| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹35.5 LAdmitted-Finance | ₹35.5 L | L1 | Admitted-Finance |
| 2 | L2₹41.0 L+₹5.5 L (15.6%)Admitted-Finance | ₹41.0 L+₹5.5 L (15.6%) | L2 | Admitted-Finance |
| 3 | L3₹41.3 L+₹5.8 L (16.3%)Admitted-Finance | ₹41.3 L+₹5.8 L (16.3%) | L3 | Admitted-Finance |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical EMD/Fee not received |
| Sl No | Description | Qty | Unit | wintech Developers Pvt Ltd, L3 | PRIME ROCKWOOL L1 | SMART SERVICES L2 |
|---|---|---|---|---|---|---|
| 1.00HOT INSULATION WITH ALUMINIUM SHEETS: Supply & application of hot insulation on Heat exchangers, Tanks, Towers, Piping etc. Cleaning the surfaces of the item (i.e. heat exchangers, tanks, piping to be taken up for insulation, Wherever required, the existing damaged insulation to be removed before cleaning), Providing and application of two coat of Red Oxide Zinc Chrome primer paint or heat resistant paint on CS and Aluminum foil of 0.05 mm on SS. Providing and fixing of MS Flat (18 mm width x 3mm thickness) as spacer rings / supporting rings lugs at 900 mm equal distance. Chlorine content should not Exceed 35 PPM. Supply and application of tested hot insulation mattresses of Lightly Resin Bonded Rock Wool mattresses with additional 3/4" x 22 SWG soft GI Hexagonal wire netting (other than OEM supply). Density of LRB mattress shall be 81-120 Kg/M3 as per group 3 of IS 8183 and thickness as mentioned below as per requirement. Providing and fixing of GI stitching & binding wire, rivets nuts and bolts for supporting, asbestos mill board small pieces having 2 to 3 mm thickness for use between lugs and support rings. Providing and fixing of Aluminum sheets (over wool mattress) in thickness of 20 SWG (0.91 mm) and 22 SWG(0.71) by sealing the joint with Tar Felt sheet 3 mm thick on LRB insulation with screws and water proof sealing compound from outside. Application of hot insulation as per above details. Wherever required, temporary scaffoldings/Winch or platforms are to be made by successful bidder. The work shall require LRB mattresses in following thickness:- | ||||||
| 1.10 | 100 mm thick with 20 SWG Aluminum sheet | 150 | Sq.M | 1,500 ₹2,25,000 | 1,400 ₹2,10,000 | 1,350 ₹2,02,500 Lowest |
| 1.20 | 100 mm thick with Cement & fluff on bottom dished ends and skirt of XU towers | 700 | Sq.M | 1,300 ₹9,10,000 | 1,150 ₹8,05,000 Lowest | 1,350 ₹9,45,000 |
| 1.30 | 75 mm thick with 20 SWG Aluminum sheet | 600 | Sq.M | 1,500 ₹9,00,000 | 1,050 ₹6,30,000 Lowest | 1,220 ₹7,32,000 |
| 1.40 | 60 mm thick with 20 SWG Aluminum sheet | 300 | Sq.M | 1,500 ₹4,50,000 | 1,000 ₹3,00,000 Lowest | 1,170 ₹3,51,000 |
| 1.50 | 50 mm thick with 22 SWG Aluminum sheet | 750 | Sq.M | 1,200 ₹9,00,000 | 950 ₹7,12,500 Lowest | 1,130 ₹8,47,500 |
| 1.60 | 25 mm thick with 22 SWG Aluminum sheet | 300 | Sq.M | 800 ₹2,40,000 Lowest | 1,100 ₹3,30,000 | 900 ₹2,70,000 |
| 2.00Supply and application of cold insulation (Thermocol) on piping, pipe fitting and equipments in HWPK site. Cleaning of surfaces pipes, equipments which are to be taken for insulation. Supply and application of one coat of red oxide zinc chrome primer paint followed by two coat of cold setting bitumen compound providing and fixing of Thermocol and sealing of joints by vapour sealing bitumen compound. Application of ¾”x22SWG MS wire meshes over a Thermocol than cement layer of 12 mm thickness. Thermocol density shall not less than 20kg/m3.Whenever required temporary scaffolding shall be made by successful bidder. The work shall require Thermocol in following thickness. | ||||||
| 2.10 | 50 mm thick Insulation | 100 | Sq.M | 1,200 ₹1,20,000 | 908 ₹90,800 Lowest | 1,200 ₹1,20,000 |
| 3.00 | Preparation of pocket,fabrication of box and fixing of box into pocket in Exchange unit Towers:-The job includes cutting of Aluminium sheet and fabrication of box as per drawing ,preparation of pockets including removal of insulation of required size in XU Towers,filling of LRB insulation into fabricated box ,fixing of fabricated box into pockets and sealing of edges with water proof sealing compound.The supply of Aluminium sheet and insulation is in the scope of bidder.Wherever required temporary scaffolding and platforms to be provided by the bidder. | 400 | Nos | 200 ₹80,000 Lowest | 518 ₹2,07,200 | 600 ₹2,40,000 |
Tender Value
₹47.0 L
EMD Value
₹94,051
Closing Date
4 May 2026, 2:30 pmClosed
GM,HWPK
HWPK
Maintenance contract for Insulation work on towers, tanks, exchangers and pipelines etc at HWPK site for Two years.
2026_HWB_904798_1
HWPK/Mech/2026/456
Open Tender
Machineries/ Mechanical Engg Items
Item Rate
730 days
HWPK
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹94,051
Yes
GM office ,HWPK
12 Sept 2026
15 Apr 2026
15 May 2026
15 Apr 2026
4 May 2026
21 Apr 2026
20 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1HOT INSULATION WITH ALUMINIUM SHEETS: Supply & application of hot insulation on Heat exchangers, Tanks, Towers, Piping etc. Cleaning the surfaces of the item (i.e. heat exchangers, tanks, piping to be taken up for insulation, Wherever required, the existing damaged insulation to be removed before cleaning), Providing and application of two coat of Red Oxide Zinc Chrome primer paint or heat resistant paint on CS and Aluminum foil of 0.05 mm on SS. Providing and fixing of MS Flat (18 mm width x 3mm thickness) as spacer rings / supporting rings lugs at 900 mm equal distance. Chlorine content should not Exceed 35 PPM. Supply and application of tested hot insulation mattresses of Lightly Resin Bonded Rock Wool mattresses with additional 3/4" x 22 SWG soft GI Hexagonal wire netting (other than OEM supply). Density of LRB mattress shall be 81-120 Kg/M3 as per group 3 of IS 8183 and thickness as mentioned below as per requirement. Providing and fixing of GI stitching & binding wire, rivets nuts and bolts for supporting, asbestos mill board small pieces having 2 to 3 mm thickness for use between lugs and support rings. Providing and fixing of Aluminum sheets (over wool mattress) in thickness of 20 SWG (0.91 mm) and 22 SWG(0.71) by sealing the joint with Tar Felt sheet 3 mm thick on LRB insulation with screws and water proof sealing compound from outside. Application of hot insulation as per above details. Wherever required, temporary scaffoldings/Winch or platforms are to be made by successful bidder. The work shall require LRB mattresses in following thickness:- | |||||
| 1.1 | 100 mm thick with 20 SWG Aluminum sheet | 150 | Sq.M | - | - |
| 1.2 | 100 mm thick with Cement & fluff on bottom dished ends and skirt of XU towers | 700 | Sq.M | - | - |
| 1.3 | 75 mm thick with 20 SWG Aluminum sheet | 600 | Sq.M | - | - |
| 1.4 | 60 mm thick with 20 SWG Aluminum sheet | 300 | Sq.M | - | - |
| 1.5 | 50 mm thick with 22 SWG Aluminum sheet | 750 | Sq.M | - | - |
| 1.6 | 25 mm thick with 22 SWG Aluminum sheet | 300 | Sq.M | - | - |
| 2Supply and application of cold insulation (Thermocol) on piping, pipe fitting and equipments in HWPK site. Cleaning of surfaces pipes, equipments which are to be taken for insulation. Supply and application of one coat of red oxide zinc chrome primer paint followed by two coat of cold setting bitumen compound providing and fixing of Thermocol and sealing of joints by vapour sealing bitumen compound. Application of ¾”x22SWG MS wire meshes over a Thermocol than cement layer of 12 mm thickness. Thermocol density shall not less than 20kg/m3.Whenever required temporary scaffolding shall be made by successful bidder. The work shall require Thermocol in following thickness. | |||||
| 2.1 | 50 mm thick Insulation | 100 | Sq.M | - | - |
| 3 | Preparation of pocket,fabrication of box and fixing of box into pocket in Exchange unit Towers:-The job includes cutting of Aluminium sheet and fabrication of box as per drawing ,preparation of pockets including removal of insulation of required size in XU Towers,filling of LRB insulation into fabricated box ,fixing of fabricated box into pockets and sealing of edges with water proof sealing compound.The supply of Aluminium sheet and insulation is in the scope of bidder.Wherever required temporary scaffolding and platforms to be provided by the bidder. | 400 | Nos | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 4.08 MB
makeinindia_certificate.pdf
Tender Documents • 0.19 MB
tenderdocuments456.pdf
Tender Documents • 0.66 MB
ProformaSchedules456.pdf
Tender Documents • 1.42 MB
AnnexureA.pdf
Tender Documents • 0.87 MB
AERBSafetyGuide.pdf
Tender Documents • 0.17 MB
GCCofHWPK.pdf
Tender Documents • 0.48 MB
BOQ_951027.xls
BOQ • 0.28 MB
SefetyGuideforH2S.pdf
Tender Documents • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .