Loading…
Loading…
Tender Value
₹12.3 L
EMD Value
₹30,900
Closing Date
11 Sept 2026, 3:00 pm
Executive Engineer
Cochin Devaswom Board,Round North,Thrissur
Keeramkulangara temple - Reconstructing collapsed retaining wall of temple pond
2026_CDB_865097_1
H1.426/25
Open Tender
Civil Works - Buildings
Percentage
120 days
Thrissur
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,950
₹30,900
12 Aug 2026
12 Aug 2026
16 Sept 2026
12 Aug 2026
11 Sept 2026
12 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.001 | Bailing out water Using 5HP Pump- Bailing out water with 5HP engine and pump set including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete | 10 | Hour | 455.83 | ₹4,558.3 |
| 1.002 | BAILING OUT WATER USING PUMP ABOVE 30HP AND UP TO 40HP Bailing out water with engine and pump set above 30HP and up to 40HP, including conveyance to site and erection,cost of fuel, lubrication oil and other stores, pay of staff etc complete | 50 | Hour | 1,329.19 | ₹66,459.5 |
| 1.003 | DISMANTLING DR - Dismanling , clearing away and carefully stacking materials useful for reuse for any thickness of walls in DR masonry including disposal of debris within a distance of 150m. | - | m3 | 757.52 | - |
| 1.004 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 40 | m3 | 257.63 | ₹10,305.2 |
| 1.005 | DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site | 163.08 | m3 | 3,993.46 | ₹6,51,253.46 |
| 1.006 | DR with Departmental. Stone - DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course using departmental rubble including packing to compactness
to lines and levels, labour charges etc. complete as per direction of Departmental
officers at site | 1 | m3 | 1,715.88 | ₹1,714.16 |
| 1.007 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 16 | m3 | 9,235.97 | ₹1,47,775.52 |
| 1.008 | Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns | 30 | m2 | 386.16 | ₹11,584.8 |
| 1.009 | Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 800 | kg | 112.43 | ₹89,944 |
| 1.01 | Solid block masonry using pre cast solid blocks (Factory made) of size 30x20x20cm or nearest available size confirming to IS 2185 part I of 1979 for foundation and plinth with thickness 20cm and above in: CM 1:6 ( 1 cement : 6 coarse sand ) etc complete | 18 | m3 | 6,457.71 | ₹1,16,238.78 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.14 MB
PRELIMINARY.pdf
Tender Documents • 0.14 MB
BOQ_1463858.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].