| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹52.9 LAccepted-AOC | ₹52.9 L | L1 | Accepted-AOC Admitted Lowest |
| 2 | L2₹55.8 LRejected-AOC | ₹55.8 L | L2 | Rejected-AOC Rejected Second Lowest |
| 3 | L3₹56.4 LRejected-AOC | ₹56.4 L | L3 | Rejected-AOC Rejected Third Lowest |
| Sl No | Description | Qty | Unit | Vargheese Francis L2 | CHACKO JOSEPH L3 | JOSE VARKEY L1 |
|---|---|---|---|---|---|---|
| 1.00Storage wier | ||||||
| 1.00 | 60.1.2:RING BUND Type II Putting up ring bund with earth fille gunny bags of top width 1.0m bottom width 2.0m height 2.0 m side and filling in between with earth to form ring bund and maintaining the same leak proof till the completion of the work and clearing the site by dismantling the bund after completion of the work.etc.complete. | 5 | metre | 1,403.91 ₹7,019.55 | 1,418.09 ₹7,090.45 | 1,331.59 ₹6,657.95 |
| 1.00 | 60.2.2:Bailing out water Using 5HP Pump- Bailing out water with 5HP engine and pump set including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete | 177 | hour | 451.27 ₹79,874.79 | 455.83 ₹80,681.91 | 428.02 ₹75,759.54 |
| 1.00 | 2.7.3:Earth work in excavation by mechanical means (Hydraulic excavator )/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.Hard rock (blasting prohibited) | 7.09 | cum | 1,470.25 ₹10,421.13 | 1,485.1 ₹10,526.39 | 1,394.51 ₹9,884.29 |
| 1.00 | 60.5.2:DOWEL BARS - Supplying and providing MS dowel bars of size 16 mm dia of 2m long (1m in rock and 1m in concrete ) including drilling holes of 20mm dia to a depth of 1m in rock and filling the gap with cement grout( 0.10kg/each) etc complete. | 75 | each | 543.13 ₹40,734.75 | 548.62 ₹41,146.50 | 515.15 ₹38,636.25 |
| 1.00 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 75.87 | cum | 9,143.61 ₹6.9 L | 9,235.97 ₹7.0 L | 8,672.58 ₹6.6 L |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 1,138.05 | kilogram | 111.31 ₹1.3 L | 112.43 ₹1.3 L | 105.57 ₹1.2 L |
| 1.01 | 4.1.6:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded
stone aggregate 40 mm nominal size derived from natural sources) | 26 | cum | 8,280.92 ₹2.2 L | 8,364.57 ₹2.2 L | 7,854.33 ₹2.0 L |
| 1.01 | 4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | 247.13 | sqm | 382.3 ₹94,477.03 | 386.16 ₹95,430.95 | 362.6 ₹89,608.61 |
| 1.01 | 60.63.1:FRP SHUTTERS - Supplying and fixing FRP Channels of "C" profile and sill beam size 100x100x100 mm with flange of 50 to 75mm depth in the grooves already arranged and as per the direction of departmental .officers. | 10 | metre | 2,462.32 ₹24,623.20 | 2,487.19 ₹24,871.90 | 2,335.47 ₹23,354.70 |
Tender Value
₹56.4 L
EMD Value
₹50,000
Closing Date
9 Mar 2026, 1:00 pmClosed
Executive Engineer
M I Division Kattappana Idukki
MI Class II Construction of a VCB and Allied Works near Kuzhippallippadi Bhagam at Thankamani Pandippara Irukutty thodu in Ward no 14 of Kamakshy Panchayath in Idukki Constiuency
2026_Irrig_840865_1
IRR/IA/TR/5647/2024_5_1_1/1
Open Tender
Civil Works - Others
365 days
Kamakshy
Please refer Tender documents.
10 documents required · 10 mandatory
₹2,760
Yes
₹50,000
Yes
25 May 2026
26 Feb 2026
10 Mar 2026
26 Feb 2026
9 Mar 2026
26 Feb 2026
Storage wier
60.1.2:RING BUND Type II Putting up ring bund with earth fille gunny bags of top width 1.0m bottom width 2.0m height 2.0 m side and filling in between with earth to form ring bund and maintaining the same leak proof till the completion of the work and clearing the site by dismantling the bund after completion of the work.etc.complete.
60.2.2:Bailing out water Using 5HP Pump- Bailing out water with 5HP engine and pump set including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete
2.7.3:Earth work in excavation by mechanical means (Hydraulic excavator )/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.Hard rock (blasting prohibited)
60.5.2:DOWEL BARS - Supplying and providing MS dowel bars of size 16 mm dia of 2m long (1m in rock and 1m in concrete ) including drilling holes of 20mm dia to a depth of 1m in rock and filling the gap with cement grout( 0.10kg/each) etc complete.
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
4.1.6:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 40 mm nominal size derived from natural sources)
4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
60.63.1:FRP SHUTTERS - Supplying and fixing FRP Channels of "C" profile and sill beam size 100x100x100 mm with flange of 50 to 75mm depth in the grooves already arranged and as per the direction of departmental .officers.
60.63.2:FRP SHUTTERS - Supplying and fixing FRP shutters of suitable size to with stand the design and max water pressure as prescribed by the departmental officer and installing the FRP channels provided in the grooves already arranged and as per the direction of departmental .officers.
Protection wall
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil
60.5.2:DOWEL BARS - Supplying and providing MS dowel bars of size 16 mm dia of 2m long (1m in rock and 1m in concrete ) including drilling holes of 20mm dia to a depth of 1m in rock and filling the gap with cement grout( 0.10kg/each) etc complete.
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
4.3.1:Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
60.7.1:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6 graded stone aggregate 20 mm nominal size derived from natural sources)
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1417711.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.10 MB
SBD.pdf
Tender Documents • 2.55 MB
Req.pdf
Tender Documents • 0.01 MB
BOQ_1417711.xls
BOQ • 0.31 MB
NIT.pdf
Tender Documents • 0.08 MB
PrilimanaryAgreement.pdf
Tender Documents • 0.15 MB
Affidavit.pdf
Tender Documents • 0.01 MB
BidSubmissionLetter.pdf
Tender Documents • 0.10 MB
IPC.pdf
Tender Documents • 0.01 MB
Download all tender documents and submit your bid