Tender Value
₹6.3 Cr
EMD Value
₹2 L
Closing Date
17 Jun 2026, 3:00 pm
Project Director, PMU-KRFB, TVM
The Project Director, Kerala Road Fund Board, Project Management Unit, Ground Floor, BSNL Office Building at CGM(O), Doorsanchar Bhavan, PMG Junction Trivandrum 695033
Construction
2026_KRFB_847713_3
PWD/KRFB-PMU/88/2025-26
Open Tender
Civil Works - Roads
270 days
Kollam
Please refer Tender documents.
8 documents required · 8 mandatory
₹13,010
Yes
₹2 L
Yes
4 Jun 2026
4 Jun 2026
19 Jun 2026
4 Jun 2026
17 Jun 2026
4 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 2Appendix -B : Surface renewal with DGBM and BC | ||||||
| 2.001 | 5.2.a Providing and applying tack coat with bitumen emulsion( RS) using emulsion pressure distributor at the rate of 0.20 - 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. | 0.2 | sqm | - | - | 2.5 |
| 2.004 | 5.6.2.a Providing and laying bituminous concrete with 80-100 TPH hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with a bituminous binder( NRMB) @ 5.2 to 5.6 percent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level, and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects For Grading - II | 0.6 | cum | - | - | 5 |
| 2.005 | od17522/2017_2018 (55.24) Providing and laying bituminous concrete with 80-100 TPH hot mix plant producing an average out put of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder (NRMB) @ 5.4 percent of mix and filler, transporting the hotmix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects (using 7% shredded plastic) Grading - II (13.2 mm nominal size) | - | cum | - | - | 5 |
| 3Appendix C: Construction of retaining walls | ||||||
| 3.002 | od162/2017_2018 : Dry rubble masonry work for foundation and super structure for retaining wall. | 1 | cum | - | - | 5 |
| 4Appendix D: Construction of CC retaining walls | ||||||
| 4.004 | 13.6 Supplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and Technical Specifications | - | MT | - | - | 558.9025 |
| 5Appendix- E Construction of CC drain | ||||||
| 5.001 | 12.1.B.1 Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Ordinary Soil - Depth upto 3m - Mechanical Means | - | cum | - | - | 2233.7999999999997 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.04 MB
NIT.pdf
Tender Documents • 0.02 MB
Requisitionfore-payment.pdf
Additional Documents • 0.10 MB
SBD.pdf
Tender Documents • 1.34 MB
BOQ_1443629.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid