Tender Value
₹62.0 L
EMD Value
₹1.2 L
Closing Date
23 Sept 2026, 5:00 pmDue today
Mandev Singh Jatian
Municipal Corporation Yamunanagar
Strengthning of Mateled Road and Road widening With IPB from Paras Ram Sweets to Shaheed Bhagat Singh Park in Model Town, Ward No.-08, M.C Yamunanagar Jagadhri Recall
2026_HRY_547315_1
202634B7B02A C830 4602 BB91 4D9D66B30571288ULB
Open Tender
Civil Works
Works
170 days
Yamunanagar
2 documents required · 2 mandatory
₹5,000
₹1.2 L
Yes
14 Sept 2026
14 Sept 2026
24 Sept 2026
14 Sept 2026
23 Sept 2026
14 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | [10.100.2]Cement Concrete 1:8:16 Flooring 2. Cement Concrete 1:8:16 with stone aggregate 40 mm size in foundation and plinth. [Through Rate] | 309.12 | cum | 1,863 | ₹5,75,890.56 |
| 1.02 | [11.5.3]12 mm cement plaster of mix : 3. 1:4 (1 cement: 4 fine sand) [Through Rate] | 276 | Sqm | 113 | ₹31,188 |
| 1.03 | [13.29.2]Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. 2. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works [Through Rate] | 6,004.25 | Kg. | 83 | ₹4,98,352.75 |
| 1.04 | [17.26.2]Tack Coat 2. Providing and applying tack coat with penetration grade bitumen VG - 10 using bitumen pressure distributor at the rate of 0.30 kg per sqm on the prepared bituminous/ granular surface cleaned with mechanical broom as per technical clause 503 of MORT&H specifications [Through Rate] | 8,280 | Sqm | 16 | ₹1,32,480 |
| 1.05 | [17.31.2]Bituminous Concrete with Batch type HMP 2. Bituminous Concrete 30 mm to 45 mm thickness (grading II) with 100-120 TPH batch type HMP Providing and laying 30mm - 45 mm bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder VG - 30 @ 5.4% per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction complete as per technical clause 507 of per MORTH specifications Note-If bitumen required is more than 5.4% as per job mix formula, no extra payment will be paid. Extra bitumen required will be considered as incidental to work. [Through Rate] | 124.2 | cum | 7,749 | ₹9,62,425.8 |
| 1.06 | [17.43.1]Laying of recycled Bituminous Pavement with Central Recycling Plant upto 75mm 1. Providing & laying 50 mm - 75 mm DBM using the reclaimed material to the extent of 30% per cent of the required quantity after carrying out necessary check and evaluation, adding fresh mateerial including rejuvenation as required, grade, level and thickness, all as specified in clause No.519. (5th revision) 2013 using bitumen VG-30 (minimum Bitumen content 4.50% i/c bitumen of retrieved material as per job mix formula) using 100-120 TPH batch type hot mix plant with appropriate arrangement for use of R.A.P, appropriate roller and with hydraulic paver finisher with sensor control to the required grade. Note-If bitumen required is more than 4.50% as per job mix formula, no extra payment will be paid. Extra bitumen required will be considered as incidental to work. Milling on Bituminous Surface [Through Rate] | 207 | cum | 5,779 | ₹11,96,253 |
| 1.07 | [17.43.2]Laying of recycled Bituminous Pavement with Central Recycling Plant upto 75mm 2. Milling on Bituminous surface: Dismantling of existing damaged Bitumen surface by cold Milling Machine up to any depth and hauling the milled material up to any lead and stacking at nearest recycling Plant site. [Through Rate] | 165.6 | cum | 403 | ₹66,736.8 |
| 1.08 | [17.69.2]Interlocking Concrete Block Pavement 2. Providing and Laying 80 mm thick ISI marked Interlocking Paver Blocks conforming to IS 15658:2006/IRC SP 63: 2004 of all shapes and colours in design mix cement M 40 over the bed of 30 mm thick fine sand complete in all respect. [Through Rate] | 2,870.4 | Sqm | 655 | ₹18,80,112 |
| 1.09 | [21.54]Constructing standard drain type II drain complete consisting of cement concrete drain moulded and laid over lime concrete foundation rendered and finished smooth with 6 mm thick rendering concrete to be 1:3:6 Paris by volume of cement sand stone Bajri and rendering to be 1:1 cement and mortar. [Through Rate] | 460 | Metre | 363 | ₹1,66,980 |
| 1.1 | [3.1.1]By Mechanical Transport including loading, unloading and stacking 1. Lime, moorum, building rubbish [5km] | 22.05 | cum | 66 | ₹1,455.3 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.98 MB
BOQ_626962.xls
BOQ • 0.30 MB
CorrigendumP.pdf
PDF • 0.53 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .