Loading…
Loading…
Tender Value
₹6.9 L
EMD Value
₹6,910
Closing Date
1 Sept 2026, 6:00 pm4d left
Chief Officer , HIMATNAGAR Nagar Palika, HIMATNAGAR
Construction Work for Chapariya Area Radhe Sweet Circle for Amar JawanJyoti Statue Development at HimmatnagarNagarpalika ,Himmatnagar
337438
2026-27
Open
Civil Works
Works
Sabarkantha
11 documents required · 10 mandatory · 1 optional
₹1,062
Chief Officer Himatnagar Nagarpalika Himatnagar
₹6,910
21 Aug 2026
21 Aug 2026
21 Aug 2026
1 Sept 2026
21 Aug 2026
Memorandum showing items works to be carried out :
Item Quantities Item Of Work Tendered Rate Total Amount
Item Quantities Item Of Work Tendered Rate Total Amount
No. к according to
In Figure In Words Unit
Estimated Rs. Ps estimated
Demolition including stacking of
serviceable materilas and disposal of
Thousand Eighty
1 10.00 unserviceable materials with all lead and 1081.83 Cu.Mt
lift. (i) R.C.C. work
Eighty Three Only
Excavation for foundation upto 1.5 m
depth including sorting out and Rupees One
stacking of useful materials and Hundred Twenty
disposing off the excavated stuff upto 50 Two and Paise
Meter lead.(A) Loose or soft soil Ninety Nine Only
Filling available excavated earth
(excluding rock) in trenches, plinth, sides Rupees One
of foundations etc. in layers not Hundred Thirty Six
exceeding 20 cm. in depth consolidation and Paise Ninety
each deposited layer by ramming and Two Only
Filling in foundation and plinth with
murrum or selected brout for out side Rupees Two
soil in layers of 20 cm. thickness Hundred Ninety
including watering, ramming and Four and Paise
consolidating etc. Complete. Thirty Eight Only
Providing & laying cement concrete 1:4:8
(1 cement : 4 coarse sand : 8 Crushed
stone aggregates 40 mm nominal size)
and excluding cost of reinforcement in
reinforced concret for following grades,
machined batched & machine vibrated
concrete using graded hard (black trap) Rupees Two
stone aggregate of 40mm nominal size Thousand Nine
obtained from quarry including Cu.Mt
5 17.00 2927.67 Hundred Twenty
mechanical mixing, mechanical vibrating,
Seven and Paise
compaction, finishing, curing Completed
Sixty Seven Only
as approved by the Architect and
Engineer-in-charge, in cement mortar in
proportion recommended by the
manufacturer.., (A) Foundation and
Providing and laying cement concrete
1:2:4 (1-Cement : 2- Coarse sand : 4-
crushed stone aggregates 20 mm
nominal size) and curing complete
including cost of design formwork but
excluding the cost of reinforsement for
6 3.00 4470.64 Hundred Seventy Cu.Mt
R.C.C work in Completed Etc As Per
and Paise Sixty Four
Architected Details Drawing and as
directd by EngineerIn Charge. A) Wall
Providing TMT Bar FE 500D
reinforcement for R.C.C. work including Rupees Seventy
7 270.00 bending, binding and placing in position 77.29 Seven and Paise Kg
complete upto floor two level Twenty Nine Only
Providing and laying polished kota stone
slab 25mm thick in risers of steps,skirting
Dedo and pillars laid on 10mm thick
cement mortar 1:3 (1-Cement : 3 coarse
sand) and jointed with gray cement slury
8 43.00 1166.93 Hundred Sixty Six Sq.mt
mixed with pigment to match the shade
and Paise Ninety
of slab including rubbing and polishing
Brick work using common burnt clay
building brick having crushing strength
not less than 35 kg/sq. cm. in foundation
9 13.00 4214.33 Hundred Fourteen Cu.Mt
and plinth in cement mortar 1:6 (1
and Paise Thirty
Cement : 6 fine sand) (b) Conventional
Brick work using common burnt clay
building bricks having crushing strength
not less than 35 kg./Sq.Cm. in
foundation and plinth in Cement Mortar
1:6 (1- Cement : 6 -fine sand) Extra for
10 10.00 4495.98 Hundred Ninety Cu.Mt
brick work in superstructure above
plinth level upto floor two level (B)
Ninety Eight Only
Conventional(upto 10 ton)
20mm thick sand faced cement plaster
on walls upto height 10 metres above
ground level consisting of 12mm thick Rupees Three
backing coat of C.M. 1:3 (1-cement : 3- Hundred Twenty
sand) and 8mm thick finishing coat of One and Paise Ten
C.M. 1:1 (1-cement : 1-sand) etc. Only
Wall painting (two coats) with plastic
emulsion paint of approved brand and
manufacture on undecorated wall
surface to give an even shade including Rupees Eighty Two
12 32.00 throughly brushing the surface free from 82.97 and Paise Ninety Sq.Mt.
mortar droppings and other foreign Seven Only
matter and sand papered smooth.
Earthwork for embankment including
breaking clods, dressing with all lead and
lift and including watering rolling and
consolidation of subgrade in layers at Rupees One
O.M.C. to required dry density including Hundred Seventy
filling the depression which occur during Seven and Paise
the process using power roller 8T to Ninety One Only
10T.(E) From Borrow area within 3.0KM.
LAYING OUT LAWN – Planting suckers of
Natural Green Australian Lawn Grass grass Rupees Six Hundred
14 56.00 roughly and maintaining till well established 666.60 Sixty Six and Paise Sq.mt
etc complete (about 45 days ) all work done
should be as per engineer incharge
Applying priming coat over new steel
and other metel surface after and
including preparing the surface by
throughly cleaning, oil,grease, dirt and
other foreign matter and scoured with
brushes fine steel wood, scrapers and Rupees One
sand paper with ready mixed priming Hundred Twenty
paint brushing red lead. Painting two Nine and Paise Four
coats Painting two coats (excluding Only
priming coat) Painting two coats
(excluding priming coat)... (item code
Providing and fixing M.S. grills of
required pattern to wall frame of
Compound Wall etc. with M.S. polished
square bar at required spacing and Rupees One
frame of As Per design flat alround with Hundred Sixty Eight
necessary hold fast including applying and Paise Eleven
priming coat and two coats of oil Only
painting etc. complete as directed by
engineer in charge.
Providing and laying Both side mirror
polished Black Granite stone slab 18 mm
(Average) thick of approved quality incl. Rupees Two
full moulded round front edge fixed in Thousand Three
17 1.00 wall for partition and jointed with grey 2396.73 Hundred Ninety Six Sq.mt
cement slurry including rubbing and and Paise Seventy
polishing etc. complete. Three Only
TOTAL AMOUNT PUT TO TENDER
TOTAL AMOUNT PUT TO TENDER
Estimated amount Estimated amount
Put to tender Rs …691064.00 Put to tender Rs…691064.00
Deduct .............% below Rs………… Add............% above Rs……………
Total Rs………… Total Rs……………
(*Please strike out whichever is not applicable).
Note : 1 All work shall be carried out as per Public Works Department Handbook and other
specifications of Division or as
Note : 2 All the columns is Schedule should be filled in ink and the total of the entries in the last
column should be struck by the
Note : 3 Rates quoted include clearance of site (prior commencement of work and at its close) in all
respects and hold good for
Note : 4 To be continued on additional sheets, if found necessary.
The Chief Officer
Himatnagar Nagarpalika
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
1 Tender NIT.pdf
2 SBD _1_.pdf
3 General Nots condictions.pdf
4 BUILDINGSPECIFICATIONSBOOK (2).pdf
5. ROAD WORKS SPECIFICATIONS (2).pdf
6.ALL GR-2.pdf
8.SCHEDULE - B.pdf
7. Item Specifications.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].