Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹51.5 LAccepted-AOC NO 121 6 SATHANUR SATHANUR MAIN ROAD SATHANUR BANGALORE KARNATAKA 560064 | BENGALURU URBAN | KARNATAKA | 560064 | ₹51.5 L | 1 | Accepted-AOC L1 |
| 2 | 2₹55.0 LRejected-Finance 9 525 21 22 23 HYKON HOUSE IKKANDA WARRIER ROAD TRICHUR THRISSUR KERALA 680001 UDYAM KL 13 0000840 | THRISSUR | KERALA | 680001 | ₹55.0 L | 2 | Rejected-Finance 2 |
| 3 | 3₹63.9 LRejected-Finance TC 6 1564 2ND FLOOR MG CORPORATE CENTER MEDICAL COLLEGE PO ULLOOR THIRUVANANTHAPURAM KERALA 695011 UDYAM KL 12 0014320 | THIRUVANANTHAPURAM | KERALA | 695011 | ₹63.9 L | 3 | Rejected-Finance 3 |
| 4 | 4₹65.5 LRejected-Finance | ₹65.5 L | 4 | Rejected-Finance 4 |
| 5 | Not Admitted-Finance | - | - | Not Admitted-Finance Not qualified for AOC |
| Sl No | Description | Qty | Unit | Techpool Consultancy Services Pvt Ltd | Perpetual Power Services Pvt Ltd | METRO POWER | HYKON INDIA LIMITED |
|---|---|---|---|---|---|---|---|
| 1.00SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF 6 KVA ONLINE UPS WITH BATTERY BANK FOR SDPK CENTRES UNDER VIJNANA KERALAM INITIATIVE | |||||||
| 1.01 | UPS:
• UPS Type: Online Double Conversion
• Capacity: 6 kVA / Minimum 4.8 kW
• Input Voltage Range: 160V – 300V AC
• Input Frequency: 50 Hz ±5%
• Output Voltage: 230V AC ±1%
• Output Frequency: 50 Hz ±0.1%
• Output Power Factor: ≥ 0.8
• Efficiency: ≥ 90% at full load
• LCD / LED showing input/output voltage, load %, battery status, alarms
• Protection : Overload protection, Short Circuit protection, Over/under Voltage protection and Battery deep discharge protection
• Cooling: Forced air cooling
• Form Factor : Tower/Industrial grade | 23 | Nos | 22,16,097.61 ₹22.2 L | 12,21,300 ₹12.2 L | 22,16,096 ₹22.2 L | 13,57,589.03 ₹13.6 L |
| 1.02 | Battery Specifications:
• Battery Type: Sealed Maintenance Free (SMF), VRLA
• Rating: 12V, 65Ah
• Technology: AGM / VRLA
• Battery Quantity – Minimum 12 Nos(Must support 5- 7 hours backup for the specified SDPK Lab Load)
• Backup Time – Minimum 5 hours preferably up to 7 hours
• Battery Rack : Heavy Duty power coated metal rack, proper ventilation and safety arrangement
• Battery manufacturing date less than 6 months from date of supply | 276 | Nos | 67,58,185.68 ₹67.6 L | 54,71,424 ₹54.7 L | 63,82,224 ₹63.8 L | 64,96,432.8 ₹65.0 L |
| 1.03 | Cabling & Accessories
• Battery interconnecting cables with Lugs
• Input and output power cables
• Battery protection using MCB/Fuse
• Earthling provision for UPS and battery bank | 23 | Nos | 46,000 ₹46,000 | 4,15,242 ₹4.2 L | 69,000 ₹69,000 | 78,895.52 ₹78,895.52 |
Tender Value
₹54.3 L
EMD Value
₹54,280
Closing Date
10 Feb 2026, 3:30 pmClosed
Member Secretary
India Heights Govt Womens College Road Vazhuthacaud Thiruvananthapuram 695014
Supply, Installation, Testing and Commissioning of 6 kVA Online UPS With Battery Bank for 23 SDPK Centres
2026_KDIC_831512_1
KDISC/SDPK/4364/2025/03
Open Tender
Hardware
14 days
23 SDPK Centres
As per Tender Document
2 documents required · 2 mandatory
₹29,500
Yes
₹54,280
Yes
K-DISC HQ Vazhuthacaud
18 Jun 2026
28 Jan 2026
11 Feb 2026
28 Jan 2026
10 Feb 2026
28 Jan 2026
28 Jan 2026 - 4 Feb 2026
5 Feb 2026
SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF 6 KVA ONLINE UPS WITH BATTERY BANK FOR SDPK CENTRES UNDER VIJNANA KERALAM INITIATIVE
UPS: • UPS Type: Online Double Conversion • Capacity: 6 kVA / Minimum 4.8 kW • Input Voltage Range: 160V – 300V AC • Input Frequency: 50 Hz ±5% • Output Voltage: 230V AC ±1% • Output Frequency: 50 Hz ±0.1% • Output Power Factor: ≥ 0.8 • Efficiency: ≥ 90% at full load • LCD / LED showing input/output voltage, load %, battery status, alarms • Protection : Overload protection, Short Circuit protection, Over/under Voltage protection and Battery deep discharge protection • Cooling: Forced air cooling • Form Factor : Tower/Industrial grade
Battery Specifications: • Battery Type: Sealed Maintenance Free (SMF), VRLA • Rating: 12V, 65Ah • Technology: AGM / VRLA • Battery Quantity – Minimum 12 Nos(Must support 5- 7 hours backup for the specified SDPK Lab Load) • Backup Time – Minimum 5 hours preferably up to 7 hours • Battery Rack : Heavy Duty power coated metal rack, proper ventilation and safety arrangement • Battery manufacturing date less than 6 months from date of supply
Cabling & Accessories • Battery interconnecting cables with Lugs • Input and output power cables • Battery protection using MCB/Fuse • Earthling provision for UPS and battery bank
Please Enable Macros to View BoQ information
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.99 MB
SDPKUPS.pdf
Tender Documents • 1.04 MB
BOQ_1397141.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid