Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹31.6 LAccepted-AOC OORAKAM VENKULAM BERUVALLUR GRAMA KERALA KL | ERNAKULAM | KERALA | 680667 | ₹31.6 L | L1 | Accepted-AOC L1 Accepted for further proceedings |
| 2 | L2₹32.1 L+₹44,448.11 (1.40%)Rejected-Finance | ₹32.1 L+₹44,448.11 (1.40%) | L2 | Rejected-Finance L2 |
| 3 | L3₹32.6 L+₹95,834.51 (3.03%)Rejected-Finance | ₹32.6 L+₹95,834.51 (3.03%) | L3 | Rejected-Finance L3 |
| Sl No | Description | Qty | Unit | P MOHAMMED L1 | P. MOHAMMED L3 | K. Abdul Rahim L2 |
|---|---|---|---|---|---|---|
| 1.00Providing protection work to Eanavoor Thodu | ||||||
| 1.01 | 2.8.1
Earth work in excavation by mechanical means (Hydraulic excavator) /manual means
in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan),
including dressing of sides and ramming of bottoms, lift up to 1.5 m, including
getting out the excavated soil and disposal of surplus excavated soil as directed,
within a lead of 50 m.All kinds of soil | 171.29 | cum | 330.41 ₹56,595.27 Lowest | 830.41 ₹1,42,239.27 | 530.41 ₹90,852.87 |
| 1.02 | 51.2.3
Filling with Quarry Muck Filling up low lying and water logged areas with local
material/ quarry muck, spreading in layers, leveling the top at site and consolidation
by ramming, etc complete for improving the CBR value of subgrade | 57.1 | cum | 906.44 ₹51,754.1 Lowest | 906.44 ₹51,754.1 Lowest | 906.44 ₹51,754.1 Lowest |
| 1.03 | 60.7.4
DR PACKING FOR APRONS - Rough stone dry packing for apron with good
quality blasted rubble including packing to compactness to lines levels, cost and
conveyance of all materials labour charges etc. complete as per direction of
Departmental officers at site | 114.19 | cum | 3,868.72 ₹4,41,776.87 Lowest | 3,868.72 ₹4,41,776.87 Lowest | 3,868.72 ₹4,41,776.87 Lowest |
| 1.04 | 4.3.1
Centering and shuttering including strutting, propping etc. and removal of form work
for:Foundations, footings, bases for columns | 887.18 | sqm | 354.69 ₹3,14,675.29 Lowest | 354.69 ₹3,14,675.29 Lowest | 354.69 ₹3,14,675.29 Lowest |
| 1.05 | 5.22.6
Steel reinforcement for R.C.C work including straightening, cutting, bending, placing
in position and binding all complete upto plinth levelThermo - Mechanically Treated
bars of grade Fe-500D or more | 6,280.56 | kilogram | 103.26 ₹6,48,530.63 Lowest | 103.26 ₹6,48,530.63 Lowest | 103.26 ₹6,48,530.63 Lowest |
| 1.06 | 4.1.5
Providing and laying in position cement concrete of specified grade excluding the
cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3
coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm
nominal size derived from natural sources) | 209.35 | cum | 7,870 ₹16,47,600.24 Lowest | 7,870.91 ₹16,47,790.75 | 7,870.91 ₹16,47,790.75 |
| 1.07 | OD296595/2025-2026
Providing and fixing granite of any colour and shade for name board of required size
lain over base of cements mortar 1:4 (1 cement and 4 couse sand)including ll charges
ec complete at all levels including leering and fixing | 1 | each | 2,806.51 ₹2,806.51 Lowest | 12,806.51 ₹12,806.51 | 12,806.51 ₹12,806.51 |
Tender Value
₹31.6 L
EMD Value
₹50,000
Closing Date
16 Jun 2026, 4:00 pmClosed
Unit In-Charge
STEEL INDUSTRIALS KERALA LTD. Ship Breaking Unit, Beypore, Kozhikode - 673015
District Panchayath Malappuram - Project No. 1381/26 - Improvements to Enaavoor Thodu in Peruvallur Grama Panchayath
2026_SILK_855113_1
SILK/SBU(B)/F-625/2026-27/122
Open Tender
Miscellaneous Works
Item Rate
365 days
Peruvallur
As per the tender documents
6 documents required · 6 mandatory
₹2,950
₹50,000
Yes
9 Jul 2026
9 Jun 2026
17 Jun 2026
9 Jun 2026
16 Jun 2026
9 Jun 2026
9 Jun 2026 - 16 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Providing protection work to Eanavoor Thodu | |||||
| 1.01 | 2.8.1
Earth work in excavation by mechanical means (Hydraulic excavator) /manual means
in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan),
including dressing of sides and ramming of bottoms, lift up to 1.5 m, including
getting out the excavated soil and disposal of surplus excavated soil as directed,
within a lead of 50 m.All kinds of soil | 0.2 | cum | - | - |
| 1.02 | 51.2.3
Filling with Quarry Muck Filling up low lying and water logged areas with local
material/ quarry muck, spreading in layers, leveling the top at site and consolidation
by ramming, etc complete for improving the CBR value of subgrade | 1 | cum | - | - |
| 1.03 | 60.7.4
DR PACKING FOR APRONS - Rough stone dry packing for apron with good
quality blasted rubble including packing to compactness to lines levels, cost and
conveyance of all materials labour charges etc. complete as per direction of
Departmental officers at site | 0.8 | cum | - | - |
| 1.04 | 4.3.1
Centering and shuttering including strutting, propping etc. and removal of form work
for:Foundations, footings, bases for columns | 0.6 | sqm | - | - |
| 1.05 | 5.22.6
Steel reinforcement for R.C.C work including straightening, cutting, bending, placing
in position and binding all complete upto plinth levelThermo - Mechanically Treated
bars of grade Fe-500D or more | - | kilogram | - | - |
| 1.06 | 4.1.5
Providing and laying in position cement concrete of specified grade excluding the
cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3
coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm
nominal size derived from natural sources) | 0.8 | cum | - | - |
| 1.07 | OD296595/2025-2026
Providing and fixing granite of any colour and shade for name board of required size
lain over base of cements mortar 1:4 (1 cement and 4 couse sand)including ll charges
ec complete at all levels including leering and fixing | - | each | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.42 MB
GCC.pdf
Tender Documents • 0.34 MB
PROFILE.pdf
Additional Documents • 0.03 MB
BOQ_1445154.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .