| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.1 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹2.4 L+₹28,032.98 (13.5%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹2.4 L+₹33,199.68 (16.0%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | Rejected-Technical | - | Rejected-Technical Reject | ||
| 5 | Rejected-Technical | - | Rejected-Technical Reject |
Tender Value
₹2.1 L
EMD Value
₹4,150
Closing Date
18 Aug 2026, 11:00 amClosed
The Assistant Engineer
1/2 Reservior Road, Kolkata-28
Restoration for cutting of black top at Chainage 4.85 Kmp to Tarun Sengupta Sarani for laying of 800 mm dia NP3 pipe by KMDA for dispose of strom water of Promodnagar KMDA, FSTP during the financial Year 2026 27.
2026_WBPWD_5017991_1
WBPWD/AE/KNSD-I/NIeT-10/26-27
Open Tender
CIVIL WORKS
Percentage
21 days
Tarun Sengupta Sarani
Please refer Tender documents.
4 documents required · 4 mandatory
₹4,150
Yes
3 Sept 2026
6 Aug 2026
20 Aug 2026
11 Aug 2026
18 Aug 2026
11 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Box cutting or filling in Road embankment in all sorts of soil including spreading the spoils properly over the flank as necessary or on berm to approximate grade & camber and rolling the sub-grade with power roller to proper camber and grade as per direction and satisfaction of Engineer-in-charge including uprooting and removing plants and jungles when and where necessary.
(a) Depth up to 1000 mm. | 55 | Sqm | 128.4 | ₹7,062 |
| 2 | Sand filling in foundation trenches and at the back
of abutments, wing-walls etc. with good local sand
free from earth in layers not exceeding 15 cm. including inundating each layer by profuse water and poking and ramming layer by layer complete including supply of sand. Quality of sand is to be
approved by the Engineer-in-charge. | - | Cum | 1,606.64 | - |
| 3 | A. Plant Mix Method:
Construction of granular sub-base by providing graded material, mixing in Wet Mix Plant at OMC, carriage of mixed material to work site, spreading in uniform layers with Motor grader on prepared surface in proper grade and camber, compacting with vibratory power roller to achieve the desired density, including lighting, guarding, barricading, including cost of all materials, machinery, tools and plants and cost of quality control complete as per Clause 401 of Specifications for Road & Bridge Works of MoRT&H (5th Revision).
(iii) Grading – III | - | Cum | 2,294.58 | - |
| 4 | A. Plant Mix Method:
Construction of granular sub-base by providing graded material, mixing in Wet Mix Plant at OMC, carriage of mixed material to work site, spreading in uniform layers with Motor grader on prepared surface in proper grade and camber, compacting with vibratory power roller to achieve the desired density, including lighting, guarding, barricading, including cost of all materials, machinery, tools and plants and cost of quality control complete as per Clause 401 of Specifications for Road & Bridge Works of MoRT&H (5th Revision).
(v) Grading – V | - | Cum | 2,364.55 | - |
| 5 | Providing, laying, spreading and compacting graded stone aggregate to Wet Mix Macadam specification including screening of aggregates and granular materials, premixing the material with waterat OMC in Wet Mix Plant, carriage of mixed material by tipper to site..............edges including cost of quality control complete as per Clause 406 of Specifications for Road & Bridge Works of MoRT&H
(5th Revision). | - | Cum | 2,415.94 | - |
| 6 | Providing and applying primer coat with Cationic Bitumen Emulsion of approved grade conforming to
IS: 8887-1978 and requisite quantity on prepared surface of granular base including cleaning of road
surface and spraying primer using Mechanical means including cost and carriage of bitumen emulsion and all other incidental costs of work complete as per Clause 502 of Specifications for Road & Bridge Works of MoRT&H (5th Revision).
(i) For WBM / WMM Surface:
(with primer @ 0.70-1.0 kg/sqm) | 55 | Sqm | 32.36 | ₹1,779.8 |
| 7 | Providing and applying tack coat with Cationic Bitumen Emulsion of approved grade conforming to IS: 8887-1978 on the prepared surface cleaned with Hydraulic broom, moistening the surface including cost and carriage of emulsion, hire charges of machinery and labour, cost of fuel and lubricants all complete as per Clause 503 of Specifications for Road & Bridge Works of MoRT&H (5th Revision).
(i) On Bituminous Surface (Using Bitumen Emulsion at the rate of 0.20 to 0.30 kg per sqm.) | 55 | Sqm | 9.22 | ₹507.1 |
| 8 | Dense Bituminous Macadam Providing and laying dense bituminous macadam with Hot Mix Plant producing an average output of 75 tonnes per hour using coarse aggregate, fine aggregate, filler and bituminous binder as per design Job Mix Formula conforming Marshall Method as per specification, including screening, cleaning of chips and preparing a uniform and quality mix in Hot Mix Plant and ensuring a homogeneous mix, in which all particles of the mineral aggregates are coated uniformly, transporting the hot mix to work site, laying the mixed materials at specified laying temperature with a hydrostatic paver finisher with sensor control to ...... of MoRT&H (5th Revision). B. For Grading 2 (26.5 mm nominal size, 50-75 mm thick.) (ii) Using Drum mix Type HMP of minimum capacity 60-90 TPH. | - | Cum | 7,770.34 | - |
| 9 | Mastic Asphalt Laying single layer of Bitumen Mastic Wearing Course for road pavement & bridge decks with Type & Grade of Bitumen to be used, the qlity grade & percentage of Coarse & fine aggregates & tiller, the temprature control for heating the material...... 25 mm compacted thickness. | 55 | Sqm | 470.69 | ₹25,887.95 |
| 10 | Providing and laying of hot applied thermoplastic
compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35. The finished surface to be level, uniform and free from streaks and holes complete as per Clause 803 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). | 3.75 | Sqm | 584 | ₹2,190 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.05 MB
AllDoc.pdf
Other Document • 0.00 MB
AnnexureXnew.pdf
Additional Documents • 0.01 MB
2911_ii.pdf
Tender Documents • 0.54 MB
BOQ_5088589.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .