| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹32.8 LAccepted-AOC | 1 | Accepted-AOC 1 | |
| 2 | 2₹32.9 L+₹2,352.55 (0.07%)Rejected-AOC | 2 | Rejected-AOC 2 |
Tender Value
₹32.9 L
EMD Value
₹50,000
Closing Date
2 Sept 2020, 6:00 pmClosed
Manager Subcontract
KEL Kochi
CONSTRUCTION OF CULVERT AND DRAINAGE AT PEZHUKRACHERAKULAM IN PIRAYARI GP, PALAKKAD DISTRICT
2020_KEL_379619_1
KRO/ BDC/ 671/2020
Open Tender
Civil Works - Others
Item Rate
150 days
KEL Kochi
As per NIT
5 documents required · 5 mandatory
₹2,950
online
₹50,000
Yes
4 Jun 2021
25 Aug 2020
4 Sept 2020
25 Aug 2020
2 Sept 2020
25 Aug 2020
25 Aug 2020 - 2 Sept 2020
Amount
A- Construction of culvert-1.00 m x1.50m
2.8.1 : Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
4.1.6 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 ( 1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size). (Cement make: Use Malabar cement only as per Govt. direction and in case of non availability of Malabar cement use Ultra Tech, Dalmia, Ramco or eq. brand in the order of preference.)
4.3.3 : Centering and shuttering including strutting, propping etc. and removal of form work for:Columns, piers, abutments, pillars, posts and struts. (Centering and shuttering for different category of work may be considered separately.)
5.3 : Reinforced cement concrete work in beams, suspended floors, roofs, having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with1:1.5:3 (1 cement : 1.5 coarse sand (Zone III) : 3 graded stone aggregate 20 mm nominal size).
5.9.3 : Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform
5.22.6 : Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more. Make: TATA, VIZAG, JSW, SAIL or eq primary steel in the order of pref.
50.2.26.1 : Filling with contractor own earth (excluding rock) in open areas in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m as per direction of site Engineer-in-charge.
16.42 : Cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 40 mm nominal size ) in pavements, laid to required slope and camber in panels as required including consolidation finishing and tamping complete
For wearing course for culvert
4.1.A.2 : Granular Sub-base with Well Graded Material (Table 400.1)(A)By Mix in Place Method Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401.(ii) For Grading II Material
3.7 : Removal of Unsuitable Soil with Disposal upto 1000 mRemoval of unsuitable soil including excavation, loading and disposal upto 1000 m lead but excluding compaction ground supporting embankment subgrade replacement by suitable soil, which shall be paid separately as per Clause 303.5.2 as per Technical Specification Clause 302.3.11
B- Drainage
2.8.1 : Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
4.1.6 : Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 ( 1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size)
4.3.2 : Centering and shuttering including strutting, propping etc. and removal of form work for:Retaining walls, return walls, (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc.
5.3 : Reinforced cement concrete work in beams, suspended floors, roofs, having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with1:1.5:3 (1 cement : 1.5 coarse sand (Zone III) : 3 graded stone aggregate 20 mm nominal size).
5.9.3 : Centering and shuttering including strutting, etc. and removal of form for:Suspended floors, roofs, landings, balconies and access platform
5.22.6 : Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more. Make: TATA, VIZAG, JSW, SAIL or eq primary steel in the order of pref.
16.42 : Cement concrete 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 40 mm nominal size ) in pavements, laid to required slope and camber in panels as required including consolidation finishing and tamping complete
Note :1 All materials, Items, Equipment shall be best branded items with IS and approved by client/KEL
2:Rate should be inclusive of Insurance,Transportation, delivery and installation cost for all items
3.Rate should be Exclusive of GST.
4.Work should be executed as per DSR/PWD specification and direction of Engineer at site.
K.G. Somasundaran
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .