Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.2 CrAdmitted-Fee/PreQual/Technical/Finance | -7.86% | ₹1.2 Cr | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹1.3 Cr+₹7.5 L (6.13%)Admitted-Fee/PreQual/Technical/Finance | -2.21% | ₹1.3 Cr+₹7.5 L (6.13%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹1.3 Cr
EMD Value
₹2.7 L
Closing Date
9 Mar 2026, 3:00 pmClosed
Commissioner Nagar Nigam Jodhpur
Nagar Nigam Jodhpur
Construction of Pit Compost by NADEP Method for Garden/Wet Waste in Various Place in Nagar Nigam Jodhpur
2026_DLB_541705_1
NIT 6684 dATE 23.02.2026
Open Tender
Civil Works
Percentage
Jodhpur
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,000
Commissioner Nagar Nigam Jodhpur and MDRISL
₹2.7 L
Yes
10 Mar 2026
25 Feb 2026
10 Mar 2026
25 Feb 2026
9 Mar 2026
25 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation for roadway, including trimming bottom and side slopes in accordance with requirement of line, grades and cross sections, including disposal of surplus material with all lift and lead upto 1000 metre as per MoRT &H specification clause 301:In all type of soil | 410.76 | cum | 235.5 | ₹96,733.98 |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level : 1:4:8 (1 Cement : 4 fine/ coarse sand : 8 graded stone aggregate 40 mm nominal size). | 132.12 | cum | 4,575 | ₹6,04,449 |
| 3 | Half brick masonry with FPS bricks of class designation 75 in superstructure above plinth level upto two stories : Cement mortar 1:4 (1 cement :4 coarse sand) | 2,970.24 | sqm | 767 | ₹22,78,174.08 |
| 4 | Brick masonry work in cement mortar with mechanical mixer with First class bricks (min. 10.5 Mpa) in foundation (at any level) complete as per drawing and technical specification and as per clause 1000 & 1300 of MoRT&H specification including all scaffolding material, labour, machinery but excluding pointing and plastering.In cement mortar 1:4 (1 cement : 4 coarse sand) | 14.78 | cum | 6,330 | ₹93,557.4 |
| 5 | Cement concrete flooring 1:2:4 (1 cement : 2 coarse sand : 4 graded 20mm nominal size stone aggregate) finished with a floating coat of neat cement including cement slurry, but excluding the cost of nosing of steps etc. complete. including Providing /mixing of synthetic fibers compulsorily complying with IS 16481:2022 of 06 mm/12 mm length to be mixed @ 0.25% by weight of Cement i.e. 125 gms per 50 kg Cement up to 900 gms per cum of Concrete/ morta :75mm thick | 1,295.91 | sqm | 792 | ₹10,26,360.72 |
| 6 | Cement plastering including T&P, scaffolding, material and complete labour, including cost of water, curing, racking of joints etc. with 20 mm cement plaster of mix : including Providing /mixing of synthetic fibers compulsorily complying with IS 16481:2022 of 06 mm/12 mm length to be mixed @ 0.25% by weight of Cement i.e. 125 gms per 50 kg Cement up to 900 gms per cum of Concrete/ mortar : 1:4 (1 cement : 4 fine/ coarse sand) | 4,633.86 | sqm | 315.5 | ₹14,61,982.83 |
| 7 | Providing at site, lowering & laying in trenches, aligning & jointing of PVC-U pipes (SN 8) as per IS 15328 (amended up to date) and as per specifications with rubber rings with socket and spigot joint, (EPDM/SBR) for all depths for pipe length as per drawing and specification including hydraulic field testing (including the cost and conveyance of water to site for testing) and commissioning etc complete as directed by Engineer. Note : E/w to be measured and paid separately. Length of pipe shall be measured in between the outer wall of two manholes / Inspection chambers. Pipe in the manhole/inspection chamber’s wall shall deemed to be included in the item of manhole/inspection chamber shall not be payable. 110 mm Nominal Dia | 714 | mtr | 263.5 | ₹1,88,139 |
| 8 | Earth work in excavation for roadway, including trimming bottom and side slopes in accordance with requirement of line, grades and cross sections, including disposal of surplus material with all lift and lead upto 1000 metre as per MoRT&H specification clause 301.In all type of soil | 1,428 | cum | 235.5 | ₹3,36,294 |
| 9 | Carriage of Materials by mechanical transport including loading, unloading and stacking :: earth lead upto 5 km | 1,428 | cum | 254.76 | ₹3,63,797.28 |
| 10 | Providing and laying lean cement concrete 1:4:8 in Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in concrete mixer, laid manually, compacted with surface vibrator, finishing and curing complete as per clause 601, 112 of MoRT&H specification including all material, labour, machinery, lighting, guarding and maintenance of diversion. | 535.5 | cum | 2,955 | ₹15,82,402.5 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.80 MB
BOQ_965658.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .