listed in Schedule "A" Part – VIII | 1 | EACH JOB | 1,05,62,118.44 | ₹1,05,62,118.44 |
| - | Lumpsum price worked out by the contractor for "EXTERNAL WATER SUPPLY", as listed in Schedule "A" Part –IX | 1 | EACH JOB | 4,22,635.93 | ₹4,22,635.93 |
stage.html
html • 0.09 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.84 MB
BOQ_860391.xls
BOQ • 0.46 MB
85465_tender.pdf
Tender Documents • 4.88 MB
Revised_Drawings_Architectural_AC SHT 1-2.pdf
Additional Documents • 0.24 MB
Revised_Drawings_Architectural_AC SHT 2-2.pdf
Additional Documents • 0.12 MB
Revised_Drawings_Architectural_AHU SHT 1-1.pdf
Additional Documents • 0.22 MB
Revised_Drawings_Architectural_BR SHT 1-4.pdf
Additional Documents • 0.56 MB
Revised_Drawings_Architectural_CAR APRKING SHT 1-1.pdf
Additional Documents • 0.19 MB
Revised_Drawings_Architectural_EM SHT 1-2.pdf
Additional Documents • 0.29 MB
Revised_Drawings_Architectural_EM SHT 2-2.pdf
Additional Documents • 0.20 MB
Revised_Drawings_Architectural_EM SHT 2-4.pdf
Additional Documents • 0.17 MB
Revised_Drawings_Architectural_FF SHT 4-4.pdf
Additional Documents • 0.14 MB
Revised_Drawings_Architectural_LOD SHT 1-1.pdf
Additional Documents • 0.23 MB
Revised_Drawings_Architectural_MAG (SHT 1-3).pdf
Additional Documents • 0.40 MB
Revised_Drawings_Architectural_MAG (SHT 2-3).pdf
Additional Documents • 0.16 MB
Revised_Drawings_Architectural_MAG SHT 3-3.pdf
Additional Documents • 0.14 MB
Revised_Drawings_Architectural_SOF SHT 1-1.pdf
Additional Documents • 0.41 MB
Revised_Drawings_Architectural_TECH SHT 1-3.pdf
Additional Documents • 0.29 MB
Revised_Drawings_Architectural_TECH SHT 2-3.pdf
Additional Documents • 0.20 MB
Revised_Drawings_Architectural_TECH SHT 3-3.pdf
Additional Documents • 0.18 MB
Revised_Drawings_Architectural_WS SHT 3-4.pdf
Additional Documents • 0.14 MB
Revised_Drawings_Structural_CEVZ-2025-LD-2157 (S) SHT NO 1-1.pdf
Additional Documents • 0.39 MB
Revised_Drawings_Structural_CEVZ-2025-WD-2157 (S) (AC) SHT NO 1-3.pdf
Additional Documents • 0.18 MB
Revised_Drawings_Structural_CEVZ-2025-WD-2157 (S) (AC) SHT NO 2-3.pdf
Additional Documents • 0.23 MB
Revised_Drawings_Structural_CEVZ-2025-WD-2157 (S) (AC) SHT NO 3-3.pdf
Additional Documents • 0.23 MB
Revised_Drawings_Structural_CEVZ-2025-WD-2157 (S) (AHU) SHT NO 1-2.pdf
Additional Documents • 0.22 MB
Revised_Drawings_Structural_CEVZ-2025-WD-2157 (S) (AHU) SHT NO 2-2.pdf
Additional Documents • 0.19 MB
Revised_Drawings_Structural_CEVZ-2025-WD-2157 (S) (CS) SHT NO 1-1.pdf
Additional Documents • 0.26 MB
Revised_Drawings_Structural_CEVZ-2025-WD-2157 (S) (GN) SHT NO 1-2.pdf
Additional Documents • 0.40 MB
Revised_Drawings_Structural_CEVZ-2025-WD-2157 (S) (GN) SHT NO 2-2.pdf
Additional Documents • 0.39 MB
Revised_Drawings_Structural_CEVZ-2025-WD-2157 (S) (MAG) SHT NO 1-8.pdf
Additional Documents • 0.67 MB
Revised_Drawings_Structural_CEVZ-2025-WD-2157 (S) (MAG) SHT NO 2-8.pdf
Additional Documents • 0.48 MB
Revised_Drawings_Structural_CEVZ-2025-WD-2157 (S) (MAG) SHT NO 3-8.pdf
Additional Documents • 0.34 MB
Revised_Drawings_Structural_CEVZ-2025-WD-2157 (S) (MAG) SHT NO 4-8.pdf
Additional Documents • 0.35 MB
Revised_Drawings_Structural_CEVZ-2025-WD-2157 (S) (MAG) SHT NO 5-8.pdf
Additional Documents • 0.40 MB
Revised_Drawings_Structural_CEVZ-2025-WD-2157 (S) (MAG) SHT NO 6-8.pdf
Additional Documents • 0.44 MB
Revised_Drawings_Structural_CEVZ-2025-WD-2157 (S) (MAG) SHT NO 7-8.pdf
Additional Documents • 0.39 MB
Revised_Drawings_Structural_CEVZ-2025-WD-2157 (S) (MAG) SHT NO 8-8.pdf
Additional Documents • 0.51 MB
Revised_Drawings_Structural_CEVZ-2025-WD-2157 (S) (STB) SHT NO 1-5.pdf
Additional Documents • 0.24 MB
Revised_Drawings_Structural_CEVZ-2025-WD-2157 (S) (STB) SHT NO 2-5.pdf
Additional Documents • 0.21 MB
Revised_Drawings_Structural_CEVZ-2025-WD-2157 (S) (STB) SHT NO 3-5.pdf
Additional Documents • 0.16 MB
Revised_Drawings_Structural_CEVZ-2025-WD-2157 (S) (STB) SHT NO 4-5.pdf
Additional Documents • 0.20 MB
Revised_Drawings_Structural_CEVZ-2025-WD-2157 (S) (STB) SHT NO 5-5.pdf
Additional Documents • 0.26 MB
Revised_Drawings_Structural_CEVZ-2025-WD-2157 (S) (SWT) SHT NO 1-1.pdf
Additional Documents • 0.29 MB
Revised_Drawings_Structural_CEVZ-2025-WD-2157 (S) (TYP) SHT NO 1-2.pdf
Additional Documents • 0.29 MB
Revised_Drawings_Structural_CEVZ-2025-WD-2157 (S) (TYP) SHT NO 2-2.pdf
Additional Documents • 0.19 MB
85465_Date_Corrigendum_29JUN.pdf
PDF • 0.61 MB
Revised_Drawing.rar
PDF • 0.22 MB
85465_Date_Corrigendum.pdf
PDF • 0.61 MB
Revised_Drawing.rar
PDF • 6.24 MB
85465Date_Corrigendum10Jun.pdf
PDF • 0.65 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .