Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.9 LAccepted-AOC NEDUMKANDAM GP | PATHANAMTHITTA | KERALA | 689694 | L1 | Accepted-AOC L1 |
| Sl No | Description | Qty | Unit | BENNY JOHN L1 |
|---|---|---|---|---|
| 1.00green wally | ||||
| 1.00 | 2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | 64 | sqm | 18.19 ₹1,164.16 Lowest |
| 1.00 | OD372724/2025-2026:Earthwork open well excavation (above water) for wells of dia. above 3.5m and upto 6.0 m in all kinds of soil and conveying and
depositing the spoil within initial lead of 50m and lift up to 1.5 m including neat banking.
NEW DATA (Prepared based on PHED SDB - Item No.1089 & 1092 (kwa -100.3.5.1)-for initial depth up to 1.5 | 18.84 | cum | 578.9 ₹10,906.48 Lowest |
| 1.00 | OD372725/2025-2026:Earthwork open well excavation (above water) for wells of dia. above 3.5m and upto 6.0 m in all kinds of soil and conveying and
depositing the spoil within initial lead of 50m and lift from 1.5 m to 3m including neat banking.
NEW DATA (Prepared based on PHED SDB - Item No.1089 & 1092 (kwa -100.3.5.2)- | 18.84 | cum | 636.8 ₹11,997.31 Lowest |
| 1.00 | OD372726/2025-2026:Earthwork open well excavation for wells of dia. above 3.5m and upto 6.0 m in all kinds of soil and conveying and
depositing the spoil within initial lead of 50m and lift from 3 m to 4.5 m including neat banking.
NEW DATA (Prepared based on PHED SDB - Item No.1089 & 1092 (kwa -100.3.5.3)- | 18.84 | cum | 694.7 ₹13,088.15 Lowest |
| 1.00 | 50.2.3.1:Pumping or Bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete | 65 | hour | 345.5 ₹22,457.5 Lowest |
| 1.01 | 5.9.12:Centering and shuttering including strutting, etc. and removal of form for:Well steining | 113.04 | sqm | 308.9 ₹34,918.06 Lowest |
| 1.01 | 50.5.7:Reinforced cement concrete work in well-staining excluding the cost of centering, shuttering, finishing and reinforcement, with 1:1. 5:3 ( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) | 18.38 | cum | 9,847.37 ₹1,81,034.05 Lowest |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 1,470.72 | kilogram | 112.4 ₹1,65,308.93 Lowest |
| 1.01 | OD372764/2025-2026:DR PACKING UNDER FOUNDATION-Dry stone packing under foundation with good quality blasted rubble including xconveyance of material and labour charges etc, complete as per the direction of engineer in charge | 5.65 | cum | 2,967.19 ₹16,770.56 Lowest |
Tender Value
₹5.9 L
EMD Value
₹14,762
Closing Date
17 Jan 2026, 10:00 amClosed
AE LSGD SECTION,KATTAPPANA MUNCIPALITY
OFFICE OF ASSISSTANT ENGINEER ,LSGD SECTION,KATTAPPANA MUNCIPALITY
Retender 655/26- Kattappana municipality-Kanakkalipadi -hilltop DWS-General Civil Work
2026_LSGD_826647_2
08/2025/AE/LIDEW/KTPMCP
Open Tender
Civil Works - Buildings
Item Rate
KATTAPPANA
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,305
Yes
₹14,762
Yes
18 Apr 2026
9 Jan 2026
17 Jan 2026
9 Jan 2026
17 Jan 2026
9 Jan 2026
green wally
2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
OD372724/2025-2026:Earthwork open well excavation (above water) for wells of dia. above 3.5m and upto 6.0 m in all kinds of soil and conveying and depositing the spoil within initial lead of 50m and lift up to 1.5 m including neat banking. NEW DATA (Prepared based on PHED SDB - Item No.1089 & 1092 (kwa -100.3.5.1)-for initial depth up to 1.5
OD372725/2025-2026:Earthwork open well excavation (above water) for wells of dia. above 3.5m and upto 6.0 m in all kinds of soil and conveying and depositing the spoil within initial lead of 50m and lift from 1.5 m to 3m including neat banking. NEW DATA (Prepared based on PHED SDB - Item No.1089 & 1092 (kwa -100.3.5.2)-
OD372726/2025-2026:Earthwork open well excavation for wells of dia. above 3.5m and upto 6.0 m in all kinds of soil and conveying and depositing the spoil within initial lead of 50m and lift from 3 m to 4.5 m including neat banking. NEW DATA (Prepared based on PHED SDB - Item No.1089 & 1092 (kwa -100.3.5.3)-
50.2.3.1:Pumping or Bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete
5.9.12:Centering and shuttering including strutting, etc. and removal of form for:Well steining
50.5.7:Reinforced cement concrete work in well-staining excluding the cost of centering, shuttering, finishing and reinforcement, with 1:1. 5:3 ( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
OD372764/2025-2026:DR PACKING UNDER FOUNDATION-Dry stone packing under foundation with good quality blasted rubble including xconveyance of material and labour charges etc, complete as per the direction of engineer in charge
23.5:Supplying, filling, spreading & leveling stone boulders of size range 5 cm to 20 cm, in recharge pit, in the required thickness, for all leads & lifts, all complete as per direction of Engineer -in- charges
23.6:Supplying, filling, spreading & leveling gravels of size range 5 mm to 10 mm, in the recharge pit,over the existing layer of boulders, in required thickness, for all leads & lifts, all complete as per direction of Engineer -in-Charge
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
50.6.3.2:Solid block masonry using pre cast solid blocks (Factory made) of size 40x20x10 cm or nearest available size confirming to IS 2185 part I of 1979 for super structure up to floor two level for 10 cm thick wall in : CM 1:6 ( 1 cement : 6 coarse sand) including cost of scaffolding complete
13.1.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand)
10.16.1:Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete.Hot finished welded type tubes
OD372737/2025-2026:Providing and fixing precoated galvanised iron profile sheets (size, shape and pitch of corrugation as approved by Engineer-in-charge) 0.350 mm (+0.05%), total coated thickness with zinc coating 120 grams per sqm as per IS: 277, in 240 mpa steel grade, 5-7 microns epoxy primer on both side of the sheet and polyester top coat 15-18 microns. Sheet should have protective guard film of 25 microns minimum to avoid scratches during transportation and should be supplied in single length upto 12 metre or as desired by Engineer-in-charge. The sheet shall be fixed using self drilling/self tapping screws of size (5.5x55mm) with EPDM seal, complete upto any pitch in horizontal/ vertical or curved surfaces, excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required.
13.46.1:Finishing walls with Acrylic Smooth exterior paint of required shade:New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm)
13.61.1:Painting with synthetic enamel paint of approved brand and manufacture to give an even shade:Two or more coats on new work
OD295286/2025-2026:Providing and fixing name board as per the requirement
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1386781.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.08 MB
BOQ_1386781.xls
BOQ • 0.31 MB
viewsbd.pdf
Tender Documents • 2.06 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .