Loading…
Loading…
Tender Value
₹2.0 Cr
EMD Value
₹3.9 L
Closing Date
5 Jun 2026, 3:00 pmClosed
Execution of Through Sleeper Renewal (Primary)-PQRS for a length of 4.995 Tr.Km in patches under the jurisdiction of ADEN/KRPU.
eT-Central-WAT-19-2026
eT-Central-WAT-19-2026
Open
12 Months
Unknown (Unspecified Location)
₹0
₹3.9 L
13 May 2026
13 May 2026
22 May 2026
measurement survey for design mode tamping). The item details are shown in Schedule-E.
Execution of all items of works covered by FR items (Pre and Post tamping track measurement
survey for design mode tamping).
S No. Item Description of Item Unit Qty Rate Amount
1 1 Pre tamping Measurements, Establishments Kilometre 100.00 6546.01 654601.00
of main GNSS (DGPS Base) Point & reference
point establishment at 150 meter maximum
interval along the track. (FR-1)
WALTAIR DIVISION-ENGINEERING/ECOR
2 2 Premeasurement for Tamping With total Kilometre 100.00 11469.46 1146946.00
station & prism Gedo/AIMIL/AMBERG or
equivalent trolley measurement and store
Gauge, Cross elevation, Chainage, shift and
lift value at every 3m (i.e.) Every 5th sleeper
interval alongside the track center line and
coordinates of track center lines at every 3m
to be submitted with track Geometry. (Per
km/round) (FR-2)
3 3 Construct Target/Designs Alignment To with Kilometre 100.00 2949.35 294935.00
the good points of existing pre measurement
profile in design software to export data in
ALC format with design alignment of
measured reading in M/C and to provide
track adjustment file with over extension and
also to provide Geometry file to provide text
file with slew, uplift and gauge every 3.0m
interval (i.e.) every 5th sleeper interval for
tamping machine operator during reference.
4 4 Post Tamping Measurements with total Kilometre 100.00 11469.46 1146946.00
station & prism Gedo/AIMIL/AMBERG or
equivalent trolley measure and store -
Gauge, Cross elevation, Chainage, shift and
lift value at every 3m i.e. every 5th sleeper
interval along the track center line and
coordinates of track center line at every 3m
to be submitted with track geometry (per
km/Round). (FR-4)
5 5 Reporting & plotting Soft and hard copies of Kilometre 100.00 2927.61 292761.00
slew & Uplift report at every 3m/5m(i.e.) at
every 5th sleeper interval compared with
design Vs pre profile report of offset distance
from track center to OHE, neighboring track
center & platform point. (FR-5)
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
GCC-2022.pdf
ATTACHMENT
GCC-2022-ACS-1to11.pdf
ATTACHMENT
InstructionstoTenderers.pdf
ATTACHMENT
Revision of Conservancy Cess Charge
ATTACHMENT
Deployment of Graduate Engineer
ATTACHMENT
GuidelinesforprotectionofCables.pdf Guidelines for protection of Cables
ATTACHMENT
PoliceVerificationforcontractStaff.pdf Police Verification of Labour
ATTACHMENT
OnlineVerificationofBG.pdf
ATTACHMENT
P-WaySpecialConditions-1.pdf
ATTACHMENT
P-WaySpecialConditions-2.pdf
ATTACHMENT
P-WaySpecialConditions-3.pdf
ATTACHMENT
NEFTForm.pdf
ATTACHMENT
Annexure-VandAnnexure-VA.pdf
ATTACHMENT
Annexure-VIB.pdf
ATTACHMENT
TenderFormFirstSheet.pdf
ATTACHMENT
PGGuaranteeBond.pdf
ATTACHMENT
Annexure-VIA.pdf
ATTACHMENT
Annexure-VI.pdf
ATTACHMENT
RevisionofConservancyCessCharges-2021.pdf
ATTACHMENT
Graduate-DiplomaEngineerdeployment.pdf
ATTACHMENT
GuidelinesforprotectionofCables.pdf
ATTACHMENT
PoliceVerificationforcontractStaff.pdf
ATTACHMENT
Download all tender documents and submit your bid