Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.1 LAdmitted-Finance 120 06 MIRZAPUR P O SWETPUR P S DEGANGA DSIT N 24 PARGANAS PIN 743234 | 24 PARAGANAS NORTH | WEST BENGAL | 743234 | L1 | Admitted-Finance | |
| 2 | L2₹3.4 L+₹25,000 (8.06%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹4 L+₹90,000 (29.0%)Admitted-Finance | L3 | Admitted-Finance | |
| 4 | Rejected-Technical H N 1 F F SAROJINI PARK SHASTRI NAGAR DELHI 110031 | DELHI | SHAHDARA | DELHI | 110031 | - | Rejected-Technical Papers inadequate. |
| Sl No | Description | Qty | Unit | C K CONSTRUCTION L3 | S.K. KUNDU ASSOCIATES L2 | TECHNOCONS CONSTRUCTION L1 |
|---|---|---|---|---|---|---|
| 1.01 | Preparation and submission of Detailed Project Report with preparation of PPT conducting Traffic Census as per IRC: 009-1972 for 7 days continuous 24 hrs, Soil investigation, Topographical Survey with Total Station alongwith Axle Load Survey, Falling Weight Deflection Test (minimum interval 130m.) as per IRC-115of 2014 and Pavement Design by latest IIT Pave Software as per IRC-37 of 2018 and KGP Back Software, Drawing, Detailed Estimate etc. for proposed Strengthening / Overlaying of Chandpara - Jhawdanga Road from 0.00 kmp to 8.14 km and Submission of Report of the same under Bongaon Highway Sub Division of Barasat Highway Division No.II, P.W.(Roads) Dte. in the District of North 24 Parganas. | 1 | Job | 4,00,000 ₹4,00,000 | 3,35,000 ₹3,35,000 | 3,10,000 ₹3,10,000 Lowest |
Tender Value
Refer Docs
Closing Date
22 Sept 2025, 3:00 pmClosed
Assistant Engineer
OFFICE OF THE ASSISTANT ENGINEER BONGAON HIGHWAY SUB DIVISION PUBLIC WORKS ROADS DIRECTORATE MOTIGANJ, P.O. BONGAON, DIST. NORTH 24 PARGANAS
Preparation and submission of Detailed Project Report with preparation of PPT conducting Traffic Census as per IRC 009 1972 for 7 days continuous 24 hrs, Soil investigation, Topographical Survey with Total Station alongwith Axle Load Survey, Falling
2025_WBPWD_900941_1
WBPWD/PWRD/BHSD/eNIQ-01/25-26
Open Tender
CIVIL WORKS
Item Rate
15 days
Gaighata Highway Section
Please refer Tender documents.
3 documents required · 3 mandatory
Exempted
15 Oct 2025
11 Sept 2025
24 Sept 2025
11 Sept 2025
22 Sept 2025
12 Sept 2025
Amount
Preparation and submission of Detailed Project Report with preparation of PPT conducting Traffic Census as per IRC: 009-1972 for 7 days continuous 24 hrs, Soil investigation, Topographical Survey with Total Station alongwith Axle Load Survey, Falling Weight Deflection Test (minimum interval 130m.) as per IRC-115of 2014 and Pavement Design by latest IIT Pave Software as per IRC-37 of 2018 and KGP Back Software, Drawing, Detailed Estimate etc. for proposed Strengthening / Overlaying of Chandpara - Jhawdanga Road from 0.00 kmp to 8.14 km and Submission of Report of the same under Bongaon Highway Sub Division of Barasat Highway Division No.II, P.W.(Roads) Dte. in the District of North 24 Parganas.
S.K. KUNDU ASSOCIATES (BID ID -6966222)
C K CONSTRUCTION (BID ID -6965810)
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .