Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹55.3 LAccepted-AOC | ₹55.3 L | L1 | Accepted-AOC Rate Quoted Below of BOQ Amount |
| 2 | L2₹57.1 LRejected-Finance AK PO GHANTAPADA TALCHER ANGUL ODISHA | TALCHER | ANGUL | ODISHA | ₹57.1 L | L2 | Rejected-Finance Rate Quoted Above of BOQ Amount |
Tender Value
₹55.5 L
EMD Value
₹1.1 L
Closing Date
23 Apr 2026, 5:00 pmClosed
Exe Eng R D Spl Div, Dhanbad
Exe Eng R D Spl Div, Dhanbad
Construction of Health Sub Centre Under PM Ayushmaan Bharat Health Infrastructure Mission Scheme (PM-ABHIM) at Behrakudar Panchayat in Baghmara-cum-Katras Block Dhanbad District
2026_RDSPL_112950_1
01/2026-27/RDSD/EE/Dhanbad/Gr. 07
Open Tender
Civil Works
270 days
Baghmara
Please refer Tender documents.
3 documents required · 3 mandatory
₹10,000
₹1.1 L
3 Jun 2026
16 Apr 2026
25 Apr 2026
16 Apr 2026
23 Apr 2026
16 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Earth work in excavation in foundation trenches in ordinary soil (vide classification of soil item B) and disposal of excavated earth as obtained to a distance upto 50M including all lifts leveling ramming the foundation treanches, removing roots of trees, and shrubs all complete as per approved design, building specification and direction of E/I. (5.1.1) | - | M3 | - | - | - |
| 2 | Extra for earthwork in hard soil as per specification and direction of E/I. ( vide classification of soil item-B) (5.1.2) | - | M3 | - | - | - |
| 3 | Earth filling in foundaion trenches and plinth in layers not exceding 150 mm thick well watered, rammed, fully compacted and fine dressed with earth obtained from excavation of foundation trenches within a lead of 50 M and lift of 1.5 M all complete as per building specification and direction of E/I. (mode of measurement compacted volume) (5.1.7) | - | M3 | - | - | - |
| 4 | Earth filling in foundation trenches and plinth in layer not exceeding 150mm thick will watered rammed fully compacted and fine dressed with earth obtained from excavation of foundation trenched with a lead of 50mm and lift of 1.5M all complete as per building specification and direction of E/I. (Mode of measurement
compacted volume). (5.1.8) | - | M3 | - | - | - |
| 5 | Providing coarse clean sand in filling in in foundation trenches or in plinth including ramming and watering in layers not exceeding 150mm thick with all leads and lifts including cost of all materials labour, royalty and taxes all complete as per building specification and direction of E/I (Mode of measurement compacted volume) (5.1.10) | - | M3 | - | - | - |
| 6 | Providing designation 75B one brick flat soling joints filled with local sand including cost of watering taxes royalty all complete as per building specification and direction of E/I.(5.6.3) | - | M2 | - | - | - |
| 7 | Providing and laying in position cement concete of soecified grade excluding the cost of centering and shuttering - All work up tp plinth level 1:3:6 (1 cement :3 coarse sand (Zone -III) :6 graded stone aggregrate 40 mm normial size) (5.3.1.4) | - | M3 | - | - | - |
| 8 | Providing and laying in position specified grade of reinforced cement concerte, excluding the cost of centering, shutteing, finishing and reinforcement- All work up to pilnth level 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size) (5.3.9.1) | - | M3 | - | - | - |
| 9 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement :
1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mmnominal size) (5.3.10) | - | M3 | - | - | - |
| 10 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement, with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size). (5.3.11) | - | M3 | - | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.03 MB
SBDNit01Gr07DoubelBid.pdf
Tender Documents • 1.33 MB
BOQ_152519.xls
BOQ • 0.45 MB
Download all tender documents and submit your bid