EXECUTIVE ENGINNER
TENDER FOR CAPITAL WORK OF HT/LT LINE & TC & LT ABC & HT ABC Work (ALL SCHEME) UNDER THAN RURAL SUB-DIVISION UNDER SURENDRANAGAR DIVISION AND/OR ANY SUB DIVISION UNDER SURENDRANAGAR DIVISION.
293412
NIVIDA NO-12
Open
Electrical Works
Surendranagar
14 documents required · 14 mandatory
₹1,475
Paschim Gujarat Vij Company Ltd
₹30,000
2 Apr 2026
2 Apr 2026
2 Apr 2026
13 Apr 2026
2 Apr 2026
2 Estimated cost in Rs. 30,00,000/-
3 Tender Fee in Rs. ( non-refundable) with 18 % GST 1475/-
4 Payment of tender fees at through RTGS/NEFT Only
Earnest Money Deposit amount in Rs. 30,000/-
(1 % of Tender Amount) (Payment through RTGS/NEFT Only)
6 On line ( e-tendering ) Tender offer
submission last Date 13/04/2026 up to 18:00 hours only
(This is mandatory )
7 Date & Time for pre bid meeting ( If Required)
8 Last date of submission of tender fee and EMD payment
Date: 13/04/2026 up to 18:00 hours. By RPAD or SPEED POST only
9 Date of opening of On Tender Fee/ EMD cover of bid at
Date 15/04/2026 @ 11:00 hours (if possible)
10 Date of opening of On Line Technical Bid at
Date 15/04/2026 @ 11:00 hours (if possible)
11 Date of on line opening of On Line Price bid,
Date-15/04/2026 @ 15:00 hours (if possible)
12 Validity of Bid 180 Days
Executive Engineer, Division Surendranagar
Sign & Stamp of The Bidder PGVCL SNR DO P a g e 2 |
Sr. No. Particulars Page No.
1 Tender Details Table No 1
2 SECTION I: INSTRUCTIONS TO THE BIDDER
3 SECTION II: Schedule A
General Instructions to the successful bidder
5 TERMS & CONDITIONS REGARDING INDUSTRIAL LAWS AND
OTHER RELATED MATTERS
6 SECTION V: TAXES
7 SECTION VI: General Terms & Conditions
8 Annexures I to XI, BG Formats for EMD and, SD, Agreement and
Indemnity Bond Formats
9 SECTION VIII Schedule B
10 SECTION IX Technical Specifications
11 SECTION X Drawings
Sign & Stamp of The Bidder PGVCL SNR DO P a g e 3 |
GENERAL INFORMATIOS FOR BIDDERS
COMMERCIAL TERMS AND CONDITIONS
The tender fee (Non-refundable) with GST @ 18 % specified in notice inviting tender only by RTGS/NEFT
• Payment of Tender fees can be accepted by RTGS/NEFT.
• The scanned copy of original documents shall have to be uploaded with the bid
The tender fees is non –refundable under normal circumstances. Howerver, if PGVCL authority decides to
scrap/cancel the tender, by one or another reason, in which bidders are not responsible for cancellation/scrap of
tender, in such case of tender, in such case tender fees without GST may be refunded to bidders, at sole discretion of
NSIC or any other certificate such Udhyam Registration, certificate of CSPO, certificate of DGS&D should not be
allowed for exemption of EMD payment in works/Service tender, Such benefit/exemption is to be allowed in
purchase/supply tender only.
• Payment of EMD can be accepted by RTGS/NEFT.
• The scanned copy of original documents shall have to be uploaded with the bid
The Detail Of bank Accont of SBI (Account holder- Paschim Gujarat Vij Company Ltd)
Bank Account :-
IFSC Code:- SBIN0060101
Online RTGS/NEFT Transaction ID acknowledgement must be uploaded on Line
3.SECURITY DEPOSIT(SD):-
The successful bidder will be required to pay an amount equivalent to 5% of the value of the Order as a
Security Deposit before placing the work order for satisfactory performance of the execution of Contract. If
the full Security Deposit amount is not paid within 07 (Seven) days after the receipt of the LOA, then the
LOA will be out rightly cancelled & work order will not be placed (at the discretion of PGVCL). EMD amount
of such bidder/s will be forfeited without entering into any correspondences and this will be binding on the
Bidder. PGVCL will also take action against such bidder/s like stop deal/black list/works at the risk & cost of
the bidder or actions as desired by the Company. Security Deposit will be payable either by/ D.D. / Bank
Guarantees. ‘Security Deposit’ & S. D. shall be paid before placing of work order in DD or BG at PGVCL,
Surendranagar. The bidder has to give bank guarantee with validity period of additional one month than
contractual validity period
a) In form of Demand Draft in favor of "Paschim Gujarat Vij Company Limited," payable at
Surendranagar of any Nationalized Bank/public sector bank OR private bank, Axis, IDBI, Bank
authorized by RBI to the Govt. business. Security Deposit if paid will be returned on successful
execution of contract.
The security deposit will be refunded only after the finalization of final bill and no any interest will be paid
against SD amount. The same shall be refunded on completion of work, successfully and on receipt of
“NOC” from concerned Dept. i.e. after completion of Twelve months of date of commencement of work
4.PENALTY FOR DELAY IN COMPLETION OF CONTRACT:
Sign & Stamp of The Bidder PGVCL SNR DO P a g e 4 |
In case of delay, penalty shall be levied at 0.5(Zero Point Five) % of contract value per week with maximum
10(TEN) % selling of per bill value per week. This will be deducted from your bill payable either from this
contract or from any other contract with the Company or from EMD or Security deposit amount.
5.CONTRACT AGREEMENT:
Successful bidder shall have to execute the contract agreement Bond on non judicial stamp paper of Rs.
300.00 the cost of the same will be borne by the bidder.
6.TAX: -The prices should be inclusive of all applicable taxes excluding prevailing GST.
In the wider interest of safety you contractor will have to provide all required safety gadgets as per PGVCL
norms to your all workmen while working. Use of same must be ensured by you and for any consequences
that arise out of non use of these safety gadgets, PGVCL will not be responsible. Certificate by contractor
must be given while submission of bill that necessary safety Gadgets is issued to and used by all workmen
working for contractor. For any deviation PGVCL will take action as per norms. It will be the responsibility of
bidder / contractor to cover sufficient amount of insurance of their personnel involved in the erection work of
tender item/s during execution of works. PGVCL shall in no way be responsible for any injury, damages,
accident etc. to their personnel execution / erection work, supervision etc. under the contract.
8.OTHER CONDITIONS OF SUPPLY:-
The PGVCL General Conditions of Contract will apply to all Supplies and Contracts and you will deemed to
be fully aware of the this General Conditions of Contract for the supply of Materials particularly in respect of
Security Deposit, Terms of Payment, Penalty for late delivery etc. and any ignorance of these Conditions
will not exempt you from liability to abide by the same.
9.FAILURE TO EXCEUTE THE CONTRACT:-
On failure to execute the order placed on successful bidder, under the terms & conditions set forth therein,
to the satisfaction of PGVCL, the contractor will be liable to make good the loss sustained by PGVCL.
Under such circumstances, PGVCL shall cancel the order and forfeit the SD. PGVCL may also go for fresh
order on other party at the risk & cost of successful tendered or may carry out
departmentally, debiting the cost to the successful bidder / contractor.
10. TERMINATION OF CONTRACT:-
The PGVCL, upon written notice of default to the contractor, shall terminate in the circumstances detailed
as under: If, in the opinion of the PGVCL, the contract or fails to complete the work specified in the scope of
works given in Schedule-A within the time specified for the same in the contract or within the period for
extension has been granted by PGVCL to the contractor. If, in the opinion of the PGVCL, the contractor
fails to comply with any of the other provision of the contract The PGVCL shall also be empowered to
cancel the contract, if any deficiency in erection work and or bad performance is noticed. The work
specified in the scope of works given in Schedule -A within the time specified for the same in the contract or
within the period for extension has been granted by PGVCL to the contractor.
11. CHANGE AND QUANTITIES:-
The PGVCL shall have the rights to make any changes /addition / deletions or modification in any terms /
conditions of the tender and / or specifications as may be deemed necessary by PGVCL at its sole
discretion at any time before the due date of opening of the tender. The quantities mentioned in the
accompanying Schedule are only approximate. Actual quantities may increase or decrease according to
the requirements. The Company reserves the right of revising or deleting any of the quantities to be
executed against the contract and final quantities actually executed by the contractor will be calculated and
paid at the rate given in contract schedule of rates.
Sign & Stamp of The Bidder PGVCL SNR DO P a g e 5 |
12. The erection work shall be carried out strictly as mentioned in Schedule-A and as per standard
specification relevant ISI & approved by PGVCL authority & Concern authority i.e. PWD, NHAI, Western-
Railway, BSNL, Local Gram Nagar Panchayat Municipality, etc.
13. PGVCL reserves the right to cancel any or all the offer / bids or to accept any offer without assigning
any reasons. PGVCL reserves the right to place the order by split ting the tender items / quantity by
awarding to more than one contractor. The technical scrutiny committee of PGVCL shall evaluate the
techno-commercial view of the tender. PGVCL reserves the right to open or not to open the price bid of the
bidders on the basis of their past performance of their work/supplied materials.
14. JURISDICTION:-
All questions, disputes or differences arising under out of or in connection with the Tender / Contract if
concluded shall be subject to the exclusive jurisdiction of the court under whose jurisdiction the place from
which the tender / Acceptance of tender is issued, is situated.
15. PGVCL as well as supplier / contractor will be bound by rules and regulation of Indian Contract act.
16. Income Tax (TDS), GST(TDS) & CESS whenever applicable will be deducted / recovered as per Govt.
rules and regulation
17. Contractors must have valid solvency as per Company’s rules. Contractor Licence, Bank Solvency,
Registration of line / cable laying work & Experience certificate to be attached as per requirement of tender.
18. Bidder has to upload scanned copies of original ( Notarized/Self attested copies of original as
specified in tender documents) documents with bid and no physical documents to be called from
bidder. Uploaded scanned documents remain legible and should not be password protected.
19. Bidder shall mention Registered E.P.F. & I.T. Dept Pan -Card, GST etc in his offer and submit the
photocopy of certificate of each, otherwise Tender shall not be considered in competition.
20. It is declared that we have no any stop deal / black list with GUVNL & its subsidiary company.
21. No tools, tackles nor their maintenance and labor for execution of order will be provided by PGVCL.
22.PERIOD OF CONTRACT:-
The contract will be remained in force for period of 12 Month. The contractor shall call / indent the required
material from S/dn / Dn Store in advance & on completion of the work, prepare and render the final detailed
material account of the received by him from the SDn./ Dns store within one month from the date of
completion of work.
23.INDEMITY BOND:-
The contractor will have to executed an indemnity bond on stamp paper of Rs.300/-at his cost before
commencement of work stating the matter conversing that for any accident to the contractor‟s
staff/equipment or any person, either fatal or non fatal, due to non observing of safety measures,
PGVCL, shall not be responsible.
24. CONTRACTOR LIABILITY:- For any accident either fatal or non-fatal to the workers due to non
observances of the safety measures as per rules or due to lack of proper care by the contractor‟s labor,
PGVCL shall not be responsible.
25. VALIDITY:- All offers should be kept valid for acceptance for a period 120 (One Hundred Twenty) days
from the date of opening of tender. Offers with short validity will be liable for rejection without any
correspondence.
26. Contractor shall submit the bill of work at regular period of stipulated time.
27. STATUTORY VARIATION:-
Sign & Stamp of The Bidder PGVCL SNR DO P a g e 6 |
Any statutory increase or decrease in the taxes subsequent to contractor / bidder offer if it takes place
within the original contractual delivery date will be to PGVCL account subject to the claim being supported
by documentary evidence. However, if any decrease takes place after the contractual delivery date, the
advantage will have to be passed on to PGVCL.
28.PAYMENT TERMS:- Payment of works shall be made in 45 Days after scrutinizing of Bill submitted by
contractor if found in order.
29.The contractor has to store all the allotted materials in safe custody on their end. The allotted materials
by PGVCL should be insured at their cost towards theft, loss, damaged etc. The contractor is fully
responsible for storing of all the materials allotted by PGVCL for the works under contract.
30.PGVCL shall issue the required materials under the contract from any store of PGVCL and the
contractor has to carry out all the transportation at their cost up to the sites.
31.PGVCL reserves the right to cancel any or all the offer/bids or to accept any offer without assigning any
32. Agencies /Contractor has to submit notarized self declaration for " criminal case or is having pending
Civil Suite, against him/her firm by PGVCL or against PGVCL filed by him/her firm “ along with Technical
33. Vendor registration must be require for applying tender. Tender is not accepted without Vendor
34. No physical documents to be called from bidder.
35. jyir[ ki[ºT^ikTr Wiri krvimi> aiv[l nvi lien kimni> b)l m&kvimi> aiv[ Ryir[ sdr nv) lien tYi
T)s) kimn& frJyit Jai[ T[g)>g kr)n[[ Jai[ sv<[ r)pi[T< b)ln) siY[ ji[Dvini> rh[S[.
36.Contractors must obtain permission letters generated online/offline through the “Call
Before You Dig” (CBuD) mobile application for any work involving excavation activity.
Executive Engineer
PGVCL Division Office, Surendranaga
Contractor Sign
Sign & Stamp of The Bidder PGVCL SNR DO P a g e 7 |
GENERAL INFORMATIOS FOR BIDDERS
1.1 The "PGVCL" shall mean the Executive Engineer Surendranagar Division, PASCHIM GUJARAT VIJ COMPANY
LTD., having its corporate office at Nanamava Main Road, Laxminagar, Rajkot. With expression shall unless
repugnant to the context include its permitted assigns or successor / authorized representatives.
1.2 The "Contractor" / Successful Bidders shall mean the Bidders, whose tender has been accepted by the PGVCL
for award of the contract and shall include his authorized representatives.
1.3 The "Engineer-in-Charge" shall mean the authorized officer of the PGVCL to act as Engineer-in-Charge to
supervise the work – for the purpose of the contract.
1.4 The "Specification" shall mean the tender forming a part of the contract along with Performa, schedules and
1.5 The "Order" shall mean the official letter issued by the PGVCL, informing the bidder that his tender has been
1.6 The "Contract" shall mean the agreement to be entered into by the PGVCL with the contractor and shall
include the commercial technical and general conditions, schedules, drawings and any other conditions
specifically agreed between the parties forming a part of the contract.
1.7 The "EMD" shall mean Earnest Money Deposit.
1.8 The "Contract Value" shall mean the total amount indicated in the contract agreement as per order placed by
1.8 The "Contract Value" shall mean the total amount indicated in the contract agreement as per order placed by
the PGVCL and calculated from the quantities indicated in the tender.
1.9 The "Completion Period" shall mean the period starting from the date of issue of "Order" and required to
complete the work in all respect.
1.10 The "Work" shall mean activities to carry out for the entire scope of this Tender.
1.11 “Inspector” shall mean the any person nominated by PGVCL from time to time to inspect the works under the
contract and/or duly authorized representative of the PGVCL “Letter of Award” shall mean the official notice
issued by the PGVCL notifying the contractor that his bid has been accepted.
1.12 “Date of Contract” Shall mean the date on which Letter of award has been issued.
1.13 “Month” shall mean the calendar month day or days unless herein otherwise expressly defined shall mean
calendar day or days of 24 hours each.
1.14 “A Week” shall men the continuous period of seven days.
1.15 HT means High Tension
1.16 Electricity Rules: - All the works shall be carried out in accordance with latest rules under Electricity Act-
1.17 Testing: - After completion of work execution required Tests are to be taken in presence of Engineer in
Charge whenever required.
1.18 Definition of “Similar work” for overhead network: Erection of overhead electric Network up to voltage
1.19 Definition of “Similar work” for underground network: Laying of HT/LT Underground Power cable network
for Distribution system.
2 PRE QUALIFICATION CRITERIA / ELIGIBLE CRITERIA FOR BIDDERS
2.1.1 Bidders fulfilling eligibility criteria as mentioned in section 1 Sr. no. 2.2. and having experience of erection &
maintenance of overhead HT/LT lines, Transformers, underground cable work, along with satisfactory work
completion certificate regarding execution of work, including work order outward number along with its
value, from order issuing authority, for last 3 (three Years) _ ending last day of month previous to the one in
which tenders are invited., of any DISCOM of GUVNL or any Govt. / Private DISCOM of any state of India. The
work executed through open / advertised tender shall only be considered for experience of work. The work
done through limited tender shall not be considered for experience.
These bidders will be considered as an experience bidder.
2.1.2 Bidders fulfilling eligibility criteria as mentioned in section 1 Clause No.2 and sub clause No. 2.2 and not
possessing any experience of erection & maintenance of overhead HT/LT lines, Transformers, underground
cable work can also participate in tender for erection & maintenance of overhead HT/LT lines, Transformers,
underground cable work. These bidders will be considered as an NEW bidder.
2.2 Following documents are mandatory for the Bidders.
1. Work Completion certificate (by Order Issuing Authority only) with copies of Work Orders for the similar works
2. Memorandum of Association or partnership deed.
3. Document showing P.F. Number obtained by the bidder.
4. Power of attorney if any for signing the bid documents.
Sign & Stamp of The Bidder PGVCL SNR DO P a g e 8 |
5. Latest solvency certificate issued by Nationalized or scheduled bank for a sum of Minimum 20% of Tender cost
6. Registration Number under Shop and Estt. Act (If as case may be applicable)
7. PF Code Number allotted by concerned PF Authority
8. Labour License (If as case may be applicable)
9. Registration under ESIC (If as case may be applicable)
10. Type test certificates for Cable Box, Straight through Joints (In Case of UG Work Involved).
11. E. P. F. Registration in the name of bidder.
12. GST Registration Certificate in the name of bidder
13. PAN card in the name of bidder
14. Valid Labour Insurance Policy in the name of bidder
15. Latest bank solvency certificate from any Nationalized/Scheduled bank
16. Adhar Card (Optional) (In case of Bidding is done on Individual name)
3.0 INSTRUCTIONS FOR e TENDERING (ON LINE TENDERING) TO BIDDERS
3.1 Bidders willing to participate in tender will have to get themselves registered on website www.nprocure.com
3.2 Bidders willing to participate in tender should have valid digital certificate / Digital Signature as per
Information technology Act 2000 using which they can sign their electronic bids. Bidders can also procure the
same from (n) code solutions, a division of GNFC Ltd., who are licensed certifying authority by Govt. of India.
Download tender Documents from PGVCL web site up to date shown in the tender document.
3.3 For details regarding digital certificate and related training the below mentioned address may be contacted
(n) Code Solution A division of GNFC, 403, GNFC Info Tower, Bodakdev, Ahmedabad 380054.Tel: +91
9898589652, E-mail: [email protected]
3.4 Bidders who already possess valid Digital certificate need not procure a new digital certificate.
3.5 Bidders can prepare and edit their offers number of times before tender submission date and time as
mentioned in this tender details table no1. After tender submission date and time, bidder cannot edit their
offer submitted in any case. No written or online request in this regard shall be granted.
3.6 Bidder shall submit their offer, i.e. Technical Bid as well as price bid in Electronic format on website
www.nprocure.com before the validity period mentioned in tender details Table no1.
3.7 Offers submitted without digitally signed will not be accepted.
3.8 Offers only in physical form will not be accepted in any case.
4 UNDERSTANDING AND CLEARIFICATIONS ON DOCUMENTS AND SPECIFICATIONS
4.1 All interested parties are requested to understand this Tender Document in detail in order to comply with
PGVCL’s requirements including but not limited to the Tender fees, EMD and deadlines, selection criteria,
selection methodology, scope of work, and minimum technical standards.
4.2 The Bidder is required to carefully examine the specifications and documents and fully inform himself as to all
the conditions and matters which may in any way affect the Work or the cost thereof. If any Bidder finds
discrepancies or omissions in the specifications and documents or is in doubt as to the true meaning of any
part, he shall at once request in writing in advance before filling in the tender, within the time limit as per
Table no 1, for an interpretation / clarification by the PGVCL Surendranagar Division office.
Then The PGVCL Surendranagar Division office will issue interpretation and clarifications as he may think fit
of such interpretations and clarifications, the Bidder may submit his bid but within the time and date as
specified in the Table no1. All such interpretations and clarifications shall form a part of the specifications
and documents, and accompany the bidder's proposal. In case of difference of opinion about interpretation of
specification etc. the decision of Executive Engineer, Surendranagar Division will be final and shall be binding
to the contractor.
4.3 Verbal clarifications and information given by the PGVCL or his employee(s) or his representative(s) shall not
in any way be binding on the PGVCL.
4.4 All interested parties requested to strictly abide by all terms prescribed in this RFP Document and provide
accurate information to the best of their knowledge without misleading PGVCL to be considered for
participation in this Project.
4.5 Bidders should be in touch with websites https://pgvcl.nprocure.com &www.pgvcl.com for
information regarding revision / corrigendum / Amendment in the Tender Document till due date of
online / off line submission and thereafter. No separate information shall be sent in this regards and
also not publish in newspaper.
5 TENDER FEES (Non Refundable & Non-transferable)
Existing rate of GST will be levied on following tender fees as per GST Rules in force during this
Sign & Stamp of The Bidder PGVCL SNR DO P a g e 9 |
5.1 The Tender fees is payable, as per following Table, between the dates mentioned in Table no 1 , by cash &
DD or Banker’s Cheque Or RTGS/NEFT if total amount of Tender fees plus applicable GST is less than Rs
DD or Banker’s Cheque Or RTGS/NEFT if total amount of Tender fees plus applicable GST is less than Rs
10,000/- or only by Demand Draft (DD), if the said amount is more than Rs 10,000/, in favour of the Paschim
Gujarat Vij Company Limited payable at Surendranagar on any Nationalized /Scheduled banks
Tender Fees in Present rate of Total Tender
Sr. No. Tender Amount
Above Rs 5,00,000/- up
Above Rs 10,00,000/- up
Above Rs 25,00,000/- up
5.2 The tender fees once paid for tender document will not be refunded under any circumstances or not
transferred to other bidder.
5.3 The Tender Fees is Non-refundable under Normal Circumstances. However, if purchaser Company decides to
scrap/cancel the Tender, by one or another reason, in which Bidders are not responsible for
cancellation/scarp of Tender fee without GST amount may be refunded to bidder(s), at sole discretion of the
Purchaser Company
6 EARNEST MONEY DEPOSIT (EMD)
6.1 The EMD payable, between the dates mentioned in Table no 1, by cash if total amount of EMD is less than Rs
6.1 The EMD payable, between the dates mentioned in Table no 1, by cash if total amount of EMD is less than Rs
10,000/- or by Demand Draft (DD) or Banker’s Cheque, if the said amount is more than Rs 10,000/-, in
favour of the Paschim Gujarat Vij Company Limited payable at Surendranagar on any Nationalized
/Scheduled banks or by Bank guarantee from any Nationalized/Scheduled nationalized bank decided by
Government of Gujarat time to time only. The EMD Amount is 1 % of the Tender Estimated Cost.
6.2 The money receipts of payment of Tender fees and EMD or DD or BG for tender fees & EMD should be
submitted in sealed cover & this cover shall be clearly marked “Tender fees & EMD Cover for Tender no.
______” along with the name and stamp of bidder.
6.3 The EMD of all unsuccessful bidders except that of the successful bidder will be returned after the award of
6.4 EMD of the successful bidder to whom a contract is awarded will be returned after the said bidder pays the
security deposit and signs the contract agreement.
6.5 If the successful bidder fails to submit a Security Deposit within 15 days from the date of LOA of the contract
or fails to sign the contract agreement then the EMD amount will be forfeited in favour of PGVCL without any
notice or and action for “Stop deal” will be initiated as decided by tender inviting authority
6.6 No interest will be payable by the PGVCL on the above Deposit.
6.7 NSIC or any other certificate such Udhyam Registration, certificate of CSPO, certificate of DGS&D
should not be allowed for exemption of EMD payment in works/Service tender, Such benefit/exemption
is to be allowed in purchase/supply tender only.
6.8 Tenders submitted without Earnest Money Deposit by the firms, who are not eligible for any exemption, will
be rejected without entering in to further correspondence in this regard and no reference will also be made.
7 In case of On line Tenders
7.1 Technical & Commercial Bid cover:
7.1.1 Following documents are mandatory and to be in submitted through sealed cover. This cover should be
clearly marked “Technical & Commercial Bid Cover for Tender no. __________” along with the name and
stamp of bidder
1 Attested Copy of successful work Completion certificate, as mentioned on page no 5 point no 2.11 of this
2 Attested copy of Memorandum of Association or partnership deed.
3 Attested copy of document showing P.F. Number obtained by the bidder.
4 Attested copy of power of attorney if any for signing the bid documents.
5 Attested copy of latest solvency certificate issued by Nationalized or scheduled bank.
6 Attested Copy of registration Number under Shop and Estt. Act (If as case may be applicable)
7 Copy of PF Code Number allotted by concerned PF Authority
8 Copy of Labour License (If as case may be applicable)
9 Copy of Registration under ESIC (If as case may be applicable)
10 All Annexures of this tender documents , duly signed by the bidder, in chronological order only
Sign & Stamp of The Bidder PGVCL SNR DO P a g e 10 |
11 Certificate – A
12 Copy of Tender Document duly signed and stamped on each page.
13 Type test certificates for Cable Box, Straight through Joints (In Case of UG Work Involved).
14 The contractor shall have a separate provident fund code of RPFC and the Contractor who do not possess
separate P.F. Code shall not be considered for acceptance of tender.
15 Contractor has to submit such certificate showing separate P.F. Code along with tender.
16 List of available safety gadgets, as per annexure XI, with the bidder.
17 Copy of documents mentioned in Section 1, Clause No. no 2.2 of this tender.
7.2 Commercial / Price Bid:
7.2.1 The bidder must clearly quote their rates in Schedule – B of this tender, in percentage above than, below
than or equal to, the tender rate in figure as well as in words. The bidder should specify whether the quoted
rates are with or without prevailing taxes, if applicable, in force at that time, The bidder must work out the
total price of their tender offered accordingly and the total amount should be clearly written in words &
total price of their tender offered accordingly and the total amount should be clearly written in words &
figure, in case of any discrepancy whatever written in words shall prevail. Company shall at liberty to decide
the matter as it deem fit.
7.2.2 In case of non SOR rate, Item wise rate should be mentioned and item wise rate will be consider for the
7.2.3 Further bidders, for “On line tenders”, are requested to submit price – bid on-line only and not to
submit the price bid in physical form. This is mandatory. If price bid is submitted in physical form, same
will not be opened and only on-line submitted price bid will be considered for evaluation. In On Line price
Bid, GST is to be mentioned in separate raw/Column.
PGVCL reserves the right to reject any OR all tenders without assigning any reasons thereof.
8 In case of Off line Tenders
8.1 Technical Bid cover
8.1.1 All the documents as specified in Section I Sr. no. 7.1 are mandatory and to be in submitted through sealed
cover. This cover should be clearly marked “Technical Bid Cover for Tender no. __________” along with
the name and stamp of bidder
8.2 Commercial / Price Bid cover:
8.2.1 All the documents as per Section 1 Sr. No. 8.2.2 & 8.2.3 are mandatory and should be submitted in
sealed cover. This cover shall be clearly marked “Commercial Bid Cover for Tender no. ______” along
with the name and stamp of bidder
8.2.2 The bidder must clearly quote their rates in Schedule – B, attached with this tender, in percentage above
than, below than or equal to, the tender rate in figure as well as in words. The bidder should specify whether
the quoted rates are with or without prevailing taxes, if applicable, in force at that time, The bidder must
work out the total price of their tender offered accordingly and the total amount should be clearly written in
work out the total price of their tender offered accordingly and the total amount should be clearly written in
words & figure, in case of any discrepancy whatever written in words shall prevail. Company shall at liberty
to decide the matter as it deem fit.
8.2.3 In case of non SOR rate, Item wise rate should be mentioned and item wise rate will be consider for the
8.2.4 No deviation in terms & condition in Schedule-B and Technical Specification will be entertained. All the
documents related to this Tender shall be final and binding to all the bidders. Any ignorance for this shall not
relieve the contractor from their contractual liability arising as per Tender documents.
9. The works referred herein shall cover the entire scope of the Tender.
10. The issuance of bid document would not mean that the bidder has qualified for the bidding. Hence bidders
should ensure themselves of their credentials before submitting their offer.
11. Executive Engineer, PGVCL, Surendranagar Division reserves the right to spread the order if required.
12. Does not anticipate change in the PGVCL ownership during the proposed period of work.
13. AMENDMENT TENDER
13.1 At any time prior to the deadline for submission of bids, as mentioned in Table1, PGVCL may, for any
reason, whether at its own initiative or in response to a clarification requested by a respective bidder,
modify the bidding documents by amendments.
13.2 The amendment will be notified, only on PGVCL Website & n-procure website in case of on line tender,
PGVCL will bear no responsibility or liability arising out of noncompliance of the same in time or otherwise.
13.3 Such amendments, clarification etc. shall be binding on the bidders and will be given due consideration by
the bidders while they submit their bids and invariably enclose such documents as a part of the bid.
Sign & Stamp of The Bidder PGVCL SNR DO P a g e 11 |
14. SUBMISSION OF TENDERS
14.1 Follow all the instructions narrated this tender document for submission and no any further communication
in the matter will be entertained.
The Bidders must ensure that all the Annexures are completely filled in their tenders and the information
called for is given in totality. A set of complete tender documents is required to be submitted duly signed
and stamped by authority competent to sign on behalf of bidder on each page as a token of unconditional
acceptance to the conditions of various clauses of tender documents. The bidder's bid and the documents
attached there to shall be considered for forming part of the contract documents.
14.2 For “On Line Tenders”
14.2.1 Tender Papers & Specifications may be down-loaded from Web site https://pgvcl.nprocure.com
(For view, download and on line submission) and PGVCL web site www.pgvcl.com (For view & down load only).
14.2.2 The bidder has to follow instruction given in this section point no 4 to 7. Both these covers, as mentioned in
this section point no 6.2, 7.11, should be submitted in one main cover, this cover shall be clearly marked
“EMD Cover, Technical _Commercial bid covers for Tender no. __________” along with the name of the
Bidder and his address.
• This main cover must be submitted physically, within time limit as mentioned in table no 1 Sr. No. 8, by
registered Post A.D. or Speed Post only , “NO COURIER SERVICE OR HAND DELIVERY” will be allowed, to
following address:
Executive Engineer,
PASCHIM GUJARAT VIJ COMPANY LTD.,
Surendranagar Division,
Address:- Nr. Shiv Hotel S T Stand Road Surendranagar.
• Price bids to be submitted ON LINE only before time limit specified in “Tender Details” Table no1 of this
14.3 For “Off Line Tenders”
14.3.1 Tender Papers & Specifications may be down-loaded from PGVCL web site www.pgvcl.com (For view & down
14.3.2 The bidder has to follow instruction given in this section point no 4 to 8. All these three covers, as mentioned
in this section point no 6.2, 7.11, 8.2 ,should be submitted in one main cover, this cover shall be clearly
marked “EMD Cover, Technical , Commercial bid covers for Tender no. __________” along with the name
of the Bidder and his address.
This main cover must be submitted physically, within time limit as mentioned in table no1, by registered Post
A.D. or Speed Post only, “NO COURIER SERVICE OR HAND DELIVERY” will be allowed, to following address:
Executive Engineer,
PASCHIM GUJARAT VIJ COMPANY LTD.,
Surendranagar Division,
Address:- Nr. Shiv Hotel S T Stand Road Surendranagar.
15. REJECTION OF TENDER:
15.1 The Bidders is expected to examine all instructions, terms, conditions, schedules and other details called for
in this specification and keep himself fully informed about all which may, in any way, affect the work, or
cost thereof. The bidder should sign on each page of tender documents , as mentioned in Section 1 point no.
2.15, failure to furnish the required information or submission of tender not as per the specification will be
at the Bidders risk may result in rejection.
15.2 The offer is liable summarily rejected if it contains.
a) Deviation/Addition/Alternations/Omissions in bidding schedules.
b) Deviation and contradictions to the terms and conditions specified in this tender.
15.3 If any bidders firm or/and partner or proprietary firm anywhere in companies (PGVCL, UGVCL, MGVCL,
GETCO, DGVCL, GSEC) under GUVNL are under criminal investigation for any kind of fraud for public and
theft of material or/and with handlings the material and any civil and/or criminal case pending at any stage
than offer of such bidder /firm will be out rightly rejected.
15.4 Bids submitted after the time and date fixed for the receipt of bids as set out in the Table no1, shall be
15.5 Any deviation found in Data/Details/Documents between online offer (e-tendering) and physically submitted
documents of bidder, offer of the same shall be liable for rejection at the discretion of PGVCL.
15.6 The Bidders shall specifically note that any over writing or corrections or manuscript in the bid shall be
ignored and will not be considered authentic unless same are signed with Bidder's Stamp/Seal as mentioned
in Section 1 point no.
15.7 Conditional bids shall not be accepted.
Sign & Stamp of The Bidder PGVCL SNR DO P a g e 12 |
15.8 DELAYED AND LATE TENDERS:
No tender shall be accepted/opened, as mentioned in the Table no 1, in any case which are
received after due date and time of the receipt of tender irrespective of delay due to postal
services of any other reasons and company shall not assume any responsibility for late receipt
of tender. Any correspondence in the matter will not be entertained.
16. LANGUAGE OF THE TENDER
All information in the bid shall be in English. Information in any other language shall be accompanied by its
translation in English. Failure to comply with this may disqualify a bid. In the event of any discrepancy in
meaning, the English language copy of all documents shall govern.
17. SIGNATURE OF BIDDER
17.1 The bid must contain the name, residence, address and place of business of the person or persons making the
bid and must be signed and sealed by the bidder with his usual signature. The name of all persons signing
should also be typed or printed below the signature.
17.2 Bids by corporation/ company must be signed with the legal name of the corporation/ company by the
President, Managing Director or by the Secretary or other person or persons authorized to bid on behalf of
such corporation/ company in the matter.
17.3 A bid by a person who affixes to his signature the word 'President', 'Managing Director' 'Secretary', 'or other
designation without disclosing his principal will be rejected.
17.4 Satisfactory evidence of authority of the person signing on behalf of the Bidder shall be furnished with the
17.5 The Bidder's name stated on the tender shall be exact legal name of the firm.
17.6 Erasures or other changes in the bid documents shall be over the initials of the person signing the bid.
17.7 The bidder should sign, as described above, on each page of tender documents & then they have to submit
this tender documents.
18. PRICE BASIS CURRENCY AND PAYMENTS
Bidder shall indicate bid prices in Indian Rupees only.
19. EFFECT AND VALIDITY OF TENDER
The bid should be kept valid for a period of 120 DAYS from the date set for opening of the technical bid.
20. EVALUATION AND COMPARISION OF TENDERS
Generally the qualifying price bids, Bid price shall mean the bid price quoted by each bidder in his bid for the
complete scope of works including all duties and Taxes, will be evaluated by the PGVCL to ascertain the best
and lowest evaluated bid in the interest of the PGVCL, for the complete works covered under these
specifications and documents.
21. ARITHMETICAL ERRORS
Arithmetical errors will be rectified on the following basis:
If there is a discrepancy between words and figures, the amount in words will prevail. If there is discrepancy
between the unit price and the total price which is obtained by multiplying the unit price and quantity, or
between sub-total and the total price, the unit or sub-total price shall prevail, and the total price shall be
corrected. In case of discrepancy between sub-total price obtained by adding various prices in the schedule
and the sub-total price indicated for that particular schedule, the sub-total obtained by addition of various
arithmetically corrected prices would be considered for evaluation.
However, the PGVCL shall be entitled to award the contract at the lowest of the prices arrived at from
various schedules, identified for that purposes, in the bid proposal sheets. If the bidder does not accept the
correction of the errors as above, his bid will be rejected.
22. AWARD OF CONTRACT
22.1 Notification of award of contract will be made in writing to the successful bidder by the PGVCL.
22.2 The contract will be awarded to the best qualified and responsive bidder offering the lowest evaluated bid in
conformity with requirements of these specifications and documents and PGVCL shall be the sole judge in
this regard and subject to the provisions of these instructions to bidders and other terms and conditions
detailed out in these documents and specifications. A responsive bid is one which accepts all terms and
conditions of these specifications and documents without any modifications.
Sign & Stamp of The Bidder PGVCL SNR DO P a g e 13 |
22.3 PGVCL Reserves the right to award separate contract to two or more parties in line with the terms and
conditions specified in the specification.
23. ADDITIONAL DOCUMENTS:
At the time of evaluation of tender PGVCL Surendranagar Division office may ask bidder to submit required
documents other than mentioned in section I Point no 2.2, if required.
24. COMPLETION PERIOD
The contractual period for execution of the work stated in Schedule – B of this Tender consist ________ Days.
The commencement date of Order shall be Date of issue of the Order.
25. VENDOR REGISTRAION
Vendor registration must be require for applying tender. Tender is not accepted without Vendor
26. The Warrantee Period
If during one year work completion any maintenance is felt necessary, for example straightning of pole
cross arms , conductor stringing , tightening of Guy etc then such work will have to done by the bidder free of cost.
If there is any new material required for maintenance during this warrantee period i.e one year time period
, such requirement will have to be approved by the Executive Engineer of concern division .
Sign & Stamp of The Bidder PGVCL SNR DO P a g e 14 |
GENERAL INFORMATION ABOUT THE BIDDER
(To be completely filled by the bidder)
1. Name of the Bidder
2 Vendor registration Number
3 Postal Address
4 Telephone nos.
e-mail address & URL
6 Type of Company Proprietorship/ Partnership/ Private
Attach Proof of Company Registration Limited/ Public Limited
along with a copy of the
Partnership Deed/ Article of
Association and Memorandum of
7 Name and designation of the
representative of the Bidder to
whom all reference shall be made
to expedite technical co-
8 Office Address
9 Stores Address where materials issued 1)
by PGVCL will be stored 2)
10 Store Documents to be submitted
11 Office Telephone/Fax no.
12 Office e-mail address
13 Permanent Account Number(PAN),
16 Labour License No.
17 Insurance Policy No. and for nos. of Policy No._______________________
Labours in the name of bidder Nos. of Labours Insured in this
18 Solvency Certificate No.
19 Adhar Card No.(Optional)
It is certified that the information provided above is true to the best of my knowledge and belief. If any
information found to be concealed, suppressed or incorrect at later date, our tender shall be liable to rejected and
our company debarred from executing any business with PGVCL.
Sign & Stamp of The Bidder PGVCL SNR DO P a g e 15 |
1.0 For Underground Cable
1. Bidder has to maintain the records of allotted Cable Drum with actual Cable/Conductor length. Cable length
must be measured before laying. Cable joints are to be done as per requirement only and length of cable
must be utilized accordingly.
2. Cable is to be laid in Trench as per instructions of Engineer-in-Charge.
3. The trench excavation and filling–in shall be so executed that all walls, roads, sewers, drains, pipes, cables,
structures, places and things shall be reasonably secured against risk of injury and shall be carried out to the
satisfaction of the authorities concerned. However, if any, damages to existing services made, Contractor
shall arrange and pay for any necessary repair, to make good the damages.
4. When the excavation of the trenches has been accurately executed, the contractor shall inform engineer in-
charge for approval. Lying of cables shall not be started until engineer in-charge approves the trench.
5. All the related material for laying the cable in trench i.e. Half round RCC Pipes having _both sides smooth
surfaces, 25.4 mm thick, 152.4 mm inner diameter, 1000 mm long and well cured and good quality; Sand
from river bed, HDPE Pipes, GI Pipes and sundries material if any (As per Schedule B) are to be supplied by
Bidder at his own Cost. All such material must be approved from concerned Engineer-in-charge before
utilization and it must be ISI marked where ever applicable.
6. Cable laying work must be executed as per prescribed in Schedule B. sand filling in Trench must be done as
mentioned in Schedule B. Megger test of Cable must be taken in presence of Engineer-in-charge before laying
and Bidder has to maintain separate Records duly signed by Engineer-in-Charge for each results. After laying
the Cable in trench it is to be covered with half round pipe of RCC as prescribed in Schedule B and approved
sample. Each Half round Pipe must be marked with “PGVCL” with solid Red Colour on Top.
7. Proper methodology of laying is to be adopted by the Bidder. Bidder has to lay Cable in the stretch on small
pulleys kept in the Trench so that it can be prevented from any scratches on Cable. Drum must be fixed on
Drum Machine while stretching and to be kept on one end of Trench for smooth laying.
8. After completion of laying as above, remaining trench must be filled with sand. Leveling with Road is to be
done after complete sand filling. No any stones or any other debris are to be utilized in filling of Trench. The
contractor shall dispose of surplus material at his own cost.
9. A pre-warning PVC yellow tape 8-Inch wide and 300 microns thick (LDPE) shall also be laid. The warning tape
shall be printed in RED letter (IN ENGLISH AS WELL AS GUJARATI) as “CAUTION: 11000 VOLTS PGVCL
CABLE” and to be placed at about 300 mm To 450 mm depth from ground level along the route of cable.
10. Trench route is to be made as per instructions of concerned Engineer-in-Charge and then laying of cable in
this trench accordingly.
11. Cable Laying with Mechanical Boring across the Road without disturbing the asphalt is to be done instructions
of concerned Engineer-in-Charge with prior approval and work is to be executed as per Specifications in
Schedule B only.
12. For Cable kit Make (Brand) Bidder has to submit any NABL accredited Lab Type test certificate not older than
Seven years and as per relevant IS 13573:2011 with latest amendment if any along with sample before
installation of cable kit at concern Division office. GTP is to be submitted with Technical Bid.
13. If any Hard Rock area is encountered during the digging of Trench, Bidder must have all the modernized
equipment i.e. Erath Cracker JCB etc. to execute the required Trench. Such area must be certified by a
formation of Committee at Division Level headed by Executive Engineer and to be executed in presence of
Engineer-in Charge.
IS 1255-1983 is to be followed for the depth of trench in such area.
14. Route Markers are to be installed at every 100 Meters length as per specifications in Schedule B The marker
should incorporate the following relevant information:
(1) The name of the Company – PGVCL.(2) Voltage – 11 KV Cable (3) Distance of cable from the marker
The interval should be maximum 50/100 meters (As per EIC instructions and requirements) between two
markers. It shall also be put at bends, curves, road crossing, Cable Joints etc. of cable route as per
requirement over and above specified distance.
15. Empty Drums are to be credited at PGVCL respective stores at Bidders cost and Risk after successful
completion and Execution of work. Otherwise Recovery will be proposed as per Section V Clause No.
16. After Laying of Cable in Trench and filling of all type Cable Box and Joints, testing must be carried out with
help of Voltage Surge Testing Kit as per IE Act by applying 22 KV for continuous Five Minutes and Cable must
hold the satisfactory Results. Bidder must have such testing facility. Following Pre commissioned Tests are
also to be carried out.
a) Insulation Resistance of each cable drum length after laying and before jointing.
b) Before laying of cable, tests for detection of damage to outer sheath, if any.
Sign & Stamp of The Bidder PGVCL SNR DO P a g e 16 |
c) After laying each cable with end termination shall withstand a voltage of 10 KV DC for one minute between
each phase to phase & phase to cable earth.
d) Test for 5 min. with system voltage applied between the conductor and the screen.
e) Continuity & Phase confirmation
17. During the Execution if any deficit found in allotted material OR in case of any theft of PGVCL allotted
material, then PGVCL will recover the cost of such material from Bidder as per the prevailing Market Rates.
18. No any Advance Payment will be made after issuing of Order.
19. PGVCL will be not responsible and liable for the material supplied by the Bidder.
20. During Execution of work for Trench and Cable Laying authorized representative of Bidder who is in
knowledge of Engineer-in-Charge must remain present.
21. Bidder must have to submit the List of all related Equipment and Testing facility necessary for the Tendered
work while quoting the Bid.
22. PGVCL reserves the right to change/modify/alter/addition in condition in case of any dispute and holds the
power to decide the final verdict.
23. GST and cess as applicable as per prevailing rates are applicable to Bidder for this work.
24. In case of any Disputes, Superintending Engineer of Concerned area is the final Authority to take any
25. Work may be required to be executed in any 66/132/220KV Sub-Stations also.
26. Necessary shutdown for connection/jumper of UG cable with existing network will be provided as per
availability or convenience of the PGVCL which shall be acceptable to the contractor & contractor shall try to
complete the work in minimum time.
27. All the sundries material like Clamps, Screws, nuts, bolts, nails etc. is at Contractor’s cost.
28. Work is to be performed as per Drawing No. PGVCL/Tech/UG cable/01/14-15 and PGVCL/Tech/UG
cable/02/14-15 are attached in Section XI.
2.0 For Overhead Line
1. Bidder has to maintain the records of allotted Conductor Drum with actual Conductor length. Conductor
length must be measured before Stringing.
2. E/o Poles must be according to RE Standards. Pole Pit, stringing installation of Fabrication must be done as
per standards and esthetically.
3. Earthing of Poles and Transformers must be as per Drawings and RE Standards. The Coal and Salt composition
must be followed as per rules. The Earth Pit must be kept at a distance mentioned in Standard form the Pole.
Earth Pit must be as per Drawing.
4. Concreting of Poles/Guys are to be carried out as per site situation and as per instructions of Engineer –In-
5. Construction of Transformer Structure must be as per standard with all required accessories like LA, Box and
6. Delta Type Three Earthing are compulsory for each Transformer Centre.
7. All the jumpers at Shackle Points/DP Structures must be of “D” Type only.
8. Wherever required, Guarding as per standard must be done.
9. Pole Concreting: Whenever concreting of poles (PSC/RSJ) required, subdivision officers has to submit the
proposal to the division office with all justification before commencement of work. Committee of Executive
Engineer, DE Tech of Division office has to verify the submitted proposal and decide whether concreting is
required or not. After the approval of committee work of concreting should be process as per specification
attached herewith.
10. Bidder must have records of each work carried out with every material inventory and account thereof issued
11. Bidder must have the well-drawn sketch of each work and to be submitted with Inventory sheet within
Days of work completion.
12. All the fabricated material and Girder Poles must be painted with Coats of Silver Oxide and without this
work, work completion will not be accepted.
13. Pole Numbering must be completed within week time as per Engineer-in-Charge Instructions. Bidder must
have proper pole accounting for the work carried out by him. He must have the location details from where
the poles are lifted and where these poles are utilized for each work. A separate Register is to be maintained
by him and details are required to be submitted with Inventory and Sketch submission.
14. Necessary shutdown for connection/jumper of newly erected line with existing network will be provided as
per availability or convenience of the PGVCL which shall be acceptable to the contractor & contractor shall
try to complete the work in minimum time.
15. Successful Bidder must have ensured for that the safety Gadgets are issued to his Labour, by him, and
required regulations of Safety will be followed while carrying out the line erection work.
16. The Work for the erection of of Poles, Guys, Earthing, Transformer and Concreting, Stringing and Guarding
must be done as per attached Specifications and Drawings.
Sign & Stamp of The Bidder PGVCL SNR DO P a g e 17 |
17. The material which is dismantled from site during the execution of work must be credited to respective
Divisional stores immediately after completion of work with complete inventory and measurement details
and length to weigh conversion calculations.
18. Any violation of Electricity Act 2003 Section No. 136 & 137, necessary action will be initiated against the
19. In case of any Disputes, Superintending Engineer of Concerned area is the final Authority to take any
General Instructions to the successful bidders
1. Letter of Intent (LOI) / Letter of Acceptance (LOA) shall be issued to the successful Bidders indicating the
quantity allocated to them and the security deposit amount to be deposited by them with PGVCL. Short
listed Bidders will be required to deposit the requisite security deposit within 15 days from issuance of LOI /
2. Security Deposit:
2.1 Security deposit will be accepted in Cash if the amount is less than Rs. 10000.00 and, if the amount is more
than Rs. 10000.00 then will be payable by Demand Draft (DD) OR Banker’s Cheque OR Bank Guarantee (BG)
from Nationalized / Scheduled Banks as per Govt. GR No. EMD / 10 / 2014 / 570 / DMO dated 01.04.15 will
be acceptable. DD should be drawn on any Nationalized /Scheduled banks in favour of Paschim Gujarat Vij
Company Ltd. payable at Surendranagar or by Bank guarantee from any Nationalized/Scheduled nationalized
bank decided by Government of Gujarat time to time only. Cheque will not be acceptable
2.2 The successful Bidders will be required to deposit the requisite security deposit within 15 days from the date
of issuance of LOA of an amount equivalent to 5 % of the value of the work to be allotted to him and as
mentioned in LOA.
2.3 In case, if the Bank Guarantee is furnished / submitted, it should have a clear one time validity till the
completion of awarded work of this work order. Bank Guarantee for interim period will not be allowed.
Security Deposit shall be suitably extended time to time as per requirement.
2.4 If by any reasons the completion period of this work order is extended, then supplier should undertake to
renew the Bank Guarantee at least one month before the expiry of the validity failing which PGVCL will be at
liberty to encase the same. CORPORATE GUARANTEES NOT ALLOWED.
2.5 No interest will be paid on the Security Deposit.
2.6 In the event of awarding the order of additional quantity, the successful Bidders will be required to deposit
additional Security Deposit on prorate basis within two weeks of the issuance of LOA for the additional order
2.7 In the event of failure to carry out work offered by successful Bidders and as accepted by them while
receiving the order within given time period, will lead to forfeiture of the Security Deposit up to 100% and
will lead to disqualification of the bidder to transaction business with PGVCL for at least TWO years or the
time duration as may be decided by the Managing Director, PGVCL.
2.8 Security deposit will be returned on after completion of awarded work.
2.9 If the successful Bidders fails to pay security deposit within given time limit then the letter of intent will
stand cancelled. EMD amount will be forfeited in favour of PGVCL without any notice or and action for “Stop
deal” will be initiated as decided by tender inviting authority.
3. SIGNING AGREEMENT
The successful Bidders will have to sign an agreement, within 15 days from the receipt of LOI/LOA, on Stamp
Paper of Rs 100/-as per Company’s rules in the prescribed form of the P.G.V.C.L. attached with this Tender.
The cost Rs.100.00 of the Stamp Paper will have to be borne by the successful Bidders.For the Tendered
work, other than turnkey work, entire material will be issued by PGVCL. Any other related material required
to carry out work mentioned in Schedule A is to be brought by Bidder. No any extra cost will be paid towards
4. Successful Bidder has to follow all the rules and Regulations of Work Safety. Required tools and Tackles for
Safety are to be arranged by Bidder only.
5. Bidder is responsible to any type theft/damages of Company’s material and also responsible to any type
damages to any property and any kind fatal/non-fatal accidents to anybody during the execution of work.
Insurance of all workers is compulsory, who are involved in Execution of Tendered work. There will be no any
financial liabilities of PGVCL for damage charges paid such way. Copy of valid Labour Insurance Policy in the
name of bidder is to be submitted with Tender Documents.
6. Rules and Regulations of PGVCL Works and Contracts Book are abided to Bidder.
7. Work must be completed in in specified Schedule narrated in the Tender. If concerned Engineer not satisfied
with quality of work, no any Time limit extension will be granted and Penalty with applicable GST with cess
as applicable and other taxes in force at that time will be levied on delayed portion of work.
Sign & Stamp of The Bidder PGVCL SNR DO P a g e 18 |
8. Agreement must be executed within 15 (Fifteen) Days from the date of issue of LOA. Security Deposit (In
form of DD/BG) and Insurance Policy is also to be submitted with Agreement within this time limit i.e.
(Fifteen) Days.
9. Remaining material is to be credited at Respective Stores of PGVCL within a month after completion of work.
10. Agreement and Indemnity Bond is to be executed on Rs. 100/- Stamp Paper and cost of stamp paper is to be
borne by Bidder. Solvency Certificate is to be submitted as per PGVCL rules and Tender Condition.
11. Bidder is solely responsible for the material supplied by PGVCL.
12. Coal and Salt are to be brought by Bidder at his own expenses, for earthing work, and work to be done as per
PGVCL rules and RE specification for this work.
13. Work is to be carried out in presence of PGVCL authorized representative and to be duly certified also.
14. No idle Labour charges will be paid by the PGVCL in case such occasion of idle Labour arises, due to want of
any materials or any other situations.
15. PGVCL have full rights to accept or reject the offer received against the Tender.
16. Bidder has to submit the Performance Certificates under whom the similar kind of Tender work has
been executed. Such Certificates must not older than 3 Years from Date of submission of the Bid.
Such Certificate must be duly signed by Cadre Executive Engineers and above only.
TERMS & CONDITIONS REGARDING INDUSTRIAL LAWS AND OTHER RELATED MATTERS:
1. COMPLIANCES WITH LAW:
The Contract shall in all respects be interpreted in accordance with the laws in force in India, including any
such laws passed or made or coming into force during the period of the Contract.
2. Wages to be paid at the time of payment etc.by the contractor
2.1 The successful bidder shall pay minimum prevailing rates per day, as may be specified here after, or rates fixed
under the Minimum Wages Act, whichever is higher. The wages of every contract labour employed by him
under this contract shall be paid by him before the expiry of 7th day of the month irrespective of which the
wages are payable i.e. wages of a last month have to be paid by him in the first week of the next month). The
contractor shall have to make wages to his workers through bank only. The agency shall have to submit the
copy of a letter given to the Bank advising for crediting wages in individual account of the workmen along with
photocopy of the cheque showing total payment to be made to all such workmen whose accounts are operated
in that branch. (If there is more than one Branch, the agency will have to submit separately for each branch.)
2.2 The successful bidder shall give his telephone number and address to the company so that in case of labour
trouble etc. the contractor can be contacted. The contractor shall arrange to have his office outside the
factory premises and the contractor shall keep himself present through the work hours.
3. Persons below the age of 18 years shall not be deployed for the said work.
4. No female worker shall be employed in the night shift between 07.00 p.m. to 6.00 am.
5. Identity cards as prescribed under the factories Act/Shops and establishment Act (As the case may be
applicable) with Photo affixed thereto, for identification.
6. The successful bidder shall maintain a valid Labour license under the contract labour (regulation and
abolition) Act for employing necessary manpower required by them. In absence of such license, the contract
shall be liable to be terminated without assigning any reason thereof.
7. The successful bidder shall at his own expenses comply with all labour laws and keep the PGVCL indemnified
in respect thereof. Some of the major liabilities under various labour and industrial laws which the
Contractor shall comply with below conditions.
7.1 Payment of contribution by way of employer's contribution towards provident fund, administrative charges
etc. at the rates made applicable from time to time by the Government of India / Government of Gujarat or
other statutory authority.
7.2 Payment of deposit in respect of each contract labour at the prevailing rate with the office of the
commissioner of labour as per the Contract Labour (Regulation and abolition) Act.
7.3 License fee as prescribed under the contract labour (Regulation and abolition) Act rules framed there under
depending upon the number of workmen.
7.4 Paid leave facility and wages as per the provision of the Factories Act at the rate of one day for every
days of working.
7.5 Payment of retrenchment compensation, Notice pay and other liabilities as per industrial Dispute Act. Any
payment to the Contractor's employee arising out of any claim of disputes under the Industrial Dispute Act
1947 or any other labour Laws.
7.6 Payment of compensation in case of accidental death or injury as per Employee's compensation Act.
7.7 Maternity leave as per the provisions of the Maternity Benefit Act.
7.8 In case, PGVCL becomes liable to pay any wages or dues to any manpower deployed or any government
Contractor under any of the provisions of the Minimum wages act, Payments of wages Act, Employee's
compensation Act, Contract Labour regulation abolition Act, Employee provident fund or any other law due
Sign & Stamp of The Bidder PGVCL SNR DO P a g e 19 |
to act of omission of the Contractor, the PGVCL may make such payment and shall recover the same from the
successful bidder's Bill.
7.9 If the PGVCL is caused to pay under any law as a principal employer such amount as may be necessary to
cause of observe, or for non-observance of the provisions stipulated in the notifications/byelaws/Acts/Rules/
Regulations/including amendments. If any, on the part of the Contractor, the PGVCL shall have the right to
deduct any money due to the successful bidder under this contract or any other contract with the PGVCL
including his amount of security deposit for adjusting the payment. The PGVCL shall also have right to
recover from the Contractor any sum required or estimated to be required for making good the loss or
damage suffered by the PGVCL.
8. Employee's compensation fund and employer's liability insurance: -
The successful bidder shall cover all his employees under employee's compensation fund and under the
liabilities insurance. The Contractor will arrange insurance policies for arranging payment to his staff injured
/ met with accident (Fatal / nonfatal) on duty of sufficient amount as per Labour laws. In case of any such
happening Contractor will be liable for any other payment to workers / staff engaged as per existing rules.
Contractor will not make any such payment to the Contractor's staff or any compensation etc. during the
pendency of the contract.
9. Following Salient features of some major laws are applicable to establishments engaged.
9.1 Employee PF and Misc. Provision Act
9.2 Payment of Gratuity Act
9.3 Maternity Benefit Act
9.4 Equal Remuneration Act
9.5 Payment of Bonus Act
9.6 Industrial Dispute Act
9.7 Industrial Employment (Standing orders) Act
9.8 Trade Union Act
9.9 Employees compensation Act
9.10 Contract Labour (Regulation and abolition) Act
9.11 Child Labour (Prohibition and regulation) Act
9.12 Inter-state migrant workmen's (Regulation of Employment and conditions of service ) Act
9.13 Minimum wages Act
9.14 Payment of Wages Act
9.15 Factories Act
9.16 Shops and Est. Act
9.17 The Employees’ State Insurance Act and the scheme ,
The above are some of the major liabilities of the Contractor in addition to other liabilities prescribed under
the various labour laws, in force from time to time, from statutory authorities like GOI-GOG, which the
Contractor shall have to comply with.
10. It should be ensured that before commencing the said work, the successful bidder should submit the details
of their labourer such as a full name, address and age with proof and subsequently changes of workers details
are submitted accordingly.
11. The successful bidder shall employ adequate number of an experienced staff at site for daily supervision
and for maintenance of various register and records required under the law and contract. No payment for
supervision shall be admissible.
12. PGVCL does not accept any responsibility as Factory Act, Minimum Wages Act, Workmen’s Compensation Act,
Insurance Rules etc. or any other act, rules or regulations that have to be observed by the contractor for
carrying out the work.
13. The contract will be governed by the company as per works terms & conditions of the company.
14. EMPLOYMENT OF LABOUR:
14.1 Persons below the age of 18 years shall not be employed for the work. No female worker shall be employed in
the night shift between 07.00 p.m. and 06.00 a.m. next day.
14.2 Contractor shall maintain a valid labour license under the Contract Labour (Regulation and abolition) Act for
employing necessary manpower required by him. In the absence of such a license, the contract shall be liable
to be terminated without assigning any reason thereof. Contractor should also employ qualified and
experiences persons as per requirement of Electricity Act and rules for carrying out supply and erection work
under this contract.
14.3 In case PGVCL becomes liable to pay any wages or dues to labour or any Government agency under any of the
provisions of the Minimum Wages Act, Payment of Wages Act, Employee Compensation Act, Contract Labour
Regulation Abolition Act, Employee Provident Fund or any other law due to act of omission of the Contractor,
PGVCL may make such payment and shall recover the same from the Contractor’s bills.
Sign & Stamp of The Bidder PGVCL SNR DO P a g e 20 |
15. PROVIDENT FUND AND FAMILY PENSION SCHEME
The Contractor shall submit along with his bills (month wise) a Statement regarding deduction against
employees Provident Fund and Family Pension Scheme in respect of each concerned employee The
contractor's contribution and the workers’ contribution towards Provident Fund and Family Pension Scheme
shall be done at the rate made applicable by the Government from time to time and deposited by the
contractor with Regional Provident Fund Commissioner, Rajkot.
16. DEPOSIT LINKED INSURANCE SCHEME
The contractor shall have to deposit 1.2% of the wages in respect of employees who are members of the
Provident Fund as the contribution to the Deposit Linked Insurance Scheme with Regional Provident Fund
Commissioner, Rajkot.
17. ADMINISTRATIVE CHARGES
Administrative charges for maintaining Provident Fund Account shall be deposited by the Contractor with
Regional Provident Fund Commissioner, Rajkot at the rates applicable.
18. PAID LEAVE FACILITY
Paid Leave Facility at the rate of one day for every twenty days worked by the Contract Labour shall be
provided by the Contractor to his, workers. He shall maintain Leave Records, Leave Cards for individual
labourer which shall be duly verified, approved and certified by the Authorized Officer of PGVCL.
Remuneration for such leave period shall be fully borne by the Contractor.
19. Workmen’s Compensation and Employer’s Liability Insurance
Insurance shall be affected for all the Contractor's employees engaged in the performance of this contract.
20. Wages to be Paid & Time of Payment etc. by the Contractor
20.1 The Contractor shall pay minimum wages per day to his Labours/ Workers as per rates fixed under the
Minimum Wages Act. The wages of every Contract Labour employed by him under this contract shall also be
paid by him before the expiry of 7th day from the last day of the month in respect of which the wages are
payable (i.e. wages of a month have to be paid by him in the first week of the next month).
20.2 Any default will result in cancellation of contact forthwith or else the Contractor shall be punishable to the
extent of Rs. 100/- for each day of default.
20.3 The Contractor shall give his Addresses, Telephone Number and etc. to PGVCL, so that, in case of labour
trouble etc. the Contractor can be contacted. The Contractor shall arrange to have his office within working
area and the contractor keep himself present throughout the working hours.
20.4 The separate P.F. code issued from RPFC is required to be taken by the contractor and if it is not taken,
offer of the firm will not be considered. The attested documentary evidence to be submitted along with the
20.5 The contractors who are having separate P.F. Code No. from RPFC, it should be ensured that all the contract
labourers are covered under the provident fund scheme and employees’ pension scheme and their
contributions are remitted regularly to the concerned RPFC. The photo copies of the Chelan in this regard
should be collected from the concerned contractor and kept in the file of the concern contractor.
The Bidder’s insurance liabilities pertaining to the scope of Works are detailed out in Clauses titled Insurance
Bidder’s attention is specifically invited to these clauses. Bid price shall include all the costs in fulfilling all
the insurance liabilities under the Contract.
28.1 The Contractor at his cost shall arrange, secure and maintain all insurance as may be pertinent to the Works
and obligatory in terms of law to protect his interest and interests of the PGVCL against all perils detailed
herein. The form and the limit of such insurance as defined herein together with the under-writer in each
case shall be acceptable to the PGVCL. However, irrespective of such acceptance, the responsibility to
maintain adequate insurance coverage at all time during the period of Contract shall be of Contractor alone.
The Contractor’s failure in this regard shall not relieve him of any of his contractual responsibilities and
obligations. The insurance covers to be taken by the Contractor shall be in the name of the Contractor. The
Contractor shall, however, be authorized to deal directly with Insurance Company or Companies and shall be
responsible in regard to maintenance of all insurance covers. Further the insurance should be in freely
convertible currency.
23. Any loss or damage to the equipment during handling, transportation, storage, erection, putting in to
satisfactory operation and all activities to be performed till the successful completion of commissioning
of the equipment shall be to the account of the Contractor. The Contractor shall be responsible for
preference of all claims and make good the damages or loss by way of repairs and/or replacement of the
Sign & Stamp of The Bidder PGVCL SNR DO P a g e 21 |
equipment, damaged or lost. The transfer of title shall not in any way relieve the Contractor of the
above responsibilities during the period of Contract. The Contractor shall provide the PGVCL with copy
of all insurance policies and documents taken out by him in pursuance of the Contract. Such copies of
documents shall be submitted to the PGVCL immediately after such insurance coverage. The Contractor
shall also inform the PGVCL in writing at least sixty (60) days in advance regarding the expiry/cancellation
and/or change in any of such documents and ensure revalidation, renewal etc., as may be necessary well in
24. The perils required to be covered under the insurance shall include, but not be limited to fire and allied
risks, miscellaneous accidents (erection risks) workman compensation risks, loss or damage in transit, theft,
pilferage, earth quake, riot and strikes and malicious damages, civil commotion, weather conditions,
accidents of all kinds, etc. The scope of such insurance shall be adequate to cover the
replacement/reinstatement cost of the equipment for all risks up to and including delivery of goods and
other costs till the equipment is delivered at Site. The insurance policies to be taken should be on
replacement value basis and/or incorporating escalation clause. Notwithstanding the extent of insurance
cover and the amount of claim available from the underwriters, the Contractor shall be liable to make good
the full replacement/rectification value of all equipment/materials and to ensure their availability as per
project requirements.
25. All costs on account of insurance liabilities covered under the Contract will be on Contractor’s account and
will be included in Contract Price, However, the PGVCL may from time to time, during the pendency of the
Contract, ask the Contractor in writing to limit the insurance coverage, risks and in such a case, the parties
to the Contract will agree for a mutual settlement, for reduction in Contract price to the extent of reduced
premium amount. The Contractor, while arranging the insurance shall ensure to obtain all discounts on
premium which may be available for higher volume or for reason of financing arrangement of the project.
26. The clause entitled ‘Insurance’ covers the additional insurance requirements for the portion of the works to
be performed at the Site.
27. The successful bidder will not be allowed to work after working hours except in special case, if any.
28. The successful bidder has to engage required strength of skilled persons for execution of work and proper
supervisor to avoid complication and unnecessary delay to complete work timely. The successful bidder will
be solely responsible for labour claims arising out of the labour employed for this job.
29. The successful bidder should furnish details of past experience of such job of similar nature completed by him
satisfactorily within the time limit in PGVCL will be preferable.
30. The successful bidder will be abide by and fulfil all the terms and provisions of the “Tender and contract” for
works as applicable and in case of any default there to the PGVCL Company shall forfeit the S.D. or any other
action as may be decided by Executive Engineer Surendranagar Division.
31. The successful bidder will certify that he has complied with the provisions of Industrial & Labour Laws
including PF Act, ESI Act etc. as may be applicable. Copy of challans of PF related to be submitted along
32. The successful bidder will governed by the PGVCL general conditions of works contract. The Booklet will be
available in the concerned office in any working days. In the event of placing order, the successful bidder will
be bound to the terms & conditions of the booklet. All the usual terms and conditions of the Company though
the same might have not been mentioned in this specification or contractor booklet will applicable to this
contract, and the decision of the Executive Engineer, Surendranagar Division shall be binding on the
TAXES and Duties: GST
1. The prices are excluding GST and Cess as applicable which will be paid extra on a given taxable goods and/or
services. The amount and % of GST and Cess as applicable should clearly be indicated separately. (GST/Cess
means all applicable Tax/Cess under GST Laws.
2. GST Laws means IGST Act, GST (Compensation to the State for Loss of Revenue) Act, CGST Act, UTGST Act
and SGSCT Act, 2017 and all related ancillary legislations).
3. The offers having price INCLUSIVE OF GST and Cess is likely to be rejected if the rate of GST and Cess is not
mentioned clearly unless the bidder has opted for Composition Scheme under GST Act, which should be
clearly indicated in the price bid. COMPANY may at its discretion consider such offer with presumption of
highest applicable rate of VAT/GST/Cess prevailing when the price quoted is inclusive of GST and Cess.
4. If the Contractor has opted for the Composition scheme of GST, the same must be clearly specified with valid
Declaration & Certificate from Department. In the event of withdrawal/cessation of the Supplier from
Composition scheme during the tenure of the contract, the rate mentioned in the price bid shall be final and
any additional GST will have to be borne by the tenderer. In no case additional amount towards tax or
otherwise will be paid / reimbursed to supplier/contractor. Further Statutory Variation clause will not be
applicable in case of Supplier / Contractor has opted for Composition Scheme under GST.
Sign & Stamp of The Bidder PGVCL SNR DO P a g e 22 |
5. Contractor should charge GST in Invoice at the rate as agreed to/mentioned in acceptance of tender only and
any deviation in the same shall not be accepted. Further, any additional liability of GST (later on due to
wrong mentioning of GST rate, mis-interpretation of HSN/SAC Code, etc.) over and above as charged in the
invoice shall be borne by the Supplier/Contractor. However, any refund received by the supplier / contractor
on account of GST charged from the company; such refund shall have to be passed on to the company, along
with interest if any. Such refund along with interest needs to be passed on suo-moto by the contractor.
6. Further, the Company has a right to recover the amount of GST along with penal interest at the rate of 15%
per annum if GST charged is not paid/short paid to the government or fail to upload the details or uploads
inaccurate particulars on GSTIN portal by the Supplier / Contractor within the stipulated time limit.
In case, Govt. revises the rate of GST rate / Code during the tenure of the contract, the provision of
GUVNL’s statutory variation clause shall apply.
7. INPUT TAX CREDIT BENEFIT
In the event of any statutory increase in the rate of Input Tax Credit and / or due to inclusion of any other
additional item of their inputs / input services under the ambit of the Input Tax Credit provisions under the
GST Act, subsequent to the date of submission of the offer, the same should be passed on to COMPANY and
you should inform such changes to COMPANY from time to time. PGVCL’s GST Registration No.is
24AADCP1453C1ZZ
8. TAXES, PERMITS & LICENCES:
The Contractor shall be liable and pay all foreign taxes, duties, levies lawfully assessed against the PGVCL or
the Contractor in pursuance of the Contract. In addition the Contractor shall be responsible for payment of
all Indian duties, levies and taxes lawfully assessed against the Contractor for his personal income & property
10. Income Tax -TDS
“Income-tax at source at the prevailing rate will be deducted from bills in accordance with the provision of
Income-Tax Laws and to that effect a certificate will be issued to the contractor, however added as
contractor has to submit separate invoice for supply parts item as well as works part item separately,
otherwise TDS will be deducted on entire invoice value.”
11. Applicable welfare cess will be deducted from contractors each bill by PGVCL to pay the same to the
respective Govt. Department. Tax will be deducted as per applicable statutory rules.
12. Statutory Deduction
Statutory deduction will be made as per applicable rules & rates for TDS, GST TDS, welfare cess or any other
taxes applicable time to time etc. All other statutory liabilities towards this contract will be on your part.
11. STATUTORY VARIATION
Any statutory increase in the taxes subsequent to your offer if it takes place within the contract period will
not be considered except GST. No statutory variation will be given for this work except GST. However, if
any decrease takes place within/after the contractual delivery date, the advantage will have to be passed on
12. The Contractor shall be fully responsible for deducting the P.F. of the employees/labour Working under him
as per statutory regulations and depositing the same with the concerned authorities.
13. The Contractor shall comply with the relevant laws of India.
The Contractor shall be liable for and shall indemnify the Employer against all losses, expenses or claims
arising in connection with the death of or injury to any person employed of the Contractor or his
subcontractors for the purposes of the Works.
GENERAL TERMS AND CONDITIONS for successful bidders
1.1 The successful bidder shall be deemed to have carefully examined all the papers, drawings, etc. attached & if
has any doubt as to the meaning of any portion of any condition / specification, etc. he shall before signing
the contract submit the particulars thereof to PGVCL in order that such doubts are removed.
Sign & Stamp of The Bidder PGVCL SNR DO P a g e 23 |
1.2 The successful bidder shall not, without the consent in writing of PGVCL, transfer, assign or sublet the work
under this contract or any substantial part thereof to any other party.
1.3 The execution of work should be commenced as per the instruction of the Engineer In Charge as per actual
requirement and should be completed within the time limit thereafter.
1.4 PGVCL may at any time by notice in writing to the successful bidder either stop the work altogether or
reduce or cut it down. If the work is stopped altogether, the Bidder shall only be paid for work done. If the
work is cut down the Bidder shall not be paid for the work as so cut down, but in neither case shall be paid
any compensation what so ever for the loss or profit which he might have made if he had been allowed to
complete all the work included in the contract.
1.5 Notices, Statements and other communications sent by PGVCL through registered post or telegram or telex
or any other way of communication to the successful bidder at his specified address shall be deemed to have
been delivered to the successful Bidder. The work shall be carried out by the successful bidder with prior
approval of PGVCL. Work carried out without PGVCL’s approval shall not be accepted and the PGVCL shall
have right to reject it and to recover the cost from the successful bidder. He will be liable against all losses,
expenses or claims arising in connection with the death of or injury to any person employed by the successful
bidder or his subcontractors for the purposes of the Works.
1.6 The successful bidder shall be responsible for any damage to the equipment during transit due to improper
or inadequate packing, handling, loading and unloading. The cases containing easily damageable material
shall be very carefully handled. Adequate protection must be provided for outdoor storage at site in tropical
humid climate, wherever necessary. The successful bidder without any extra cost shall supply any material
found short inside intact store area.
1.7 If the successful bidder neglects to execute the work with due diligence and expedition or refuses or neglect
to comply with any reasonable orders within two days’ notice given in writing to the successful bidder and if
he fails to comply with the notice, then in such a case PGVCL shall be at liberty to get the work or any part
of it, executed through any other agency/Bidder in the manner and on the terms it thinks proper. If the cost
of executing the work as aforesaid shall exceed the balance due to the Bidder, and the Bidder fails to make
good the deficiency, PGVCL may recover it from the Bidder in any lawful manner.
1.8 PGVCL shall have at all reasonable time access to the works being carried out by the Bidder under this
contract and stores where material issued by PGVCL is stored. All the works shall be carried out by the
Bidder to the satisfaction of PGVCL.
1.9 The quantities mentioned in the accompanying schedule B are only approximate same may decrease or
increase. The PGVCL reserves the right for revising or omitting any of the quantities. The actual work
executed by the successful bidder will be calculated at the rate given in the contract schedule of the rates
binding to the successful bidder.
1.10 No higher rate or revised rate will be application for the work, if work is held-up/closed due to whatever so
1.11 Price shall not be changed subject to any upward/downward revision on any account whatsoever through the
period of contract.
1.12 All other general terms and conditions as prevailing in the PGVCL shall be applicable to this work contract.
1.13 The successful bidder has to co-ordinate and co-operate fully with Engineer In Charge and for execution of
1.14 Either successful bidder or successful bidder’s authorized person should contact our Engineer In Charge as
well as Division Office, Surendranagar daily for the availability of materials required for this work, failing to
which this work order shall be terminated without giving any notice.
1.15 The successful bidder has to maintain site register covering all aspects of material
received/utilized/dismantled for day to day work and has to obtain signature of Engineer in Charge.
1.16 In case of any dispute doubt, the decision of Executive Engineer Surendranagar Division shall be
unchallengeable and final, which will be binding to the contractor.
1.17 Security Deposit (without any Interest) will be refunded after completion of guaranteed period if any.
1.18 All legal complication of disputes is subject to Surendranagar jurisdiction only.
1.19 A fresh and valid solvency certificate to the extent of 20% of the ordered value will have to be produced by
the contractor and party has to submit attested copy of solvency certificate to the company before
commencing of work.
1.20 The successful bidder will be solely responsible for any accident/damage either to equipment or any human
being during the time of execution of work.
1.21 Prior institution in writing for starting the job will be given by PGVCL for the work.
1.22 The successful bidder will have to make his own arrangement for required all kinds of tools, tackles, required
for the execution of work.
1.23 The cost of damages, if any will be recovered from the successful bidder’s bill. The assessment of which will
be done by Engineer In Charge in consultation with division office, and his sole discretion and his decision
shall be binding to the successful bidder and shall be considered as final and unchallengeable.
Sign & Stamp of The Bidder PGVCL SNR DO P a g e 24 |
1.24 The successful bidder will have to give indemnity bond to PGVCL against any possible claim of compensation
for damage to Contractor’s equipment or staff or any of third parties during the execution of work as per
attached format.
1.25 The successful bidder will have to complete entire work, as mentioned in Schedule-B of contract awarded to
him, as per directive and instruction of Engineer In Charge. If he fails to do so entire work will be carried out
at the risk and cost of Contractor.
1.26 The contractor must engage sufficient knowledgeable person round the clock, exclusively for execution of
1.27 Specification in any items mentioned in tender are subject to change without any prior notice and binding to
the contractor.
1.28 The PGVCL shall deduct the Income-Tax and other taxes as per prevailing rules of all relevant Govt.
Authorities from the bill.
1.29 If the work is required to be carried out during fix outage then the successful bidder has to deploy adequate
man power, material, tools etc. well in advance and has to complete the entire work during this specific
outage period only, failing to which Company shall be at liable to deduct the amount of revenue loss due to
prolong outage.
1.30 The tender include all minor accessories and items of work which may not have been specifically mentioned
in the specification / Schedule etc. but are essential for completion of work. The contractor will not be
eligible for any extra payment in respect of such minor accessories and item of work.
1.31 The successful bidder shall not refuse to execute the work order at any time and it will be his sole
responsibility to execute and complete this work as per the instruction of Engineer In Charge.
1.32 For shortage of any materials issued by the PGVCL for the work, recovery shall be made from you, on the
basis of prices of the materials (prevailing on the date of settlement of materials account) plus 15%
supervision charges.
1.33 The successful bidder has to carry out all the works in accordance with revised and latest provision under I.E.
Rule Act made there under and as per instruction of Engineer In Charge.
1.34 All the materials issued by PGVCL shall be transported to the work site on same day and to be preserved in
safe custody failing to which PGVCL shall initiate Police action. Similarly as per instruction of Engineer In
Charge, you have to credit the material at PGVCL store without any loss of time failing to which PGVCL shall
initiate Police action.
1.35 Any delay causing extension of outages shall be successful bidder’s responsibility and appropriate amount (in
term of Rupees) as decided by Executive Engineer, Surendranagar Division shall be recovered from successful
bidder’s bill as a penalty with applicable GST.
1.36 No tools, tackles, manpower, crane facilities etc. will be provided by the PGVCL.
1.37 The contractor has to follow all labour laws, safety rules and regulations. The PGVCL does not take any
responsibility in case of accident or injury to the workers. The safety, security of men, materials and
equipment shall be sole responsibility of the contractor.
1.38 The compliances of all Central / State Govt. Rules, safety and insurance rules etc. and that of local body is a
must condition for the successful bidder.
1.39 The successful bidder shall specifically note that PGVCL will not pay any extra amount towards any type of
claim except for the description indicated in Schedule –A. The party has to carry out all other additional
required activities / work as directed by Engineer In Charge which is not mentioned in Schedule but required
to be completed as per the site condition and for this work no extra payment shall be made by PGVCL.
1.40 The contractor should employ as a Supervisor with sufficient qualification and experience who could
supervise the execution of work throughout. He should always be present on the site.
1.41 The contractor shall be responsible for breakages, losses and a theft of material during transit or erection
after the materials issued from the stores till the completion of work and is taken over by the PGVCL.
1.42 As regard damages to the materials, equipment, successful bidder himself will be responsible. If there is any
compensation to be paid in respect of “WORKMAN” Compensation Act or any other statutory provisions, the
same will be paid by contractor directly. If he thinks fit, he may take necessary insurance covering at his
1.43 The successful bidder shall co-operate with the PGVCL for taking measurement etc. as early as possible and
he shall fulfil the entire requirement which is necessary to finalize the accounts.
1.44 The competent authority can delete any item in schedule of the tender if he feels that the rate quoted by
the contractor for the item is abnormally high when compared to the estimated rates.
1.45 The successful bidder shall not refuse to execute this work order at any time and it will be his sole
responsibility to execute and complete this work as per the instruction of Engineer In Charge.
1.46 The erection work should be carried out according to the specification as per instructions and programmed
laid out by the Engineer in charge. Contractor has to ensure safe shifting and erection of all accessories /
equipment as per standard norms.
1.47 The Bidder shall not display the photograph of the work and shall not take advantage through publicity of
the work without written permission of PGVCL.
Sign & Stamp of The Bidder PGVCL SNR DO P a g e 25 |
1.48 The inspection as mentioned in above clause No. 6 of this section by PGVCL’s representative shall not relieve
the successful bidder from full responsibility of completing the work confirming to the requirement of this
1.49 Under the Contract, the Contractor shall be responsible for loss or damage to the line and Electrical
Equipment until the successful completion as defined elsewhere in the Bid document.
1.50 All demurrage, wharf age and other expenses incurred due to delayed clearance of the material or any other
reason shall be to the account of the Contractor.
1.51 The law applicable to the contract shall be the laws in force in India. The courts of Rajkot shall have
exclusive jurisdiction in all matters arising under the contract.
2 PRICE EVALUATION:
No price preference shall be given on any account. All tenders must be submitted firm price basis (Inclusive
of all Taxes) and lowest evaluated bid in the interest of the PGVCL, for the complete works covered under
these specifications and documents.
If more than one party is to be considered for placement of order, they willhave to match their end cost with
end cost of L-1 technically acceptable bidder. PGVCL (tender Inviting Authority) may go to the L-2, L-3 and
so on depending upon the requirement. If PGVCL (tender Inviting Authority) feels that there is lack of serious
competition or any other reasons, PGVCL (tender Inviting Authority) may negotiate with the L-1 party.
PGVCL’s (tender Inviting Authority) decision shall be final and binding on all the parties.
3 QUANTITY DISTRIBUTION
3.1 For Erection & Maintenance work of HT/LT/TC:
The Contractors whether non-experienced / New or experienced / Regular who have confirmed /fulfilled pre
eligibility criteria, as mentioned in Section 1 Sr. No. 2 , will only be considered for price evaluation. PGVCL
will not consider the, price bid of any contractor who does not confirm / fulfil the eligibility criteria as
mentioned in Section 1 Sr. No
3.1.1 While placing the order, the quantity distribution to each new contractors / new firms shall be restricted up
to 30 % of the tender amount/Qty. for all such new bidders provided the price of New contractor is lower
than the regular/experienced contractor. New contractor / new firm will be considered as a regular
contractor only after full filing experience criteria as mentioned in Bidders qualifying criteria as per point no.
2 in Section I.
3.1.2 The new contractor will be asked to match the L-1 prices of the new contractor only and the Regular
contractor has to match the L-1 price of the Regular/experienced contractor only.
But if there are no Regular contractor OR if the rate of Regular contractor is very high, the above condition
no. 2.11 shall be suitably relaxed by PGVCL. L-1 regular contractor however will get heavy weight age in
order placement.
3.2 For laying of Under Ground Cable work:
3.2.1 While placing the order, the quantity distribution to each new contractors / new firms, Section 1 Sr. No.
shall be restricted up to 10 % of the tender amount/Qty. for all such new bidders provided the price of new
contractor is lower than the regular/experienced contractor. New contractor / new firm will be considered
as a regular contractor only after full filing experience criteria as mentioned in Bidders qualifying criteria as
per point no. 2 in Section I.
3.2.2 The new contractor will be asked to match the L-1 prices of the new contractor only and the Regular
contractor has to match the L-1 price of the Regular/experienced contractor only. But if there are no Regular
contractor OR if the rate of Regular contractor is very high, the above condition no. 2.21 shall be suitably
relaxed by PGVCL. L-1 regular contractor however will get heavy weight age in order placement. The
Contractors who have confirmed /fulfilled pre eligibility criteria will only be considered for price evaluation.
PGVCL will not consider the price bid of any contractor who does not confirm / fulfil the eligibility criteria.
L-1 regular contractor however will get heavy weight age in order placement.
4 IDENTIFICATION OF SITE:
Details of each location shall be made available through Executive Engineer of each concerned Divisions
under above locations. The planning for each location has to be prepared in consultation of the Deputy
Engineer of the concerned Sub Division under whose control the work is allocated. The work must be carried
out under Supervision of concerned S/dn Head or Authorized Staff appointed by SDO.
5. ALLOTMENT OF MATERIAL AND ITS STORAGE
Required material for the work as per Schedule shall be allotted from any store Centres of PGVCL
jurisdiction and successful bidder has to take delivery from these stores at his own only.
Sign & Stamp of The Bidder PGVCL SNR DO P a g e 26 |
6. Contractor will be issued only 3 (Three) Sub work orders at a time. He will be issued Fourth Sub Work
Order only after the submission of Inventory sheet with sketch and material account statement for any
of the three previously issued Sub Work Orders.
7. TAKING DELIVERY AND INSURANCE:
7.1 The contractor has to keep all materials in safe custody and transport to the respective sites and will
be fully responsible for any damage to or loss of all materials at any stage during transportation or
erection till taking over by PGVCL
7.2 The Contractor has to open site store/s (Maximum Two Nos.) and ensure for safe custody of all the
stored materials at his own cost. Material which is to be allotted by PGVCL is to be carted, loaded and
unloaded at Bidder’s cost and risk from PGVCL’s respective Stores. PGVCL must have access to such
Store/s at any time of Day thought the contractual period and Contractor will cooperate for
verification of such store/s and Inventory accounting. Failing to which actions may be initiated after
issuance of required Notice to the Contractor. Store address/s is to be mentioned in the “General
information about the Bidder” under Section I of this Tender.
7.3 The Contractor shall have total responsibility for the entire materials stored, loose, semi assembled
and/or erected by him at site in his custody. The Contractor shall make suitable security
arrangements at his own cost to ensure the protection of all materials, equipment and works from
theft, fire pilferage and any other damages and loss. It shall be the responsibility of the contractor to
arrange for security till the works are finally taken over by the PGVCL
7.4 STORAGE-CUM-INSURANCE:-
The contractor shall take suitable storage-cum-erection insurance cover at his cost to the extent of 100 %
cost of materials, which are required to complete the work. Contractor shall have to take comprehensive
insurance policy equivalent to the Order Value against any loss, damage, theft, pilferage, fire etc. for the
complete period of storage, erection and commissioning up to the time of taking over by PGVCL. The
Contractor shall deal directly and pursue the claim with the Insurance Company and shall be responsible in
regard to maintenance of all insurance coverage as well as for settlement of claim. The proof of insurance
policy taken by the successful Contractor shall be furnished to Engineer-In-Charge. In absence of the above
insurance policy, R.A. Bill payment will be withheld.
In the event of any damage, theft, loss, pilferage, fire etc., Contractor will be responsible to lodge, pursue
and settle all the claims with the Insurance Company for all items, materials and the PGVCL shall be kept
informed about it. Contractor shall replace the lost / damaged materials / items promptly irrespective of
the settlement of the claims by underwriter and ensure that the work progress is as per agreed schedule.
The loss, if any, such replacement will have to be borne by the Contractor and PGVCL will not entertain any
claim / representation in this regard. However it will be contractor's responsibility to insure the entire
project is taken over by the PGVCL.
8. Account of material issued:
8.1 The successful bidder shall have to maintain accurate day to day item wise account of use of issued
materials which shall be got checked from time to time by the Engineer In Charge of the Company. The
contractor will be responsible for custody and preserving the issued materials till the work is hand over by
the contractor after completion.
8.2 The successful bidder has to maintain site register, covering all the daily details of material receipt and
utilization, progress of work etc. This register shall be checked and signed by Engineer In Charge/Deputy
/Executive Engineer,___________ Sdn/Division during the site visit as per requirement and exigency of work
8.3 After completion of the work against each Sub Work Order, all the surplus materials issued by the PGVCL
shall be returned by you to the respective divisional /Regional stores only at contractor’s cost. Such Material
Shall not be credited in S/Dn store.
9. Work Completion Period:
9.1 In the event of placement of order, successful bidder shall have to complete the ordered work within
____ Days from the Date of issue of Work Order.
9.2 Time limit of each sub work order should not be maximum up to 60 Days.
8.3 WORKING DAYS: -
In case, it is not possible for the successful bidder to continue the work either due to heavy rains or other
reasonable causes, such facts should be immediately brought to notice of the Engineer In Charge. If the
reasons for stopping the work are genuine the Engineer In Charge may ask the successful bidder to start the
work again as per condition. The period of such stoppage will not be considered as a part of working days
moreover the successful bidder cannot claim compensation for such stoppage.
Sign & Stamp of The Bidder PGVCL SNR DO P a g e 27 |
9.4 PROGRESS OF WORK
You will have to submit fortnightly progress report regularly in duplicate to Engineer In Charge and Executive
Engineer Surendranagar. If found that the work is unsatisfactory or not progressing as per schedule then any
action would be taken by the PGVCL as may deemed fit to see that work is completed at the risk and cost of
contractor. The completion time allowed for each Sub work Order shall be strictly observed.
9. Time limit extension will be given, as per Clause No. 12 of this section, if material is not supplied in
time and in any case of objection not cleared in time. But if materials given in time and there is no any
objection, then no time limit extension will be granted and penalty with applicable GST with Cess will
be imposed as per rules.
11 CHANGE OF QUANTITY:
11.1 During the execution of the Contract, the PGVCL reserves the right to increase or decrease the quantities of
items under the Contract but without any change in unit price or other terms & conditions. Such variations
unless otherwise specified in the accompanying GCC and/or Technical Specifications, shall not be subjected
to any limitation for the individual items but the total variations in all such items under the Contract shall be
limited to the extent of 30% (Thirty Percent) of the contract price by way of suitable amendment to the
11.2 The Contract price shall accordingly be adjusted based on the unit rates available in the Contract for the
change in quantities as above. The base unit rates, as identified in the Contract shall however remain
constant during the currency of the Contract, In case the unit rates are not available for the change in
quantity, the same shall be subjected to mutual agreement.
11.3 As this is an EPC contract, engineering work will be done by the Contractor. Responsibility of material will be
that of the contractor.
12. Penalty with GST:
12.1 Penalty with GST is levied on the time limit of Sub Work Orders. If the work is not completed within the
scheduled period as prescribed in Sub Work Order, penalty with GST and cess as applicable at the rate of
% per week or part thereof on delayed portion subject to maximum up to 10 % of the sub work order Value
with GST and cess as per applicable rate. This will be deducted from the bills payable either against this
contract or any bank guarantee or any other amount payable under any other contract with the PGVCL. For
Penalty calculations or Time limit Extension, following points are to be observed.
12.2 Start Date of Sub Work Order for Penalty Calculation will be the Day/Date on which the first material is
issued against the Sub Work Order.
12.3 If material is not available in respective stores then “NO STOCK” stamping by Store In-charge/Store Keeper
must be taken against the particular item by the contractor.
12.4 In Case of non-availability of Material, contractor must visit the respective store every fortnight and no
stock material details are to be submitted to respective Executive Engineer and concerned SDO.
12.5 TLE of Sub work order can be granted on the basis of above such documents produced by Contractor.
12.6 Time limit Extension must be given as per F & A Letter No. PGVCL/F&A/5083/14-06-2017 and
12.7 At the time of submission of Bill against SWO, all such Documents are to be submitted by contractor for
waiver of Penalty if applicable.
12.8 Time limit of Annual Work Order should be maximum up to 365 Days.
12.9 During the execution of Work, if Contractor/Labour are found violating OR Braking the Safety rules and
Regulations, then Engineer-in-Charge will serve the warning Notice on first Instance. On second Instance
the amount of Fine will be Rs. 500.00 or 0.1 % of amount of SWO (Whichever is high) with GST and cess.
Even If after above two instances, still Contractor found breaking of Safety Rules and Regulations then
Procedures for Stop dealing must be initiated against him as per rules and regulations.
13. Payment terms shall be as follows:
13.1 Payment will be made against Invoice value and shall be paid against actual execution. The bills should be
submitted in Duplicate to respective Executive Engineer, Division Office along with following documents:
• Measurement Report of each site by PGVCL authorized inspection Officer (not below the rank of Deputy
• Material Accounting for work duly certified by Engineer-in-charge
• Work Completion Certificate duly signed by Contractor for which the Bill is submitted.
• Copy of Insurance Policy against the Material equivalent to the Order Value as per Tender Condition No.
No.7 under this Section.
• Contractor must submit the above documents within Fifteen (15) Days from the actual date of
completion of work to respective S/dn Office.
• DOP is to be followed for Payments against the Work Orders.
13.2 R.A. Bill shall be paid by the PGVCL, if it satisfy with the output of works otherwise only final bill shall be
Sign & Stamp of The Bidder PGVCL SNR DO P a g e 28 |
13.3 The time limit for the work may be reduced and contractor should make all his efforts to complete the work
within stipulated time limit as may be given by the Engineer In Charge depending upon emergency of work.
14 FORCE MAJEURE:
Force Majeure means any circumstances beyond the control of the parties including:
14.1 War and other hostilities, (whether war be declared or not), invasion, act of foreign enemies, mobilization,
requisition or embargo;
14.2 Rebellion, revolution, insurrection, military or usurped power and civil war;
14.3 Ionizing radiation or contamination by radioactivity from any nuclear fuel or from any nuclear waste from the
combustion of nuclear fuel, radioactive toxic explosive, or other hazardous properties of any explosive
nuclear assembly or nuclear components thereof;
14.4 Riot, commotion or disorder, except where solely restricted to employees of the Contractor.
14.5 Neither party shall be considered to be in default or in breach of his obligations under the Contract to the
extent is that performance of such obligations prevented by any circumstances of Force Majeure that arise
after the date of the Notification of Award.
14.6 If either party considers that any circumstances of Force Majeure have occurred which may affect
performance of his obligations he shall promptly notify the other party.
14.7 Upon the occurrence of any circumstances of Force Majeure, the Contractor shall endeavour to continue to
perform his obligations under the Contract so far as reasonably practicable. The Contractor shall notify the
Engineer-in-Charge of the steps he proposes to take including any reasonable alternative means for
performance, which are not prevented by Force Majeure. The Contractor shall not take any such steps unless
directed so to do by the Engineer-in-Charge.
14.8 If circumstances of Force Majeure have occurred and shall continue for a period of 180 days,
notwithstanding, the Contractor may by reason thereof, having been granted an extension of Time for
Completion of the Works, either party shall be entitled to serve upon the other, 30 days’ notice to terminate
the Contract. If at the expiry of the period of 30 days Force Majeure shall continue, the Contract shall
15 TESTING & COMMISSIONING:
The successful bidder will ensure that completion of execution of work i.e. all works connected with line
having been completed correctly as per Indian Electricity Rules & procedure. Any extra cost involved due to
incompleteness of work or bad workmanship found out subsequently shall be set right with and by you at
16 HANDING OVER OF ASSET
16.1 After successful completion of the lines and Transformers or any other electrical equipment the entire newly
created network is to be handed over to the concern Deputy Engineer of PGVCL. The handing over note
covering the details of all the materials used and total work executed must be signed jointly by the bidder
and PGVCL Engineer. Copy of handing over note must be attached along with bill.
16.2 The contractor shall arrange to hand over the complete work immediately on completion of entire work.
If some material/Item is not installed/fixed for allotted work and as per SOR by contractor due to non-
availability of particular item/material for long period of time and TLE cannot be approved for that work
beyond certain time limit Or such item if not required to be installed at particular location, then Recovery is
to be made as mentioned below for not carrying out that work from SWO issued for that work.
➢ Empty Wooden Drum (Assorted Sizes) : Rs. 325.00 per Drum
All work other than above must be completed by contractor and No any other Recovery should be made
other than above Work.
18 CONTRACT QUALITY ASSURANCE:
18.1 The Bidder shall include in his proposal the Quality Assurance Program containing the overall quality
management and procedures which he proposes to follow in the performance of the Works during various
phases as detailed in relevant clause of the General Technical Conditions.
18.2 At the time of Award of Contract, the detailed Quality Assurance Program to be followed for the execution of
the Contract. PGVCL reserve the right to inspect the work at any stage of contract i.e. during the execution
and after the execution of work.
18.3 The Bidder shall clearly specify the list of sub-vendors from whom the bought out items (if any) are being
supplied. Such details shall be accompanied by their list of previous supplies made performance reports etc.
However, in case of orders are placed, specific approval shall be obtained from the PGVCL for the vendor
Sign & Stamp of The Bidder PGVCL SNR DO P a g e 29 |
supplied materials. The quality assurance program shall be furnished for each material separately for
19 TERMINATION OF CONTRACT ON PGVCL’S INITIATIVE
19.1 In case of any type of misappropriations, cheating or intention of cheating, frauds, irregularities,
malpractice, etc. the Managing Director PGVCL reserves the right to cancel the order without giving reasons
thereof and forfeit the security deposit.
19.2 The PGVCL reserves the right to terminate the Contract either in part or in full due to reasons other than
those mentioned under clause entitled ‘Contractor’s Default. The PGVCL shall in such an event give fifteen
(15) days’ notice in writing to the Contractor of his decision to do so.
19.3 The Contractor upon receipt of such notice, as per point no.19.2 above, shall discontinue the work on the
date and to the extent specified in the notice, make all reasonable efforts to obtain cancellation of all orders
and Contracts to the extent they are related to the work terminated and terms satisfactory to the PGVCL,
stop all further sub-contracting or purchasing activity related to the work terminated, and assist PGVCL in
maintenance, protection, and disposition of the works acquired under the Contract by the PGVCL. In the
event of such a termination the Contractor shall be paid compensation, equitable and reasonable, dictated
by the circumstances prevalent at the time of termination.
19.4 If the Contractor is an individual or a proprietary concern and the individual or the proprietor dies and if the
Contractor is a partnership concern and one of the partners dies then unless the PGVCL is satisfied that the
legal representatives of the individual Contractor or of the proprietor of the propriety concern and in the
case of partnership, the surviving partners, are capable of carrying out and completing the Contract the
PGVCL shall be entitled to cancel the Contract as to its in completed part without being in any way liable to
payment of any compensation to the estate of deceased Contractor and/or to the surviving partners of the
Contractor’s firm on account of the cancellation of the Contract. The decision of the PGVCL that the legal
representatives of the deceased Contractor or surviving partners of the Contractor’s firm cannot carry out
and complete the
Contract shall be final and binding on the parties. In the event of such cancellation the PGVCL shall not hold
the estate of the deceased Contractor and/or the surviving partners of the estate of the deceased Contractor
and/or the surviving partners of the Contractor’s firm liable to damages for not completing the Contract.
20 ARBITRATION:
Any question, dispute or difference whatsoever arises between PGVCL and Bidder, in connection with this
agreement except as to matters, the decision for which has been specifically provided, either party may
forthwith give to the other notice in writing of existence of such questions, dispute, difference and the same
shall be referred to the sole arbitration of a person nominated by Managing Director, PGVCL. This reference
shall be governed by Indian Arbitration Act prevailing at the time of dispute and the rules made there under.
The award in such arbitration shall be final and binding on all the parties. Work under the agreement shall
continue during the arbitration proceedings unless the PGVCL or the Arbitrator directs otherwise.
The technical information, drawings, specifications and other related documents forming part of the enquiry
or Contract are property of PGVCL and shall not be used for any other purpose, except for the execution of
the contract. All rights related to the technical specifications, drawings and records are reserved by PGVCL
only and no part or partial should be reproduced, copied or alter without prior permission to PGVCL in
writing. In the event of the breach of this provision, PGVCL can claim the damages caused by such events.
22 Stop Dealing:
Bidder/Contractor shall be put under Stop Deal due to following reasons.
22.1 Has submitted fake, false or forged documents/certificates
22.2 Has revised/withdrawn price bid after opening of Techno: commercial bid, until and unless it is sought for
22.3 Has refused to accept Letter of Acceptance/Purchase Order/Work Order after the same is issued by the
Company within the validity period and as per agreed terms and conditions
22.4 Has committed breach of contract or has failed to perform a contract or has abandoned the contract
22.5 Has failed to provide suitable expertise for the work as per prescheduled program
22.6 Has failed to submit all the necessary Test reports/documents within time schedule / as per Company's time
limit, as mentioned in the LOA, if the Letter of Acceptance (LOA) is placed subject to submission of type
reports / documents to the firm.
22.7 Has indulged in construction and erection of defective works.
22.8 Has substituted materials In lieu of materials supplied by the Company or has not returned or has short
returned or has unauthorised disposed of materials/ documents/ drawings/ tools or plants or equipment
supplied by the Company
22.9 Has involved in malpractices such as bribery, corruption, fraud, canvassing and pilferage
Sign & Stamp of The Bidder PGVCL SNR DO P a g e 30 |
22.10 Has unauthorised obtained official company information or copies of documents, in relation to the
Tender/Contract
22.11 Has failed to follow the stipulated mode of communication, if specified by the tendering authority/
22.12 Any other ground for which in the opinion of the Company makes it undesirable to deal with the Firm, and
22.13 In case the State Government directs the Company to place a firm in stop dealing/ banned for business
dealing/ blacklisting
22.14 The firm, stop deal and/or banned for business dealing and/ or blacklist by GUVNL or any subsidiary
Companies of GUVNL shall be considered as a stop deal and/ or banned for business dealing and/ or
blacklisting for all Companies.
23. Effect of putting a proprietor/firm for Stop dealing/Banned for business dealing are as below:
23.1 The proprietor/all the partners/directors of the stop deal/ banned for business dealing/ blacklisting
firm shall also be considered for stop deal/ banned for business dealing.
23.2 Once the name of the firm and/ or proprietor/ partner/ director of the firm appears in the list of Stop
dealing / Banned for business dealing in any Company of GUVNL and its Subsidiary Companies,
(i) No enquiry shall be issued to a firm.
(ii) No bids / tender shall be considered for evaluation and the bid submitted by the Firm shall be returned.
23.3 Action to be taken, when a Firm and/or proprietor/ partner/ director of the firm is put on Stop dealing/
Banned for business dealing by GUVNL or any of its subsidiary Companies, during tender process: -
(i) Before opening Technical bids, the bid submitted by the Firm will be treated as “Disqualified Bid” and
automatically stand as “Rejected Bid” at the time of scrutiny of Preliminary / Technical Bid.
(ii) After opening Technical bid but before opening the price bid, the price bid of the Firm should not be opened
and the bid submitted by the Firm will be treated as “Disqualified Bid” and automatically stand as “Rejected
Bid” at the time of scrutiny of Technical Bid.
(iii) After opening of price bid, the offer of the Firm should be ignored and will not be further evaluated. The
Firm will not be considered for issue of order even if its price is the lowest. In this situation, the next lowest
bidder shall be considered as L1.
(iv) The BG/EMD submitted by the Firm with tender should be returned after obtaining confirmation from GUVNL
and its other subsidiary Companies that there are no outstanding dues recoverable from the firm.
23.4 If a Firm is put on Stop dealing / Banned for business dealing in one Company and is already executing work
and/ or Letter of Acceptance/ purchase order awarded to them by another Company, then the firm should
be allowed to complete such awarded work / supply.
23.5 The amount of EMD/SD/ any payment against supply withheld at the instance of GUVNL or any of its
subsidiary Companies shall be appropriated against the dues recoverable from the firm by GUVNL or any of
its subsidiary Companies. EMD/ SD/ PG in the form of bank Guarantee shall be encashed and appropriated.
23.6 The Stop dealing/ Banned for business dealing shall be Firm- specific and when a Firm is put on Stop dealing/
Banned for business dealing, all the manufacturing works of the Firm shall be on Stop dealing/ Banned for
business dealing for GUVNL and its Subsidiary Companies & for all Services of the Firm.
23.7 If the Firm placed on Stop Dealing/ Banned for business dealing is a Proprietary Concern, then all the
Concerns of the same Proprietor shall also be considered to be on Stop Dealing/ Banned for business dealing.
23.8 The Board of Directors of the concerned Company may however, if he considers it to be in the interest of the
Company, remove the ban in respect of any specific Service from any Contractor for that Company only.
24. Every bidder should, at the time of submission of bid, give a declaration as per Annexure VI attached with
this Tender, that bidder and/or proprietor/ partner/ director of the firm has not been placed on Stop dealing
/ Banned for business dealing / blacklisting by GUVNL and it’s any Subsidiary Companies.
25. JURISDICTION:
All questions, disputes, or differences arising under out of or in connection with Tender/Contract if
concluded shall subject to the exclusive jurisdiction of the Court under whose jurisdiction the
place from which Tender/Acceptance if Tender is issued, is situated i.e. respective Location’s
Sign & Stamp of The Bidder PGVCL SNR DO P a g e 31 |
Annexures/BG/Agreement/Indemnity Bond
TIME SCHEDULE FOR COMPLETING THE WORK
(To be completely filled by the Bidder)
Name of the Bidder
Sr. No. Item Time required for work Mentioned in Tender
1 Labour work for Laying of
Underground cable and E/o HT
LT Line and Transformers and
Sign & Stamp of the Bidder
Sign & Stamp of The Bidder PGVCL SNR DO P a g e 32 |
Details of work experience in last three years
(To be completely filled by the Bidder)
Sr. Name of the Company
N with full address, Ref. & date Details of order
Work Description Order
ophone, fax and name of of the order
. contact person
• Copies of MAJOR Work orders along with Work completion certificates should be attached with this information.
• If necessary, separate sheet may be used to submit the information
Sign & Stamp of the Bidder
Sign & Stamp of The Bidder PGVCL SNR DO P a g e 33 |
Details of Pending Orders as on Bidding Date
(To be completely filled by the Bidder)
Sr. Name of the Company Reason for non-
N with full address, Ref. & date completion with
Work Description Order
o phone, fax and name of the order Certification of Order
. of contact person issuing Authority
• Copies of Resumes and appropriate certifications should be attached with this information.
• If necessary, separate sheet may be used to submit the information.
Sign & Stamp of the Bidder
Sign & Stamp of The Bidder PGVCL SNR DO P a g e 34 |
(Strike off whichever is not applicable)
This is to declare that Mr. /Ms. __________________________________, employee of PGVCL
(designation & name).
This is to declare that none of the Proprietors/ Partners/ Directors are having any relatives employed or
working with Paschim Gujarat VijCo.Ltd.at any of its offices or its parent Department i.e. Energy &
Petrochemicals Dept., Govt. of Gujarat.
Date: Sign. & Stamp of the Bidder
Sign & Stamp of the Bidder
Sign & Stamp of The Bidder PGVCL SNR DO P a g e 35 |
DEVIATION SHEET
Any deviations offered from the terms and conditions of the Offer should be clearly specified below in this sheet.
If there are no deviations offered, it should be clearly mentioned on this page.
Deviation offered to Chapter No,
Clause No. of the tender Deviation offered
Sign & Stamp of the Bidder
Sign & Stamp of The Bidder PGVCL SNR DO P a g e 36 |
List of Onsite Testing Facility (For the work of Laying of HT/LT Underground Cable)
(To be completely filled by the Bidder)
Sr.No. Name of equipment Date of purchase Date of calibration Utility
Sign & Stamp of the Bidder
Sign & Stamp of The Bidder PGVCL SNR DO P a g e 37 |
Sub: -UNDERTAKING IN REGARD TO STOP DEAL/BLACK LIST THEREOF
All bidders will have to furnish the following undertaking duly filled in signed and stamped for each quoted
item of the tender along with the Technical Bid.
M/s_________________________________________________ is not stop deal/black listed by GUVNL and or
any subsidiary companies viz. PGVCL/UGVCL/DGVCL/PGVCL/GSECL/GETCO for the tendered item.
Sign & Stamp of the Bidder
Sign & Stamp of The Bidder PGVCL SNR DO P a g e 38 |
LIST OF TYPE TESTS REPORTS SUBMITTED WITH THE TECHNICAL BID
(For the work of Laying of HT/LT Underground Cable)
(Not Older than 7 Years)
Type Test Tests Carried Rating & Type / Results
Sr. No Report No. & out at (Name of Designation of Item Of the
Date Laboratory) / Equipment Tests.
Sign & Stamp of the Bidder
Sign & Stamp of The Bidder PGVCL SNR DO P a g e 39 |
List of Performance Certificate:
Name of the Authority by whom
Sr. No. Reference No. & Date Details of items
certificate is issued
Sign & Stamp of the Bidder
Sign & Stamp of The Bidder PGVCL SNR DO P a g e 40 |
Details of Fatal/Non-Fatal Accidents Occurred To the Contractor Labours during Last Five Years
Type Of Accident Nos. of Affected Brief Reason for the
Sr. NO. Fatal/Nonfatal
(Electrical/Mechanical) Labour/s Accident
Sign & Stamp of the Bidder
Sign & Stamp of The Bidder PGVCL SNR DO P a g e 41 |
(UNDERTAKING IN REGARD TO STOP DEAL/BANNED FOR BUSINESS DEALING /
BLACK LIST &THEREOF)
Sub:-Undertaking In regard to Stop Deal / Banned for Business dealing /Black List &
(All bidders/agencies will have to furnish the following undertaking duly filled in, signed
and stamped for each quoted item of the tender along with the Technical Bid.)
authorized signatory of M/s_____________________________________________
hereby certify that M/s__________________________________________and their
proprietor / any partner / any directors of the firm is not stop deal and/or banned for
business dealing and/or black listed by GUVNL and/or their any subsidiary company
viz. GSECL/GETCO/ DGVCL/ MGVCL/UGVCL/PGVCL.
Seal of the Firm
Signature of the Tenderer
Sign & Stamp of The Bidder PGVCL SNR DO P a g e 42 |
(DECLARATION IN REGARDS TO NO CRIMINAL OFFENSE / NO PENDING CIVIL
Sub: -Declaration in regard of no criminal offense/no pending civil suite & there of
(All bidders/agencies will have to furnish the following declaration duly filled in, signed
and stamped and notarized on Rs.300.00 Non-Judicial Stamp Paper, with self-
declaration/authorized declaration submit for each quoted item of the tender along with
the Technical Bid.)
I/We solemnly declare that there is no criminal offense and or no pending civil suite
before the court filled by PGVCL or other subsidiary company of GUVNL against
M/s__________________________________________and their proprietor / any
partner / any directors of the firms/Agencies/company’s. (Strike out which is not
I/we take the oath and solemnly declare that, the above particulars furnished by me/us
(on behalf of the Firm/Agencies/ Partner / Proprietor /Director of companies, are correct
and that I/we have not concealed or misrepresented any facts.
Seal of the Firm
Signature of the Tenderer
Sign & Stamp of The Bidder PGVCL SNR DO P a g e 43 |
List of Safety Gadgets Owned by Bidder
Nos. gadgets Owned by
Sr.NO. List of Safety Gadget Unit
2 Earthing Rod No
4 Safety Belt No
5 Hand Gloves for LT Pair
6 Hand Gloves for HT Pair
7 Other safety items
Above safety gadgets are in per proposition to the labours engaged for
any additional labours required safety gadgets will be provide
Sign & Stamp of the Bidder
Sign & Stamp of The Bidder PGVCL SNR DO P a g e 44 |
On Firm’s Letter Head
CERTIFICATE – “A”
I/We__________________________________________ authorized signatory of
M/s._________________________________________ is not related with other firms who
have submitted tenders for the same items under this inquiry / Tender.
• Seal of the Firm Signature of the Tenderer
• Place: With Designation
Sign & Stamp of The Bidder PGVCL SNR DO P a g e 45 |
E.M.D. BANK GUARANTEE FORMAT
FOR TENDER NO.: ……………………………..…….
(Bank Guarantee on Non-Judicial Stamp Paper of Rs.100/-)
WHEREAS M/s. ____________________________________ (Name & Address of the Firm) having their
registered office at _____________________________________ (Address of the firms Registered office) (hereinafter
called the ‘Tenderer’) wish to participate in the tender No.
Erection Work) (Name of the material/equipment/Work) for _________________________ Paschim Gujarat Vij
Company Ltd. and WHEREAS a Bank Guarantee for (hereinafter called the “Beneficiary”) Rs._____________
(Amount of EMD) valid till _________ (Mention here date of validity of this Guarantee which will be 5 (FIVE) months
beyond initial validity of Tender’s offer) which is required to be submitted by the tenderer along with the tender.
We, __________________ (Name of the Bank and address of the Branch giving the Bank Guarantee) having our
registered office at ______________________ (Address of Bank’s registered office) hereby give this Bank Guarantee
No.________________ dated _________ and hereby agree unequivocally and Unconditionally to pay immediately on
demand in writing from the Paschim Gujarat Vij Company Ltd. or any officer authorized by it in this behalf any
amount not exceeding Rs. ______________ (Amount of E.M.D.), (Rupees _________________________________ (In
words) to the said Paschim Gujarat Vij Company Ltd. on behalf of the Tenderer.
We ___________________________ (Name of the Bank) also agree that withdrawal of the tender or part
thereof by the Tenderer within its validity or Non submission of Security Deposit by the Tenderer within one month
from the date tender or a part thereof has been accepted by the Paschim Gujarat Vij Company Ltd. would
constitute a default on the part of the Tenderer and that this Bank Guarantee is liable to be invoked and encashed
within its validity by the Beneficiary in case of any occurrence of a default on the part of the Tenderer and that
the encashed amount is liable to be forfeited by the Beneficiary.
This agreement shall be valid and binding on this Bank up to and inclusive of ____________________ (Mention here
the date of validity of Bank) and shall not be terminable by notice or by Guarantor change in the constitution of the
Bank or the firm of Tenderer Or by any reason whatsoever and our liability hereunder shall not be impaired or
discharged by any extension of time or variations or alternations made, given, conceded with or without our
knowledge or consent by or between the Tenderer and the PGVCL.
“Notwithstanding anything contrary contained in any law for the time being in force or banking practice, this
Guarantee shall not be assignable, transferable by the beneficiary (i.e. GUVNL or Subsidiaries). Notice or
invocation by any person such as assignee, transferee or agent of beneficiary shall not be entertained by the Bank.
Any invocation of the Guarantee can be made only by the beneficiary directly.”
NOTWITHSTANDING anything contained hereinbefore, our liability under this guarantee is restricted to Rs.
__________ (Amt. of E.M.D.) (Rupees ____________________________________) (In words). Our Guarantee shall
remain in force till _________ (Date of validity of the Guarantee). Unless demands or claims under this Bank
Guarantee are made to us in writing on or before_______ (Date of Validity of the Guarantee), all rights of
Beneficiary under this Bank Guarantee shall be forfeited and we shall be released and discharged from all liabilities
Please Mention here Complete Postal Address
Signature of the Bank’s Authorized Signatory with
of the Bank with Branch Code, Telephone and
Official Round Seal.
NAME OF DESIGNATED BANKS:
• All Nationalized Banks including Public Sector Banks IDBI Bank Ltd.
• Private Sector Banks authorized by RBI to undertake the state Government business, which are (i) Axis Bank (ii)
ICICI Bank (iii) HDFC Bank
• Co-operative Banks and Commercial Banks and recognized/notified by Government of Gujarat (GoG)
Note: The Banks shall be the Banks recognized / notified by the Finance Department, Government of Gujarat (GoG)
from time to time.
Sign & Stamp of The Bidder PGVCL SNR DO P a g e 46 |
FORM OF BANKER’S UNDERTAKING (For SD)
(Bank Guarantee on Non-Judicial Stamp Paper of .100/-)
We, Bank of ___________________________________ hereby agree unequivocally and unconditionally to pay
immediately on demand in writing from the Paschim Gujarat Vij Company Ltd. or any Officer authorized by it in
this behalf any amount up to and not exceeding _______ (in words) Rupees ___________________ to the said
Paschim Gujarat Vij Company Ltd. on behalf of M/s. _________________________________________________who
have entered into a contract for the supply/works specified below
This agreement shall be valid and binding on this Bank up to and inclusive of ______________ and shall not be
terminable by notice or by change in the constitution of the Bank or the firm of Contractors / Suppliers or by any
other reasons whatsoever and our liability hereunder shall not be impaired or discharged by any extension of time
or variations or alterations made, given conceded or agreed, with or without our knowledge or consent, by or
between parties to the said within written contract.
“Notwithstanding anything contrary contained in any law for the time being in force or banking practice, this
Guarantee shall not be assignable, transferable by the beneficiary (i.e. GUVNL or Subsidiaries). Notice or
invocation by any person such as assignee, transferee or agent of beneficiary shall not be entertained by the Bank.
Any invocation of the Guarantee can be made only by the beneficiary directly.”
“NOTWITHSTANDING” anything contained herein before, our liability under this guarantee is restricted to
Rs.___________ (Rupees ___________________________ only). Our guarantee shall remain in force until
____________________ (Date of validity of the Guarantee). Unless demands or claims under this Bank Guarantee
are made to us in writing on or before_______ (Date of validity of the Guarantee), all rights of Beneficiary under
this Bank Guarantee shall be forfeited and we shall be released and discharged from all liabilities there under:
Please Mention here Complete Postal Address Signature of the
of the Bank with Branch Code, Telephone and Bank’s Authorized Signatory with Official
Fax Nos. Round Seal.
NAME OF DESIGNATED BANKS:
• All Nationalized Banks including Public Sector Banks IDBI Bank Ltd.
• Private Sector Banks authorized by RBI to undertake the state Government business, which are (i) Axis Bank
(ii) ICICI Bank (iii) HDFC Bank
• Co-operative Banks and Commercial Banks and recognized/notified by Government of Gujarat (GoG)
Note: The Banks shall be the Banks recognized / notified by the Finance Department, Government of Gujarat (GoG)
from time to time.
This agreement is made at ___________the ___ day of ______month _______Year between the Paschim Gujarat Vij
Company Ltd. & __________________________ (hereinafter referred to as “the Contractor “which expression shall
unless excluded by or repugnant to the context included its successors or permit assigns) of the one part and the
Paschim Gujarat Vij Company Ltd. Having its Regd. and Corporate Office at Laxminagar, Off Nanamava Road,
Rajkot, 360004 (hereinafter called “The Company” which expression shall unless excluded by or repugnant of the
context include its successors of assigns) of the other part.
Whereas the aforesaid Company has accepted the tender of the aforesaid contractor for the work of
____________________, Dated ___________, hereinafter called “The works and more particularly desorbed
enumerated or referred to in the specifications, terms and
other letters and schedule of price which for the purpose of identification have been signed by The Superintending
Engineer/Executive Engineer, , Circle/Division, PGVCL on behalf of the Company, a list where of is
made out in the schedule here under written and all of which said documents are deemed to form part of this
contract and include in the expression “The works “wherever herein used, upon the terms and subject to the
conditions hereinafter mentioned.
And whereas the Company has accepted the tender of the contractors for the Maintenance & Erection of HT / LT
Line & T/C and Underground cable up on the terms and subject to the conditions herein mentioned. The
Sign & Stamp of The Bidder PGVCL SNR DO P a g e 47 |
contractors shall do and perform all works and things in this contract mentioned and described or which are implied
therein of therefore respectively or are reasonable necessary for the completion of the works as mentioned and at
the time in the manner and subject to the terms conditions and stipulation contained in this contract and in
consideration of the due provision, executions, construction and completion of the works agreed to by the
contractors as aforesaid the company both hereby covenant with the contractor to pay all the claims of money as
and when they become due and payable to the contractor under the provisions of the contract such payment to be
made at such times in such manner as is provided by the contract.
1.) The conditions and covenant stipulation here in before in this contract are subject to and without prejudice
to the right of the company to enforce for delay and or any other rights whatever including the right to reject and
cancel on default or breach by the contract of the conditions and the covenant as stipulated in the general
conditions specifications form Or tender schedule drawing etc. attached with the Company LOA No.
2.) The Contractor will strictly follow the safety Rules and Regulations during the execution of aforesaid work.
The Contractor will also provide all required Safety Gadgets to his Supervisors and labours to execute the work
mentioned in Tender. On violating or breaking the Safety Rules and Regulations, and if Supervisors/Labours are
found without Safety Gadgets, “The Company” reserves the right to take actions as per the terms and conditions
mentioned in Tender without any prejudice.
3.) The Company reserves the right to terminate the Contract either in part or in full due to reasons other than
those mentioned under clause entitled ‘Contractor’s Default’. The PGVCL shall in such an event give fifteen (15)
days’ notice in writing to the Contractor of his decision to do so.
4.) The Contractor upon receipt of such notice shall discontinue the work on the date and to the extent
specified in the notice, make all reasonable efforts to obtain cancellation of all orders and Contracts to the extent
they are related to the work terminated and terms satisfactory to the Company, stop all further sub-contracting or
purchasing activity related to the work terminated, and assist “The Company” in maintenance, protection, and
disposition of the works acquired under the Contract by the Company. In the event of such a termination the
Contractor shall be paid compensation, equitable and reasonable, dictated by the circumstances prevalent at the
time of termination.
5.) If the Contractor is an individual or a proprietary concern and the individual or the proprietor dies and if
the Contractor is a partnership concern and one of the partners dies then unless “the Company” is satisfied that
the legal representatives of the individual Contractor or of the proprietor of the propriety concern and in the case
of partnership, the surviving partners, are capable of carrying out and completing the Contract “the Company”
shall be entitled to cancel the Contract as to its in completed part without being in any way liable to payment of
any compensation to the estate of deceased Contractor and/or to the surviving partners of the Contractor’s firm on
account of the cancellation of the Contract. The decision of the Company that the legal representatives of the
deceased Contractor or surviving partners of the Contractor’s firm cannot carry out and complete the Contract
shall be final and binding on the parties. In the event of such cancellation the Company shall not hold the estate of
the deceased Contractor and/or the surviving partners of the estate of the deceased Contractor and/or the
surviving partners of the Contractor’s firm liable to damages for not completing the Contract.
The contract value extent of supply delivery dates, specifications as other relevant matters may be altered by
mutual agreement and if so altered shall not be deemed or constructed to mean and to effect or alter other terms
and conditions of the contract and the contract so altered or revised shall be and shall always be deemed to have
been subject without prejudice to and stipulation.
In witness where of the parties here to have set their hands and seal this day and month year first above written.
1. Signed sealed and delivered by for and on
Behalf of the presence of name and address.
2. Signed sealed and delivered by for and on behalf
Of The Paschim Gujarat Vij Company Ltd
Sign & Stamp of The Bidder PGVCL SNR DO P a g e 48 |
In consideration of the PASCHIM GUJARAT VIJ COMPANY LTD., herein after known as the COMPANY having given
contract for the work of _________________________________
__________________________, dated _______________ and all future contract that may be awarded to me in
the next one year and in terms of the condition in clause 33 of the COMPANY’s tender and contract for work.
I residing at by this Bond bind myself responsible for and shall pay
compensation to my workmen payable under the workmen’s compensation ACT – 1923 (viii of 1923) hereinafter
called the said Act for death or injuries caused to the workmen engaged by this presents, if such compensation is
paid by the COMPANY as principal under such sub-section (1) of section 12 of the said Act on behalf of me, to pay
such amount of compensation on demand within 48 hours to the COMPANY that it might have to spend as legal and
other incidental charges in defending any suit or action arising out of the death of injuries in regard to
compensation paid to the workmen or heirs of the deceased workmen.
Now the condition of the above written Bond is such that any suit of action arising out of the death or injuries to
the workmen engaged by me. During the execution of work of said contract and all future contracts that may be
awarded to me in the next one year is filed by the worker against the COMPANY, I shall
imbrues to the COMPANY such sum that the COMPANY is required to spend as legal and other incidental charges in
defending such suit or action and also the amount that may be ordered to be paid to the worker / or his heirs as
compensation and that the above written bind shall remain in full force and virtue till the COMPANY is required to
defend such suit or action filed by the workers and or heirs against the COMPANY. Further it is applicable on death
of contractor himself also. No any compensation will be claimed by legal heirs of contractor.
Signature of the Executant
Sign & Stamp of The Bidder PGVCL SNR DO P a g e 49 |
Sign & Stamp of The Bidder PGVCL SNR DO P a g e 50 |
Sign & Stamp of The Bidder PGVCL SNR DO P a g e 51 |
Sign & Stamp of The Bidder PGVCL SNR DO P a g e 52 |
Sign & Stamp of The Bidder PGVCL SNR DO P a g e 53 |
Sign & Stamp of The Bidder PGVCL SNR DO P a g e 54 |
Sign & Stamp of The Bidder PGVCL SNR DO P a g e 55 |
Sign & Stamp of The Bidder PGVCL SNR DO P a g e 56 |
Sign & Stamp of The Bidder PGVCL SNR DO P a g e 57 |
Sign & Stamp of The Bidder PGVCL SNR DO P a g e 58 |
Sign & Stamp of The Bidder PGVCL SNR DO P a g e 59 |
Sign & Stamp of The Bidder PGVCL SNR DO P a g e 60 |
Sign & Stamp of The Bidder PGVCL SNR DO P a g e 61 |
Sign & Stamp of The Bidder PGVCL SNR DO P a g e 62 |
Sign & Stamp of The Bidder PGVCL SNR DO P a g e 63 |
Sign & Stamp of The Bidder PGVCL SNR DO P a g e 64 |
Total Estimated Tender Cost Rs. _____________________
Sign & Stamp of The Bidder PGVCL SNR DO P a g e 65 |
Technical Specifications
TECHNICAL SPECIFICATIONS FOR THE WORK TO BE CARRIED OUT For erection work 11 KV and L.T.
Distribution lines and Transformer Centres
The work should be strictly as per specifications and approved designs of the PGVCL. The
inferior and unsatisfactory work is liable for rejection and to be rectified at the cost of contractor. The
work will have to be carried out as per programmed laid down by department and under the entire
instruction of engineer-in-Charge and contractor should employ supervisor who could supervise the
works through out and he should remain present on site. No tools & Tackles will be supplied by the
(A) Erection of HT and LT Lines:
Site clearing and tree branches trimming which come in the way of line will be done by the contractor
at his cost. The Company will assist the contractor in getting necessary permission for tree cutting
etc. Any claim for compensation in above respect will have to be borne by contractor.
(B) Fixing: Pole Position:
The Points of pole structures, guys and earthing will be fixed by the department and will be shown to
the contractor. He should adhere to these locations in all circumstances unless directed by the
department to make any change. The Poles from One site to other site or at proposed locations must
be carted by loading on Tractor or Hand-Cart. The Poles shall not be carted by toeing/Dragging with
Tractor or Cart or with any other means.
(C) Pole setting:
Where poles are set in good solid ground the depth of pit shall be 1/6th of the height of the pole and
for grounds of any other nature. The pit must be size of 2 X 2 X 5 feet. The poles and guys must not be
set at the edge of cuts/at shore/embankment where the soil is liable to be washed or eroded out of
such setting should be avoided. While back filling, earth must be packed tight and in no case earth be
dumped to greater depth more than four inches without being rammed, hard before the next layer is
thrown in. Extra earth should be packed around the poles and rammed.
The cost of damage done to the pole during erection will be recoverable from the contractor. No
pole, which is out of plumb or out of alignment shall be accepted. The pole will be in his safe custody
till erected and he is liable to compensate to the Company the full cost of pole along with supervision
charges, if the pole is broken during erection, or stolen from his custody. He should be able to render
full account of the poles entrusted to him whenever the Supervising Officer demands to scrutinizes
(D) Erection of Complete single Pole Structure
Erection of single pole structure comprises of shifting of pole from the stacking place in the village,
excavation of pit, erection in position (with base plate where required), of 8/10 meter PSC poles /
to 13 meter Steel Pole or any other suitable pole, fitting of clamps and cross arms and fabricated
materials, fixing of caution board, anti-climbing device etc. complete as per drawing and
specification inclusive of painting, numbering. Generally vertical formation will be used on each pole.
However horizontal formation will have to be used in special circumstances as per instruction at
Engineer in change.
(E) Double Pole (D. P.) Structure
Double poles structure such as for HT line tapping, Railway crossing, any other HT/LT or telephone
line crossing, terminal structure for distribution transformer centre comprises of Excavation suitable
pits and refilling of earth, erection in position of two Nos. of 8/10 meter PSC
poles / 9 to 13 meter Steel Pole or any other suitable pole, fitting of clamps, cross arms, bracing cross
arm bracing etc. as per drawing/ standards with mounting D.O. fuses/A.B. switches/HT metering
equipment’s etc., painting, Pole numbering, fixing of caution Board and anti-climbing devices. The
D.P. must be properly aligned and must be in plumb. Special structure if included will be erected as
per drawing supplied. Each Shackle Points must have “D” type Jumpers only.
(F) Stringing of conductors
This includes stringing of stranded and solid bare conductor with fitting of necessary HT/LT pin and
strain insulators, binding on insulators, jumpers, the jointing in HT line will be done by twisting sleeve
Sign & Stamp of The Bidder PGVCL SNR DO P a g e 66 |
joints as per standard practice. Care must be taken in handling the conductor to protect against cuts,
scratches or kinks. The conductor must not be drawn over rough or rocky ground, when it is liable to
be damaged. AAA/ACSR conductors must be drawn on wooden or aluminium pulley only. Wastage and
cutting should be avoided as far as possible. Not more than 3 % sag will be accepted in the materials
account. The sag and spans will be maintained as per drawing/standard. The cross arms insulators
must be so fixed that neither tilts nor bands from position. The sagging should be uniform for all
conductors and uneven sagging will not be allowed. The ground clearance to be maintained as per IE
Rules 2010 Clause No. 58 as mentioned below.
For lines of voltage not exceeding 650 Volts 5.8 Meters
Across a street For lines of voltage exceeding 650 Volts but
not exceeding 33 kV
For lines of voltage not exceeding 650 Volts 5.5 Meters
street For lines of voltage exceeding 650 Volts but
not exceeding 33 kV
If bare - 4.6 Meter
Elsewhere For lines of voltage up to and including
than along or 11,000 Volts
street For lines of voltage exceeding 11,000 Volts
but not exceeding 33 kV
• An overhead line shall not cross over an existing building as far as possible and no building
shall be constructed under an existing overhead line.
Where an overhead line of voltage not exceeding 650 V passes above or adjacent to or
terminates on any building, the following minimum clearances as per IE Rules 2010 Clause No.
from any accessible point, on the basis of maximum sag, shall be observed, namely:-
(i) for any flat roof, open balcony, varandah roof and lean-to-roof and Pitched Roof
(a) When the line passes above the building a vertical clearance of highest part of building
immediately under such line 2.5 meters from the highest point,
(b) When the line passes adjacent to the building a horizontal clearance of 1.2 meters from the
(ii) Where an overhead line of voltage exceeding 650 V passes above or adjacent to or terminates on
any building, the following minimum clearances as per IE Rules 2010 Clause No. 61 from any
accessible point, on the basis of maximum sag, shall be observed, namely:-
(a) when the line passes having voltage 650 V and up to and including 33000 V above the building a
vertical clearance of highest part of building immediately under such line 3.7 meters from the
(b) When the line having voltage 650 V and up to and including 11000 V passes adjacent to the
building a horizontal clearance between nearest Conductor and any part of such building on
the basis of maximum deflection of wind must be 1.2 meters
(iii) Minimum clearances in meters between lines crossing each other as per IE 2010 Clause No. 69 are
Nominal System 110-132
1 Low and Medium 2.44 3.05 4.58 5.49
In case of illegal construction / structure on the line under erection, the same is to be put in
written notice to the Engineer-In-charge.
(G) Erection of Stay Set:
The erection of stay set comprises of anchor rod, turn buckle, eye bolt and excavation of suitable pit
size of 2 X 2 X 5 foot, fixing of stay clamp on pole, binding of GI stay wire. The stay insulators must
be inserted in the stay wire on all stays as per drawing. The wrapping of the Guy wire strands at
both ends the stay insulator must be even and must presents neat appearance and good
workmanship. No stay should be left loose but should be tight and straight to withstand in say
cyclone or sand storm, the item includes refilling of earth and painting of fabrication material. If
Sign & Stamp of The Bidder PGVCL SNR DO P a g e 67 |
stays are not required to be concreted, a pre casted cement concrete block will be supplied by the
department from his division store which the contractor will have to transport at his own cost to the
site of work and will have to use for fixing of anchor rod at site.
A pits of 2 X 2 X 5 foot is to be dig about 4 foot away from the pole on which earthing is required to be
carried out. The earthing pipe/earthing plate/earthing coil supplied by the company shall be used as per
specification and drawing. GI wire no. 8 SWG for earthing should be bolted with earthing pipe/earthing
plate/earthing coil. G. I. Wire must be passed through PVC rigid Pipe which must be buried at least
Meter in ground and to be kept 2.0 Meters above ground along the Pole. The earthing are to be done at
place as indicted in the pole schedule or as selected by the field Engineer. The coke and salt will have to
be supplied by the contractor at his cost. Erection of earthing should be carried out under the supervision
of the Engineer in charge or nominated Supervisors. At least 20 KG of salt and 20 KG of coal per earth on
alternate layers (as per drawing) will be used by contractor. No amount will be paid if the work is not
done in accordance with these specification.
The guarding will have to provide at crossing of lines, telephone line crossing, road crossing and any
accident prone places as indicated by the Engineer in Charge. The work comprises of fixing of guard cross
arms, eye bolts, guard cradle as per design, GI cross lacing wires complete. Any special type of guarding
if required will be designed by the department. Binding cross arms must be used where the HT line
crosses the road. The ground clearance, line to line clearances etc. to be maintained as per IE Rules
69 and 70. The poles for road crossing may be concreted as instructions of the Engineer In-charge. The
work has to be carried out as instructions of the Engineer In-charge.
(J) Painting and Numbering:
Rail poles and girder poles shall be given one coat of approved red-lead paint and two coats of
approved aluminium paint. All fabricated material will also be painted with two coats of approved
aluminium paint and there should be sufficient interval between every coat of painting in order to
allow for drying. The bolts and must shall be dipped in anticorrosive oil before insertion. The lower
portion of steel poles up 3 foot above ground level shall be cleaned of all dust and rust. This surface
should be given a base coat of red lead and an additional coat of black bituminous paint before
inserting in the ground. The good quality paint will be supplied by the contractor and should be of
I.S.I mark and will be got approved from Executive Engineer, prior to starting work.
Name of the feeder and pole number has to be written on all the poles in English/Gujarati as per
instruction of Engineer In-charge. The colour of back ground and name/number must be of contras
colour. Prior to apply Colour for Numbering on P.S.C poles, it should be properly cleaned and all
accumulations of earth, dirt etc. should be removed.
(K) Concreting:
Unless Specified concreting is to be done for Girder Poles/Guys only. No any PSC Pole/Guys to be
concreted without any special reason. The Concreting of PSC Poles must be approved by concerned
Executive Engineer prior to execution as per Tender Condition mentioned under Section III
Clause No. 2 and sub clause No. 8. Certificates for special Reason and approvals must be submitted
with detail Bill.
Cement concrete for any pole / stay should be carried out as per specification given by Engineer In-
Charge as and where required. Concreting should be with one part of cement, two part of specified
quality sand and four parts of well burnt Brice bats (1:2:4). The mixture should be prepared on GI
sheet and should be free from the dust. Cement, river sand and metal should be used by contractor
at his own cost. The finishing coat of cement plaster shall be applied on outer surface Concreting
and boxing for smoothness.
The normal size of concreting of pole shall be 2 X 2 X 2 Feet (0.226 cmt) & that for stay 2 x 2x 1 Feet
(0.113 cmt). In case of Boxing for pole, it shall be 18” dia. x 3 feet (h) (2’ above and 1' below
ground) (0.15 cmt).
(L) Distribution Transformer Centre:
The distribution transformer centre (10 KVA to 200 KVA) will be of outdoor type on two poles
structures as per standard drawing and 5 KVA Transformers are to be on Single Pole. This work
include erection of special two pole structure as per Item No. 2 and fixing of all fabricated material
for support of line, L.A., HG Fuse/AB Switch, Transformer, LT Dist. Box, cable wiring, anti-climbing
devices etc. The works includes of transportation and hoisting of transformer, numbering and
painting of all fabricated materials. For transformer having capacity of 100 KVA and above MS
Sign & Stamp of The Bidder PGVCL SNR DO P a g e 68 |
channel shall be utilize which will be supplied by the company. Three Earthing are to be provided
on each Transformers.
1) Earthing of LA on One side.
2) Earthing of all Metal Parts from Top angle and Transformer Body and Dist. Box on other side.
3) For neutral, two separate Earth wire on both side of Transformer and to be common at ground.
All three earthing are to be done as in Delta Formation as shown in the attached Drawing. All
earthing wires are to be connected by proper size of lug and bolted at each earthing points properly.
The Earthing of Transformer Body must be done with lug only.
Looping or winding with Earthing Bolt on Transformer Body is not allowed. Earthing wire Lugs are
to be brought by Contractors. No any extra cost will be paid for this material.
Extra payment for hard soil or rock is payable as per SOR as per committee report to be formed
to decide hard soil or rock which shall consists of Concerned SDO, Deputy Engineer (Tech) and
Executive Engineer.
The cost of damage done to the transformer while erection/Transportation is recoverable from
Before starting the work (new, alteration or addition) and during the works the contractor must
obtain line clear wherever necessary for the concerned officer of this office of other Office. For any
damage done to the Men, Materials and/or property due to non-observance of rules, the contractor
will be solely responsible.
Sign & Stamp of The Bidder PGVCL SNR DO P a g e 69 |
Check-list for Work Cross Verification
Sr. No. Check list for work as per specification Comment
1 Pole pit up to mark
2 Pole earthing with pipe end buried under ground
3 MS Fabrication as per drawing
4 Structure Alignment (Pole/DP), Pole facing
5 Pin Insulator bottom nut tightened
6 MS Fabrication painted with Red oxide + silver oxide coat
7 Proper stringing
No unsafe crossing and crossing with guarding/AB cable at
9 No double power on any structure
Proper Clearance as per norms with nearby structures,
buildings, lines, ground.
Providing proper earthing in transformer(3 Nos. separate)
and HT line pole as per specification
Earthing wire of Transformer centre must be provided
through proper size of lugs
13 Tightening of Guy-set
14 S/S set as per drawing
15 Proper rating of DO fuse with alignment
Lightening arrester fixing with proper jumpering and
17 Separate Delta earthing for DTC
Proper laying of incoming/outgoing LT cable from
distribution box to service pole of LT line
19 D-type jumpers
20 Breather in DTC
Arcing horns with "as is" clearance and position on
22 Pole number painting
23 MCB of DTC must be properly installed
24 Nut-Bolt as per requirement and fastening with washer
25 Separate pole & earthing pits
26 Coal & salt as per specification for earthing
27 Credit of Conductor scrap
28 Credit of Scrap other materials
Name of scheme :
Location/Feeder :
Cross verified by (Name, Design., Office) :
Sign & Stamp of The Bidder PGVCL SNR DO P a g e 70 |
Sign & Stamp of The Bidder PGVCL SNR DO P a g e 71 |
Sign & Stamp of The Bidder PGVCL SNR DO P a g e 72 |
Sign & Stamp of The Bidder PGVCL SNR DO P a g e 73 |
Sign & Stamp of The Bidder PGVCL SNR DO P a g e 74 |
Sign & Stamp of The Bidder PGVCL SNR DO P a g e 75 |
Sign & Stamp of The Bidder PGVCL SNR DO P a g e 76 |
Sign & Stamp of The Bidder PGVCL SNR DO P a g e 77 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
TENDER-NIVIDA-12-SR NO 23.pdf
Download all tender documents and submit your bid